SlideShare a Scribd company logo
Patty Carberry
Cell: (720) 233-8866 Email: spcarberry@msn.com
Project Profile
I have over ten years of experience as a civil designer, engineer technician and production
scheduler. Project experience includes concrete segmental, steel box and AASHTO girder
bridges. Also, I have been involved with such project types as parking structures, office
buildings, stadiums, roadway design plans, culverts and retaining walls. I am proficient in
AutoCAD, MIcrostation, Microsoft Word, Excel and trained in AutoCAD Civil3D. In addition
to jobsite experience I am a certified CDOT construction inspector.
Relevant Project Experience
Harmony Road Bridge over Cache La Poudre River – Timnath, Colorado
Carberry completed a full set of contract drawing for a three span, (317’ X 112’) bridge with 14-
BT54 Girders, ornamental pedestrian railing and a 60 foot tower architectural feature.
Incorporating electronic drawings from the surveyor and architect into structural drawings,
determining elevations and dimension for the substructure and superstructure were her
responsibility.
Miller Street Bridge Repairs – Arvada, Colorado
Patty prepared a plan set of drawings showing demolition limits of a weathered existing, two-cell
concrete box culvert incorporating repair work with widening and adding new sidewalks and
barriers for the roadway over Ralston Creek.
W. 88th
Ave –W. 86th
Parkway – Arvada, Colorado
A simple span bridge widening a cast in place skewed slab over Farmers Highline Canal added
two lanes, a median, sidewalks and barriers on both sides. Working with drawings of the
existing structure, field dimensions and survey data Carberry prepared plans for a new structure
tying into the existing structure and roadway improvements.
Cherry Creek Drive South – Denver, Colorado
Patty provided drawings of designs for stepped retaining walls along trail ramps. Drawings
showed elevations, a typical section with sidewalk and railing, design tables, footing line,
intersecting pipe details and handrail connections.
Riverside County Flood Control – Irvine, California
Carberry showed plans and sections for removal and restoration of channel walls salvaging
existing reinforcement and reconstruction of walls for tie-in of 24 inch, 60 inch and 80 inch
concrete pipes. Junction Structure was designed to be poured monolithically with main line
storm drains. Drawing showed all elevations of inverts and dimensioning for placement of
reinforcement.
Patricia Carberry Project Profile
2
Broadway Bridge over Cherry Creek – Denver, Colorado
Carberry provided design/drafting services for this project consisting of a skewed, six-lane steel
box girder bridge with ornamental lighting and planters as architectural treatment with retaining
walls that incorporated a bike path access under the bridge. This was a replacement bridge that
required utilization and preservation of existing abutments and was also built in phases to
accommodate traffic. Carberry was responsible for such drawings as General Layout, Abutment
Details, Framing Plan, End Diaphragm and Field Splice Details, Slab Plans and Details.
Morrison Road/SH 470 Interchange, Mainline Bridges – Morrison, Colorado
This project consisted of two mirror-image, cast-in-place, post-tensioned concrete segmental
three span structures. The center span was 220 feet, with traffic signals attached and the south
span was over Bear Creek. Carberry worked on drawings including Project Overview, Quantities,
Typical Sections, Footing and Piling Layout, Footing and Caisson Layout, Pier Details, and Cast-
In-Place Post-Tensioned Box Girder Details.
Morrison Road/SH 470 Interchange, Ramp B and D – Morrison, Colorado
Both bridges were two spans with five G-72 girders over Bear Creek. Carberry was responsible
for drawings of General Layout, Construction Layout, Piling and Caisson Layout, Girder Layout,
Superstructure Details and Approach Slab Details.
I-25 / U.S. Interchange – Denver, Colorado
This project consisted of a six-span curved ramp bridge. The structure has stepped bearing pier
caps and abutments for the four G-72 girders. Carberry was responsible for such drawings as
General Layout, Piling and Caisson Layout, Girder Layout, Superstructure Details and Approach
Slab Details.
Additional Bridge Projects
 French Creek Viaduct Bridge
 Meadows Parkway / A.T. & S.F. Railroad Underpass Bridge
 Washington Lake Floating Bridge
EDUCATION
Bachelor of Science in Civil Engineering Technology with a Construction Concentration
Metropolitan State University of Denver, Denver Colorado
Associate of Applied Science in Drafting for Construction
Red Rocks Community College, Lakewood, Colorado

