November 28, 2011

FROM: Boston Center For Independent Living &               Community Access Project
Karen Schneiderman, Senior Advocacy Specialist             Eileen Feldman, Director
60 Temple Place                                            P.O. Box 434
Boston, MA 02111                                           Somerville, MA 02143

TO: MA Architectural Access Board
Thomas Hopkins, Executive Director
Donald Lang, Chair
One Ashburton Place - Room 1310
Boston, MA 02108

RE: Public Comments on Application for Variance, The Isabella Stewart Gardner Museum
280 the Fenway
Boston, MA 02115

Dear AAB Board and Staff,

The Boston Center for Independent Living and the Community Access Project have a partnership
in reviewing, analyzing and providing comments and recommendations regarding architectural
accessibility topics impacting the Greater Boston area. We submit the following comments
regarding the Variance Application for the Isabella Stewart Gardner Museum, sent to MA AAB on
July 21, 2011.

The Museum seeks a variance during ongoing reconstruction and preservation work of the historic
Palace Building in order to exempt them from creating useable access for people using wheeled
mobility devices in eight rooms, plus the elevator serving first through third floors; plus, to keep the
historic handrails on the Main stairwell, which also serves First through Third floors, as-is.

1. We ask that the variance regarding the Handrails for the Main Staircase (which serves the 1st
through 3rd floors, as does the existing elevator) be granted.

2. We ask that the Accessible Route decisions regarding the Buddha Room and Spanish Cloister
be continued, so that the architects can examine all possible solutions, including raising and
reinstalling the original floor, to create at least one ramped entry into this room while there is still
an opportunity (the already-planned complete rebuild/restoration of the Buddha Room1). Since
these important sustainable design considerations may also affect a more durable and aesthetic
solution for accessible route into the Spanish Cloister, we include that space for a continuance.

3. We ask that the Elevator and Doorway Width portions of this Variance be denied, since asking
wheelchair users to re-position themselves into narrower wheelchairs in order to save money on
widening and resetting doorways is about as competent as asking non-wheelchair users to re-


1
 page 7, text of the application states, "In addition, the Buddha Room will be reconstructed to its
original form."
                                                                                            page 1 of 6
position themselves in size 4 shoes prior to entering these six rooms. In addition, since the existing
elevator is smaller than the minimal 48 by 48 inches standards required by some 21st century
wheelchair models, this elevator's accessibility upgrade is a necessity to ensure access for a
broader diversity of potential visitors and staff.

4. We ask that the AAB question why the applicants include
• Gallery Preparation (climate control, packing of objects for storage during reconstruction
   work),
• Security and Operations (allowing outside contractors to work within the Museum's public
   spaces), and
• Reinstallation (reinstalling stored objects to the historic gallery spaces)

as "additional" and "unique" costs in the application's pricing scheme, when applied to 21st
Century Accessibility upgrades;

yet, these normative costs were not considered additionally burdensome when applied to non-
Accessibility-related renovations in the historic Palace, such as:

    ! relocating an art installation at the south end of the east cloister;
    ! fully reconstructing the Buddha Room to its original form;
    ! completing a decade-long restoration of the Tapestry Room;
    ! installing new period-style pendant fixtures and fiber optic lights to improve the lighting in
        the Tapestry room, Yellow Room and other historic galleries; and
    ! recovering and reinstalling artifacts and other materials to be displayed "in the historical
        perspective as originally intended."

5. We ask that the AAB question why the applicants tack on separate "architectural, legal and
management fees," for each element requiring Accessibility upgrades. This increases the cost for
these feasible renovations by 51%.
Please see pages 5 and 6 for an element-by-element discussion of this questionable costing
scheme.

6. We request a fuller understanding of why the Applicants and the MA Historical Commission
director conceptualize certain Accessibility-related construction and renovation issues as the
prohibitive "loss of historic features" within this "totally preserved" historic site, such as

•   moving and resetting the Tambour opening;
•   stockpiling and retoothing masonry;
•   reframing openings;
•   touch-up painting; and
•   rebuilding a jack arch

while, at the same time, the original site has been enormously transformed without equivalent
historic preservation-related cautions, including the following:

    ! removing a total of 12,000 cubic yards of dirt from the site during excavation;
    ! installing eight geothermal wells, reaching depths of 1,500 feet to provide energy efficient
                                                                                         page 2 of 6
heating and cooling in the new building;
     ! creating an entirely new building within 50 feet of the Palace;
     ! pouring 110 trucks-full of concrete to form the base of that new building's foundation;
     ! relocating the Museum's main entrance to Evans Way; and
     ! creating a new glass atrium entrance to wholly replace the original entrance in order to
         physically link the historic palace to the new facility.

