Introduction to Environmental
Impact Assessment
Dr.P. Venkateswara Rao
Fundamental Approach to
Environmental Impact Assessment (EIA)
BASIC CONCEPTS OF EIA :
โ€ข EIA is an activity designed to identify and predict the
impact of a project on bio-geo-physico-chemical
environment and on human health so as to
recommend appropriate legislative measures,
programs, and operational procedures to minimize
the impact.
BASIC CONCEPTS OF EIA
โ€ข EIA is an exercise to be carried out before any
project or major activity is undertaken to
ensure that it will not in any away harm the
environment on a short-term or long-term
basis.
โ€ข Any developmental activity requires EIA to be
done before executed to know the effect of a
proposed development on the environment.
EIA: Purpose
โ€ข To provide information for decision-making on
the environmental consequences of proposed
actions;
and
โ€ข To promote environmentally sound and
sustainable development through the
identification of appropriate enhancement
and mitigation measures.
Sustainable development
โ€˜development that meets the needs of todayโ€™s
generation without compromising those of
future generationsโ€™
Why EIA is important
โ€ข Reducing the burden of environmental impacts is
necessary if development is to become
sustainable.
โ€ข These impacts are more complex, larger in scale
and further reaching in their potential
consequences than thirty years ago when EIA was
first introduced.
โ€ข As a result, EIA has become of ever increasing
importance as a tool for development decision-
making.
Why EIA is important
โ€ข In practice, EIA is applied primarily to prevent
or minimise the adverse effects of major
development proposals, such as a power
station, dams and reservoirs, industrial
complexes, etc.
โ€ข This process is also used as a planning tool to
promote sustainable development by
integrating environmental considerations into
a wide range of proposed actions.
What are the aims and objectives of EIA?
The aims and objectives of EIA can be divided into two
categories.
โ€ข The immediate aim and ultimate (long term) aim
โ€ข The immediate aim of EIA is to inform the process of
decision-making by identifying the potentially significant
environmental effects and risks of development proposals.
โ€ข The ultimate (long term) aim of EIA is to promote
sustainable development by ensuring that development
proposals do not undermine critical resource and ecological
functions or the well being, lifestyle and livelihood of the
communities and peoples who depend on them.
Immediate objectives of EIA are
To
โ€ข improve the environmental design of the
proposal;
โ€ข ensure that resources are used appropriately and
efficiently;
โ€ข identify appropriate measures for mitigating the
potential impacts of the proposal; and
โ€ข facilitate informed decision making, including
setting the environmental terms and conditions
for implementing the proposal.
Long term objectives of EIA are
To:
โ€ข protect human health and safety;
โ€ข avoid irreversible changes and serious damage
to the environment;
โ€ข safeguard valued resources, natural areas and
ecosystem components;
and
โ€ข enhance the social aspects of the proposal.
Limitations of EIA
โ€ข EIA is also a way of ensuring that environmental factors are
considered in decision-making process along with the
traditional economic and technical factors.
โ€ข Importantly EIA requires the scientific (technical) and value
issues to be dealt with in a single assessment process.
โ€ข This helps in the proper consideration of all advantages and
disadvantages of a proposal.
โ€ข Environmental considerations may, therefore, be set aside in
favour of what are felt to be more important considerations.
โ€ข Alternatively, predicted adverse effects on the environment
might lead to strict conditions being imposed to avoid these
effects or remedy any adverse effects, or perhaps lead to the
complete abandonment of a proposal.
Limitations of EIA
โ€ข However, it is most important to recognise that EIA
cannot be regarded as a means of introducing an
environmental โ€œvetoโ€ power into administrative
decision-making processes.
โ€ข Decisions that are unsatisfactory from an
environmental point of view can still be made, but
with full knowledge of the environmental
consequences.
โ€ข The final decision about a proposal depends upon
the likely severity of the adverse effects, balanced
against other expected benefits.
Limitations of EIA
โ€ข In other words, EIA is an administrative process that identifies
the potential environmental effects of undertaking a proposal,
and presents these environmental effects alongside the other
advantages and disadvantages of the proposal to the decision-
makers.
โ€ข In the vast majority of EIA procedures this means that the
outcome of the EIA process provides advice to the decision-
makers โ€“ it does not provide a final decision.
โ€ข So, by itself, the EIA procedures cannot be expected to stop a
proposal โ€“ although this is an outcome that some members of
the general community and environment groups may expect.
Principles of EIA administration and practice
โ€ข EIA is one of a number of policy tools that are used to evaluate
project proposals.
โ€ข It is also a relatively recent development when compared to use of
economic appraisal methods.
โ€ข A number of factors led to the introduction of EIA in different
countries, including public concern about the quality of the
environment and the increasing effects of new technologies and
ever-larger development schemes.
โ€ข In addition, then available economic appraisal techniques, such as
benefit cost analysis, did not take account of the environmental and
social impacts of major projects.
โ€ข Today, EIA is applied in more than 100 countries, and by all
development banks and most international aid agencies.
โ€ข EIA has also evolved significantly, driven by improvements in law,
procedure and methodology.
Principles of EIA administration and practice
โ€ข To date, EIA has been applied primarily at the
project-level.
โ€ข This โ€˜first generationโ€™ process is now complemented
by SEA (Sustainable Environmental Assessment) of
policies, plans and programmes, and both EIA and
SEA are being adapted to bring a greater measure of
โ€˜sustainability assuranceโ€™ to development decision
making.
โ€ข These trends have brought new perspectives on
what constitutes EIA good practice and effective
performance.
Principles of EIA administration and practice
Three core values on which the EIA process is based:
โ€ข Integrityโ€“ the EIA process should meet
