Overcoming challenges
of
HPGR Grinding
systems
Internal use only, not intended for further distribution or publication
2
» Producing greener cement and at the same time reducing input costs.
» Methods used are
» Clinker produced from alternative fuels.
» Use of low grade coal.
» Clinker from calcined clay, slag, etc.
» Use of higher percentage of alternative cement materials such as
slag, limestone, concrete waste, wet flyash, etc.
» Optimizing existing systems to decrease energy consumption.
Though low percentage reduction of CO2 for grinding circuits but
direct financial benefits.
Existing system should be capable of handling the challenges and
thereby upgrading.
Present challenges in the cement industry
Internal use only, not intended for further distribution or publication
3
» Faster
» Low investment
» Easy implementation
» Quicker ROI
Why to upgrade?
Internal use only, not intended for further distribution or publication
What could be upgraded?
» Rollers with HEXADUR®- zero maintenance wear
protection system.
» From closed loop hydraulic system to open loop
hydraulic system.
» Feeding system adaptable to different types of feed
materials.
» Combination separator to change from
pregrinding/flake recycling system to semi finish system
as the initial grinding plants supplied where HPGR was
used as pregrinder or flake recycle.
HEXADUR® roller surface
Gravity feeder
Koesep® Separator
Upgrading of Grinding systems
4
» founded in 1898 in Hattingen, Germany by Family
Köppern
» Production of roller presses and briquetting plants since
the early 20th century
» 1986: first High Pressure Grinding Roll (HPGR) for
cement comminution
» 1996: development of HEXADUR®-wear protection
» 2015: first full industrial operation of 2-Stage Koesep®
in Vils/Austria
» 2015: Upgraded Roller Press from another OEM in
Thailand with HEXADUR ®, Köppern feeding and
hydraulic system.
» 2020: Commissioning of first complete grinding Plant in
Vils/Austria with 2 Stage Koesep ® /HPGR/Ball Mill.
Steady development since 1898
Köppern at a glance
Internal use only, not intended for further distribution or publication
5
Internal use only, not intended for further distribution or publication
HEXADUR®
Unconditional
High
Performance
6
Implementation of HEXADUR® – Surface profiling
HEXADUR ® concept
Internal use only, not intended for further distribution or publication
7
HEXADUR ® Roller Surfaces
After 2,000 hours After 53,700 hours, wear rate 0.5 to 0.6 mm
per 10,000 hours of operation
After 12400 hours, wear rate 1.3 to 1.8 mm
per 10,000 hours of operation
After 33,600 hours, wear rate 1.0 to 1.3 mm
per 10,000 hours of operation
Internal use only, not intended for further distribution or publication
8
Internal use only, not intended for further distribution or publication
Country Material Roller size HPGR Operation Hexadur Start up
D x W Supplier Hours Installations Hexadur
[mm] [-] [h] [-] [Year]
Europe
Clinker 1.000 x 930 Köppern 75.000 1 1996
Slag (23% Slag) 1.000 x 500 Other > 46.000 1 1998
Clinker (35% Slag) 1.000 x 630 Other 43.000 1 2001
Clinker 1.400 x 1.200 Other 76.000 2 2001
Clinker 1.400 x 660 Other > 35.000 1 2003
Clinker 1.400 x 660 Other > 26.000 1 2006
Clinker 1.400 x 660 Other > 25.000 1 2007
Feldspat/Kaolin 532 x 400 Other 8.630 1 2008
Clinker 1.000 x 380 Other 37.300 1 2008
Clinker (35% Slag) 1.500 x 1.300 Köppern 24.464 1 2011
Clinker (75% Slag) 1.500 x 1.300 Köppern > 25.500 1 2012
Clinker 1.150 x 630 Other > 53.700 1 2012
Clinker 1.400 x 530 Other 14.000 1 2012
Clinker (56% Slag) 1.000 x 380 Other 25.600 1 2014
Clinker 1.400 x 800 Other 25.500 1 2016
Clinker (Slag 30%) 1.450 x 1.000 Other > 16.500 1 2020
Clinker (Slag 20%) 1.400 X 1.400 Other > 17.700 1 2020
Clinker 1.000 X 930 Köppern > Ordered 1 2022
North America
Clinker 1.150 x 1.000 Other > 39.000 1 2009
Clinker 1.400 x 800 Other > 27.000 1 2012
Limestone 1.000 x 380 Other 22.000 1 2012
Clinker 1.400 x 525 Other > 32.000 1 2013
Limestone 1.400 x 1.100 Other > 26.000 1 2016
Clinker 1.400 x 1.400 Other Ordered 1 2022
* Excerpt, dated Dec’2022
Reference List*
9
Internal use only, not intended for further distribution or publication
Country Material Roller size HPGR Operation Hexadur Start up
D x W Supplier Hours Installations Hexadur
[mm] [-] [h] [-] [Year]
South America
Clinker 1.150 x 1.000 Other > 19.000 1 2013
Clinker 1.700 x 1.400 Other 39.000 1 2014
Clinker 1.400 x 1.400 Other > 29.900 1 2017
Clinker (14 % Riolito
Quarzporphyr)
1.740 x 1.000 Other > 15.500 1 2018
Limestone 1.200 x 630 Other > 7.500 1 2019
Asia
Clinker 1.200 x 1.200 Köppern 40.500 2 1999
Clinker (35% Slag) 1.200 x 1.200 Köppern 43.000 2 2002
Clinker 1.200 x 1.200 Köppern > 27.800 1 2003
Clinker 1.500 x 1.300 Köppern > 46.500 2 2010
