All Change! 
Fenella Collins MRICS 
Head of Planning Permitted development rights forChange of use of farm buildings
National Planning Policy Framework Reinstatement of the Right of appeal for the non- validation of planning applicationsPermitted development rights for the change of use of farm buildings to: Range of commercial uses –GPDO Part 3 Class M Residential use –GPDO Part 3 Class MB Some recent CLA lobbying successes
Town and Country Planning (General Permitted Development) Order 1995 (as amended) Withdrawing permitted development rights Article 4 directionCondition on a previous planning permission 
What is permitted development
Change of use of farm buildings to: Class M –commercial uses Class MB-(a) residential use and (b) operations to facilitate the change of useThresholds –150m2 and 500m2, 450m2Protected areas (aka Article 1(5) land) (NP, AONB, the Broads, WHS) Class J –B1(a) offices to residential 
What changes are there?
SI 2013 1101 Class M (30 May 2013) Existing buildings up to 500 sqmbut sui generis Range of uses: 
A1 –retail, A2 –professional office, A3 –food and drink 
B1 –office/light industry, B8 –warehousing and distribution 
C1 –hotel, guest house 
D2 –sports/leisure/cinema 
 Prior Approval requirements: Up to 150sqm notify LPA: 150-500sqm prior approval (56 days) + public consultationGPDO Part 3 –Class M –commercial uses
SI 2013 1101 Class J (30 May 2013) Existing office building and land with its curtilageTime limited –3 years to 30 May 2016 but possible retentionPrior approval application and 21 day public consultationNPPFExempted landBuilding not in B1(a) use e.g. farm officeGPDO Part 3 –Class J –office to residential
SI 2014 no. 564 (6 April 2014) The change of use of an agricultural building and land within its curtilageto use as a dwelling house 
andThe building operations necessary to convert the building to a dwellinghouseCurtilage(for purposes of Classes M, MA or MB) drawn very tight to the building 
What is permitted under new Class MB
Established agricultural unit “means agricultural land occupied as a unit for the purposes of agriculture” AND on 20 March 2013Agricultural building “trade or business” 10 year rule Cumulative floor space = 450 sqmbefore and after Up to 3 dwellings on an established agric unitCan’t extend beyond existing foot print Conditions and Limitations
Protection for tenants under AHA’86 and ATA’95New GPDO Part 3 Class MB vsGPDO Part 6 (10 year rule) GPDO Part 6 v new GPDO Part 3 Class MB (20/3/13) GPDO Part 1 (dev within curtilageof dwelling) Conditions and Limitations (cont)
Class MB not available on: Article 1(5) land (National Parks, AONBs, Conservation Areas, the Broads, WHS) or SSSI, safety hazard areas, military explosive storage areas orListed buildings and scheduled monuments 
Conditions and Limitations (cont)
Buildings operations “cannot extend beyond”: Installing or replacing Windows, doors, roofs or exterior wallsWater, drainage, electricity, gas or other services 
And Partial demolition “to the extent reasonably necessary” Conditions and Limitations (cont)
Building operations reasonably necessary?
All development under Class MB requires prior approval BEFORE any development commences 
Assessment of ImpactsTransport and highways NoiseContaminationFlooding Notification requirements
Prior approval also to assess: Location SitingImpractical or undesirable Design and external appearanceNotification requirements (cont)
Refused
Approved
Approved
LPA determination period –56 days following date of receipt of prior approval application ( includes 21 days public consultation) 
When can development commence? Written notice prior approval not requiredNotice that prior approval is grantedNo decision received within 56 days following date of receipt of application 3 years to commence development 
Prior approval procedure –Class M, MB and J
NPPF and relevance to prior approval mattersRequest for further informationConditionsRefusal of prior approval applicationFlood risk assessment Compliance with prior approval procedure 
Prior approval procedure -government clarification
Wildlife surveys Building RegulationsRestrictive covenantsCondition on a previous planning permissionOther matters
But it is possible with full planning permission
Get cracking!
THANK YOU16 BelgraveSquare London SW1X 8PQTel 020 7235 0511Fax 020 7235 4696Email mail@cla.org.ukWebsite www.cla.org.uk

Permitted Development Rights for Change of use of Farm Buildings

  • 1.
    All Change! FenellaCollins MRICS Head of Planning Permitted development rights forChange of use of farm buildings
  • 2.