internationally accepted requirements and standards
of practice;
โ€ข Utilityโ€“ the EIA process should provide the
information which is sufficient and relevant for
decision-making; and
โ€ข Sustainabilityโ€“ the EIA process should result in the
implementation of environmental safeguards which
are sufficient to mitigate serious adverse effects and
avoid irreversible loss of resource and ecosystem
functions.
EIA process
โ€ข The particular components, stages and activities of an EIA
process will depend upon the requirements of the country or
donor.
โ€ข However, most EIA processes have a common structure
โ€ข The application of the main stages is a basic standard of good
practice.
โ€ข Typically, the EIA process begins with screening to ensure time
and resources are directed at the proposals that matter
environmentally.
โ€ข It should end with some form of follow up on the
implementation of the decisions and actions taken as a result
of an EIA report.
EIA process
EIA practice and outcomes
โ€ข screens out environmentally unsound projects;
โ€ข modifies the design of feasible proposals to reduce their
environmental impact;
โ€ข identifies the best practicable environmental option;
โ€ข predicts the significant adverse effects of proposals with
reasonable accuracy;
โ€ข identifies mitigation measures that work successfully to avoid,
reduce and offset major impacts;
โ€ข influences decision making and approvals and the
implementation of terms and conditions; and
โ€ข results in environmental gains and benefits relative to other
options.
Deficiencies of EIA practice
โ€ข Technical shortcomings, expressed by the poor quality of many EIA
reports. The accuracy of impact predictions, the utility of mitigation and
management measures, and the relevance of reports for decision-making
often fall short of internationally accepted standards.
โ€ข Procedural limitations, including inconsistencies in process administration
and guidance. Time delays and costs of applying EA remain a serious
concern for project proponents. Affected communities are more
concerned with the lack of quality control of EIA studies or enforcement of
mitigation measures.
โ€ข Structural issues, stemming from the application of EIA as a separate
process, unrelated to the project cycle or the larger context of decision
making.
โ€ข In order to be effective, EIA requires a coherent policy-planning
framework and systematic follow up procedures.
Costs and benefits of EIA
โ€ข Although there are costs associated with undertaking EIA,
experience has shown that the potential savings over the life
of a project can repay the investment many times over.
โ€ข The savings can be economic (e.g. identification of least cost
alternative) as well as environmental (e.g. impact reduction,
maintaining other resource use opportunities).
โ€ข Generally the earlier EIA process is introduced in the project
cycle, the greater the potential returns.
โ€ข When EIA is integrated into the project preparation phase,
environmental design considerations can be introduced in the
first place rather than the proposal having to be modified
later.
Costs and benefits of EIA
Benefits
โ€ข The benefits of EIA can be direct, such as the
improved design or location of a project, or indirect,
such as better quality EIA work or raised
environmental awareness of the personnel involved
in the project.
โ€ข In these cases, there will be with flow-on effects in
their future work. As mentioned above, these
potential gains from EIA increase the earlier the
process is applied in the design process.
Costs and benefits of EIA
In general the benefits of EIA include:
โ€ข Better environmental planning and design of a proposal. Carrying out an EIA entails
an analysis of alternatives in the design and location of projects. This can result in
the selection of an improved technology, which lowers waste outputs or an
environmentally optimum location for a project. A well-designed project can
minimise risks and impacts on the environment and people, and thereby avoid
associated costs of remedial treatment or compensation for damage.
โ€ข Ensuring compliance with environmental standards. Compliance with
environmental standards reduces damage to the environment and disruption to
communities. It also avoids the likelihood of penalties, fines and loss of trust and
credibility.
โ€ข Savings in capital and operating costs. EIA can avoid the undue costs of
unanticipated impacts. These can escalate if environmental problems have not
been considered from the start of proposal design and require rectification later.
An โ€˜anticipate and avoidโ€™ approach is much cheaper than โ€˜react and cureโ€™.
Generally, changes which must be made late in the project cycle are the most
expensive.
โ€ข Reduced time and costs of approvals of development applications. If all
environmental concerns have been taken into account properly before submission
for project approval, then it is unlikely that delays will occur as a result of decision-
makers asking for additional information or alterations to mitigation measures.
Increased project acceptance by the public.
Costs and benefits of EIA
Costs
โ€ข It can be difficult to determine the exact costs of an EIA
because major projects typically require a large number of
investigations and reports, often for closely related purposes
(e.g. engineering feasibility studies of hydrology and surface
materials).
โ€ข The World Bank notes that the cost of preparing an EIA rarely
exceeds one per cent of the project costs and this percentage
can be reduced further if local personnel are used to do most
of the work.
โ€ข For Bank projects, the relative cost of an EIA typically ranges
from only 0.06 per cent to 0.10 per cent of total project costs.
โ€ข The total cost of an EIA might range from a few thousand
dollars for a very small project, to over a million dollars for a
large and complex project, which has a significant
environmental impact and requires extensive data collection
and analysis.
Costs and benefits of EIA
Costs
Although many proponents complain that EIA
causes excessive delays in projects, many of
these are caused by poor administration of the
process rather than by the process itself.
These occur when:
โ€“ the EIA is commenced too late in the project cycle;
โ€“ the terms of reference are poorly drafted;.
โ€“ the EIA is not managed to a schedule;
โ€“ the technical and consultative components of EIA are inadequate; and
โ€“ the EIA report is incomplete or deficient as a basis for decision making.
Thank you

