This document is a pre-screening form for applicants seeking an Environmental Clearance Certificate from the Environmental Management Authority in Trinidad and Tobago. The applicant, Sycon Developers Limited, is seeking approval for a mixed use residential and commercial development project covering 22.3592 hectares. The project will include housing lots, townhouses, a shopping center, gas station, village shops, and taxi stand. The form requests information about the property, proposed activities, environmental impacts and mitigation measures for both the construction and operational phases.
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEzubeditufail
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE IN RESPECT OF THE
PROPOSED KHAIRAGURA OPENCAST EXPANSION COAL
MINING PROJECT NEAR KHAIRAGURA VILLAGE,
TIRIYANI MANDAL, ADILABAD DISTRICT, A.P.
DEPARTMENT OF ENVIRONMENT
THE SINGARENI COLLIERIES COMPANY LIMITED
(A Government Company)
KOTHAGUDEM COLLIERIES-507101 (A.P)
JANUARY 2013
Environmental Concerns in Construction Projects- KSPCB SimhaADDA
This presentation on the Environmental Concerns in Construction Projects was presented by MDN Simha Chief Environmental Officer (Retd.) during "Self Sufficient Apartment Communities - Open House " conducted by ApartmentADDA during 15th June 2013.
He explains about the legal information related to Pollution Control and Environmental concerns which are useful for Builders, Real Estate Developers, RWAs, Apartment Owners Associations, Housing Societies located in Karnataka, India. This Slideshare also details on the Acts and Rules,Categorization of construction projects applicable to Environmental concerns.
To get details on legal information related to Environmental concerns check the link here
http://apartmentadda.com/blog/blog/2013/06/17/self-sufficient-apartment-communities-an-open-house/
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEzubeditufail
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE IN RESPECT OF THE
PROPOSED KHAIRAGURA OPENCAST EXPANSION COAL
MINING PROJECT NEAR KHAIRAGURA VILLAGE,
TIRIYANI MANDAL, ADILABAD DISTRICT, A.P.
DEPARTMENT OF ENVIRONMENT
THE SINGARENI COLLIERIES COMPANY LIMITED
(A Government Company)
KOTHAGUDEM COLLIERIES-507101 (A.P)
JANUARY 2013
Environmental Concerns in Construction Projects- KSPCB SimhaADDA
This presentation on the Environmental Concerns in Construction Projects was presented by MDN Simha Chief Environmental Officer (Retd.) during "Self Sufficient Apartment Communities - Open House " conducted by ApartmentADDA during 15th June 2013.
He explains about the legal information related to Pollution Control and Environmental concerns which are useful for Builders, Real Estate Developers, RWAs, Apartment Owners Associations, Housing Societies located in Karnataka, India. This Slideshare also details on the Acts and Rules,Categorization of construction projects applicable to Environmental concerns.
To get details on legal information related to Environmental concerns check the link here
http://apartmentadda.com/blog/blog/2013/06/17/self-sufficient-apartment-communities-an-open-house/
Land Development Ukraine provides services such as geodesy and landsurvey, site selection and prolongation of land lease contracts, legal audit-due-dilligence, evaluation and approvals for receiving building permit fro real estate objects.
Permitted Development Rights for Change of use of Farm BuildingsCLA - East
CLA Head of Planning Fenella Collins MRICS presentation on Permitted Development Rights for change of use of farm buildings, given at CLA East's Planning for the Future event in Essex on 18 November 2014.
NASA Condition Assessment and Rehabilitation Plan for Hangar OneSteve Williams
The project is a study that investigates current conditions and the expected condition after the
remediation project by the Navy of Hangar One, as well as cost estimates for potential rehabilitation
options.