7. Finally, we question the presumption that the current stakeholders have any more ability to
discern the "original intent" of Ms. Gardner's will than we or anyone else does.

•     We note that Ms. Gardner's will created an endowment of $1 million for the preservation of
     the Museum's objects; but that the language does not appear to prohibit necessary structural
     improvements that will allow persons with disabilities to enjoy equitable and integrated access
     and opportunities, side by side, with nondisabled members of the general public.
         Ms. Gardner's will states, “I bequeath all my interest in the pictures, statuary, works of art,
         bric-a-brac, furniture, books and papers…in trust as a Museum for the education and
         enjoyment of the public forever.”
         – Will and Codicil of Isabella Stewart Gardner, 1924

•     We note that Ms. Gardner's will also included "sizable bequests to the Massachusetts Society
     for the Prevention of Cruelty to Children, Industrial School for Crippled and Deformed
     Children, Animal Rescue League and Massachusetts Society for the Prevention of Cruelty to
     Animals."2

One of the writers of these comments is an alumnus of the "Industrial School for Crippled and
Deformed Children"(renamed Cotting School).

The "Industrial School for Crippled and Deformed Children" was founded during Ms. Gardner's
lifetime (in 1893) as the nation's first day school for students with disabilities.

We don't believe that the Museum's stakeholders, nor the Massachusetts historical Commission,
has the capacity to presume to understand what Ms. Gardner's considerations would be today,
when it is considered standard and legitimate practice to find solutions to design challenges so that
people with disabilities are afforded non-discriminative, equal, integrated and usable built
environments that are, at the very least, minimally compliant with accessibility regulations, such as
521 CMR, which has been enforced in Massachusetts since 1968.

•     We note that the applicant's have interpreted Ms. Gardner's will broadly enough to allow
     necessary modernizations of the building's mechanical, electrical and plumbing systems, and
     to install new lighting fixtures, and to create a wholly new entrance that is linked to a wholly
     new building;
        yet,
        regarding Accessibility upgrades, such as widening doorways to allow potential staff and
        visitors who use wheelchairs into 6 galleries, the interpretation narrows to disallow the


2
    http://www.gardnermuseum.org/about/isabella_stewart_gardner
                                                                                           page 3 of 6
expansion of door widths in lieu of "alternate accessibility by way of museum-provided
      wheelchairs and staff assistance."

Such concepts overlay a definition of dependency upon an entire class of individuals. This
preserves the historic devaluation of people with disabilities as substandard individuals, rather than
keeping pace with modernized 21st century human rights values and ideals.

•   We note the Mission Statement adopted by the Board of Trustees, 2000:

        Mission Statement
        The museum exercises cultural and civic leadership by nurturing a new generation of talent
        in the arts and humanities; by delivering the works of creators and performers to the public;
        and by reaching out to involve and serve its community. The collection is at the center of
        this effort as an inspiring encounter with beauty and art.

Nothing in that statement tells us that the fullest inclusion and nurturance of the talents, enjoyment
and employment of people with physical disabilities is outside of the scope of the Mission and
goals of this world-class Museum and programs.

•    Finally, we note that, while there is extensive mastery involved in this Project from the start,
    this application was prepared by the Project's Code Consultants, who are noted experts in fire
    protection, fire prevention and fire incident forensics- but not Universal Design and
    Architectural Accessibility.

      We strongly encourage the applicants to invest in hiring master architects who have
demonstrated knowledge in utilizing Universal Design and Architectural Accessibility principles
and codes in order to create usability solutions in the Buddha room, Spanish Cloister and linked
Courtyard passageways, and to check over the Project's existing designs at this time, when the
Museum is closed to the entire public, so that this Project can enable people from all over the
world with a diverse range of physical and sensory attributes to visit, work in, and learn from the
Gardner Museum's offerings, without qualifications and exclusionary distinctions, for years to
come.

Thank you for your attention.

Sincerely,

Eileen Feldman, Community Access Project
CAPSom@verizon.net
and
Karen Schneiderman, Boston Center for Independent Living
KSchneiderman@bostoncil.org




                                                                                          page 4 of 6
Argument that it is "impracticable" includes "architectural, legal and management fees," which
increase the costing estimate as follows:

Elevator Project
In order to enlarge the cab by 2 1/2", the existing cab will be removed. The total cost is estimated
at $203,695.
The estimated sum of the "architectural, legal and management fees" is $102,517 = ~ 50% of the
total estimated cost.

Widening 5 Doorways to 32" :Gothic Room, Long Gallery, Dutch Room, West Cloister, McKnight
Room

        Gothic Room. In order to widen the door passage from elevator hall, the masonry opening
and associated finishes would need to be altered and the wooden passage would need to be
altered and relocated. The total cost is estimated at $239,105.
The estimated sum of the "architectural, legal and management fees" is $125,682 = ~ 53% of the
total estimated cost.