More Related Content

What's hot

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentShubhranshu Upadhyay
ย 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
ย 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSayyid Ina
ย 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodologyJustin Joy
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
ย 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationMizanur R. Shohel
ย 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrateek Bansal
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
ย 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsiShashi Shekar
ย 
Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)S.Shafiqur Rehman
ย 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaMizanur R. Shohel
ย 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureKANTHARAJAN GANESAN
ย 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)SANDEEP PATRE
ย 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
ย 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Arvind Kumar
ย 

What's hot (20)

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
ย 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
ย 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
ย 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
ย 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigration
ย 
Iee
IeeIee
Iee
ย 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
ย 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
ย 
What is eia
What is eiaWhat is eia
What is eia
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
ย 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsi
ย 
Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)
ย 
EIA
EIAEIA
EIA
ย 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
ย 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
ย 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
ย 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
ย 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
ย 

Similar to eia.ppt

Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentNasiru Ibrahim Barda
ย 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
ย 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
ย 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAikinsOsei1
ย 
3rd EIA Law, Policy and Institutional Arrangements.pptx
3rd EIA Law, Policy and Institutional Arrangements.pptx3rd EIA Law, Policy and Institutional Arrangements.pptx
3rd EIA Law, Policy and Institutional Arrangements.pptxAbdiwali Abdullahi
ย 
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)HNaliniNirala
ย 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
ย 
Environmental_impact_assessment_EIA.pptx
Environmental_impact_assessment_EIA.pptxEnvironmental_impact_assessment_EIA.pptx
Environmental_impact_assessment_EIA.pptxMohamedSherbiny7
ย 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13Adilah Anuar
ย 
UNIT โ€“ I ptpg final (2).ppt
UNIT โ€“ I ptpg final (2).pptUNIT โ€“ I ptpg final (2).ppt
UNIT โ€“ I ptpg final (2).pptkrpnath1
ย 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfssusereef268
ย 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
ย 
SEA.pptx
SEA.pptxSEA.pptx
SEA.pptxQuasid
ย 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfChandanLawrence
ย 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
ย 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
ย 