3 BHK & 4 BHK Flats in Bandra | Flats in Bandrashikhadesai1990
Looking for apartments in Bandra? Check out Rustomjee Seasons that offers 3 & 4 BHK apartments in Bandra with top-class facility. Visit now - https://www.rustomjee.com/residential-property/rustomjee-seasons-bandra-bkc/
Eia of township and area development projectsSandeep Kumar
Source : Environmental Impact Assessment Guidance Manual for BUILDING, CONSTRUCTION, TOWNSHIPS and AREA DEVELOPMENT PROJECTS Prepared by Administrative Staff College of India for Ministry of Environment & Forests, GOVERNMENT OF INDIA, NEW DELHI
A fact sheet from Max Environmental detailing information about their planned 21-acre expansion of the Bulger (Washington County), PA landfill to accept more Marcellus drill cuttings and even liquid waste. Max will file an application with the PA Dept. of Environmental Protection later in 2014, a process which they figure will take nearly five years to be approved.
Land Development Ukraine provides services such as geodesy and landsurvey, site selection and prolongation of land lease contracts, legal audit-due-dilligence, evaluation and approvals for receiving building permit fro real estate objects.
Permitted Development Rights for Change of use of Farm BuildingsCLA - East
CLA Head of Planning Fenella Collins MRICS presentation on Permitted Development Rights for change of use of farm buildings, given at CLA East's Planning for the Future event in Essex on 18 November 2014.
NASA Condition Assessment and Rehabilitation Plan for Hangar OneSteve Williams
The project is a study that investigates current conditions and the expected condition after the
remediation project by the Navy of Hangar One, as well as cost estimates for potential rehabilitation
options.
3 BHK & 4 BHK Flats in Bandra | Flats in Bandrashikhadesai1990
Looking for apartments in Bandra? Check out Rustomjee Seasons that offers 3 & 4 BHK apartments in Bandra with top-class facility. Visit now - https://www.rustomjee.com/residential-property/rustomjee-seasons-bandra-bkc/
Eia of township and area development projectsSandeep Kumar
Source : Environmental Impact Assessment Guidance Manual for BUILDING, CONSTRUCTION, TOWNSHIPS and AREA DEVELOPMENT PROJECTS Prepared by Administrative Staff College of India for Ministry of Environment & Forests, GOVERNMENT OF INDIA, NEW DELHI
A fact sheet from Max Environmental detailing information about their planned 21-acre expansion of the Bulger (Washington County), PA landfill to accept more Marcellus drill cuttings and even liquid waste. Max will file an application with the PA Dept. of Environmental Protection later in 2014, a process which they figure will take nearly five years to be approved.
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
Understanding the Challenges of Street ChildrenSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
2024: The FAR - Federal Acquisition Regulations, Part 36
Cec application form_a
1. ENVIRONMENTAL MANAGEMENT AUTHORITY
CERTIFICATE OF ENVIRONMENTAL CLEARANCE
PRE-SCREENING FORM
Please note that pursuant to Rules 6 and 7 of the CEC Rules, the final determination of all
CEC applications remains with the Environmental Management Authority (EMA)
Revised by AO 2/4/19
This Form must be completed in addition to the CEC Application Form A
1. Please state the Activity as well as the purpose of the project for which the CEC
application is being submitted (state the activity and definition categories under
which you are applying. Please refer to CEC Designated Activities Order).
List all the Activity/Activities that apply:
Definition (a) (b) (c) (d)
Purpose:
2. This Application package contains:
➢ Completed CEC Application Form A (signed and dated)
➢ Evidence of payment of prescribed Application Fee ($500.00)
➢ Where the Applicant is the property owner: Evidence of certified
copies of Proof of Ownership (e.g. deed, license/lease agreement)
➢ Where the Applicant is not the property owner: An authorisation
letter from property owner(s) supported by proof of ownership and a
copy of a valid form of Identification from the owner(s)
➢ Letter of Authorisation for agent/consultant (if applicable)
➢ Where the Applicant is a Company: CEC Application Form is signed
by the head of the organisation and stamped with the company
stamp and supported by a Certificate of Incorporation
➢ All attached documents submitted
Declaration:
I declare that the information provided on the application form and supporting
documents is true and correct. I hereby acknowledge that any wilful false
statement makes me liable to be subjected to civil proceedings for fraudulent
misrepresentation.
