Wildpoldsreid
• Make twice as much energy as you need
• Clever Energy
– How?
• Work together
• http://www.youtube.com/watch?v=Tzc77Lqkl
dk (aa1)
(c) My Power Station Technology 2013 2
Wildpoldsreid
• A city wide learning centre that makes the
citizens money and helps everyone
understand the technology and its social
impact
• Storage
– Hydrogen (H) + CO2 = Methane CH4 & Oxygen
(c) My Power Station Technology 2013 3
Work Smarter
• Smarter Grid
• Distributed Storage
• Active Participation
• http://www.youtube.com/watch?v=5_J97qpF
0I4 (aa2)
(c) My Power Station Technology 2013 4
Introduction
Setting the context
Developing the framework for a Virtual Power Station
Systems Thinking
(c) My Power Station Technology 2013 5
Virtual Power Station
• Power Station (Plant): Producing electricity
(and heat)
• Virtual: Simulated(not in one place)
• Power Station
– Centralised
• Virtual Power Station
– Decentralised; integrated; smart
(c) My Power Station Technology 2013 6
© Orbital Renewable Energy
2009
Power Supply Today: A Few Power Plants For Many Users
Downsides:
Use of un-renewable resources
Air pollution
Ozone hole
Global warming
More natural disasters
Health risks
Loss of life quality
Dependence on OPEC,
governments and corporations
Nuclear danger
Nuclear waste
High costs for governments
and end-users due to results of
natures’ abuse
© Orbital Renewable Energy
2009
Power Supply Tomorrow: Many Private Power Producers
Benefits:
Use of renewable resources
No air pollution
Turn around of global warming
Healing of the planet
Creating a future
No health risks
Enhancement of life quality
No dependence on OPEC,
governments & corporations
No nuclear danger
No nuclear waste
Affordable, healthy and
environmentally friendly
energy for everybody,
everywhere
My Power Station
• My Power Station helps you power your life,
internally and externally
• Software, Energy, Power
• Internal Energy
– What keeps us going internally
– Sport, Exercise, Learning, Health, Family
– Power comes from sharing, trusting and working
together
• External Energy
– External inputs to ourselves; Money, Work, Jobs(c) My Power Station Technology 2013 9
Eskom 49m Energy Saving Campaign
(c) My Power Station Technology 2013 10
Why are you here?
• What would you like to get out of this
workshop?
• Why?
(c) My Power Station Technology 2013 11
Why I’m here
• I’d like you to leave here with the essential
toolset to convince yourself and your board of
directors and customers of the possibility of
solving our electricity crisis
– And reducing our cost of living
• For ourselves
• For our home, planet earth
– And making money and profits, sustainably
• What electricity crisis?
(c) My Power Station Technology 2013 12
We’re in trouble!!
• South Africa
– No new base load power station build in the past
20 years
– vs: China: >1 GW per week added to their grid!!!
– China installed 18 GW of Wind in 2011; 40 GW
was installed worldwide. Zero in South Africa
– By end of 2012, China had 75.5 GW of Wind
(growing 80% per annum since 2007)
– In 2012 China produced more wind energy (100
TWh) than Nuclear (98 TWh)
(c) My Power Station Technology 2013 13
We’re in trouble!!
• Can you see where South Africa’s going?
• New Coal Power Stations: only 10 GW
– Electricity is already sold!!
– 10.5 GW will be decommissioned in 2020’s
(c) My Power Station Technology 2013 14
Electricity Build and
Decommissioning
(c) My Power Station Technology 2013 15
From White Paper on Renewable Energy, 2003
2008 Load Shedding
Spare Capacity
Money
• Existing or New?
• Can’t we use existing money to finance our
new build?
(c) My Power Station Technology 2013 16
News on 15th May 2012
• “Work to begin on 68km R5.2 billion in Nov
2012 (R5,200,000,000) railway line to supply
Majuba Power Station with 14 million tons of
Coal per annum” (Actual Start March 2013?)
– http://www.engineeringnews.co.za/article/work-on-r52bn-majuba-rail-line-to-begin-in-
nov-eskom-2012-05-14
• R100 billion being spent on new coal mines
• At least R2 Trillion on New Power Stations
– & R166 bn on The Grid (Eskom Transmission Plan)
• 5,000 x 1,200 kWh per month houses can be
permanently “removed” from the grid per R1bn, so
R2 Trillion is at least 10 million houses
(c) My Power Station Technology 2013 17
What happened at Majuba?
• Majuba built in 1980’s. Majuba coal mine had
certain geological deficiencies, so coal is
trucked in from up to 68 km away.
(c) My Power Station Technology 2013 18
Photo from Bloomberg
BRICS
Brazil, Russia, India, China, South Africa
• Page 69: NPC Report (Nov 2011): “Brazil, China, India, Indonesia, South
Korea and Russia will account for more than half of all global growth,
growing by an average of 4.7% a year to 2025, by which time their share of
global GDP will have grown from 36% to 45%.”
– My Comment: [It is time for South Africa and Africa to
shed its association with its colonial masters, England,
France, Germany, Portugal, Spain, and the USA, which are
part of the dying Western Empire, and change to a much
closer association with the Asian Tigers, BRICS (China
(9.5%)), Indonesia, South Korea, and of-course the African
Tigers: Ghana (13.5%)(2nd highest), Mozambique (7.2%),
Ethiopia (7.5%), Nigeria (6.9%), Botswana (6.2%), South Africa
(3.4%). 36 Africa countries growing faster than the RSA.
– Qatar (18.7%), India (7.8%), Russia (4.3%), Brazil (2.8%), Germany
(2.7%), USA (1.5%), UK (1.1%), Portugal (-2-2%), Greece (-6%)]
– Growth rates in % are net growth after inflation.
(c) My Power Station Technology 2013 19
China’s 12th 5-year plan tabled in 2011
• “Has a striking change from the past”
• “From
– A focus on investment-driven, high energy and
low-cost manufacturing”
• “To
– Low-carbon industries, new energy, next
generation information technology and high-end
manufacturing
– China’s goal is to achieve 15% global share of
these industries, compared with 3% now (in 2011)”
(c) My Power Station Technology 2013 20
South Africa is still stuck here!
Note that the Chinese quote comes from
the NPC document! Page 69, NPC Plan 2020
Money will be borrowed
• Reason for the BRICS Development Bank!
• The BRIC will lend money to the S!
• The BRIC needs South Africa’s resources
• A no-brainer for them
• But the resource curse for us:
– The resource curse (Paradox of Plenty) refers to the paradox that countries
and regions with an abundance of natural resources, specifically point-source
non-renewable resources like minerals and fuels, tend to have less economic
growth and worse development outcomes than countries with fewer natural
resources.
– https://en.wikipedia.org/wiki/Resource_curse
(c) My Power Station Technology 2013 21
News on 28th March 2012; and 27th March 2013
• President Jacob Zuma at the BRICS conference
seeking R1 trillion for the next 20 years
infrastructure expansion program
• Other BRICS countries growing at 10% per
annum after inflation; SA at 2%
– 10% + 5% inflation = R450 billion this year!
• Does government need to borrow this R1
trillion with us citizens (and countryside) as surety?
– 1 million new jobs; R1,000,000 debt per job!
– 50 mil to 57 mil people by 2020: need 3.15 mil jobs!
• Is there a better way? Using VPS Ideas?
(c) My Power Station Technology 2013 22
R1 bn = 5,000 houses(VPS & Jobs)
• What is R1 bn anyway?
– Electrify 5,000 * 1,200 kWh per month houses
– 5,000 Smart Electricity Meters
– 5,000 inverters
– 5,000 solar water heaters
– 200,000 solar panels (Photovoltaic PV)
– Circuit Breakers; Cable; Fuses; Grounding Rods
– People
• 250 installers per year for the PV
– 25,000 installers employed for at least 20 years for entire country
• Manufacturers; designers; support people; etc
(c) My Power Station Technology 2013 23
And
Only govt loan guarantees are required
– Supported by the Trevor Manuel and National
Planning Commission (NPC Plan 2030)
No subsidies
No government borrowing