        Long Gallery. In order to create an accessible doorway, the masonry passage would need
to be widened and the finishes would need to be repaired and replicated. The total cost is
estimated at $149,784.
The estimated sum of the "architectural, legal and management fees" is $83,406 = ~ 56% of the
total estimated cost.

        Dutch Room. In order to create an accessible doorway, objects would need to be
temporarily removed and the interior finishes and wall fabric altered. The total cost is estimated at
$213,310.
The estimated sum of the "architectural, legal and management fees" is $119,715 = ~ 56% of the
total estimated cost.

        West Cloister. In order to create an accessible doorway, the masonry opening would need
to be disassembled and reconstructed, the deinstallation of a stone relief surround at the door, and
the possible relocation of an adjacent relief sculpture embedded in the south wall of the West
Cloister. The total cost is estimated at $163,348.
The estimated sum of the "architectural, legal and management fees" is $102,382 = ~63% of the
total estimated cost.

        McKnight Room. In order to create an accessible entry to the gallery, two doors will need
to be widened. The finishes surrounding both doors would need to be replicated Objects in the
wallspace adjacent to the gallery would need to be removed and relocated. The total cost is
estimated at $204,026.
The estimated sum of the "architectural, legal and management fees" is $107,559 = ~53% of the
total estimated cost.




                                                                                        page 5 of 6
Accessible Route Compliance for the Spanish Cloister, Chinese Loggia and Buddha Room.

The Variance states that lifts would be the least invasive, but would still require significant
changes, loss of historic features and "significant cost compared to the increase in accessibility."

Actually, the creation of accessible routes would increase accessibility 100% for people that
require accessible routes, so the applicants appear to be saying that they subjectively do not
consider it a valuable investment to allow people who require accessible routes into these spaces.

In addition, the Project has already integrated a complete re-build and re-installation for the
Buddha room. Therefore, we are requesting that the Accessible Route variance portions be
continued so that the applicants have an opportunity to consider more up-to-date, aesthetic, and
durable solutions for this as well as the linked Spanish Cloister access.

        Spanish Cloister. In order to create any access for people using wheeled mobility devices,
a platform and lift would be constructed at the north end of the Spanish Cloister, providing access
to the Chinese Loggia. Historic tile and finishes would be permanently covered in the Spanish
Cloister.
The total cost is estimated at $209,694.
The estimated sum of the "architectural, legal and management fees" is $96,271 = ~46% of the
total estimated cost.

        Buddha Room. In order to create any access for people using wheeled mobility devices, a
lift would be provided from the Chinese Loggia into the Buddha Room. "The lift would occupy a
footprint large enough that reinstallation of the gallery would not be feasible."
The total cost is estimated at $205,770.
The estimated sum of the "architectural, legal and management fees" is $95,930 = ~47% of the
total estimated cost.

Main Stairway - Making Handrails Compliant

This is the centerpiece stairway to the Palace Building, connecting the 1st through 3rd floors. The
handrails are currently marble handrail/guardrail on inner side and a brass handrail on outer side
and are each 2 inches or larger in diameter.

Since there is an existing elevator provided to the floors served by the stairway,
it seems reasonable to grant this portion of the variance request rather than alter the historic
fabric of the stairway.

However, the code specialists once again create the impression that "architectural, legal and
management fees" are an extra costing; rather than integrating these into the cost of doing
business, which is to create a world-class museum.
The total cost has been estimated at $95,966.
The estimated sum of the "architectural, legal and management fees" is $32,244 = ~34% of the
total estimated cost.



                                                                                         page 6 of 6

More Related Content

What's hot

Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansuKumar Snehansu
 
Comox Valley Community Presentation - June 2nd, 2015
Comox Valley Community Presentation - June 2nd, 2015Comox Valley Community Presentation - June 2nd, 2015
Comox Valley Community Presentation - June 2nd, 2015Island Health
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Prasad Thanthratey
 
Campbell River Community Information Meeting presentation March 12, 2015
Campbell River Community Information Meeting presentation March 12, 2015Campbell River Community Information Meeting presentation March 12, 2015
Campbell River Community Information Meeting presentation March 12, 2015Island Health
 
The Galleries 032116.1
The Galleries 032116.1The Galleries 032116.1
The Galleries 032116.1Stewart Cardon
 

What's hot (6)

Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansu
 
Comox Valley Community Presentation - June 2nd, 2015
Comox Valley Community Presentation - June 2nd, 2015Comox Valley Community Presentation - June 2nd, 2015
Comox Valley Community Presentation - June 2nd, 2015
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
Campbell River Community Information Meeting presentation March 12, 2015
Campbell River Community Information Meeting presentation March 12, 2015Campbell River Community Information Meeting presentation March 12, 2015
Campbell River Community Information Meeting presentation March 12, 2015
 