Signed
Applicant (PRINT NAME)
Date
8
✔
A mixed use: Residential and Commercial Development
2. SCHEDULE
FORM A (Rule 3(1))
THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001
APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE
This form must be completed for any proposed activity identified in the Schedule of
the Certificate of Environmental Clearance (Designated Activities) Order, 2001. Essential
additional information such as plans, maps, diagrams, photographs or text may be
included in the application as an appropriately referenced attachment.
To: The Environmental Management Authority,
I/We hereby apply for a Certificate of Environmental Clearance (CEC).
Signed
Applicant (PRINT NAME)
Signed
Head of Organisation (PRINT NAME)
(Company Stamp)
Date
FOR OFFICIAL USE ONLY
Application Received……………………… Received by: ……………………………
(Date) (Signature)
Ref. No.
Acknowledgment Sent…………………………..
(Date)
Category of intended activity: (i) New (ii ) Modification
(please tick appropriate box)
(iii) Abandonment/ Decommissioning
Definition
PROJECT CLASSIFICATION
Activity
Application requires CEC: Yes No Application requires EIA: Yes No
EMA: CEC 1
3. 2
CERTIFICATE OF ENVIRONMENTAL CLEARANCE
APPLICATION FORM
A. GENERAL INFORMATION
1. Name of applicant
2. Postal Address
Electronic mailing address (e-mail address)
3. Telephone No. 4. Fax No.
5. Location of proposed activity:
(a) District/Village
(b) Street (Name and Lot or LP No.)
6. Do you own the property on which the activity is intended to be carried out?
Yes No
If Yes, please attach certified copies of Proof of ownership.
If No, what is the nature of your interest in this property? Please attach supporting
documents, justifying your claim (e.g. lease).
7. Names and addresses of adjoining property owners:
SYCON DEVELOPERS LIMITED
488-7792
MAYARO
GAS STATION
VILLAGE SHOPPES
MAYARO SHOPPING CENTRE
TAXI STAND
4. 3
8. (a) Previous Application for CEC for this site? Yes No
(b) If yes, Reference No of most recent application
9. Activity for which CEC required (state the activity and definition categories under which you
are applying -refer to CEC Order) as well as the purpose of the project.
Activity Definition
Purpose:
10. Site Description (physical setting of the proposal, both developed and undeveloped areas)
Give an outline description of the physical features of the site to include information on:
(a) Topography and gradient i.e. generally flat rolling/undulating terrain or hilly
(b) Are there any springs or aquifers in or adjacent to the site? Yes No
(c) Are there any rivers, streams or drainage within or adjacent to the project site? Yes No
(d) Are there any ponds, reservoirs or wetland areas within or contiguous to the project site?
Yes No
(e) What is the predominant soil type? Clay based Sand Loam Alluvial
(f) Is the project located within 5km from the coast or further inland ?
(g) Present site land use: Residential Agricultural Commercial
Industrial Forestry
11. Estimated project capital (TT dollars)
8 A
A mixed use: Residential and Commercial Development
✔
5. 4
B. DESCRIPTION OF INTENDED ACTIVITY
12. Description of the Intended Activity, which must include information on:
(a) Total area intended for the activity (ha or m2
)
(b) Percentage of the total surface area allocated to covered space and paved areas (%)
(c) Potable water consumption rate (m3
/day)
(d) Process water consumption rate (m3
/day)
(e) Project’s intended operating capacity (metric tons per annum)
(f) Production output rate, if different from above (metric tons per annum)
(g) Intended commencement date
Site Preparation and Construction Phase
13. cutting excavation
Does the project site require major earthworks such as clearing
grading blasting dredging ?
If yes, state the method of disposal (and disposal site) of material generated as a result
(a) Does the site require filling reclamation coastline stabilisation/alteration ?
If yes, state the source and quantity (metric tons) of material required.
(b) Would the project require major waterworks such as abstraction diversion of water
courses creation of standing water bodies ?
If yes, give an estimate of the volume of water to be impounded (m3
) or the rate of abstraction
(m3
/day) and the source of this water
(c) Would the site require infrastructure and utility development:
access roads and/or bridges power generating or transmission facilities
telecommunications installation or modification of a drainage system
sewage system ?