No new regulations, in fact deregulation is
required
And best of all:
– Electricity plus People plus Resources enables:
• Clean Economic GROWTH -> more money for govt
• Massive Employment
(c) My Power Station Technology 2013 24
“Breaking the Code of History”
• Eskom have said (email) that they “will
support private people working together to
look like a big customer to Eskom.” This
customer can be called a Virtual Power
Station.
• For fast growth, an economy needs:
• By David Murrin in “Breaking the Code of History” book
– Population Growth
– Resources
– Electricity
– South Africa has the first two, but the 3rd is
stagnant (c) My Power Station Technology 2013 25
Our Environment: GDP
• World GDP Growth
(c) My Power Station Technology 2013 26
Our Environment: Wind
(c) My Power Station Technology 2013 27
In 2011 Capacity Installed: China 18GW; Doubled every year 2005 to 2009;
Total Installed Wind Capacity Worldwide in 2011: 41,000 MW!
World Wide Wind Total Installed Capacity: 238,000 MW (238 GW)
Our Environment
• Photovoltaic (PV) Production
(c) My Power Station Technology 2013 28
Video
We Live in Exponential Times
• 5 minutes
• http://www.youtube.com/watch?v=lUMf7FW
GdCw
• This exponential growth depends on
exponential availability of inexpensive
electricity
– For reference: watch later
(c) My Power Station Technology 2013 29
The Virtual Power Station / Plant
• "Virtual power plants represent an ‘Internet of Energy,’" says senior
analyst Peter Asmus of Pike Research. "These systems tap existing grid
networks to tailor electricity supply and demand services for a customer.
VPPs maximize value for both the end user and the distribution utility
using a sophisticated set of software-based systems. They are dynamic,
deliver value in real time, and can react quickly to changing customer load
conditions.”
– http://en.wikipedia.org/wiki/Virtual_power_plant
• Estimated growth $5.2 billion worldwide in 2010 to between $7.4 billion
and $12.7 billion by 2015
• IT + ET = EI (Information Technology + Energy Tech = Energy Internet)
– Thomas Friedman, in Hot, Flat and Crowded (pg 224 onwards)
(c) My Power Station Technology 2013 30
The Smart Grid
• vs The Dumb Grid
– Doesn’t know what its customers are doing and
when they will need something
– Uses historical information gathering
• The Grid interacts with its stakeholders
– “knows” the future
• Re customers
• Re suppliers
• Re pricing
(c) My Power Station Technology 2013 31
Systems Thinking
• What exactly is a system? A system is a group
of interacting, interrelated, and
interdependent components that form a
complex and unified whole
– http://www.pegasuscom.com/systems-thinking.html
• We need to consider the big picture, not just
parts of it
(c) My Power Station Technology 2013 32
Video: A bigger System
• a: Amory Lovins: a new fire (first 5 mins of 27)
– We can watch more later in the day if there is time
– Video available on TED
• http://www.ted.com/talks/amory_lovins_a_50_year_pl
an_for_energy.html
(c) My Power Station Technology 2013 33
What benefits do big electricity
users get?
(c) My Power Station Technology 2013 34
What benefits do big electricity
users get?
• Member of Electricity Intensive User Group
• High Level Meetings with Eskom
• Involved in Daily Eskom Scheduling
• Time of Use Tariffs
• ESCO Rebates; Demand Response
• Lower Electricity Charges
• Ability to export energy to the grid (Mondi)
• They are taken seriously by Eskom. They have
power (c) My Power Station Technology 2013 35
How can these benefits be made
available to small / all electricity
users?
(c) My Power Station Technology 2013 36
How can these benefits be made
available to small / all electricity
users?
• Build a Virtual Power Station
– a cluster of small users which looks like a big
customer to Eskom
• The Nine Dots Model
– Solving the “Reverse Feed Problem”
– EV’s to “soak up” excess production and to
provide electricity at peak time
(c) My Power Station Technology 2013 37
Virtual Power Station Videos
b: conEdison Smart Grid 5 mins
http://youtu.be/QPWCCz_OTGU
c: GE 8 mins (perhaps later)
http://youtu.be/ztw3aYLX4_U
d: Duke 4 mins
http://youtu.be/E1Jrdt1OV8s
(c) My Power Station Technology 2013 38
End of Introduction
Beginning of Technologies
(c) My Power Station Technology 2013 39
Our workshop
• Looking at electricity as the core missing
enabler to get our economy moving
• What tools do we need?
• What types of technologies are available?
• How can benefits that big business get be
made available to small business?
(c) My Power Station Technology 2013 40
Riaan Smit
@ Wind Energy Conference, Cape Town, Tuesday 29th May 2012
• South Africa needs a
– “New Future Vision”
• Riaan is Chief Engineer in National Planning at Eskom
(c) My Power Station Technology 2013 41
Thinking Differently
• Should we think differently?
– Do we need cars? How many? What sort? Can
they be shared?
– Do people need to go to work or can they
telework?
– Should our systems stay centralised or can they be
decentralised?
– How would we design the system if there was no
coal or nuclear energy?
(c) My Power Station Technology 2013 42
Our problems
• Everything going UP
• Government taxing infrastructure instead of
growing the economy and getting money from
taxation
• Infrastructure
– Electricity; water; rates; fuel taxes; transport
– E-tolls; carbon taxes; electricity levies
– Exporting raw materials; importing finished goods
• Bad balance of payments / rand depreciation / inflation
(c) My Power Station Technology 2013 43
Petrol Price Increases since 2002
(c) My Power Station Technology 2013 44
Petrol price at pump; Oil = Rand $ in January each year * Brent Crude Converted to litres
Buying and Producing Electricity
Graph in Rand per kwh ex VAT
(c) My Power Station Technology 2013
Government’s Problem
• Get’s large amounts of revenue from
electricity generation
• Electricity makes a loss at peak time
– Eg Ankerlig: R4 to R13 per kWh
– Eg City of Cape Town Peak Demand: 72c (to R2.47)
per kWh + Demand Charge
– Means all Eskom’s rebates are based on removing
peak load so that they can be more profitable
– PV doesn’t fit into this! Or does it?
(c) My Power Station Technology 2013 46
Ankerlig
• Near Atlantis
• 9 x 150 MW Combined Cycle Turbines
– Can use Diesel or gas; currently diesel
• 25,000 litres of diesel per minute
– X 60 minutes * R12 per litre = R18 million per hour
• R18 million / 1,350,000 MW
• = R13 per kWh!
(c) My Power Station Technology 2013 47
Photo: ESBi Engineering
What knowledge do you have?
• Technical Terms
• Quick Recap?
(c) My Power Station Technology 2013 48
This is what a Renewable Energy
System (without batteries) Looks Like …
(c) My Power Station Technology 2013 49
PV Array
Combiner
Box
Grid Tie Inverter
DB Board
Mains
Utility
[Schematic excludes Grounding Systems; DC & AC Disconnect; Fuses; etc.]
Start here …
The grid is the “battery” (backup)
Eskom say Grid Tie is unsafe because
what if there is load shedding or if the
grid is switched off?
Anti-Islanding
• Used when the grid supply is shut off:
– “Since 1999, the standard for anti-islanding
protection in the United States has been UL 1741,
harmonized with IEEE 1547. Any inverter which is
listed to the UL 1741 standard may be connected
to a utility grid without the need for additional
anti-islanding equipment, anywhere in the United
States or other countries where UL standards are
accepted.”
(c) My Power Station Technology 2013 50
http://en.wikipedia.org/wiki/Solar_inverter
This is what a Renewable Energy
System (with batteries) Looks Like …
(c) My Power Station Technology 2013 51
PV Array
Combiner
Box
Solar Charge
Controller
Battery Bank
Inverter / Charger
(Island System)
DB Board
Mains
DB Board
Backup Loads
Utility
[Schematic excludes Grounding Systems; DC & AC Disconnect; Fuses; etc.]
Start here …
Generator
Grid Tie Island Schematic
(c) My Power Station Technology 2013 52