The Galleries 032116.1
The Galleries 032116.1The Galleries 032116.1
The Galleries 032116.1
 
54 Jeff Final Board
54 Jeff Final Board54 Jeff Final Board
54 Jeff Final Board
 

Similar to CAPS/BCIL Comments: Gardner Museum Project. Boston, MA

Carolina Basilis Spreads, MCH2022, Dominican Republic
Carolina Basilis Spreads, MCH2022, Dominican RepublicCarolina Basilis Spreads, MCH2022, Dominican Republic
Carolina Basilis Spreads, MCH2022, Dominican RepublicMCH
 
1st Presentation to ELC Building Committee
1st Presentation to ELC Building Committee1st Presentation to ELC Building Committee
1st Presentation to ELC Building CommitteeScott Greider
 
Anthology - A history of my education
Anthology - A history of my educationAnthology - A history of my education
Anthology - A history of my educationOren Yarbrough
 
Portfolio 2009
Portfolio 2009Portfolio 2009
Portfolio 2009Jessica_Wu
 
Unravelling Urban Design Project3 public artstrategy
Unravelling Urban Design Project3 public artstrategyUnravelling Urban Design Project3 public artstrategy
Unravelling Urban Design Project3 public artstrategyKa Long Bryan Wong
 
Jennifer Carlson Portfolio
Jennifer Carlson PortfolioJennifer Carlson Portfolio
Jennifer Carlson PortfolioJennifer Carlson
 
12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial Buildings12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial BuildingsSeventh Hill
 
ADAPTIVE REUSE_CASE STUDIES.pdf
ADAPTIVE REUSE_CASE STUDIES.pdfADAPTIVE REUSE_CASE STUDIES.pdf
ADAPTIVE REUSE_CASE STUDIES.pdfGeeva Chandana
 
MaryTran Charleston Internship Portfolio
MaryTran Charleston Internship PortfolioMaryTran Charleston Internship Portfolio
MaryTran Charleston Internship Portfoliomarytran86
 
Herzog & de meuron,
Herzog & de meuron,Herzog & de meuron,
Herzog & de meuron,AZad RK
 
dispensary theory
dispensary theory dispensary theory
dispensary theory HugoCopire1
 
HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015Steve Joel
 
Sainsbury center - truss structure
Sainsbury center - truss structureSainsbury center - truss structure
Sainsbury center - truss structureHusseinAzher
 
Jansen Meals Portfolio
Jansen Meals PortfolioJansen Meals Portfolio
Jansen Meals PortfolioJansen Meals
 
Noah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner
 
Interior Design Autum term -research
Interior Design Autum term -researchInterior Design Autum term -research
Interior Design Autum term -researchRuby Hooper
 

Similar to CAPS/BCIL Comments: Gardner Museum Project. Boston, MA (20)

Carolina Basilis Spreads, MCH2022, Dominican Republic
Carolina Basilis Spreads, MCH2022, Dominican RepublicCarolina Basilis Spreads, MCH2022, Dominican Republic
Carolina Basilis Spreads, MCH2022, Dominican Republic
 
Academic Portfolio
Academic PortfolioAcademic Portfolio
Academic Portfolio
 
1st Presentation to ELC Building Committee
1st Presentation to ELC Building Committee1st Presentation to ELC Building Committee
1st Presentation to ELC Building Committee
 
Anthology - A history of my education
Anthology - A history of my educationAnthology - A history of my education
Anthology - A history of my education
 
Portfolio 2009
Portfolio 2009Portfolio 2009
Portfolio 2009
 
Unravelling Urban Design Project3 public artstrategy
Unravelling Urban Design Project3 public artstrategyUnravelling Urban Design Project3 public artstrategy
Unravelling Urban Design Project3 public artstrategy
 
Jennifer Carlson Portfolio
Jennifer Carlson PortfolioJennifer Carlson Portfolio
Jennifer Carlson Portfolio
 
12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial Buildings12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial Buildings
 
ADAPTIVE REUSE_CASE STUDIES.pdf
ADAPTIVE REUSE_CASE STUDIES.pdfADAPTIVE REUSE_CASE STUDIES.pdf
ADAPTIVE REUSE_CASE STUDIES.pdf
 
MaryTran Charleston Internship Portfolio
MaryTran Charleston Internship PortfolioMaryTran Charleston Internship Portfolio
MaryTran Charleston Internship Portfolio
 
