The document explores achieving grid parity for wave and tidal energy systems, targeting a cost of £75/MWh by 2030, which requires significant deployment and subsidies. It highlights that wave and tidal technologies must reach a cumulative installed capacity of 2GW and achieve a 12% learning rate on levels of energy cost (LCOE). Additionally, it discusses the necessary historical cost trajectories and innovations required for both sectors to meet this goal within the expected timeframe.