Battery Only System
(c) My Power Station Technology 2013 53
Watch Battery System Installation Video
http://www.youtube.com/watch?v=LT1AF4ycAQY
Terminology
• Grid Tie: an electrical system that is connected to the
government electricity grid
• Reverse Feed / Embedded Generation: where someone
besides Eskom sells electricity to the Grid
• Net Metering: where the consumer buys and sells
electricity at the same price
• Feed In Tariff: where the Grid Operator / Utility pays the
“Embedded Generator” a higher rate to feed the grid
• Time of Use Metering: where electricity is bought (and
sold) at different rates depending on grid demand (during off-
peak, standard time, and peak-time, or in the future on a second by second basis)
• Inverter / Grid Tied Inverter: Changes DC to AC electricity
• Island: allows a grid-tie inverter to operate during a power
failure, whilst isolating it from the grid
(c) My Power Station Technology 2013 54
The Toolset
(c) My Power Station Technology 2013 55
“Night” and Peak Demand
• Start with “the battery”, the most difficult
component
– Because Eskom doesn’t want us to export energy
– They and the Cities allow “Parallel Feed” which is
essentially what Solar Water Heaters (and heat
pumps) do, except that Solar Water Heaters
remove peak demand. Same for Timers and
Demand Response (DR).
(c) My Power Station Technology 2013 56
“Night”
• What does it cost to build more generation (to
oversupply) vs how to store and manage
energy?
– Ie over generation vs energy storage
– This might change due to storage costs coming
down, carbon taxes, environmental legislation
– http://www.renewableenergyworld.com/rea/news/article/2013/04/e
nergy-storage-series-why-we-need-it-and-why-we-dont
(c) My Power Station Technology 2013 57
“Night”?
• For Night and Cloudy Days customers will
need batteries, energy storage, and will need
to import electricity from the Eskom /
Munipalities, preferably at “off peak time”
• We need Behaviour Change (Toolset)
• AND we need Energy Efficiency (Toolset)
• Customers can save up to 77% of their
electricity requirement – and Eskom has incentives for
this
(c) My Power Station Technology 2013 58
Toolset: EV – Nissan Leaf
• Available for $200 a month in Austin, Texas on
rental
• Battery pack should last 5 to 7 years in Austin
• 4.7km per kWh at R1.50 per kWh or 31 cents
per km in Cape Town
• 14 km per litre for 1.4 litre car at R12.73 per
litre or 91 cents per km
• Nissan Leaf is 1/3rd of the cost to run.
Repayments are about the same per month.
(c) My Power Station Technology 2013 59
EV = Electric Vehicle (there are also Hybrids)
Toolset: Pumped Storage
a large scale battery
(c) My Power Station Technology 2013 60
http://www.eskom.co.za/c/article/207/pumped-storage/
Pumped Storage Potential
• Lesotho Highlands
– 3GW Pumped Storage Potential
• USAID Electricity Supply Industry of Lesotho General
Information for Potential Investors report in May 2008
• Palmiet / Steenbras Dam (near Cape Town)
– 2 x 200 MW reversible Francis pump/turbines
• Generator manufactured by Fuji of Japan
• Turbine manufactured by Voith of Germany
– Construction started 1983
– Commissioned 1988
(c) My Power Station Technology 2013 61
Toolset: Battery
• CSP (Concentrated Solar Power)
• Solar Tower
• Storage:
– In Salt or Sulphur
– Electricity produced in the normal way via steam
and turbines
• From sun during the day, or molten salt at night
• Needs external energy to keep the salt “wet” (liquid)
– Runs for 16 hours a day in Spain, eg 5am to 9pm,
covering the morning and evening peaks in South
Africa (c) My Power Station Technology 2013 62
Solar Towers
(c) My Power Station Technology 2013 63
http://designbuildsource.com.au/worlds-largest-solar-towers-take-to-the-sun
Abengoa and Brightsource’s Palen Solar Tower Project, California
Solar Towers
(c) My Power Station Technology 2013 64
http://designbuildsource.com.au/worlds-largest-solar-towers-take-to-the-sun
Abengoa and Brightsource’s Palen Solar Tower Project, California
Toolset: Large Scale Batteries
• XTremePower
– eg 36 MW
• http://www.duke-energy.com/news/releases/2013012301.asp
• Flywheel
• Ultra-capacitors
• Global Key Players
– Generalists: ABB, Alstom, GE, S&C Electric,
Schneider Electric, Siemens
– Purists: A123, BYD, Panasonic, Toshiba, Xtreme
Power, ZBB Technologies, etc
(c) My Power Station Technology 2013 65
http://zpryme.com/news-room/asian-grid-scale-energy-storage-market-364b-by-2020-zpryme-smart-grid-insights-reports.html
Toolset: Water
• Hydro
– Large Scale and Micro-Hydro
• Tidal
– Eg Siemens 1.2 MW for 1,500 households in
Northern Island
• Wave
• Ocean Currents
– Benguela and Agulhas Currents flowing at up to
3m/s (10km/h), 24 hours a day, 7 days a week
(c) My Power Station Technology 2013 66
Also: Desalination
Toolset: Biogas
(c) My Power Station Technology 2013 67
e.g.: GE Jenbacher Gas Engines
Toolset: BioGas
GE Jenbacher
• Landfill gas
– 1 million tons of waste power 1MW plant for
more than 15 years
– Waste from US city of 1 million can power 8MW
plant
• Sewerage
– Waste water from city of half a million powers
1MW plant; 100% of energy needed for the plant!
• BioGas
– 5000 cows can power 1 MW plant
(c) My Power Station Technology 2013 68
Toolset: Local Storage
• “Municipal Energy Companies”
– Dr Hermann Scheer in The Solar Economy
– Every industrial business is also an energy
business
– Local integration
• Local jobs & a stronger local economy
– Lower costs with decentralised systems
– CHP: Combined Heat and Power, easier because of
local electricity production
(c) My Power Station Technology 2013 69
Toolset: “Summer time”
• Windhoek 1 sun hour West of Durban. Could
build Solar Tower and PV plants there to
provide energy to Durban for the evening
peak.
• World's largest solar towers being built: 2 at 250 MW each in
the Californian Desert. Currently the largest tower is in Abu
Dhabi and it is 100 MW. The new design uses 50% less water
and 13% less land for a similar Solar Tower plant, and 33% less
land than a PV plant. Solar Towers also provide for energy
storage and already run for 16 hours a day in Spain.
(c) My Power Station Technology 2013 70
Toolset: Behaviour Change
(c) My Power Station Technology 2013 71
Toolset: Energy Efficiency
• Examples
• Calculations
(c) My Power Station Technology 2013 72
Energy Efficiency Examples
• Energy Efficiency is all about not using or
needing electricity in the first place
• Eg:
– Electricity Meter
– Insulation
• Ceiling, window, pool cover
– Heating / Cooling
• Solar Water Heater; Ice Cooler
– Energy Efficient Appliances
(c) My Power Station Technology 2013 73
Simple Electricity Meter
(c) My Power Station Technology 2013 74
NegaWatts, not MegaWatts
(c) My Power Station Technology 2013 75
PV = Photovoltaic System
EE = Energy Efficiency: Spend to save
ER = Eskom ESCO Rebate (approximate)
Price Per Total Monthly
%tage watts watt Price Repayments kwh price per kwh Inc VAT
PV 100% 8,000 R20.00 R160,000.00 R1,600.00 1,200 R1.33 R1.52
EE 0% 8,000 R20.00 R0.00
PV 30% 8,000 R20.00 R48,000.00
EE 70% 8,000 R12.00 R67,200.00
R115,200.00 R1,152.00 1,200 R0.96 R1.09
ER R290.00
R862.00 1,200 R0.72 R0.82
NegaWatts = Negative Watts
RE Example and Effect of EE
Figures as at July 2011
(c) My Power Station Technology 2013 76
House Loads 1200 kwh/month Ball Park Number for Grid Tie Rand per kwh
Peak Average Sun Hours 5 h with Battery Backup R 60.00 R 1.06
Estimated W installed 7890 Electricity Cost pa R 15,264.00
Estimated Rand Value R 473,424.66 kwh/pa 14400
New Electricity Use Efficiency Electrical
Cost Saving Equipment Savings Water Savings Savings pa
Awareness R 899.00 15% R 71,013.70 pa R 2,289.60
Insulation - roof / ceiling R 3,000.00 10% R 47,342.47 R 1,526.40
Insulation - pool cover R 36,000.00 7% R 30,772.60 R 1,869.60 R 992.16
Pool Pumps R 3,000.00 10% R 46,800.00 R 1,508.91
Fridge R 5,000.00 4% R 16,800.00 R 541.66