Similar to eia.ppt (20)

Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
ย 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
ย 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
ย 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
ย 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of Ghana
ย 
EIA process
EIA processEIA process
EIA process
ย 
3rd EIA Law, Policy and Institutional Arrangements.pptx
3rd EIA Law, Policy and Institutional Arrangements.pptx3rd EIA Law, Policy and Institutional Arrangements.pptx
3rd EIA Law, Policy and Institutional Arrangements.pptx
ย 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
ย 
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
ย 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
ย 
Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment
ย 
Environmental_impact_assessment_EIA.pptx
Environmental_impact_assessment_EIA.pptxEnvironmental_impact_assessment_EIA.pptx
Environmental_impact_assessment_EIA.pptx
ย 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
ย 
UNIT โ€“ I ptpg final (2).ppt
UNIT โ€“ I ptpg final (2).pptUNIT โ€“ I ptpg final (2).ppt
UNIT โ€“ I ptpg final (2).ppt
ย 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdf
ย 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
ย 
SEA.pptx
SEA.pptxSEA.pptx
SEA.pptx
ย 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
ย 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
ย 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
ย 

Recently uploaded

Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Bookingtanu pandey
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
ย 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...tanu pandey
ย 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
ย 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
ย 
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...kauryashika82
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
ย 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...SUHANI PANDEY
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
ย 

Recently uploaded (20)

Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
ย 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
ย 