    National Planning PolicyFramework Reinstatement of the Right of appeal for the non- validation of planning applicationsPermitted development rights for the change of use of farm buildings to: Range of commercial uses –GPDO Part 3 Class M Residential use –GPDO Part 3 Class MB Some recent CLA lobbying successes
  • 3.
    Town and CountryPlanning (General Permitted Development) Order 1995 (as amended) Withdrawing permitted development rights Article 4 directionCondition on a previous planning permission What is permitted development
  • 4.
    Change of useof farm buildings to: Class M –commercial uses Class MB-(a) residential use and (b) operations to facilitate the change of useThresholds –150m2 and 500m2, 450m2Protected areas (aka Article 1(5) land) (NP, AONB, the Broads, WHS) Class J –B1(a) offices to residential What changes are there?
  • 5.
    SI 2013 1101Class M (30 May 2013) Existing buildings up to 500 sqmbut sui generis Range of uses: A1 –retail, A2 –professional office, A3 –food and drink B1 –office/light industry, B8 –warehousing and distribution C1 –hotel, guest house D2 –sports/leisure/cinema  Prior Approval requirements: Up to 150sqm notify LPA: 150-500sqm prior approval (56 days) + public consultationGPDO Part 3 –Class M –commercial uses
  • 6.
    SI 2013 1101Class J (30 May 2013) Existing office building and land with its curtilageTime limited –3 years to 30 May 2016 but possible retentionPrior approval application and 21 day public consultationNPPFExempted landBuilding not in B1(a) use e.g. farm officeGPDO Part 3 –Class J –office to residential
  • 7.
    SI 2014 no.564 (6 April 2014) The change of use of an agricultural building and land within its curtilageto use as a dwelling house andThe building operations necessary to convert the building to a dwellinghouseCurtilage(for purposes of Classes M, MA or MB) drawn very tight to the building What is permitted under new Class MB
  • 8.
    Established agricultural unit“means agricultural land occupied as a unit for the purposes of agriculture” AND on 20 March 2013Agricultural building “trade or business” 10 year rule Cumulative floor space = 450 sqmbefore and after Up to 3 dwellings on an established agric unitCan’t extend beyond existing foot print Conditions and Limitations
  • 9.
    Protection for tenantsunder AHA’86 and ATA’95New GPDO Part 3 Class MB vsGPDO Part 6 (10 year rule) GPDO Part 6 v new GPDO Part 3 Class MB (20/3/13) GPDO Part 1 (dev within curtilageof dwelling) Conditions and Limitations (cont)
  • 10.
    Class MB notavailable on: Article 1(5) land (National Parks, AONBs, Conservation Areas, the Broads, WHS) or SSSI, safety hazard areas, military explosive storage areas orListed buildings and scheduled monuments Conditions and Limitations (cont)
  • 11.
    Buildings operations “cannotextend beyond”: Installing or replacing Windows, doors, roofs or exterior wallsWater, drainage, electricity, gas or other services And Partial demolition “to the extent reasonably necessary” Conditions and Limitations (cont)
  • 12.
  • 13.
    All development underClass MB requires prior approval BEFORE any development commences Assessment of ImpactsTransport and highways NoiseContaminationFlooding Notification requirements
  • 14.
    Prior approval alsoto assess: Location SitingImpractical or undesirable Design and external appearanceNotification requirements (cont)
  • 15.
  • 16.
  • 17.
  • 18.
    LPA determination period–56 days following date of receipt of prior approval application ( includes 21 days public consultation) When can development commence? Written notice prior approval not requiredNotice that prior approval is grantedNo decision received within 56 days following date of receipt of application 3 years to commence development Prior approval procedure –Class M, MB and J
  • 19.
    NPPF and relevanceto prior approval mattersRequest for further informationConditionsRefusal of prior approval applicationFlood risk assessment Compliance with prior approval procedure Prior approval procedure -government clarification
  • 20.
    Wildlife surveys BuildingRegulationsRestrictive covenantsCondition on a previous planning permissionOther matters
  • 21.
    But it ispossible with full planning permission
  • 22.
  • 23.
    THANK YOU16 BelgraveSquareLondon SW1X 8PQTel 020 7235 0511Fax 020 7235 4696Email mail@cla.org.ukWebsite www.cla.org.uk