Clinker 1.000 x 765 Köppern > 55.600 4 2011
Clinker 1.500 x 1.300 Köppern > 45.500 1 2012
Clinker 1.500 x 1.300 Köppern 33.973 3 2013
Clinker 1.500 x 800 Other 43.500 2 2014
Clinker 1.220 x 760 Other > 48.500 1 2015
Clinker 2.120 x 1.300 Köppern > 13.500 1 2020
Clinker 1.524 x 965 Other > 13.340 1 2015
Clinker 1.200 x 1.200 Köppern > 19.000 2 2015
Clinker 1.000 x 930 Köppern > 30.500 3 2015
Clinker 1.000 x 765 Köppern > 32.571 2 2016
Clinker 1.500 x 800 Other 42.000 1 2016
Clinker (Trass 23%) 1.500 x 1300 Köppern > 3.800 2 2020
Limestone 1.730 x 1500 Köppern > 4.500 1 2020
* Excerpt, dated Dec’ 2022
Reference List*
10
Internal use only, not intended for further distribution or publication
Country Material Roller size HPGR Operation Hexadur Start up
D x W Supplier Hours Installations Hexadur
[mm] [-] [h] [-] [Year]
Asia
Clinker 1.524 x 965 Other > 8.500 1 2021
Clinker 1.400 x 1.100 Other > 2.800 1 2022
Clinker 1.350 x 1.100 Köppern Delivered 1 2021
Limestone 1.780 x 1.500 Köppern Ordered 1 2022
Clinker, wet flyash 2.050 x 1.500 Other Ordered 1 2022
* Excerpt, dated Dec’ 2022
Reference List*
11
Internal use only, not intended for further distribution or publication
» Customized tile composition
» Profiled surface for better nip
» Constant intake and throughput
» Production increase
» Constant grinding pressure
» Resistant against tramp metal
» Regular maintenances not required
» Yearly ultrasonic wear
measurement
Advantages of HEXADUR®
12
HPGR upgrades
Feeding system
Hardmetal cheek plates
Hydraulic system
13
14
Never Operate at Static Gap!
Working gap
Static gap
Fixed Roller Moving Roller
15
Throughput = Bed Pressure =
16
Feeding system
• Inlet shaft (1)
• Adjustable face walls (2)
• Regulating devices (3)
• Lateral cheek plates* (4)
• Thrust bolts* (5)
• Openings for inspection (6)
• Cover plates (7)
* - not part of the feeding system
17
Motorised feeding system
Minimum
Maximum
Arbitary
18
Feeding system
HPGR Throughput and Power Consumption vs. Gravity Feeder Opening
19
Feeding system- Advantages
à Flexibel adjustment of the gravity feeder opening according to process requirement
(Standard version: manually or motorised: automatically with geared motor).
à Optimizing of roller press throughput and power consumption.
à Easy adjustment and maintenance.
à Cheek plates with installed hard metal à lifetime > 5 years without maintenance.
à Position of cheek plates is fixed with spring loaded thrust bolts à possibility to
move out in case of back pressures from the rollers or material.
à Bottleneck of production or quality loss due to side-leakage through the cheek plate
area is very much reduced.
20
Köppern open loop Hydraulic system
Hydraulic Unit
Salient features
- Two pumps operating 24/7, 365 days to maintain the
pressure.
- Pressure is regulated with proportional valves which
are pressure dependent valves and maintains
pressure as being set.
- Effective and automatic skew control with individual
pumps and proportional valves.
- Online filteration and cooling unit. Filteration unit is
also used for oil filling therefore avoiding dirt in the
system.
- Operation logic can be implemented in customer‘s
DCS i.e. no requirement of separate black box.
21
Hydraulic System
S1 > S2
SP1 > SP2
S2
S1
S1 < S2
SP1 < SP2
S2
S1
SP1
SP2
SP1
SP2
case 1
case 2
skew
22
Hydraulic system
27 .
09 .
1999
09 :
58 :
40 09 :
58 :
50 09 :
59 :
00 09 :
59 :
10 09 :
59 :
20 09 :
59 :
30
K
N
M
2600
2275
1950
1625
1300
975
650
325
0
MM
55
50
45
40
35
30
25
M /
_
S
1 ,
8
1 ,
7
1 ,
6
1 ,
5
1 ,
4
1 ,
3
1 ,
2
1 ,
1
1 ,
0
A
1750
1500
1250
1000
750
500
250
0
0z3S peed -fi
xed -r
o l 1z4S peed -
m ove -r
o ll
e 2z3C u rr
en t-fi
xed -r
o 3z3C u rr
en t-
m ove -r
o l
4z3 t
o r
que -fi
xed -r
o l 5z3S peed -fi
xed -r
o ll 6z3v i
b r
a ti
on1 7z3v i
b r
a ti
on1
8z3 r
o ll
e r-
gap -
A 9z3 r
o ll
e r-
gap -
B 10z3p r
essu r
e -
A 11z3p r
essu r
e -
B
12z3 t
o r
que -
m ove -r
o l 13z3S peed -
m ove -r
o ll F o r
m e l0 14z3S a f
e ty coup li
ng
01 .
05 .2
16 :
32 :
58 ,
5 16 :
32 :
59 ,
5 16 :
33 :
00 ,
5 16 :
33 :
01 ,
5 16 :
33 :
02 ,
5 16 :
33 :
03 ,
5 16 :
33 :
04 ,
5
m *
H z
2 ,
00
1 ,
75
1 ,
50
1 ,
25
1 ,
00
k
N
m
800
750
700
650
600
550
500
450
400
0z3
S peed -fi
xed -r
o l 1z3
S peed -
m ove -r
o ll
e 2z3
C u rr
en t-fi
xed -r
o 3z3
C u rr
en t-
m ove -r
o l 4z3 t
o r
que -fi
xed-ro l 5z3
S peed -fi
xed -r
o ll
6z3v i
b r
a ti
on1 7z3v i
b r
a ti
on1 8z3ro ll
e r-
gap-
A 9z3ro ll
e r-
gap-
B 10z3p r
essur
e -
A 11z3p r
essur
e -
B
12z3 t
or
que-
m ove -r
o l 13z3Speed -
m ove-r
o ll 14z3Sa f
e t
y coup li
ng 15z3
M e t
a ll
de t
ec t
or
Conventional system (closed hydraulic) vs. Köppern system (open hydraulic)
Comparision of operation curves
23
Hydraulik block – Pendulum piston
Forces transmitted directly to the