SWH R 30,000.00 25% R 118,356.16 R 3,816.00
Gas cooking
Totals R 77,899.00 70% R 331,084.93 R 10,674.73
New Rands New W Rqd
New Estimate 473-331k+78k R 220,238.73 R 142,339.73 2372.3
New pool cover every 5 years; Pool Size: 50 sq m; Roof Size: 100 sq m; Elec savings higher if inflation included
Inverters life expectancy is 15 yrs. Replacement Not included.
Gas Cooking: probably no savings, but reduces peak electricity demand.
Battery Inefficiency = 20%; Grid Tie Inefficiency = 6%. R60 per watt incl inefficiencies. For 20 years
20kl Water Usage for Pool Per Month for 6 Months @ R15.58 R 1,869.60 R 37,392.00
Haven’t taken into account
• Potential sales to the City of Cape Town
• Net Metering through the transformer
• Retail Wheeling
• Time of Use Tariffs
• Carbon Credits
• Eskom ESCO rebate
• DR (Demand Response)
(c) My Power Station Technology 2013 77
Toolset: Time of Use Tariffs
• Give the member of the Virtual Power Station
the opportunity to get paid to move their
loads outside Peak Time
• The member also gets the opportunity to sell
electricity at peak time
– We’ll see this when we discuss Net Metering
(c) My Power Station Technology 2013 78
Cape Town Time of Use Tariffs
(c) My Power Station Technology 2013 79
Cape Town Residential Stepped Tariffs
(c) My Power Station Technology 2013 80
http://www.capetown.gov.za/en/electricity/Pages/ElectricityTariffs.aspx
Toolset: Computers
• Computers and the Internet
• Allowing the move:
– ET + IT = EI
– Energy Technology
– Internet Technology
– The Energy Internet
• Eg: Homeowner tells the utility that she needs the oven
for 1 hour during the day
• Work Smart
(c) My Power Station Technology 2013 81
Computers: The ISP Model
• The Backbone
– Telkom, BCX, Internet Solutions
– Sells to ISPs
• The ISP: Internet Services Provider
– Sells to the public
• A relatively small number of backbone
suppliers
• A large number of public users
(c) My Power Station Technology 2013 82
The ESP Model
• ESP = Electricity Services Provider
• Based on the ISP model
• Other examples:
– Railway grid in Europe
– Aviation grids
– Telecommunications grid
– All shared. Paid for by whom?
• Capex payments
• Utilisation payments
(c) My Power Station Technology 2013 83
ISMO: Independent System
and Market Operator
= electricity middleman
1998 Electricity White Paper
re ISMO & Competition
2003 RE White Paper
re Competition
ISMO Bill Update in Business Report on 27th March 2013:
http://www.iol.co.za/business/business-news/new-electricity-middleman-nears-lift-off-as-ismo-bill-is-finalised-1.1492346#.UVlfEGnlw9B
Smart Metering and Control
(c) My Power Station Technology 2013 84
Measure - SMART energy
"If you can not measure it, you can not improve
it.", Lord Kelvin
(c) My Power Station Technology 2013 85
What your electricity measurement
should do
• Real time reporting
• Onboard reporting
• Long term data collection
• RS-232 communication to
database via GSM, Wifi or
Ethernet modules
• SMART control for geyser
heating and pool pumps
• Load shifting and DR
• SMART geyser element
management
(c) My Power Station Technology 2013 86
ESCO Rebates
(c) My Power Station Technology 2013 87
ESCO Rebates
• Standard Product (specific products)
– Lighting
– Solar Water Heater (homes)
– Showerheads
– Timers
• Standard Offer (projects)
– 70c per kWh deemed rebate for SWH
– R1.20 per kWh for first 10MW of NM PV
– Eskom IDM Web Site
• Other (c) My Power Station Technology 2013 88
Demand Response
• http://www.eskomidm.co.za/demand-
response
• It is a dynamic energy infrastructure management programme designed to
support the stability of the national electricity grid, and meet South
Africa’s growing demand for energy with the assistance of large and very
large energy users – in both the industrial and commercial sectors – who
agree to switch off certain production processes or turn down certain
electrical loads during periods of peak demand.
(c) My Power Station Technology 2013 89
Demand Response
• Demand Response is a highly flexible programme that can be customized
to the individual financial and energy usage objectives of participating
companies. The programme offers:
– Energy and capacity incentive payments;
– Seamless business continuity;
– Information on energy cost reduction; and
– Recognition for supporting the national grid and, therefore, the stability of electricity
supply to South Africa and its people.
• Utilising ground breaking software, hardware and support services that
reduce the demand for energy of participating companies, Demand
Response allows large and very large energy users to participate for free
and, most importantly, without operational interruptions.
(c) My Power Station Technology 2013 90
Demand Response
• Eskom pays customers to reduce load on
instruction to balance supply and demand
• 3 types
– 1 second notice: up to 10 mins
– 10 min notice: up to half an hour
– 30 min notice: up to 2 hours
• Needs “Aggregator” & Customer Services Provider
• Eskom pays for measuring and other
equipment plus monthly fees
• Eskom looking for 500 MW short term and 2
GW long term (c) My Power Station Technology 2013 91
Some Eskom DR / ESCO Rebates
• ESCO Incentives
– 42 cents per kwh for reducing electricity at peak
time
– 10 cents per kwh for reducing electricity at off-
peak time
– 70 cents per kwh for water heating
– For customers with more than 100 kW to save
– Note that I am unsure what the latest numbers
are for these rebates (as at 3rd April 2013)
(c) My Power Station Technology 2013 92
Demand Response
(c) My Power Station Technology 2013 93
Homeowner DR
• Is it possible?
• How?
• TOU and DR
• PV and DR
• Taking DR to the people
(c) My Power Station Technology 2013 94
My Suggestion for the VPS DR
• Standard Time Rate: R1.50 per kWh
• Peak Time Rate: R3.00 per kWh
• Off Peak Rate: 20 cents to 75 cents per kWh
• Prices including VAT
• And
• Using Net Metering
– Incentivises people to minimise use at peak time
and to try to sell at peak time.
(c) My Power Station Technology 2013 95
Homeowner VPS DR
• ESCO Rebate
– 53 cents per kwh for reducing electricity at peak
time
– 10 cents per kwh for reducing electricity at off-
peak time
• Homeowner assumption
(c) My Power Station Technology 2013 96
Carbon Credits
(c) My Power Station Technology 2013 97
Carbon Credits
• Electricity Producer in “developing” country
earns carbon credits
• Paid for by polluter in “developed” country
• ETFs (Exchange Traded Funds)
– Allows one to trade Carbon Credits
(c) My Power Station Technology 2013 98
Net Metering (NEM)
• Normal
– Buy and sell at the same rate, eg R1.50 per kWh
– Bank excess electricity used during the day
– Buy back at night
• Other
– 1: Buy at the normal rate; Sell at a lower rate
• In South Africa, this would get NEM going
– 2: Sell at the normal rate; Buy at a higher rate
• Great for users who can make more electricity than
they need.
(c) My Power Station Technology 2013 99
The Jargon: http://www.thegreentimes.co.za/stories/energy/item/1130-net-metering-buzz-words
Net Metering (NEM)
• Avoided Costs
• Incl: the sum of all costs that the utility avoids as a result of customer generation to the grid,
including: energy purchases; generation capacity or resource adequacy; line losses;
transmission and distribution capacity; air pollution permits and offsets; ancillary services;
renewable energy purchases (E3, Net Metering Cost-Effectiveness Evaluation, Jan 2000,
California Public Utilities Commission)
• Facilities Private Investment
• If we are at Grid Parity it makes sense
• Facilitates Job Growth which in the USA is 10x
faster than the economy as a whole; 75% are
installation Jobs which are local and cannot be
exported
(c) My Power Station Technology 2013 100
Countries with Net Metering
• 13 Countries + 42 USA States
• More than 20 years experience
– Were already running in 1991
