Change order management is crucial for project success as it can impact cost and schedule. Effective change order management requires close coordination between engineering disciplines early in the project to minimize errors and changes later. It also requires the procurement team to thoroughly review supplier offers and calculations to reduce commercial errors. While some changes are unavoidable, taking actions like cross-discipline reviews, early supplier involvement, and double checking prices can help optimize the number of change orders and reduce impacts to cost and schedule.
Tahap Pra Konstruksi SPAL - Pekerjaan PersiapanJoy Irman
Pelatihan Pelaksanaan Konstruksi atau Pembangunan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) terdiri dari beberapa modul, yaitu Modul (A) Dasar-dasar Pelaksanaan Konstruksi, (B) Tahap Pra Konstruksi, (C) Pelaksanaan Konstruksi/Pembangunan, dan (D) Penyelenggaraan Pelaksanaan Konstruksi. Masing-masing Modul tersebut terdiri atas beberapa sub-modul . Peserta pelatihan dapat memilih Modul/Sub-Modul sesuai dengan kebutuhannya masing-masing.
Tahap Pra Konstruksi SPAL - Pekerjaan PersiapanJoy Irman
Pelatihan Pelaksanaan Konstruksi atau Pembangunan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) terdiri dari beberapa modul, yaitu Modul (A) Dasar-dasar Pelaksanaan Konstruksi, (B) Tahap Pra Konstruksi, (C) Pelaksanaan Konstruksi/Pembangunan, dan (D) Penyelenggaraan Pelaksanaan Konstruksi. Masing-masing Modul tersebut terdiri atas beberapa sub-modul . Peserta pelatihan dapat memilih Modul/Sub-Modul sesuai dengan kebutuhannya masing-masing.
The 2015 Millennial Majority Workforce: Study ResultsElance-oDesk
Millennials will be the largest generation in the U.S. workforce as of 2015. Yet businesses have a difficult time hiring members of this youngest professional generation. Disjoints abound as the nation’s workforce shifts -- millions of jobs remain unfilled while many millennials struggle to build careers. This study reveals changes in how we work, generational differences, and the critical role millennials play for businesses as we move forward.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
Construction Delay Analysis, SimplifiedMichael Pink
Learn how to perform a delay analysis in the construction industry. Capture and study your impacts to determine why a project was late. Use this proven method to ensure that you get paid for delays caused by others.
08-HO-Pengendalian Biaya, Mutu dan Waktu.pdfssuser91ceb01
HO-Pengendalian Biaya, Mutu dan Waktu. Dalam dunia konstruksi, pengendalian biaya, mutu dan waktu adalah fokus utama untuk menghasilkan produk yang baik dan bagus untuk penyedia jasa.
Paparan Sosialisasi SE PUPR Nomor 19 Tahun 2021 tentang Pedoman Pelaksanaan ...Khalid Mustafa
Paparan mengnai SE PUPR Nomor 19 Tahun 2021 tentang Pedoman Pelaksanaan Tertib Evaluasi Kewajaran Harga pada Tender Pekerjaan Konstruksi di Kementerian PUPR
The 2015 Millennial Majority Workforce: Study ResultsElance-oDesk
Millennials will be the largest generation in the U.S. workforce as of 2015. Yet businesses have a difficult time hiring members of this youngest professional generation. Disjoints abound as the nation’s workforce shifts -- millions of jobs remain unfilled while many millennials struggle to build careers. This study reveals changes in how we work, generational differences, and the critical role millennials play for businesses as we move forward.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
Construction Delay Analysis, SimplifiedMichael Pink
Learn how to perform a delay analysis in the construction industry. Capture and study your impacts to determine why a project was late. Use this proven method to ensure that you get paid for delays caused by others.
08-HO-Pengendalian Biaya, Mutu dan Waktu.pdfssuser91ceb01
HO-Pengendalian Biaya, Mutu dan Waktu. Dalam dunia konstruksi, pengendalian biaya, mutu dan waktu adalah fokus utama untuk menghasilkan produk yang baik dan bagus untuk penyedia jasa.
Paparan Sosialisasi SE PUPR Nomor 19 Tahun 2021 tentang Pedoman Pelaksanaan ...Khalid Mustafa
Paparan mengnai SE PUPR Nomor 19 Tahun 2021 tentang Pedoman Pelaksanaan Tertib Evaluasi Kewajaran Harga pada Tender Pekerjaan Konstruksi di Kementerian PUPR
Training Slides of Claims and Counterclaims Preparation, Analysis, Assessment and Successful Settlement of Disputes , discussing the importance of Claims and Counterclaims.
Some Key-Points:
- The Framework of Compliance
- Corporate Governance
- Compliance Program
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
1. TOPIC: CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS:
ABSTRACT
It can be argued that the successful management of change is crucial to any organization in order to
survive and succeed in the present highly competitive and continuously evolving business environment.
The purpose of this paper is, to provide an industrial views / Action to Reduce / Minimize the changes
(either it is an Engineering change or a Commercial change) at post award of Contracts or Purchase
Orders. Supply Chain Team plays important role towards constructing a new framework for managing
changes.