cylinder body and then to the press
frame. No vertical loads through the
seals.
24
Hydraulic System
Major advantages to conventional systems (closed systems)
à More stability of grinding pressure, which could be changed during operation as
per the process requirement.
à Reduced torque fluctuations in drive train.
à Skew controller for stable grinding bed.
à Bigger Nitrogen accumulator serving as an oil reservoir in case of rapid roller
movement.
à Pendulum piston cylinders with improved design (no vertical loads).
à Easy adjustment and maintenance.
à Emergency operation with single pump and single valve possible.
25
Case Study -Customer‘s pain visa vis Köppern‘s
solutions
1. Severe problems with roller surface
maintenances due to chunk offs and
profile repairs.
2. HEXADUR® process audit indicated
following
§ Skew operation
§ Pressure fluctuation
§ Repeated seal failures and severe
leakages from the cylinders
§ Uneven pressure distribution.
§ Operation with very high bed
pressure resulting to problems with
roller surface, frequent damage of
shafts and bearings.
§ Repeated problem with gearbox
1. HEXADUR® roller was
commissioned in May‘2015.
2. Köppern open hydraulic system
was commissioned in 2016.
3. Köppern patented Gravity feeder
was commissioned in Sept‘2018.
Solutions
26
Before Upgradations
Old Hydraulic system Old Feeding system
Case Study -Customer‘s pain visa vis Köppern‘s
solutions
27
Before Upgradations
Case Study Asia Cement -Customer‘s pain visa vis
Köppern‘s solutions
Internal use only, not intended for further distribution or publication
28
After Upgradations
Köppern Hydraulic
system
Köppern Feeding system
Case Study -Customer‘s pain visa vis Köppern‘s
solutions
29
• Average increase of production from 118 tph to 128.5 tph which is approx. 9%
• Average reduction of power consumption from 43.66 kWh/t to 37.93 kWh/t
which is approx. 14 %
• Yearly saving of production cost approximately half a million euro i.e. till now 2
Million euros and still adding.
• Payback achieved within two years of operation.
• Higher lifetime of machine components therefore lower maintenance costs.
Case Study -Customer‘s pain visa vis Köppern‘s
solutions - Results
30
Set-up and function:
1 – feed (product from HPGR)
2 – primary air inlet
3 – baffle plates
4 – guiding plates
5 – outer cone
6 – coarse discharge → back to HPGR
7 – guide vanes
8 – rotating cage
9 – motor
10 – inner cone
11 – middlings discharge
→ to ball mill
12 – feed (product from ball mill)
13 – product + air discharge
1
1
2
2
3
4
5
6
7
8
9
10
11
12 13
static
classifying
stage
dynamic
classifying
stage
Patented in Germany and Europe
The 2-Stage Koesep
31
Upgrade in Austria: HPGR in pre-grinding mode upgraded into semi-finish grinding
existing
Fresh Feed
Product
Product
Flake Recycle
① HPGR
② Dynamic Air Classifier
③ Ball Mill
④ Köppern 2-Stage Koesep
⑤ Cyclones
①
②
③
④ ⑤
» downtime during upgrade:
40 hours only
Case Study Schretter Cement, Upgradation with
Koesep®
Internal use only, not intended for further distribution or publication
32
Comparison of combined air classifiers
Construction height of air classifiers with a plant capacity of 41 t/h, like at the Austrian cement plant
scaled figures
» more than 40 % less construction
height with 2-Stage Koesep
compared to usual combination
17.8
m
10.7
m
static
air
classifier
dynamic
air
classifier
static
+
dynamic
air
classifier
3. The 2-Stage Koesep
33
Cement
Type
HPGR in pre-grinding mode
HPGR in semi-finish grinding mode with 2-Stage Koesep,
with former cement strength
Spec. surface
in cm2
/g
Capacity
in t/h
Spec. surface
in cm2
/g1)
Capacity
in t/h
Improvement
in %
A 5000 22 4900 26 18.2
B 4200 27 4100 32 18.5
C 4200 34 4000 40 17.6
D 4800 26 4700 32 23.1
1)
Specific surface could be decreased to achieve required 2-days- and 28-days-strength.
0
5
10
15
20
25
30
35
40
45
A B C D
Capacity
in
t/h
Cement Type
HPGR in pre-grinding mode with
conventional dynamic air classifier
HPGR in semi-finish grinding mode
with 2-Stage Koesep
capacity
+20 %
spec. energy
-13 %
Case Study Schretter Cement, Upgradation with
Koesep®
Internal use only, not intended for further distribution or publication
34
Why Köppern?
» Products and quality – Made in
Germany.
» Audits of existing grinding plants.
» Upgradation of existing grinding
circuit and Roller Press.
» Transfer of more than 30 years of
Grinding process Know – How.
» Supply of improvement parts for
other makes presses.
» On time delivery.
» Service support.
35
Thank you very much
for your patience
hearing.
Kaushik Ghosh
Phone: + 49 2324 207- 256
Mobile + 49 1784 207203
Email k.ghosh@koeppern.de
Internet: http://www.koeppern.com
Internal use only, not intended for further distribution or publication