eia.ppt

  • 1. Introduction to Environmental Impact Assessment Dr.P. Venkateswara Rao
  • 2. Fundamental Approach to Environmental Impact Assessment (EIA) BASIC CONCEPTS OF EIA : โ€ข EIA is an activity designed to identify and predict the impact of a project on bio-geo-physico-chemical environment and on human health so as to recommend appropriate legislative measures, programs, and operational procedures to minimize the impact.
  • 3. BASIC CONCEPTS OF EIA โ€ข EIA is an exercise to be carried out before any project or major activity is undertaken to ensure that it will not in any away harm the environment on a short-term or long-term basis. โ€ข Any developmental activity requires EIA to be done before executed to know the effect of a proposed development on the environment.
  • 4. EIA: Purpose โ€ข To provide information for decision-making on the environmental consequences of proposed actions; and โ€ข To promote environmentally sound and sustainable development through the identification of appropriate enhancement and mitigation measures.
  • 5. Sustainable development โ€˜development that meets the needs of todayโ€™s generation without compromising those of future generationsโ€™
  • 6. Why EIA is important โ€ข Reducing the burden of environmental impacts is necessary if development is to become sustainable. โ€ข These impacts are more complex, larger in scale and further reaching in their potential consequences than thirty years ago when EIA was first introduced. โ€ข As a result, EIA has become of ever increasing importance as a tool for development decision- making.
  • 7. Why EIA is important โ€ข In practice, EIA is applied primarily to prevent or minimise the adverse effects of major development proposals, such as a power station, dams and reservoirs, industrial complexes, etc. โ€ข This process is also used as a planning tool to promote sustainable development by integrating environmental considerations into a wide range of proposed actions.
  • 8. What are the aims and objectives of EIA? The aims and objectives of EIA can be divided into two categories. โ€ข The immediate aim and ultimate (long term) aim โ€ข The immediate aim of EIA is to inform the process of decision-making by identifying the potentially significant environmental effects and risks of development proposals. โ€ข The ultimate (long term) aim of EIA is to promote sustainable development by ensuring that development proposals do not undermine critical resource and ecological functions or the well being, lifestyle and livelihood of the communities and peoples who depend on them.
  • 9. Immediate objectives of EIA are To โ€ข improve the environmental design of the proposal; โ€ข ensure that resources are used appropriately and efficiently; โ€ข identify appropriate measures for mitigating the potential impacts of the proposal; and โ€ข facilitate informed decision making, including setting the environmental terms and conditions for implementing the proposal.
  • 10. Long term objectives of EIA are To: โ€ข protect human health and safety; โ€ข avoid irreversible changes and serious damage to the environment; โ€ข safeguard valued resources, natural areas and ecosystem components; and โ€ข enhance the social aspects of the proposal.
  • 11. Limitations of EIA โ€ข EIA is also a way of ensuring that environmental factors are considered in decision-making process along with the traditional economic and technical factors. โ€ข Importantly EIA requires the scientific (technical) and value issues to be dealt with in a single assessment process. โ€ข This helps in the proper consideration of all advantages and disadvantages of a proposal. โ€ข Environmental considerations may, therefore, be set aside in favour of what are felt to be more important considerations. โ€ข Alternatively, predicted adverse effects on the environment might lead to strict conditions being imposed to avoid these effects or remedy any adverse effects, or perhaps lead to the complete abandonment of a proposal.
  • 12. Limitations of EIA โ€ข However, it is most important to recognise that EIA cannot be regarded as a means of introducing an environmental โ€œvetoโ€ power into administrative decision-making processes. โ€ข Decisions that are unsatisfactory from an environmental point of view can still be made, but with full knowledge of the environmental consequences. โ€ข The final decision about a proposal depends upon the likely severity of the adverse effects, balanced against other expected benefits.
  • 13. Limitations of EIA โ€ข In other words, EIA is an administrative process that identifies the potential environmental effects of undertaking a proposal, and presents these environmental effects alongside the other advantages and disadvantages of the proposal to the decision- makers. โ€ข In the vast majority of EIA procedures this means that the outcome of the EIA process provides advice to the decision- makers โ€“ it does not provide a final decision. โ€ข So, by itself, the EIA procedures cannot be expected to stop a proposal โ€“ although this is an outcome that some members of the general community and environment groups may expect.
  • 14. Principles of EIA administration and practice โ€ข EIA is one of a number of policy tools that are used to evaluate project proposals. โ€ข It is also a relatively recent development when compared to use of economic appraisal methods. โ€ข A number of factors led to the introduction of EIA in different countries, including public concern about the quality of the environment and the increasing effects of new technologies and ever-larger development schemes. โ€ข In addition, then available economic appraisal techniques, such as benefit cost analysis, did not take account of the environmental and social impacts of major projects. โ€ข Today, EIA is applied in more than 100 countries, and by all development banks and most international aid agencies. โ€ข EIA has also evolved significantly, driven by improvements in law, procedure and methodology.
  • 15.
  • 16. Principles of EIA administration and practice โ€ข To date, EIA has been applied primarily at the project-level. โ€ข This โ€˜first generationโ€™ process is now complemented by SEA (Sustainable Environmental Assessment) of policies, plans and programmes, and both EIA and SEA are being adapted to bring a greater measure of โ€˜sustainability assuranceโ€™ to development decision making. โ€ข These trends have brought new perspectives on what constitutes EIA good practice and effective performance.
