The document summarizes a proposal for a centralized monitored cooling system for a Dubai project. It includes: - Details on the refrigeration units and compressors needed, with a total cooling capacity requirement of 84kW. - Descriptions of the physical systems including vibration isolation, electrical boards meeting standards, and refrigeration pipes made of copper. - An overview of the electronic monitoring system which allows remote control and monitoring of parameters, alarms, and historical data filing for maintenance. - An 18-month warranty on refrigeration plant parts, excluding some damages and wear items.