More Related Content

What's hot

Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationNITIN ASNANI
 
LOESCHE Grinding Technology for the Power Industry
LOESCHE Grinding Technology for the Power IndustryLOESCHE Grinding Technology for the Power Industry
LOESCHE Grinding Technology for the Power IndustryLOESCHE
 
Siemens Steam Turbine SST-600
Siemens Steam Turbine SST-600Siemens Steam Turbine SST-600
Siemens Steam Turbine SST-600Yasser ...
 
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw MaterialLoesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw MaterialLOESCHE
 
Vertical raw mill pradeep kumar
Vertical raw mill pradeep kumarVertical raw mill pradeep kumar
Vertical raw mill pradeep kumarpradeepdeepi
 
Sand Control
Sand Control Sand Control
Sand Control petroEDGE
 
Basic Operation and Function of Control Valves
Basic Operation and Function of Control ValvesBasic Operation and Function of Control Valves
Basic Operation and Function of Control ValvesBelilove Company-Engineers
 
Cement ball mill process calculation pdf
Cement ball mill process calculation pdfCement ball mill process calculation pdf
Cement ball mill process calculation pdfhamedmustafa093
 
Sand Problem in Oil Wells
Sand Problem in Oil WellsSand Problem in Oil Wells
Sand Problem in Oil Wellsthe_duke7
 
Wenzel Downhole Tools Product Catalogue
Wenzel Downhole Tools Product CatalogueWenzel Downhole Tools Product Catalogue
Wenzel Downhole Tools Product CatalogueWenzel Downhole Tools
 
Pump api 675 presentation
Pump api 675 presentationPump api 675 presentation
Pump api 675 presentationVothanh Trung
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)danperth
 
Jys casting for metso hp4 cone crusher parts
Jys casting for metso hp4 cone crusher partsJys casting for metso hp4 cone crusher parts
Jys casting for metso hp4 cone crusher partsTomas Chien
 
aixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement Industryaixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement IndustryLOESCHE
 

What's hot (20)

Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimization
 
LOESCHE Grinding Technology for the Power Industry
LOESCHE Grinding Technology for the Power IndustryLOESCHE Grinding Technology for the Power Industry
LOESCHE Grinding Technology for the Power Industry
 
Siemens Steam Turbine SST-600
Siemens Steam Turbine SST-600Siemens Steam Turbine SST-600
Siemens Steam Turbine SST-600
 
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw MaterialLoesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
 
Vertical raw mill pradeep kumar
Vertical raw mill pradeep kumarVertical raw mill pradeep kumar
Vertical raw mill pradeep kumar
 
Sand Control
Sand Control Sand Control
Sand Control
 
Basic Operation and Function of Control Valves
Basic Operation and Function of Control ValvesBasic Operation and Function of Control Valves
Basic Operation and Function of Control Valves
 
Cement ball mill process calculation pdf
Cement ball mill process calculation pdfCement ball mill process calculation pdf
Cement ball mill process calculation pdf
 
Sand Problem in Oil Wells
Sand Problem in Oil WellsSand Problem in Oil Wells
Sand Problem in Oil Wells
 
Wenzel Downhole Tools Product Catalogue
Wenzel Downhole Tools Product CatalogueWenzel Downhole Tools Product Catalogue
Wenzel Downhole Tools Product Catalogue
 
Three Phase Separators
Three Phase SeparatorsThree Phase Separators
Three Phase Separators
 
Pump api 675 presentation
Pump api 675 presentationPump api 675 presentation
Pump api 675 presentation
 
Cement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawyCement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawy
 
Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)
 
Boiler Feedwater Pumps
Boiler Feedwater PumpsBoiler Feedwater Pumps
Boiler Feedwater Pumps
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)
 