More Related Content

What's hot

Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17
CirculateSD
 
Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16 Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16
omedina91
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24
CirculateSD
 
Additional Work Experience
Additional Work ExperienceAdditional Work Experience
Additional Work ExperienceJoel Cummings
 
Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16
omedina91
 
05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation
AISC/NSBA
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
Fairfax County
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16David Beverly
 
Celestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceCelestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceAlfred Celestain
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
Fairfax County
 
Lukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase IILukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase II
Fairfax County
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
CirculateSD
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Daniel X. O'Neil
 
07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards Presentation07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards Presentation
AISC/NSBA
 
Busway Extension to Florida City
Busway Extension to Florida CityBusway Extension to Florida City
Busway Extension to Florida City
Brand Communications
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Fairfax County
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Fairfax County
 
Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundaboutsBird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundabouts
THECITYALLIANCE
 

What's hot (20)

Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17
 
Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16 Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24
 
Additional Work Experience
Additional Work ExperienceAdditional Work Experience
Additional Work Experience
 
Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16
 
05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation05 AASHTO Bridge Committee Awards Presentation
05 AASHTO Bridge Committee Awards Presentation
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
 
Celestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceCelestain Jr Alfred_Refernce
Celestain Jr Alfred_Refernce
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
 
Lukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase IILukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase II
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
 
Graham Barton CV
Graham Barton CVGraham Barton CV
Graham Barton CV
 
07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards Presentation07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards Presentation
 
Busway Extension to Florida City
Busway Extension to Florida CityBusway Extension to Florida City
Busway Extension to Florida City
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
 
Senior Project PSR
Senior Project PSRSenior Project PSR
Senior Project PSR
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020
 
Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundaboutsBird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundabouts
 

Similar to Carberry_Project Profile

I-64 Kanawha River Bridge
I-64 Kanawha River BridgeI-64 Kanawha River Bridge
I-64 Kanawha River Bridge
PostTensioningInstitute
 
Alaa Jafar Resume
Alaa Jafar ResumeAlaa Jafar Resume
Alaa Jafar ResumeALAA JAFAR
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor HarperTaylor Harper
 
Josh Newmaster - Resume
Josh Newmaster - ResumeJosh Newmaster - Resume
Josh Newmaster - ResumeJosh Newmaster
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resumecarlos betts
 
Foundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docxFoundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docx
budbarber38650
 
David Brotchie
David Brotchie David Brotchie
David Brotchie
Brotchie
 

Similar to Carberry_Project Profile (20)

CV_Appas J
CV_Appas JCV_Appas J
CV_Appas J
 
resume_2015
resume_2015resume_2015
resume_2015
 
Ponicsan.Dave.DEN
Ponicsan.Dave.DENPonicsan.Dave.DEN
Ponicsan.Dave.DEN
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
New Resume 5-09-14
New Resume 5-09-14New Resume 5-09-14
New Resume 5-09-14
 
I-64 Kanawha River Bridge
I-64 Kanawha River BridgeI-64 Kanawha River Bridge
I-64 Kanawha River Bridge
 
Alaa Jafar Resume
Alaa Jafar ResumeAlaa Jafar Resume
Alaa Jafar Resume
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
Imran-Res
Imran-ResImran-Res
Imran-Res
 
Josh Newmaster - Resume
Josh Newmaster - ResumeJosh Newmaster - Resume
Josh Newmaster - Resume
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
 
Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resume
 
Foundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docxFoundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docx
 
BDE80_p10
BDE80_p10BDE80_p10
BDE80_p10
 
Sergio Carratala Profile
Sergio Carratala ProfileSergio Carratala Profile
Sergio Carratala Profile
 
Resume_Desmond I Codrington
Resume_Desmond I CodringtonResume_Desmond I Codrington
Resume_Desmond I Codrington
 