22.2359 HA
N/A
N/A
N/A
✔
MATERIAL WILL BE DISPOSED OF AT AN APPROVED DUMPING SITE
✔
✔
✔
✔
6. 5
If yes, give details
14. Will the project require relocation of people houses facilities from the site?
If yes, give details:
15. What percentage of the intended project area would be cleared of vegetation?
16. State mitigation measures for adverse impacts resulting during site preparation and
the construction phase.
Operational Phase
17. State the required raw/input materials and the quantities/volumes (kg or metric tons/m3
) to be
kept in stock for the project as well as their respective rates of consumption (kg or metric
tons per day/m3
per day).
ROADSIDE DRAINS TO RECEIVE WATER FROM HOUSING AND
COMMERCIAL LOTS, AS WELL AS, SEWER TREATMENT PLANT(S) FOR
APPROXIMATELY 202 HOUSING LOTS, 45 TOWNHOUSES AND SHOPPING
CENTRE.
- HOARDING WILL BE PLACED ALONG THE MANZANILLA / MAYARO ROAD
AND AROUND EXISTING COMMUNITY.
- CONSTRUCTION ACTIVITY WILL BE LIMITED TO DAY TIME, EXCEPT IN
RARE OCCASIONS, E.G. CONCRETE POURS THAT GO BEYOND THE
PLANNED 6:00PM FINISH TIME.
- SEDIMENTATION CONTROL PITS WILL BE INSTALLED.
- TRUCK WASH BAYS WILL BE USED BEFORE LEAVING SITE.
- ALL TRUCK TRAYS WILL BE COVERED.
N/A
7. 6
(a) Would the activity require any ancillary process related chemicals (e.g. catalysts, pesticides)?
(b) State the final products to be derived and the rate of production (metric tons/m3
per year)
(c) State any intermediate products resulting from this activity indicating the rate of production
(metric tons/m3
per year) and their fate.
(d) State the rate of production (metric tons per year) and method of disposal of domestic solid
waste generated during the operational phase.
(e) List, characterise and quantify (metric tons per year) process related solid waste. State the
method(s) and location intended for their disposal.
(f) Provide respective estimates for the rate of generation (m3
per day) of domestic wastewater
and sewage. State the respective treatment methods intended for domestic wastewater and
sewage as well as their ultimate effluent points.
(g) State the source and process water consumption rate (m3
per day)
If yes, state the quantity (kg or metric tonnes/ m3) and rate of consumption.
Yes No
N/A
N/A
N/A
N/A
8. 7
(h) Would the activity discharge process related liquid effluent? Yes No
If yes, state the source, composition, discharge rate (m3
per day) and the ultimate effluent points.
(i) Would this activity utilise any hazardous (i.e. toxic, flammable, explosive, radioactive etc.)
substances? Yes No
If yes, provide a listing of the substances and the quantities to be used or stored.
18. No
Would the project require storage of input and/or waste material on site? Yes
If yes, give estimates of the quantities (kg or metric tons) for the storage of:
Waste Input material
(a) Describe briefly the facilities allocated for this purpose
19. Indicate the mode(s) of transport intended for materials and equipment necessary
for the operational phase.
20. Will the activity generate air emissions (i.e. particulate emissions such as dust or pollutant
gaseous emissions) during the operational phases? Yes No
If yes, describe types and sources and provide an estimated emission rate or loading
N/A
9. 8
21. Will the activity routinely produce odours (i.e. for more than 1 hour per day)? Yes No
22. Will the activity generate significant levels of noise (i.e. for more than 1 hour per day at
levels exceeding 60 dB) during its operational phase? Yes No
23. Will the project have adverse effects on the aesthetics of the area where it is located (i.e.
result in radical changes of the landscape, such as scarring/mass vegetation removal)?
Yes No
24. State mitigation measures for adverse impacts resulting during the operational phase.
25. State the expected lifespan of this activity
C. CONFIDENTIALITY
26. (a) Do you consider any information provided here to be a trade secret or other
confidential business information and that such information be omitted from the Register?
Yes No
(b) Give details
27. Other relevant information
28. Please list any attachments included in the application
N/A
N/A