Jys casting for metso hp4 cone crusher parts
Jys casting for metso hp4 cone crusher partsJys casting for metso hp4 cone crusher parts
Jys casting for metso hp4 cone crusher parts
 
aixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement Industryaixergee - Process Optimization for the Cement Industry
aixergee - Process Optimization for the Cement Industry
 
Pipe body properties catalogue
Pipe body properties catalogue Pipe body properties catalogue
Pipe body properties catalogue
 
VRM
VRMVRM
VRM
 

Similar to Cemtech Presentation

STM Environment
STM EnvironmentSTM Environment
STM EnvironmentJoe Riley
 
Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine Ammy Cheng
 
yaxi introduction V1.4
yaxi introduction V1.4yaxi introduction V1.4
yaxi introduction V1.4Tina Lee
 
cement mill(ball)seminar.pdf
cement mill(ball)seminar.pdfcement mill(ball)seminar.pdf
cement mill(ball)seminar.pdfMuhammad565043
 
Sandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media WorksSandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media WorksEvery Media Works | Everentures
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013Aamer Pathan
 
Clirik large capacity ball mill cement ball mill with fairest price
Clirik large capacity ball mill cement ball mill with fairest priceClirik large capacity ball mill cement ball mill with fairest price
Clirik large capacity ball mill cement ball mill with fairest priceAmmy Cheng
 
Indus pre fabricated stp
Indus pre fabricated stpIndus pre fabricated stp
Indus pre fabricated stpSuresh Kumar
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbeclAlibaba Construction Ltd.
 
Introduccion ntf 1
Introduccion ntf 1Introduccion ntf 1
Introduccion ntf 1Jaime Troya
 
Dust collection system-Field study & proposed Design modification
Dust collection system-Field study & proposed  Design modificationDust collection system-Field study & proposed  Design modification
Dust collection system-Field study & proposed Design modificationHarinder Saini P.Eng., M.Tech., MBA
 

Similar to Cemtech Presentation (20)

STM Environment
STM EnvironmentSTM Environment
STM Environment
 
ZIPP Gear Reducer Catalog
ZIPP Gear Reducer CatalogZIPP Gear Reducer Catalog
ZIPP Gear Reducer Catalog
 
2020 ZIPP Gear reducer catalog
2020 ZIPP Gear reducer catalog2020 ZIPP Gear reducer catalog
2020 ZIPP Gear reducer catalog
 
ZIPPGEAR Gearing solution catalog - 2020 Update
ZIPPGEAR Gearing solution catalog - 2020 UpdateZIPPGEAR Gearing solution catalog - 2020 Update
ZIPPGEAR Gearing solution catalog - 2020 Update
 
ZIPP Gear Reducer General Catalog
ZIPP Gear Reducer General CatalogZIPP Gear Reducer General Catalog
ZIPP Gear Reducer General Catalog
 
Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine Clirik clum mill-calcium carbonate powder making machine
Clirik clum mill-calcium carbonate powder making machine
 
yaxi introduction V1.4
yaxi introduction V1.4yaxi introduction V1.4
yaxi introduction V1.4
 
cement mill(ball)seminar.pdf
cement mill(ball)seminar.pdfcement mill(ball)seminar.pdf
cement mill(ball)seminar.pdf
 
Sandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media WorksSandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media Works
 
Construction_Pocket_Guide
Construction_Pocket_GuideConstruction_Pocket_Guide
Construction_Pocket_Guide
 
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptxAir Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
 
Clirik large capacity ball mill cement ball mill with fairest price
Clirik large capacity ball mill cement ball mill with fairest priceClirik large capacity ball mill cement ball mill with fairest price
Clirik large capacity ball mill cement ball mill with fairest price
 
Indus pre fabricated stp
Indus pre fabricated stpIndus pre fabricated stp
Indus pre fabricated stp
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
 
Introduccion ntf 1
Introduccion ntf 1Introduccion ntf 1
Introduccion ntf 1
 
La Meccanica Srl Machinery
La Meccanica Srl MachineryLa Meccanica Srl Machinery
La Meccanica Srl Machinery
 
ChevroNet
ChevroNetChevroNet
ChevroNet
 
Dust collection system-Field study & proposed Design modification
Dust collection system-Field study & proposed  Design modificationDust collection system-Field study & proposed  Design modification
Dust collection system-Field study & proposed Design modification
 
Die extrusion
Die extrusionDie extrusion
Die extrusion
 

Recently uploaded

Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxCenterEnamel
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 

Recently uploaded (20)

Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 

Cemtech Presentation

  • 1. 1 Overcoming challenges of HPGR Grinding systems Internal use only, not intended for further distribution or publication
  • 2. 2 » Producing greener cement and at the same time reducing input costs. » Methods used are » Clinker produced from alternative fuels. » Use of low grade coal. » Clinker from calcined clay, slag, etc. » Use of higher percentage of alternative cement materials such as slag, limestone, concrete waste, wet flyash, etc. » Optimizing existing systems to decrease energy consumption. Though low percentage reduction of CO2 for grinding circuits but direct financial benefits. Existing system should be capable of handling the challenges and thereby upgrading. Present challenges in the cement industry Internal use only, not intended for further distribution or publication
  • 3. 3 » Faster » Low investment » Easy implementation » Quicker ROI Why to upgrade? Internal use only, not intended for further distribution or publication What could be upgraded? » Rollers with HEXADUR®- zero maintenance wear protection system. » From closed loop hydraulic system to open loop hydraulic system. » Feeding system adaptable to different types of feed materials. » Combination separator to change from pregrinding/flake recycling system to semi finish system as the initial grinding plants supplied where HPGR was used as pregrinder or flake recycle. HEXADUR® roller surface Gravity feeder Koesep® Separator Upgrading of Grinding systems
  • 4. 4 » founded in 1898 in Hattingen, Germany by Family Köppern » Production of roller presses and briquetting plants since the early 20th century » 1986: first High Pressure Grinding Roll (HPGR) for cement comminution » 1996: development of HEXADUR®-wear protection » 2015: first full industrial operation of 2-Stage Koesep® in Vils/Austria » 2015: Upgraded Roller Press from another OEM in Thailand with HEXADUR ®, Köppern feeding and hydraulic system. » 2020: Commissioning of first complete grinding Plant in Vils/Austria with 2 Stage Koesep ® /HPGR/Ball Mill. Steady development since 1898 Köppern at a glance Internal use only, not intended for further distribution or publication
  • 5. 5 Internal use only, not intended for further distribution or publication HEXADUR® Unconditional High Performance
  • 6. 6 Implementation of HEXADUR® – Surface profiling HEXADUR ® concept Internal use only, not intended for further distribution or publication
  • 7. 7 HEXADUR ® Roller Surfaces After 2,000 hours After 53,700 hours, wear rate 0.5 to 0.6 mm per 10,000 hours of operation After 12400 hours, wear rate 1.3 to 1.8 mm per 10,000 hours of operation After 33,600 hours, wear rate 1.0 to 1.3 mm per 10,000 hours of operation Internal use only, not intended for further distribution or publication
  • 8. 8 Internal use only, not intended for further distribution or publication Country Material Roller size HPGR Operation Hexadur Start up D x W Supplier Hours Installations Hexadur [mm] [-] [h] [-] [Year] Europe Clinker 1.000 x 930 Köppern 75.000 1 1996 Slag (23% Slag) 1.000 x 500 Other > 46.000 1 1998 Clinker (35% Slag) 1.000 x 630 Other 43.000 1 2001 Clinker 1.400 x 1.200 Other 76.000 2 2001 Clinker 1.400 x 660 Other > 35.000 1 2003 Clinker 1.400 x 660 Other > 26.000 1 2006 Clinker 1.400 x 660 Other > 25.000 1 2007 Feldspat/Kaolin 532 x 400 Other 8.630 1 2008 Clinker 1.000 x 380 Other 37.300 1 2008 Clinker (35% Slag) 1.500 x 1.300 Köppern 24.464 1 2011 Clinker (75% Slag) 1.500 x 1.300 Köppern > 25.500 1 2012 Clinker 1.150 x 630 Other > 53.700 1 2012 Clinker 1.400 x 530 Other 14.000 1 2012 Clinker (56% Slag) 1.000 x 380 Other 25.600 1 2014 Clinker 1.400 x 800 Other 25.500 1 2016 Clinker (Slag 30%) 1.450 x 1.000 Other > 16.500 1 2020 Clinker (Slag 20%) 1.400 X 1.400 Other > 17.700 1 2020 Clinker 1.000 X 930 Köppern > Ordered 1 2022 North America Clinker 1.150 x 1.000 Other > 39.000 1 2009 Clinker 1.400 x 800 Other > 27.000 1 2012 Limestone 1.000 x 380 Other 22.000 1 2012 Clinker 1.400 x 525 Other > 32.000 1 2013 Limestone 1.400 x 1.100 Other > 26.000 1 2016 Clinker 1.400 x 1.400 Other Ordered 1 2022 * Excerpt, dated Dec’2022 Reference List*