David Brotchie
David Brotchie David Brotchie
David Brotchie
 

Carberry_Project Profile

  • 1. Patty Carberry Cell: (720) 233-8866 Email: spcarberry@msn.com Project Profile I have over ten years of experience as a civil designer, engineer technician and production scheduler. Project experience includes concrete segmental, steel box and AASHTO girder bridges. Also, I have been involved with such project types as parking structures, office buildings, stadiums, roadway design plans, culverts and retaining walls. I am proficient in AutoCAD, MIcrostation, Microsoft Word, Excel and trained in AutoCAD Civil3D. In addition to jobsite experience I am a certified CDOT construction inspector. Relevant Project Experience Harmony Road Bridge over Cache La Poudre River – Timnath, Colorado Carberry completed a full set of contract drawing for a three span, (317’ X 112’) bridge with 14- BT54 Girders, ornamental pedestrian railing and a 60 foot tower architectural feature. Incorporating electronic drawings from the surveyor and architect into structural drawings, determining elevations and dimension for the substructure and superstructure were her responsibility. Miller Street Bridge Repairs – Arvada, Colorado Patty prepared a plan set of drawings showing demolition limits of a weathered existing, two-cell concrete box culvert incorporating repair work with widening and adding new sidewalks and barriers for the roadway over Ralston Creek. W. 88th Ave –W. 86th Parkway – Arvada, Colorado A simple span bridge widening a cast in place skewed slab over Farmers Highline Canal added two lanes, a median, sidewalks and barriers on both sides. Working with drawings of the existing structure, field dimensions and survey data Carberry prepared plans for a new structure tying into the existing structure and roadway improvements. Cherry Creek Drive South – Denver, Colorado Patty provided drawings of designs for stepped retaining walls along trail ramps. Drawings showed elevations, a typical section with sidewalk and railing, design tables, footing line, intersecting pipe details and handrail connections. Riverside County Flood Control – Irvine, California Carberry showed plans and sections for removal and restoration of channel walls salvaging existing reinforcement and reconstruction of walls for tie-in of 24 inch, 60 inch and 80 inch concrete pipes. Junction Structure was designed to be poured monolithically with main line storm drains. Drawing showed all elevations of inverts and dimensioning for placement of reinforcement.
  • 2. Patricia Carberry Project Profile 2 Broadway Bridge over Cherry Creek – Denver, Colorado Carberry provided design/drafting services for this project consisting of a skewed, six-lane steel box girder bridge with ornamental lighting and planters as architectural treatment with retaining walls that incorporated a bike path access under the bridge. This was a replacement bridge that required utilization and preservation of existing abutments and was also built in phases to accommodate traffic. Carberry was responsible for such drawings as General Layout, Abutment Details, Framing Plan, End Diaphragm and Field Splice Details, Slab Plans and Details. Morrison Road/SH 470 Interchange, Mainline Bridges – Morrison, Colorado This project consisted of two mirror-image, cast-in-place, post-tensioned concrete segmental three span structures. The center span was 220 feet, with traffic signals attached and the south span was over Bear Creek. Carberry worked on drawings including Project Overview, Quantities, Typical Sections, Footing and Piling Layout, Footing and Caisson Layout, Pier Details, and Cast- In-Place Post-Tensioned Box Girder Details. Morrison Road/SH 470 Interchange, Ramp B and D – Morrison, Colorado Both bridges were two spans with five G-72 girders over Bear Creek. Carberry was responsible for drawings of General Layout, Construction Layout, Piling and Caisson Layout, Girder Layout, Superstructure Details and Approach Slab Details. I-25 / U.S. Interchange – Denver, Colorado This project consisted of a six-span curved ramp bridge. The structure has stepped bearing pier caps and abutments for the four G-72 girders. Carberry was responsible for such drawings as General Layout, Piling and Caisson Layout, Girder Layout, Superstructure Details and Approach Slab Details. Additional Bridge Projects  French Creek Viaduct Bridge  Meadows Parkway / A.T. & S.F. Railroad Underpass Bridge  Washington Lake Floating Bridge EDUCATION Bachelor of Science in Civil Engineering Technology with a Construction Concentration Metropolitan State University of Denver, Denver Colorado Associate of Applied Science in Drafting for Construction Red Rocks Community College, Lakewood, Colorado