• Government’s White Paper on RE – Nov 2003
– “Government is committed to the introduction of
greater levels of competition in electricity markets
– The production and distribution of energy should
be sustainable and lead to an improvement in
standard of living of citizens
– Barriers to entry should be lowered”
(c) My Power Station Technology 2013 101
The Grid
(c) My Power Station Technology 2013 102
From Eskom Annual
Report 2009
Quick Summary
• We can do all of this without residential and
other end user PV
• Although we should allow the utility to buy
energy at peak time, eg from battery backup
and/or EV’s and/or generators, etc
• And the utility and municipality should make
TOU tariffs available to small users
(c) My Power Station Technology 2013 103
Renewable Energies
• Solar: SWH, PV, CSP, Solar Tower. + with storage
• Water: ocean, tidal, river, wave, pumped storage
• Other: Wind, Geo-thermal, Biogas, Sewerage to Gas
• Storage: battery, fuel-cell, water, salt, Sulphur, Hydrogen
• Non-renewable: coal, oil, gas, nuclear
(c) My Power Station Technology 2013 104
Riverside Renewable Energy
Holt Logistics
Gloucester Marine Terminal
New Jersey, USA
• 9MW Roof Top PV
• $42m
• ~ 110,000 square meters
• 80% of energy requirement
What is PV?
Photovoltaic Panels
(c) My Power Station Technology 2013 105
Can we produce electricity cheaper
than we can buy it?
Whiteboard / Word
• Assumptions:
– City of Cape Town
– Borrowing at 10% interest rate over 20 years
– Rooftop PV Systems
– 3 bedroom, 4 person household using 1,200 kwh per month
• Homeowner
– R1.29 per kwh 16% R1.50
• Business owner
– R1.02 per kwh 16% R1.18 + 1 cent (additional) levy + R120 per
ton carbon tax, ie 12 cents per kwh R1.31 28%
• More Info: R1,800; R182,400; 8 KW; R22.80; R182,400; R20 per watt?
How?
(c) My Power Station Technology 2013 106
The real savings in being energy
independent (kw vs kwh)
• If you spend R1m a year on electricity
• And you can install your own system for
R900,000 per year
• What would you prefer?
• If you buy your own system, then at 10% per
annum over 20 years, the R900,000 equates to
a capital cost of R7.5M
(c) My Power Station Technology 2013 107
The Cherry on Top
• Once you’ve paid off the system, it is YOURS
• Your electricity cost doesn’t increase every
year …
☞ … which means that you can plan for the future!
• And: you can save 70%+ of your electricity
cost over 20 years
(c) My Power Station Technology 2013 108
Buying and Producing Electricity
Graph in Rand per kwh ex VAT
(c) My Power Station Technology 2013
Fix your price and save
(c) My Power Station Technology 2013 110
Discussion
(c) My Power Station Technology 2013 111
Trust & Expectations
• Can we rely on the system?
• Should we rely on the system?
• What is “the system”?
• Customers expect
– The system to be up
– Maybe we expect “load shedding” because of
what happened in 2008
– Many private people and businesses installed
generators to give themselves security of supply
(c) My Power Station Technology 2013 112
Opportunity to sell electricity
• To Cities, Eskom, other users
• Especially at peak time
– Average electricity cost to City of Cape Town is 55
cents per kwh
– E.g.: Ankerlig near Atlantis produces 1,350 MW,
uses 25,000 litres of diesel per minute, at a cost of
between R4 and R13 per kwh
– So, we can produce at R1.32 per kwh and sell at
R3 per kwh!
(c) My Power Station Technology 2013 113
How to get started?
• “Mandelaton” CID
– Community Improvement District
• Milnerton Proper; Woodbridge Island; Lagoon Beach; Joe Slovo /
Phoenix; Sunset Beach
• Measure: 2,000 meters * R6,000 each installed
– Incl, Voltage, Current, Peak Demand,
– Can tell what’s running by looking at “profiles”
– Can control Geyser
– Can switch loads on and off (DSM and rebates)
– Is Wireless, so user needs internet connection
• Design, Finance, Implement, Insure, Maintain
(c) My Power Station Technology 2013 114
Mandelaton CES
(c) My Power Station Technology 2013 115
VPS Mandelaton Prezi
http://prezi.com/p0j3paibfy6j/echo-
2/?auth_key=20848266276fdb23f7d16535f3ceb50b9136f3f0&kw=view-p0j3paibfy6j&rc=ref-
15959272
(c) My Power Station Technology 2013 116
Discussion
(c) My Power Station Technology 2013 117
Social and Technical Factors
(c) My Power Station Technology 2013 118
Social and Technical Factors
• Social
– “Belief”
– “Myth”
• Technical
– Prices are dropping 10 to 20% per annum
– Energy Storage is possible; cheaper than running
peaking power stations
– RE allows non-degreed installation and
maintenance personnel, appropriate for RSA
(c) My Power Station Technology 2013 119
Energy Literacy
• How literate are South Africans about their
energy choices?
• The USA has
http://www1.eere.energy.gov/education/ener
gy_literacy.html and http://www.need.org/
(c) My Power Station Technology 2013 120
Do we know the risks & costs?
• Of Fossil Fuel Energy
– No, even after 150 years of building power
stations
– Kusile and Medupi: budgetted to cost R79 billion
for 4.8 GW each; now R125 billion each and rising
– Coal and other fossil fuel costs rising faster than
expected
• Of Renewable Energy
– Yes, and they are decreasing
(c) My Power Station Technology 2013 121
The Risks
• Mainly our 20th Century assumptions
• Compare wind and nuclear risks
• Donor assistance risks
(c) My Power Station Technology 2013 122
Assumptions
• Our economy has an assumption built into it
– Cheap and reliable Electricity ??
• But 150% increase over the past 5 years
– Cheap build ??
• But R79 bn quote: R125 bn now; 12 months behind schedule
– Cheap raw materials ??
– Reliable Distribution Systems ??
• Transformer life: was 35 years -> now 12.5 years
• Decreasing Costs works for IT ✔
– Lets find out if it can work for electricity?
• How risky are our assumptions?
(c) My Power Station Technology 2013 123
Riskscontinued
• Environmental Risks
– Water, health, pollution, jobs, GDP growth
• Security of Supply
– Coal, oil, nuclear: Wind, sun:
• Cost of Supply
– Coal, oil, nuclear: Wind, Sun:
• The Cost of Unserved Energy
– Energy Security; what is the cost of being out of action?
• For a business; for a homeowner who doesn’t know they are off?
– R75 per kWh
• Nuclear Waste Management
(c) My Power Station Technology 2013 124
Risks
(c) My Power Station Technology 2013 125
IRP2010 v8 (nothing re PV; nothing re Net Metering)
Cheap?
Reliable?
Risks: The “Nuclear Fleet” Cost
• 9.6 GW
• What’s it going
to cost?
• With such widely
varying costs, would
you do this project?
• Can we remove
9.6 GW from the
grid at peak /
any time?
• How? (c) My Power Station Technology 2013 126
Risk of “old thinking”
• South Africa might miss out on the 21st
Century “Gold Rush”
(c) My Power Station Technology 2013 127
Risks Section – New Build
(c) My Power Station Technology 2013 128
World Energy Growth Rates by Source
Percent Annual Average Growth
(c) My Power Station Technology 2013 129
Solar Insolation Map
(c) My Power Station Technology 2013 130
Germany: 2.4 ave peak sun hours per day; SA 5.9 (5 after derate factor)
Risks Section - Wind Power
(c) My Power Station Technology 2013 131
http://www.earth-policy.org/data_highlights/2013/highlights37
Risk Section – Chinese Wind vs
Nuclear Generation
(c) My Power Station Technology 2013 132
Risk Thinking – Chinese Wind
Power Potential
(c) My Power Station Technology 2013 133
The Big Energy Myth
• From Dr Hermann Scheer’s Book
– “The Solar Economy” pp 169 to 170
– “Once the fear of the small scale has been dispelled,
once RE has demonstrated that it can replace fossil
energy in its entirety, then the aura of the centralised
nuclear/fossil industry will quickly fade. While fossil
mythology remains unchallenged, humanity is faced
with the absurd prospect of choosing death over a
solution it is afraid to embrace. … Ordinary people are
caught up in the myth of big technology … We need
an active and engaged society”
(c) My Power Station Technology 2013 134
