9. A Closer Look at UPS Production Workload Automation
9
Initiatives Description Result
Automated Failed
Job Restarts
We reduced manual Interventions by operators by automatically restarting failed
workload processed through CA WLA ESP. The target was to automatically
restart failed workload whose only documented instruction was to restart the
failed job.
Average of 300 less
Manual Job Restarts
per Month
Automated Force
Completes
We reduced manual Interventions by operators by automatically force
completing failed workload processed through CA WLA ESP. The target was to
automatically force complete failed workload whose only documented
instruction was to restart the failed job.
Average of 450 less
Manual Force
Completes per Month
CA WLA ESP Smart
Jobs
Built to assist the operators in monitoring the various CA WLA ESP views by
providing an early warning of at risk critical processes alerting the operator
should the risk factors (long running, job failure, nearing expected end time)
near realization.
Greater CA WLA ESP
View and Workload
Awareness
Production Process
Checklist
Created to validate workload schedule changes and provide step by step detail
on the work effort required to implement the change in the production
environment including execution and back out plans, customer sign-off in
addition to CA WLA ESP process simulations.
Creation of Production
Automation Process
Model
Semi Annual PTF
Maintenance
This maintenance is required to ensure CA WLA ESP remains up-to-date with the
latest level of vendor support
Enhanced Vendor
Collaboration
‘Sampling of UPS initiatives which lead to decreased job failures and increased workload efficiencies’