  • 17. Principles of EIA administration and practice Three core values on which the EIA process is based: โ€ข Integrityโ€“ the EIA process should meet internationally accepted requirements and standards of practice; โ€ข Utilityโ€“ the EIA process should provide the information which is sufficient and relevant for decision-making; and โ€ข Sustainabilityโ€“ the EIA process should result in the implementation of environmental safeguards which are sufficient to mitigate serious adverse effects and avoid irreversible loss of resource and ecosystem functions.
  • 18.
  • 19. EIA process โ€ข The particular components, stages and activities of an EIA process will depend upon the requirements of the country or donor. โ€ข However, most EIA processes have a common structure โ€ข The application of the main stages is a basic standard of good practice. โ€ข Typically, the EIA process begins with screening to ensure time and resources are directed at the proposals that matter environmentally. โ€ข It should end with some form of follow up on the implementation of the decisions and actions taken as a result of an EIA report.
  • 21. EIA practice and outcomes โ€ข screens out environmentally unsound projects; โ€ข modifies the design of feasible proposals to reduce their environmental impact; โ€ข identifies the best practicable environmental option; โ€ข predicts the significant adverse effects of proposals with reasonable accuracy; โ€ข identifies mitigation measures that work successfully to avoid, reduce and offset major impacts; โ€ข influences decision making and approvals and the implementation of terms and conditions; and โ€ข results in environmental gains and benefits relative to other options.
  • 22. Deficiencies of EIA practice โ€ข Technical shortcomings, expressed by the poor quality of many EIA reports. The accuracy of impact predictions, the utility of mitigation and management measures, and the relevance of reports for decision-making often fall short of internationally accepted standards. โ€ข Procedural limitations, including inconsistencies in process administration and guidance. Time delays and costs of applying EA remain a serious concern for project proponents. Affected communities are more concerned with the lack of quality control of EIA studies or enforcement of mitigation measures. โ€ข Structural issues, stemming from the application of EIA as a separate process, unrelated to the project cycle or the larger context of decision making. โ€ข In order to be effective, EIA requires a coherent policy-planning framework and systematic follow up procedures.
  • 23. Costs and benefits of EIA โ€ข Although there are costs associated with undertaking EIA, experience has shown that the potential savings over the life of a project can repay the investment many times over. โ€ข The savings can be economic (e.g. identification of least cost alternative) as well as environmental (e.g. impact reduction, maintaining other resource use opportunities). โ€ข Generally the earlier EIA process is introduced in the project cycle, the greater the potential returns. โ€ข When EIA is integrated into the project preparation phase, environmental design considerations can be introduced in the first place rather than the proposal having to be modified later.
  • 24. Costs and benefits of EIA Benefits โ€ข The benefits of EIA can be direct, such as the improved design or location of a project, or indirect, such as better quality EIA work or raised environmental awareness of the personnel involved in the project. โ€ข In these cases, there will be with flow-on effects in their future work. As mentioned above, these potential gains from EIA increase the earlier the process is applied in the design process.
  • 25. Costs and benefits of EIA In general the benefits of EIA include: โ€ข Better environmental planning and design of a proposal. Carrying out an EIA entails an analysis of alternatives in the design and location of projects. This can result in the selection of an improved technology, which lowers waste outputs or an environmentally optimum location for a project. A well-designed project can minimise risks and impacts on the environment and people, and thereby avoid associated costs of remedial treatment or compensation for damage. โ€ข Ensuring compliance with environmental standards. Compliance with environmental standards reduces damage to the environment and disruption to communities. It also avoids the likelihood of penalties, fines and loss of trust and credibility. โ€ข Savings in capital and operating costs. EIA can avoid the undue costs of unanticipated impacts. These can escalate if environmental problems have not been considered from the start of proposal design and require rectification later. An โ€˜anticipate and avoidโ€™ approach is much cheaper than โ€˜react and cureโ€™. Generally, changes which must be made late in the project cycle are the most expensive. โ€ข Reduced time and costs of approvals of development applications. If all environmental concerns have been taken into account properly before submission for project approval, then it is unlikely that delays will occur as a result of decision- makers asking for additional information or alterations to mitigation measures. Increased project acceptance by the public.
  • 26. Costs and benefits of EIA Costs โ€ข It can be difficult to determine the exact costs of an EIA because major projects typically require a large number of investigations and reports, often for closely related purposes (e.g. engineering feasibility studies of hydrology and surface materials). โ€ข The World Bank notes that the cost of preparing an EIA rarely exceeds one per cent of the project costs and this percentage can be reduced further if local personnel are used to do most of the work. โ€ข For Bank projects, the relative cost of an EIA typically ranges from only 0.06 per cent to 0.10 per cent of total project costs. โ€ข The total cost of an EIA might range from a few thousand dollars for a very small project, to over a million dollars for a large and complex project, which has a significant environmental impact and requires extensive data collection and analysis.
  • 27. Costs and benefits of EIA Costs Although many proponents complain that EIA causes excessive delays in projects, many of these are caused by poor administration of the process rather than by the process itself. These occur when: โ€“ the EIA is commenced too late in the project cycle; โ€“ the terms of reference are poorly drafted;. โ€“ the EIA is not managed to a schedule; โ€“ the technical and consultative components of EIA are inadequate; and โ€“ the EIA report is incomplete or deficient as a basis for decision making.