Herzog & de meuron,
Herzog & de meuron,Herzog & de meuron,
Herzog & de meuron,
 
dispensary theory
dispensary theory dispensary theory
dispensary theory
 
Y044165167
Y044165167Y044165167
Y044165167
 
portfolio TUdelft τελικο
portfolio TUdelft τελικοportfolio TUdelft τελικο
portfolio TUdelft τελικο
 
HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015HEA SE Bid - Appendix 2 - Design Report - October 2015
HEA SE Bid - Appendix 2 - Design Report - October 2015
 
Sainsbury center - truss structure
Sainsbury center - truss structureSainsbury center - truss structure
Sainsbury center - truss structure
 
Jansen Meals Portfolio
Jansen Meals PortfolioJansen Meals Portfolio
Jansen Meals Portfolio
 
Bernard Tshcumi
Bernard TshcumiBernard Tshcumi
Bernard Tshcumi
 
Noah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner Portfolio Sample
Noah Gardiner Portfolio Sample
 
Interior Design Autum term -research
Interior Design Autum term -researchInterior Design Autum term -research
Interior Design Autum term -research
 

More from eilily Community Access Project, Somerville

More from eilily Community Access Project, Somerville (20)

Somerville, MA 2012 FHWA #Disability Rights complaint smrdact Feldman
Somerville, MA 2012 FHWA #Disability Rights complaint smrdact FeldmanSomerville, MA 2012 FHWA #Disability Rights complaint smrdact Feldman
Somerville, MA 2012 FHWA #Disability Rights complaint smrdact Feldman
 
Feldman on MA 2013 Fair Housing AI
Feldman on MA 2013 Fair Housing AIFeldman on MA 2013 Fair Housing AI
Feldman on MA 2013 Fair Housing AI
 
Economics + Disability Nationwide 2012
Economics + Disability Nationwide 2012Economics + Disability Nationwide 2012
Economics + Disability Nationwide 2012
 
SNAPS +PwD in US 2012
SNAPS +PwD in US 2012SNAPS +PwD in US 2012
SNAPS +PwD in US 2012
 
#Maleg H97 Opposing Testimony Feldman 11:19:13
#Maleg H97 Opposing Testimony Feldman 11:19:13#Maleg H97 Opposing Testimony Feldman 11:19:13
#Maleg H97 Opposing Testimony Feldman 11:19:13
 
Boston Disability Commission Ltr to AG re: Remote Participation
Boston Disability Commission Ltr to AG re: Remote ParticipationBoston Disability Commission Ltr to AG re: Remote Participation
Boston Disability Commission Ltr to AG re: Remote Participation
 
AAB #C10 165 66-70 UnionSquare Somerville Update 9/2012
 AAB #C10 165 66-70 UnionSquare Somerville Update 9/2012 AAB #C10 165 66-70 UnionSquare Somerville Update 9/2012
AAB #C10 165 66-70 UnionSquare Somerville Update 9/2012
 
Feldman Testimony on MA Workforce Development + ADA H.136 Feldman
Feldman Testimony on MA Workforce Development + ADA H.136 FeldmanFeldman Testimony on MA Workforce Development + ADA H.136 Feldman
Feldman Testimony on MA Workforce Development + ADA H.136 Feldman
 
Somerville MA libraries Federal Settlement Agreement May 2013
Somerville MA libraries Federal Settlement Agreement May 2013Somerville MA libraries Federal Settlement Agreement May 2013
Somerville MA libraries Federal Settlement Agreement May 2013
 
Somerville libraries Voluntary Resolution Settlement May 2013
Somerville libraries Voluntary Resolution Settlement May 2013Somerville libraries Voluntary Resolution Settlement May 2013
Somerville libraries Voluntary Resolution Settlement May 2013
 
Koty public info ltr 9/24/08
Koty public info ltr 9/24/08Koty public info ltr 9/24/08
Koty public info ltr 9/24/08
 
AAB #C10 165 66-70 Union Square, Amended 2012
 AAB #C10 165 66-70 Union Square, Amended 2012 AAB #C10 165 66-70 Union Square, Amended 2012
AAB #C10 165 66-70 Union Square, Amended 2012
 
AAB Bldg complaint Somerville 66-70 Union Square
AAB Bldg complaint Somerville 66-70 Union SquareAAB Bldg complaint Somerville 66-70 Union Square
AAB Bldg complaint Somerville 66-70 Union Square
 
AAB parking lot complaint 66-70 Union Square, Somerville
AAB parking lot complaint 66-70 Union Square, SomervilleAAB parking lot complaint 66-70 Union Square, Somerville
AAB parking lot complaint 66-70 Union Square, Somerville
 