Seven Crises(video)
- caused by our energy system
• Climate crisis
• Fossil fuel availability crisis
• Social (3rd World) crisis
• Health crisis
• Nuclear crisis
• Water crisis
• Food (agricultural) crisis
Dr Hermann Scheer, Member of the German Government, President of EUROSOLAR,
General Chairman World Council for Renewable Energy (WCRE)
Photo: “For Work and Environment”, from Dr Scheer’s Facebook Page.
(c) My Power Station Technology 2013 135
Show Dr Scheer Video
http://youtu.be/w_KZ01ps6gI
(c) My Power Station Technology 2013 136
Crises / Risks of the Fossilised Fuel Industry
Dr Scheer at Retech Conference, February 2009, Las Vegas, USA
• [3rd world]:
– 40 countries are unable to pay their energy bill
– Their oil import bill is more than their total export
earnings
• COP 17 and global treaties
– How do we organise the technological revolution?
– Which technological revolution happened as a
result of a global treaty? Not One!
• We should do it because it is an advantage of
us
(c) My Power Station Technology 2013 137
The [3rd world]
My brackets ([])
• The so called “third world” is where the new
empires are starting
– Where development is happening
• The “third world”
– Has population growth
– Has resources
• Most of the Developed World is stagnating
– Has growth potential
• The Developed (1st) world
– Stuck in an old paradigm?
(c) My Power Station Technology 2013 138
The “Downturn”
• Is it possible that we’re creating it ourselves?
– By focusing on cost savings instead of growth?
• Just something to think about
– I’m not saying we’ve created our recession, but I
wonder if its in our minds, as a self-fulfilling
prophesy
– Also in South Africa:
• One has to do the same thing over and over again
• A huge waste of resources, time and energy
(c) My Power Station Technology 2013 139
What’s electricity for anyway?
• It’s like ICT, except ICT depends on Electricity
• It’s an enabler to get the country moving
• Fast, cheap, reliable pathways from a to b will
get our economy going
– Communications (Infrastructure)
– Electricity, Population Growth, Resources
• David Murrin: “Breaking the Code of History”
• Can the “Energy Internet” finally happen?
– Thomas Friedman in “Hot, Flat and Crowded”
(c) My Power Station Technology 2013 140
Donor Assistance Risks (DAR)
BRICS Dev Bank?
• What are the risks?
– Dependence on outside funding
– If the exchange rate weakens, repayments get
higher
– Little capacity building
– An expected “repayment” for donor assistance
• What chance is there that we can build our
future infrastructure needs without DAR?
(c) My Power Station Technology 2013 141
Some of the Rules
• See application Form – Embedded Generation for
City of Cape Town’s rules
(c) My Power Station Technology 2013 142
Government and Citizens
• Is making our own electricity legal?
• “Embedded Energy” Generation Legislation
Already Exists
• SABS: NRS 097-01-2010 (December, 2010)
• NERSA: Embedded Generation (2011)
• Waiting for:
– Eskom adoption
– City adoption
– Business and Homeowner adoption
(c) My Power Station Technology 2013 143
Red Tape
• City of Cape Town
– Red Tape to Red Carpet Process
• South Africa
– 15 laws; 10 standards; 10 documents
– Just for “parallel feed”!
• USA
– 2 laws; 3 standards; 1 document
• Germany
– Install; inspect; FITs 8 days later
(c) My Power Station Technology 2013 144
How to convince Govt
of The Five Winners?
• The Five Winners http://youtu.be/I7W6kn9M8pI
– Customers
• eg the homeowner (electricity generator & consumer)
• Eg the business owner (and employees)
– Suppliers
• Installers; Designers; Maintenance People; Call Centres;
Inspectors; Manufacturers
– Cities
– Eskom
– The Environment
• Fast economic growth. “Base Load” can’t keep up!
(c) My Power Station Technology 2013 145
Reaching Grid Parity
(c) My Power Station Technology 2013 146
Reaching Grid Parity
• Feed in Tariffs and their purpose
• Rebates and their purpose
• Net Metering
(c) My Power Station Technology 2013 147
Why FITs? Why any kind of incentive?
• Introduced in Germany in 1991
– In 1993, the FIT was $1.34 per kWh
– In 1993 Rands, this was R4.57 per kWh
– In 2012 Rands, this was R11.32 per kWh
– In 2001 in South Africa:
• Per kWh: Domestic 24.59c; Manu and Mining 12.32c
• The FIT had three principles
– The Utility must connect anyone to the grid
– They must buy all the energy that is produced
– They must buy at a fixed price for the length of the
contract, ie 15 to 20 years
(c) My Power Station Technology 2013 148
So what did FITs do?
• Brought down the cost of Renewable Energy
• Note that the FIT contract is similar to the
contract the government signs with Eskom to
build a power station
– An agreement to buy a certain amount of
electricity
– At a certain price
– For a certain period of time
• There are “FITs” in our car production system
– Government gives R5 billion of incentives to car companies annually
– The Joule needed R9.5 billion. And South Africa would have had its
own electrical car!
(c) My Power Station Technology 2013 149
What do Rebates do?
• Kickstarted Renewable Energy
• Benchmark: 30%
– A utility’s “avoided cost”
• Germany: 50%
– Higher incentive
• Different kinds
– Rebate
– Tax Credit
(c) My Power Station Technology 2013 150
EQUALITY
• How did we get to Equality (Grid Parity)?
• Who helped?
– Germany (G): Feed In Tariffs since 1991
– Still the largest installed base of PV panels (roof
top, building integrated, farm, etc)
– 370,000 people employed in RE in G in 2010
– Targeted 20% RE by 2020
• Achieved this in 2011!
• Now targeting 35% by 2020
• Solved the “Grid Destabilisation” problem in 2011
(c) My Power Station Technology 2013 151
Retail Wheeling
(c) My Power Station Technology 2013 152
Retail Wheeling
• Selling electricity across the grid
• Similar to
– Airways
– Railways
– Telecommunications
• Pay the Grid Operator a Wheeling Tariff for
using the grid
• Needs an Independent System Operator?
(c) My Power Station Technology 2013 153
Next Steps
• Contact me for training, consulting and to set
up Virtual Power Stations
• Contact me for Financial ICT Solutions
(c) My Power Station Technology 2013 154
Contacts
• David Lipschitz, My Power Station
– Phone
• 021 551 9935 (W); 074 119 3246 (C)
– Email
• david@mypowerstation.biz
– Web
• http://www.mypowerstation.biz
(c) My Power Station Technology 2013 155
• End of presentation
• The rest is for reference
(c) My Power Station Technology 2013 156
Virtual Power Station Agenda
• See hand out
• I’d like us to brainstorm and develop a solution
• We will consider:
– Systems Thinking
– What benefits do big electricity users get?
– How can these benefits be made available to small
/ all electricity users?
– Reaching Grid Parity – how did we get here
– Feed In Tariffs and their purpose
(c) My Power Station Technology 2013 157
Agenda continued
– Rebates and their purpose
– Net Metering
– Time of Use Tariffs
– Demand Response
– Energy Efficiency
– Smart Metering
– Social Factors
– Technical Factors
(c) My Power Station Technology 2013 158
Agenda Continued
– Types of technologies that can be used in a Virtual
Power Station
• Photovoltaic Systems; Concentrated Solar Power; CSP
Tower; BioGas
• Pumped Storage
• Battery, ultra-capacitors, hydrogen storage, fuel-cell
– Dealing with peak demand
– What about rainy days and night?
– Government’s role. NRS 097-2-1:2010 and NERSA.
Embedded Generation and its Rules. Laws, Policy.
(c) My Power Station Technology 2013 159
Agenda
• Electricity Generation; Assumptions & Risks
• Electricity and Infrastructure Challenges
• Some Questions & Myths
• Our Environment
– We live in Exponential Times
• Electricity & “The Grid”
– Can we rely on The Grid?
– Can we make electricity ourselves cost effectively?
• How to get started?
• Q&A (c) My Power Station Technology 2013 160
The Numbers
• How to understand the really big numbers?