1. Introduction:
Change Order Management is the backbone of the Project. Project Team need to handle it very
strategically to achieve the Project Success. In Oil & Gas, Power, Petrochemical Industrial, We generally
build Large Refineries, Chemical Plants. It is a huge Investment by the Government / Private Investors.
Governments / Private Investors do the feasibility studies in critical areas concerning to the project For
example cost & schedule, Site Environmental condition, Design, Process, Safety, logistic, cultural
differences and political & social interference etc. with the help of Engineering Consultants / Financial
planners / Project Planners / Equipment Cost estimation / Construction Cost Estimation etc. Based on the
inputs from these consultants, Investor will take a decision to Kick-start the project, if find it feasible or
profitable (will able to complete within the desired schedule & Cost). Here in this paper we will focus
How Change Order Management plays critical Rolls in project success / failure. Cost & Schedule is the
only key components shall be impacting due to changes.
2. Definitions:
Change Order Management: A change order Management is a component of the change management
process whereby changes in the Scope of Work agreed to by the Owner, Contractor and
Architect/Engineer are implemented or executed.
Project Cost: The project cost is the total project cost which includes engineering fees, material costs,
and construction costs, permit fees, land, furnishings, financing and all other costs that were incurred in
completion of the project.
Project Schedule: The Project Schedule that communicates what work needs to be performed, which
resources of the organization will perform the work and the timeframes in which that work needs to be
performed. It is a part of Contact documents.
2. 3. Basics:
We define Project Cost in 2 major heads, Material Cost and Construction Cost (Appx. 90%), balance 10%
is the miscellaneous costs. You will surprise to hear that Material Cost, specially the Project Long Lead
Materials comprising 35-40% of total project cost.
For example in building a Petrochemical plant, we need Boiler, Waste water Treatment plant, Cooling
Tower, Transformers, DG Sets, Pumps, Electrical Cables, piping bulks, Electrical bulks,
Instrumentation’s bulks and many other small items / Equipments.
The Equipment Purchasing Cost & manufacturing / fabrication process must be closely monitored with
respect to allotted budget and Project Baseline schedule respectively.
4. Change Order Management:
When we think about Change Order Management following questions start running around us:
A. Who initiate the Change Order & Why we need Change Order after placing the Purchase Order?
B. Who approve the Change Order?
C. Who negotiate & release the change orders to the Supplier?
D. How Change orders impacting the Project overall Cost & Schedule completion date?
E. What actions should be taken to minimize the Change Orders?
Answering these questions create a firm foundation about the understanding on Change Order
Management.
A. Change order could be initiated by Equipment Responsible Engineer / Buyer.
a. Change order initiated by the Engineer is termed as Technical / Engineering Change Order,
mostly due to the any one or more of the reasons listed below.
Size/ capacity of Equipment Change
Process Change
Client Inputs
Construction Inputs
HAZOP (Hazard and operability study)
Change in quantities (Increase / Decrease) /substitution of one item for another
b. Change order initiated by the Buyer is termed as Commercial Change Order , mostly due the
following reasons
Inadvertently omission of supplier’s commercial offers few pricings.
Inadvertently follow the wrong Technical Bid Evaluation Sheet.
Price Calculation Error /change in price for an ordered item
Delivery Extension
3. B. In general Technical Change order will be approved by the Engineering Manager / Client (if
applicable). Commercial Change orders will be approved by the Project authorised signature matrix
listed approval Authorities or by the clients (as agreed in Client Contract).
C. Buyer will negotiate & release the Change Order to the Supplier.
D. Change orders impact the Project in terms of Cost & schedule, it can be positive cost impact (means
reduction to the PO value) or Negative cost impact (means increase in the PO value). In terms of
schedule, if material delivery delayed from the agreed PO contractual delivery date than it will extend
the overall project completion date. If we get early delivery of material than we can save the
construction cost or overall project cost with respect to the budget by early completing the project.
E. We can minimize or optimize the change order counts, but not touch the zero count. For example, in
large Project, Material Requirement / Requisition were generated by the Engineering disciplines such
as, Civil, Structural, Mechanical, Electrical, Control System, Piping, and Safety etc. Mostly the lack
of close coordination or communication gap between engineering departments will leads to origin of
Change Orders on the projects.
Following action must be taken to optimize the change order counts.
a) Conducting Weekly / Bi-weekly meetings among engineering disciplines before release of
technical RFQ to the Procurement Department.
b) Peer review of engineering documents by discipline colleagues.
c) Early involvement of Procurement, Quality department in reviewing the technical RFQs.
d) Client review of Engineering RFQ
e) Buyer must review & crosscheck the commercial offers pricing in detailed manner to
eliminate the wrong prices errors.
f) Buyer must read the Engineer’s issued final Purchase Requisition OR Technical Bid
evaluation.
g) Price calculation error must reach to the zero count; it can be archived by re-checking and
getting the peer review of prices.
h) Delivery extension Request always comes from the Supplier, buyer to issue the change
order based on the facts presented by the supplier.
5. Conclusion:
All projects, even the best planned projects, will experience change, and there will be costs, impacts, and
disruptions associated with implementing the changes. So we need to minimize or try to remove the root
cause of Change Orders. This paper will help you more in achieving the organization goals of best change
order management in terms of minimizing the change order counts.