CAPS to AAB re: Armory Fine Abatement Decision
CAPS to AAB re: Armory Fine Abatement DecisionCAPS to AAB re: Armory Fine Abatement Decision
CAPS to AAB re: Armory Fine Abatement Decision
 
CAPS Somerville AAB #C10 264 Mtn4Reconsider
CAPS Somerville AAB #C10 264 Mtn4ReconsiderCAPS Somerville AAB #C10 264 Mtn4Reconsider
CAPS Somerville AAB #C10 264 Mtn4Reconsider
 
Feldman to City: Streetscape Access Plan needed
Feldman to City: Streetscape Access Plan neededFeldman to City: Streetscape Access Plan needed
Feldman to City: Streetscape Access Plan needed
 
AAB Armory decision April 11, 2012
AAB Armory decision April 11, 2012AAB Armory decision April 11, 2012
AAB Armory decision April 11, 2012
 
CAPS response to Somerville AAB plan-14 location remediation 2012
CAPS response to Somerville AAB plan-14 location remediation 2012CAPS response to Somerville AAB plan-14 location remediation 2012
CAPS response to Somerville AAB plan-14 location remediation 2012
 
Community Access Project re Wayne Apartments Project May 2012
Community Access Project re Wayne Apartments Project May 2012Community Access Project re Wayne Apartments Project May 2012
Community Access Project re Wayne Apartments Project May 2012
 

Recently uploaded

Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCollege Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCall girls in Ahmedabad High profile
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemenkfjstone13
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Ismail Fahmi
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsPooja Nehwal
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 

Recently uploaded (20)

Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service KolhapurCollege Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
College Call Girls Kolhapur Aanya 8617697112 Independent Escort Service Kolhapur
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 