• Should we think differently?
– Do we need cars? How many? What sort? Can
they be shared?
– Do people need to go to work or can they
telework?
– Should our systems stay centralised or can they be
decentralised
– How would we design the system if there was no
coal or nuclear energy?
(c) My Power Station Technology 2013 161
R2.3 trillion
R2,300,000,000,000
• Repayments
– At 10% over 20 years
– R23,000,000,000 per month
• R23 billion per month is what the people of South
Africa will be paying for their new electricity fleet if we
follow the old 20th Century technology path
– 50 million people; 7 million taxpayers
• R3,285 per taxpayer per month
– for capex repayments only
(c) My Power Station Technology 2013 162
R125 billion for Kusile
R125,000,000,000
• 12,500,000 * R10,000 Solar Water Heaters
– i.e. : 12.5 million R10,000 Solar Water Heaters
• Kusile
– 4.8GW
– 12,500,000 SWH need 20 GW of electricity
• SWH can be used to
– Heat water & air
– Cool water & air
– R46 billion (58%) over budget already
(c) My Power Station Technology 2013 163
Electricity Challenges
• For City Dwellers without electricity, NO:
– Water, Banking, Petrol, Transport, Food, Life
– Only 4 days of food in the supply chain
• Everything we do depends on electricity
– We need security of supply
– We need price certainty
• Therefore we need a game plan to make this a
reality
(c) My Power Station Technology 2013 164
Some Questions
• http://www.surveymonkey.com/s/NetMeterin
g-2012-12-22
• If you could make your own electricity
cheaper than you could buy it, would you
want to do this?
• Do you know what Net Metering is?
• Do you want to make money and conserve the environment?
(c) My Power Station Technology 2013 165
Global Energy Resources
(c) My Power Station Technology 2013 166
30 TWH in 2030
10 TWH in 1990
The sun
provides
5,000 times
the amount
of energy
required by
the entire
planet
How long do we have?
At 3% electricity consumption growth
(c) My Power Station Technology 2013 167
Buying and Selling Electricity
• Normally
– We buy electricity
• From Eskom
• From the Cities, who buy from Eskom
• Now
– We can produce electricity
• We can use it ourselves
• We can sell it to The Grid
• We can sell it to our own customers!
(c) My Power Station Technology 2013 168
Producing Electricity (Energy) 1
• History
– Before Electricity
• Windmills; Pumps; Water-Mills; Steam
– “Base Load” (after electricity “invented”)
• Coal, Nuclear, Hydro-electric (3)
– Now
• Sun, wind, river, tide, ocean-current, geo-thermal (6)
• Sun: PV, CSP, Tower, Solar Water Heating (+3)
– PV = Photovoltaics (like the leaves of a tree)
– CSP = Concentrated Solar Power (with or without storage)
(c) My Power Station Technology 2013 169
Producing Electricity (Energy) 2
• History
– Benefits and Costs
• Base load electrical systems dramatically reduced our
costs and allowed the industrial revolution to happen
• But this assumed unlimited, cheap, supply of
equipment and raw materials (coal, etc)
• But: population growth and industrial growth have put
huge constraints on the systems
• And: at the same time, maintenance costs have been
rising rapidly for power stations, transmission and
distribution systems
(c) My Power Station Technology 2013 170
Reliability of equipment
• What happens when there is a problem?
• Disruption in power supply
– Unplanned and prolonged downtimes
– Destruction of equipment
– Sudden cut offs
• No proper shutdowns
• Customer dissatisfaction/frustration
(c) My Power Station Technology 2013 171
Uni of Joburg talk at Transformer and SwitchGear Conference
Joburg April 2012
David Lipschitz
• BSc (Honours) MBA
• My Power Station Technology: Energy Expert, Software Developer
• Grid-Tied Photovoltaics Course: Feb 2009, Phoenix, AZ, USA
• NABCEP Level 1 Certification
– North American Board of Certified Energy Practitioners
• Additional related technical training
• Spoke / Chaired Energy Efficiency conference 2010
• Spoke at Various other Energy Conferences
• Presented in Parliament re. Climate Change Hearings
• Presented to Parliament re. IRP2010 Hearings
• Presented at Powering Africa Strategy Summit in November 2011
• Contact Details:
– 021 551 9935 (Office)
– 074 119 3246 (Cell/Mobile/iPhone)
– david@mypowerstation.biz
– Mypowerstation (Skype)
– http://www.linkedin.com/in/davidlipschitz (LinkedIn)
(c) My Power Station Technology 2013 172
Designs
• We charge R6,800 plus VAT for a design for a private houses and for systems up to
10KW. Above 10 KW we charge R50,000 plus VAT, excludes EIAs, Engineering or
Architect Fees.
• Why we charge for designs?
– A design includes a site visit, a formal design with a parts list, an Efergy electricity meter so that
the client can become aware of their electricity use and reduce it, and an energy efficiency
exercise
– If the client buys a system from us and the value of the system is over R80,000, we discount their
installed price by the fee.
– This is fair as the design requires experience and designs in IT, Architecture, etc, aren’t free.
Designs can take up to 3 days. All prices and equipment needs to be checked. If we do 10 designs
and then someone buys from us, we need to constantly increase the prices of the systems to
recover our sales cost investment; this means that we either go out of business or run at a loss,
which isn’t in our or our clients bests interests
– We need to recover our investment of over R4 million so far in ensuring that we install systems
that meet electricity needs, are properly grounded, cable sizes are correct, the proper circuit
breakers and fuses are used, etc. At the moment we follow the USA NEC article 690 RE guidelines
as far as possible as there aren’t guidelines in South Africa, although there are DC guidelines.
– Update November 2011: NERSA have published RFD Embedded Generation which refers to NRS
097-2-1:2010 (Grid Interconnection Of Embedded Generation). We are now waiting for
implementation by Eskom and the Cities.
(c) My Power Station Technology 2013 173
Research
(c) My Power Station Technology 2013 174
Do wind turbines kill birds?
(c) My Power Station Technology 2013 175
Bibliography - Mindmaps
• Renewables and Sustainability Mindmap by David
Lipschitz:
https://www.mindmeister.com/maps/show/13046747
• Domestic Energy Independence by David Lipschitz:
https://www.mindmeister.com/maps/show/47331785
• Living Without Grids – a survival mechanism by David
Lipschitz:
https://www.mindmeister.com/maps/show/14204830
(c) My Power Station Technology 2013 176
Project Video and Example
• Gecko Rock
– Specification:
http://mypowerstation.co.za/2010/09/16/my-
power-station-completes-installation-of-power-
station-at-gecko-rock-press-release-16th-
september-2010/
– Video:
http://www.youtube.com/watch?v=LT1AF4ycAQY
(c) My Power Station Technology 2013 177
Other Resources
• Total Installed Electricity Capacity Worldwide:
http://www.steamtablesonline.com/electricity
/electricity-installed-capacity.aspx
• Eco Economy Indicators: http://www.earth-
policy.org
• Insolation Map: http://www.earth-
policy.org/indicators/C49/wind_power_2012
(c) My Power Station Technology 2013 178
Other Resources
• Books
– Hot, Flat and Crowded by Thomas Friedman
• 2008
– Bending the Curve by Robert Zipplies
• 2008
– Screw Business as Usual by Richard Branson
• 2011
– Breaking the Code of History by David Murrin
• 2010
(c) My Power Station Technology 2013 179
Country Production Graphs
• Germany
– http://www.agora-
energiewende.de/service/aktuelle-
stromdaten/stromerzeugung-und-verbrauch/
• Portugal
– http://www.centrodeinformacao.ren.pt/PT/Inform
acaoExploracao/Paginas/EstatisticaDiariaDiagrama
.aspx
(c) My Power Station Technology 2013 180
Germany Net Exporter of
Electricity
• http://www.pv-
magazine.com/news/details/beitrag/germany-
-power-exporter-even-with-fewer-nuclear-
plants_100010756
(c) My Power Station Technology 2013 181