  • 9. 9 Internal use only, not intended for further distribution or publication Country Material Roller size HPGR Operation Hexadur Start up D x W Supplier Hours Installations Hexadur [mm] [-] [h] [-] [Year] South America Clinker 1.150 x 1.000 Other > 19.000 1 2013 Clinker 1.700 x 1.400 Other 39.000 1 2014 Clinker 1.400 x 1.400 Other > 29.900 1 2017 Clinker (14 % Riolito Quarzporphyr) 1.740 x 1.000 Other > 15.500 1 2018 Limestone 1.200 x 630 Other > 7.500 1 2019 Asia Clinker 1.200 x 1.200 Köppern 40.500 2 1999 Clinker (35% Slag) 1.200 x 1.200 Köppern 43.000 2 2002 Clinker 1.200 x 1.200 Köppern > 27.800 1 2003 Clinker 1.500 x 1.300 Köppern > 46.500 2 2010 Clinker 1.000 x 765 Köppern > 55.600 4 2011 Clinker 1.500 x 1.300 Köppern > 45.500 1 2012 Clinker 1.500 x 1.300 Köppern 33.973 3 2013 Clinker 1.500 x 800 Other 43.500 2 2014 Clinker 1.220 x 760 Other > 48.500 1 2015 Clinker 2.120 x 1.300 Köppern > 13.500 1 2020 Clinker 1.524 x 965 Other > 13.340 1 2015 Clinker 1.200 x 1.200 Köppern > 19.000 2 2015 Clinker 1.000 x 930 Köppern > 30.500 3 2015 Clinker 1.000 x 765 Köppern > 32.571 2 2016 Clinker 1.500 x 800 Other 42.000 1 2016 Clinker (Trass 23%) 1.500 x 1300 Köppern > 3.800 2 2020 Limestone 1.730 x 1500 Köppern > 4.500 1 2020 * Excerpt, dated Dec’ 2022 Reference List*
  • 10. 10 Internal use only, not intended for further distribution or publication Country Material Roller size HPGR Operation Hexadur Start up D x W Supplier Hours Installations Hexadur [mm] [-] [h] [-] [Year] Asia Clinker 1.524 x 965 Other > 8.500 1 2021 Clinker 1.400 x 1.100 Other > 2.800 1 2022 Clinker 1.350 x 1.100 Köppern Delivered 1 2021 Limestone 1.780 x 1.500 Köppern Ordered 1 2022 Clinker, wet flyash 2.050 x 1.500 Other Ordered 1 2022 * Excerpt, dated Dec’ 2022 Reference List*
  • 11. 11 Internal use only, not intended for further distribution or publication » Customized tile composition » Profiled surface for better nip » Constant intake and throughput » Production increase » Constant grinding pressure » Resistant against tramp metal » Regular maintenances not required » Yearly ultrasonic wear measurement Advantages of HEXADUR®
  • 12. 12 HPGR upgrades Feeding system Hardmetal cheek plates Hydraulic system
  • 13. 13
  • 14. 14 Never Operate at Static Gap! Working gap Static gap Fixed Roller Moving Roller
  • 15. 15 Throughput = Bed Pressure =
  • 16. 16 Feeding system • Inlet shaft (1) • Adjustable face walls (2) • Regulating devices (3) • Lateral cheek plates* (4) • Thrust bolts* (5) • Openings for inspection (6) • Cover plates (7) * - not part of the feeding system
  • 18. 18 Feeding system HPGR Throughput and Power Consumption vs. Gravity Feeder Opening
  • 19. 19 Feeding system- Advantages à Flexibel adjustment of the gravity feeder opening according to process requirement (Standard version: manually or motorised: automatically with geared motor). à Optimizing of roller press throughput and power consumption. à Easy adjustment and maintenance. à Cheek plates with installed hard metal à lifetime > 5 years without maintenance. à Position of cheek plates is fixed with spring loaded thrust bolts à possibility to move out in case of back pressures from the rollers or material. à Bottleneck of production or quality loss due to side-leakage through the cheek plate area is very much reduced.
  • 20. 20 Köppern open loop Hydraulic system Hydraulic Unit Salient features - Two pumps operating 24/7, 365 days to maintain the pressure. - Pressure is regulated with proportional valves which are pressure dependent valves and maintains pressure as being set. - Effective and automatic skew control with individual pumps and proportional valves. - Online filteration and cooling unit. Filteration unit is also used for oil filling therefore avoiding dirt in the system. - Operation logic can be implemented in customer‘s DCS i.e. no requirement of separate black box.
  • 21. 21 Hydraulic System S1 > S2 SP1 > SP2 S2 S1 S1 < S2 SP1 < SP2 S2 S1 SP1 SP2 SP1 SP2 case 1 case 2 skew
  • 22. 22 Hydraulic system 27 . 09 . 1999 09 : 58 : 40 09 : 58 : 50 09 : 59 : 00 09 : 59 : 10 09 : 59 : 20 09 : 59 : 30 K N M 2600 2275 1950 1625 1300 975 650 325 0 MM 55 50 45 40 35 30 25 M / _ S 1 , 8 1 , 7 1 , 6 1 , 5 1 , 4 1 , 3 1 , 2 1 , 1 1 , 0 A 1750 1500 1250 1000 750 500 250 0 0z3S peed -fi xed -r o l 1z4S peed - m ove -r o ll e 2z3C u rr en t-fi xed -r o 3z3C u rr en t- m ove -r o l 4z3 t o r que -fi xed -r o l 5z3S peed -fi xed -r o ll 6z3v i b r a ti on1 7z3v i b r a ti on1 8z3 r o ll e r- gap - A 9z3 r o ll e r- gap - B 10z3p r essu r e - A 11z3p r essu r e - B 12z3 t o r que - m ove -r o l 13z3S peed - m ove -r o ll F o r m e l0 14z3S a f e ty coup li ng 01 . 05 .2 16 : 32 : 58 , 5 16 : 32 : 59 , 5 16 : 33 : 00 , 5 16 : 33 : 01 , 5 16 : 33 : 02 , 5 16 : 33 : 03 , 5 16 : 33 : 04 , 5 m * H z 2 , 00 1 , 75 1 , 50 1 , 25 1 , 00 k N m 800 750 700 650 600 550 500 450 400 0z3 S peed -fi xed -r o l 1z3 S peed - m ove -r o ll e 2z3 C u rr en t-fi xed -r o 3z3 C u rr en t- m ove -r o l 4z3 t o r que -fi xed-ro l 5z3 S peed -fi xed -r o ll 6z3v i b r a ti on1 7z3v i b r a ti on1 8z3ro ll e r- gap- A 9z3ro ll e r- gap- B 10z3p r essur e - A 11z3p r essur e - B 12z3 t or que- m ove -r o l 13z3Speed - m ove-r o ll 14z3Sa f e t y coup li ng 15z3 M e t a ll de t ec t or Conventional system (closed hydraulic) vs. Köppern system (open hydraulic) Comparision of operation curves