CAPS/BCIL Comments: Gardner Museum Project. Boston, MA

  • 1. November 28, 2011 FROM: Boston Center For Independent Living & Community Access Project Karen Schneiderman, Senior Advocacy Specialist Eileen Feldman, Director 60 Temple Place P.O. Box 434 Boston, MA 02111 Somerville, MA 02143 TO: MA Architectural Access Board Thomas Hopkins, Executive Director Donald Lang, Chair One Ashburton Place - Room 1310 Boston, MA 02108 RE: Public Comments on Application for Variance, The Isabella Stewart Gardner Museum 280 the Fenway Boston, MA 02115 Dear AAB Board and Staff, The Boston Center for Independent Living and the Community Access Project have a partnership in reviewing, analyzing and providing comments and recommendations regarding architectural accessibility topics impacting the Greater Boston area. We submit the following comments regarding the Variance Application for the Isabella Stewart Gardner Museum, sent to MA AAB on July 21, 2011. The Museum seeks a variance during ongoing reconstruction and preservation work of the historic Palace Building in order to exempt them from creating useable access for people using wheeled mobility devices in eight rooms, plus the elevator serving first through third floors; plus, to keep the historic handrails on the Main stairwell, which also serves First through Third floors, as-is. 1. We ask that the variance regarding the Handrails for the Main Staircase (which serves the 1st through 3rd floors, as does the existing elevator) be granted. 2. We ask that the Accessible Route decisions regarding the Buddha Room and Spanish Cloister be continued, so that the architects can examine all possible solutions, including raising and reinstalling the original floor, to create at least one ramped entry into this room while there is still an opportunity (the already-planned complete rebuild/restoration of the Buddha Room1). Since these important sustainable design considerations may also affect a more durable and aesthetic solution for accessible route into the Spanish Cloister, we include that space for a continuance. 3. We ask that the Elevator and Doorway Width portions of this Variance be denied, since asking wheelchair users to re-position themselves into narrower wheelchairs in order to save money on widening and resetting doorways is about as competent as asking non-wheelchair users to re- 1 page 7, text of the application states, "In addition, the Buddha Room will be reconstructed to its original form." page 1 of 6
  • 2. position themselves in size 4 shoes prior to entering these six rooms. In addition, since the existing elevator is smaller than the minimal 48 by 48 inches standards required by some 21st century wheelchair models, this elevator's accessibility upgrade is a necessity to ensure access for a broader diversity of potential visitors and staff. 4. We ask that the AAB question why the applicants include • Gallery Preparation (climate control, packing of objects for storage during reconstruction work), • Security and Operations (allowing outside contractors to work within the Museum's public spaces), and • Reinstallation (reinstalling stored objects to the historic gallery spaces) as "additional" and "unique" costs in the application's pricing scheme, when applied to 21st Century Accessibility upgrades; yet, these normative costs were not considered additionally burdensome when applied to non- Accessibility-related renovations in the historic Palace, such as: ! relocating an art installation at the south end of the east cloister; ! fully reconstructing the Buddha Room to its original form; ! completing a decade-long restoration of the Tapestry Room; ! installing new period-style pendant fixtures and fiber optic lights to improve the lighting in the Tapestry room, Yellow Room and other historic galleries; and ! recovering and reinstalling artifacts and other materials to be displayed "in the historical perspective as originally intended." 5. We ask that the AAB question why the applicants tack on separate "architectural, legal and management fees," for each element requiring Accessibility upgrades. This increases the cost for these feasible renovations by 51%. Please see pages 5 and 6 for an element-by-element discussion of this questionable costing scheme. 6. We request a fuller understanding of why the Applicants and the MA Historical Commission director conceptualize certain Accessibility-related construction and renovation issues as the prohibitive "loss of historic features" within this "totally preserved" historic site, such as • moving and resetting the Tambour opening; • stockpiling and retoothing masonry; • reframing openings; • touch-up painting; and • rebuilding a jack arch while, at the same time, the original site has been enormously transformed without equivalent historic preservation-related cautions, including the following: ! removing a total of 12,000 cubic yards of dirt from the site during excavation; ! installing eight geothermal wells, reaching depths of 1,500 feet to provide energy efficient page 2 of 6
  • 3. heating and cooling in the new building; ! creating an entirely new building within 50 feet of the Palace; ! pouring 110 trucks-full of concrete to form the base of that new building's foundation; ! relocating the Museum's main entrance to Evans Way; and ! creating a new glass atrium entrance to wholly replace the original entrance in order to physically link the historic palace to the new facility. 7. Finally, we question the presumption that the current stakeholders have any more ability to discern the "original intent" of Ms. Gardner's will than we or anyone else does. • We note that Ms. Gardner's will created an endowment of $1 million for the preservation of the Museum's objects; but that the language does not appear to prohibit necessary structural improvements that will allow persons with disabilities to enjoy equitable and integrated access and opportunities, side by side, with nondisabled members of the general public. Ms. Gardner's will states, “I bequeath all my interest in the pictures, statuary, works of art, bric-a-brac, furniture, books and papers…in trust as a Museum for the education and enjoyment of the public forever.” – Will and Codicil of Isabella Stewart Gardner, 1924 • We note that Ms. Gardner's will also included "sizable bequests to the Massachusetts Society for the Prevention of Cruelty to Children, Industrial School for Crippled and Deformed Children, Animal Rescue League and Massachusetts Society for the Prevention of Cruelty to Animals."2 One of the writers of these comments is an alumnus of the "Industrial School for Crippled and Deformed Children"(renamed Cotting School). The "Industrial School for Crippled and Deformed Children" was founded during Ms. Gardner's lifetime (in 1893) as the nation's first day school for students with disabilities. We don't believe that the Museum's stakeholders, nor the Massachusetts historical Commission, has the capacity to presume to understand what Ms. Gardner's considerations would be today, when it is considered standard and legitimate practice to find solutions to design challenges so that people with disabilities are afforded non-discriminative, equal, integrated and usable built environments that are, at the very least, minimally compliant with accessibility regulations, such as 521 CMR, which has been enforced in Massachusetts since 1968. • We note that the applicant's have interpreted Ms. Gardner's will broadly enough to allow necessary modernizations of the building's mechanical, electrical and plumbing systems, and to install new lighting fixtures, and to create a wholly new entrance that is linked to a wholly new building; yet, regarding Accessibility upgrades, such as widening doorways to allow potential staff and visitors who use wheelchairs into 6 galleries, the interpretation narrows to disallow the 2 http://www.gardnermuseum.org/about/isabella_stewart_gardner page 3 of 6
  • 4. expansion of door widths in lieu of "alternate accessibility by way of museum-provided wheelchairs and staff assistance." Such concepts overlay a definition of dependency upon an entire class of individuals. This preserves the historic devaluation of people with disabilities as substandard individuals, rather than keeping pace with modernized 21st century human rights values and ideals. • We note the Mission Statement adopted by the Board of Trustees, 2000: Mission Statement The museum exercises cultural and civic leadership by nurturing a new generation of talent in the arts and humanities; by delivering the works of creators and performers to the public; and by reaching out to involve and serve its community. The collection is at the center of this effort as an inspiring encounter with beauty and art. Nothing in that statement tells us that the fullest inclusion and nurturance of the talents, enjoyment and employment of people with physical disabilities is outside of the scope of the Mission and goals of this world-class Museum and programs. • Finally, we note that, while there is extensive mastery involved in this Project from the start, this application was prepared by the Project's Code Consultants, who are noted experts in fire protection, fire prevention and fire incident forensics- but not Universal Design and Architectural Accessibility. We strongly encourage the applicants to invest in hiring master architects who have demonstrated knowledge in utilizing Universal Design and Architectural Accessibility principles and codes in order to create usability solutions in the Buddha room, Spanish Cloister and linked Courtyard passageways, and to check over the Project's existing designs at this time, when the Museum is closed to the entire public, so that this Project can enable people from all over the world with a diverse range of physical and sensory attributes to visit, work in, and learn from the Gardner Museum's offerings, without qualifications and exclusionary distinctions, for years to come. Thank you for your attention. Sincerely, Eileen Feldman, Community Access Project CAPSom@verizon.net and Karen Schneiderman, Boston Center for Independent Living KSchneiderman@bostoncil.org page 4 of 6
  • 5. Argument that it is "impracticable" includes "architectural, legal and management fees," which increase the costing estimate as follows: Elevator Project In order to enlarge the cab by 2 1/2", the existing cab will be removed. The total cost is estimated at $203,695. The estimated sum of the "architectural, legal and management fees" is $102,517 = ~ 50% of the total estimated cost. Widening 5 Doorways to 32" :Gothic Room, Long Gallery, Dutch Room, West Cloister, McKnight Room Gothic Room. In order to widen the door passage from elevator hall, the masonry opening and associated finishes would need to be altered and the wooden passage would need to be altered and relocated. The total cost is estimated at $239,105. The estimated sum of the "architectural, legal and management fees" is $125,682 = ~ 53% of the total estimated cost. Long Gallery. In order to create an accessible doorway, the masonry passage would need to be widened and the finishes would need to be repaired and replicated. The total cost is estimated at $149,784. The estimated sum of the "architectural, legal and management fees" is $83,406 = ~ 56% of the total estimated cost. Dutch Room. In order to create an accessible doorway, objects would need to be temporarily removed and the interior finishes and wall fabric altered. The total cost is estimated at $213,310. The estimated sum of the "architectural, legal and management fees" is $119,715 = ~ 56% of the total estimated cost. West Cloister. In order to create an accessible doorway, the masonry opening would need to be disassembled and reconstructed, the deinstallation of a stone relief surround at the door, and the possible relocation of an adjacent relief sculpture embedded in the south wall of the West Cloister. The total cost is estimated at $163,348. The estimated sum of the "architectural, legal and management fees" is $102,382 = ~63% of the total estimated cost. McKnight Room. In order to create an accessible entry to the gallery, two doors will need to be widened. The finishes surrounding both doors would need to be replicated Objects in the wallspace adjacent to the gallery would need to be removed and relocated. The total cost is estimated at $204,026. The estimated sum of the "architectural, legal and management fees" is $107,559 = ~53% of the total estimated cost. page 5 of 6
  • 6. Accessible Route Compliance for the Spanish Cloister, Chinese Loggia and Buddha Room. The Variance states that lifts would be the least invasive, but would still require significant changes, loss of historic features and "significant cost compared to the increase in accessibility." Actually, the creation of accessible routes would increase accessibility 100% for people that require accessible routes, so the applicants appear to be saying that they subjectively do not consider it a valuable investment to allow people who require accessible routes into these spaces. In addition, the Project has already integrated a complete re-build and re-installation for the Buddha room. Therefore, we are requesting that the Accessible Route variance portions be continued so that the applicants have an opportunity to consider more up-to-date, aesthetic, and durable solutions for this as well as the linked Spanish Cloister access. Spanish Cloister. In order to create any access for people using wheeled mobility devices, a platform and lift would be constructed at the north end of the Spanish Cloister, providing access to the Chinese Loggia. Historic tile and finishes would be permanently covered in the Spanish Cloister. The total cost is estimated at $209,694. The estimated sum of the "architectural, legal and management fees" is $96,271 = ~46% of the total estimated cost. Buddha Room. In order to create any access for people using wheeled mobility devices, a lift would be provided from the Chinese Loggia into the Buddha Room. "The lift would occupy a footprint large enough that reinstallation of the gallery would not be feasible." The total cost is estimated at $205,770. The estimated sum of the "architectural, legal and management fees" is $95,930 = ~47% of the total estimated cost. Main Stairway - Making Handrails Compliant This is the centerpiece stairway to the Palace Building, connecting the 1st through 3rd floors. The handrails are currently marble handrail/guardrail on inner side and a brass handrail on outer side and are each 2 inches or larger in diameter. Since there is an existing elevator provided to the floors served by the stairway, it seems reasonable to grant this portion of the variance request rather than alter the historic fabric of the stairway. However, the code specialists once again create the impression that "architectural, legal and management fees" are an extra costing; rather than integrating these into the cost of doing business, which is to create a world-class museum. The total cost has been estimated at $95,966. The estimated sum of the "architectural, legal and management fees" is $32,244 = ~34% of the total estimated cost. page 6 of 6