  • 23. 23 Hydraulik block – Pendulum piston Forces transmitted directly to the cylinder body and then to the press frame. No vertical loads through the seals.
  • 24. 24 Hydraulic System Major advantages to conventional systems (closed systems) à More stability of grinding pressure, which could be changed during operation as per the process requirement. à Reduced torque fluctuations in drive train. à Skew controller for stable grinding bed. à Bigger Nitrogen accumulator serving as an oil reservoir in case of rapid roller movement. à Pendulum piston cylinders with improved design (no vertical loads). à Easy adjustment and maintenance. à Emergency operation with single pump and single valve possible.
  • 25. 25 Case Study -Customer‘s pain visa vis Köppern‘s solutions 1. Severe problems with roller surface maintenances due to chunk offs and profile repairs. 2. HEXADUR® process audit indicated following § Skew operation § Pressure fluctuation § Repeated seal failures and severe leakages from the cylinders § Uneven pressure distribution. § Operation with very high bed pressure resulting to problems with roller surface, frequent damage of shafts and bearings. § Repeated problem with gearbox 1. HEXADUR® roller was commissioned in May‘2015. 2. Köppern open hydraulic system was commissioned in 2016. 3. Köppern patented Gravity feeder was commissioned in Sept‘2018. Solutions
  • 26. 26 Before Upgradations Old Hydraulic system Old Feeding system Case Study -Customer‘s pain visa vis Köppern‘s solutions
  • 27. 27 Before Upgradations Case Study Asia Cement -Customer‘s pain visa vis Köppern‘s solutions Internal use only, not intended for further distribution or publication
  • 28. 28 After Upgradations Köppern Hydraulic system Köppern Feeding system Case Study -Customer‘s pain visa vis Köppern‘s solutions
  • 29. 29 • Average increase of production from 118 tph to 128.5 tph which is approx. 9% • Average reduction of power consumption from 43.66 kWh/t to 37.93 kWh/t which is approx. 14 % • Yearly saving of production cost approximately half a million euro i.e. till now 2 Million euros and still adding. • Payback achieved within two years of operation. • Higher lifetime of machine components therefore lower maintenance costs. Case Study -Customer‘s pain visa vis Köppern‘s solutions - Results
  • 30. 30 Set-up and function: 1 – feed (product from HPGR) 2 – primary air inlet 3 – baffle plates 4 – guiding plates 5 – outer cone 6 – coarse discharge → back to HPGR 7 – guide vanes 8 – rotating cage 9 – motor 10 – inner cone 11 – middlings discharge → to ball mill 12 – feed (product from ball mill) 13 – product + air discharge 1 1 2 2 3 4 5 6 7 8 9 10 11 12 13 static classifying stage dynamic classifying stage Patented in Germany and Europe The 2-Stage Koesep
  • 31. 31 Upgrade in Austria: HPGR in pre-grinding mode upgraded into semi-finish grinding existing Fresh Feed Product Product Flake Recycle ① HPGR ② Dynamic Air Classifier ③ Ball Mill ④ Köppern 2-Stage Koesep ⑤ Cyclones ① ② ③ ④ ⑤ » downtime during upgrade: 40 hours only Case Study Schretter Cement, Upgradation with Koesep® Internal use only, not intended for further distribution or publication
  • 32. 32 Comparison of combined air classifiers Construction height of air classifiers with a plant capacity of 41 t/h, like at the Austrian cement plant scaled figures » more than 40 % less construction height with 2-Stage Koesep compared to usual combination 17.8 m 10.7 m static air classifier dynamic air classifier static + dynamic air classifier 3. The 2-Stage Koesep
  • 33. 33 Cement Type HPGR in pre-grinding mode HPGR in semi-finish grinding mode with 2-Stage Koesep, with former cement strength Spec. surface in cm2 /g Capacity in t/h Spec. surface in cm2 /g1) Capacity in t/h Improvement in % A 5000 22 4900 26 18.2 B 4200 27 4100 32 18.5 C 4200 34 4000 40 17.6 D 4800 26 4700 32 23.1 1) Specific surface could be decreased to achieve required 2-days- and 28-days-strength. 0 5 10 15 20 25 30 35 40 45 A B C D Capacity in t/h Cement Type HPGR in pre-grinding mode with conventional dynamic air classifier HPGR in semi-finish grinding mode with 2-Stage Koesep capacity +20 % spec. energy -13 % Case Study Schretter Cement, Upgradation with Koesep® Internal use only, not intended for further distribution or publication
  • 34. 34 Why Köppern? » Products and quality – Made in Germany. » Audits of existing grinding plants. » Upgradation of existing grinding circuit and Roller Press. » Transfer of more than 30 years of Grinding process Know – How. » Supply of improvement parts for other makes presses. » On time delivery. » Service support.
  • 35. 35 Thank you very much for your patience hearing. Kaushik Ghosh Phone: + 49 2324 207- 256 Mobile + 49 1784 207203 Email k.ghosh@koeppern.de Internet: http://www.koeppern.com Internal use only, not intended for further distribution or publication