More Related Content

What's hot

Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...Sekem Energy
 
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy  an overview by mohammed mostafa el khayat- nrea_egyptWind energy  an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy an overview by mohammed mostafa el khayat- nrea_egyptRCREEE
 
Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...
Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...
Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...Société Française d'Energie Nucléaire
 
New base 581 special 13 april 2015
New base 581 special  13 april  2015New base 581 special  13 april  2015
New base 581 special 13 april 2015Khaled Al Awadi
 
Microsoft word new base 668 special 19 august 2015
Microsoft word   new base 668 special  19 august 2015Microsoft word   new base 668 special  19 august 2015
Microsoft word new base 668 special 19 august 2015Khaled Al Awadi
 
Wind Directions, September 2013
Wind Directions, September 2013Wind Directions, September 2013
Wind Directions, September 2013Victoria Media
 
Solar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab IsmaelSolar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab IsmaelSekem Energy
 
Morocco industrial integration of csp technologies
Morocco industrial integration of csp technologiesMorocco industrial integration of csp technologies
Morocco industrial integration of csp technologiesParti Djibouti
 
Boo wind power in egypt
Boo wind power in egyptBoo wind power in egypt
Boo wind power in egyptRCREEE
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMouhcine Benmeziane
 
World Energy Council: Tracking Energy Transition Innovation- 2017
World Energy Council: Tracking Energy Transition Innovation- 2017World Energy Council: Tracking Energy Transition Innovation- 2017
World Energy Council: Tracking Energy Transition Innovation- 2017Energy for One World
 
Creating an Efficient SmartGrid Eco-system
Creating an Efficient SmartGrid Eco-systemCreating an Efficient SmartGrid Eco-system
Creating an Efficient SmartGrid Eco-systemArtemy Voroshilov
 
How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?Ashish Verma
 
Canarie Green It Presentation
Canarie Green It PresentationCanarie Green It Presentation
Canarie Green It Presentationenternet
 
New base 521 special 19 january 2014
New base 521 special  19 january 2014New base 521 special  19 january 2014
New base 521 special 19 january 2014Khaled Al Awadi
 

What's hot (20)

Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
 
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy  an overview by mohammed mostafa el khayat- nrea_egyptWind energy  an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
 
EEHC-Mag-Issue1
EEHC-Mag-Issue1EEHC-Mag-Issue1
EEHC-Mag-Issue1
 
Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...
Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...
Cédric PHILIBERT Energy and Climate Change Analyst IEA (Atoms for the Future ...
 
New base 581 special 13 april 2015
New base 581 special  13 april  2015New base 581 special  13 april  2015
New base 581 special 13 april 2015
 
Microsoft word new base 668 special 19 august 2015
Microsoft word   new base 668 special  19 august 2015Microsoft word   new base 668 special  19 august 2015
Microsoft word new base 668 special 19 august 2015
 
Wind Directions, September 2013
Wind Directions, September 2013Wind Directions, September 2013
Wind Directions, September 2013
 
Solar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab IsmaelSolar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab Ismael
 
Chairman ptfp goodwill message at naee
Chairman ptfp  goodwill message at naeeChairman ptfp  goodwill message at naee
Chairman ptfp goodwill message at naee
 
Morocco industrial integration of csp technologies
Morocco industrial integration of csp technologiesMorocco industrial integration of csp technologies
Morocco industrial integration of csp technologies
 
Boo wind power in egypt
Boo wind power in egyptBoo wind power in egypt
Boo wind power in egypt
 
Solar Tech- HR Final Project
Solar Tech- HR Final Project Solar Tech- HR Final Project
Solar Tech- HR Final Project
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy Sector
 
World Energy Council: Tracking Energy Transition Innovation- 2017
World Energy Council: Tracking Energy Transition Innovation- 2017World Energy Council: Tracking Energy Transition Innovation- 2017
World Energy Council: Tracking Energy Transition Innovation- 2017
 
Sgcp13proctor
Sgcp13proctorSgcp13proctor
Sgcp13proctor
 
GCU364 Honors Paper
GCU364 Honors PaperGCU364 Honors Paper
GCU364 Honors Paper
 
Creating an Efficient SmartGrid Eco-system
Creating an Efficient SmartGrid Eco-systemCreating an Efficient SmartGrid Eco-system
Creating an Efficient SmartGrid Eco-system
 
How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?
 
Canarie Green It Presentation
Canarie Green It PresentationCanarie Green It Presentation
Canarie Green It Presentation
 
New base 521 special 19 january 2014
New base 521 special  19 january 2014New base 521 special  19 january 2014
New base 521 special 19 january 2014
 

Viewers also liked

C:\documents and settings\selvam.mc\my documents\automation testing process
C:\documents and settings\selvam.mc\my documents\automation testing processC:\documents and settings\selvam.mc\my documents\automation testing process
C:\documents and settings\selvam.mc\my documents\automation testing processselvam mc
 
Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Engaaupcfira
 
Mimic infotech Company Presentation R-1
Mimic infotech Company Presentation R-1Mimic infotech Company Presentation R-1
Mimic infotech Company Presentation R-1ABHIJIT UNDRE
 
ThruPut Manager AE+: Automation for Production Control and Capacity Management
ThruPut Manager AE+: Automation for Production Control and Capacity ManagementThruPut Manager AE+: Automation for Production Control and Capacity Management
ThruPut Manager AE+: Automation for Production Control and Capacity ManagementCA Technologies
 
OSS4B: Installing & Managing MySQL like a real devops
OSS4B: Installing & Managing MySQL like a real devopsOSS4B: Installing & Managing MySQL like a real devops
OSS4B: Installing & Managing MySQL like a real devopsFrederic Descamps
 
Building The Virtual Plant For DeltaV
Building The Virtual Plant For DeltaVBuilding The Virtual Plant For DeltaV
Building The Virtual Plant For DeltaVJim Cahill
 
Data Acquisition System and Data loggers
Data Acquisition System and Data loggersData Acquisition System and Data loggers
Data Acquisition System and Data loggersSwara Dave
 
Ppt on automation
Ppt on automation Ppt on automation
Ppt on automation harshaa
 
Data acquisition system (DAS)
Data acquisition system (DAS)Data acquisition system (DAS)
Data acquisition system (DAS)Sumeet Patel
 
INDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLCINDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLCMehvish Mushtaq
 

Viewers also liked (11)

C:\documents and settings\selvam.mc\my documents\automation testing process
C:\documents and settings\selvam.mc\my documents\automation testing processC:\documents and settings\selvam.mc\my documents\automation testing process
C:\documents and settings\selvam.mc\my documents\automation testing process
 
Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Eng
 
Mimic infotech Company Presentation R-1
Mimic infotech Company Presentation R-1Mimic infotech Company Presentation R-1
Mimic infotech Company Presentation R-1
 
GTL INITIATIVES 2
GTL INITIATIVES 2GTL INITIATIVES 2
GTL INITIATIVES 2
 
ThruPut Manager AE+: Automation for Production Control and Capacity Management
ThruPut Manager AE+: Automation for Production Control and Capacity ManagementThruPut Manager AE+: Automation for Production Control and Capacity Management
ThruPut Manager AE+: Automation for Production Control and Capacity Management
 
OSS4B: Installing & Managing MySQL like a real devops
OSS4B: Installing & Managing MySQL like a real devopsOSS4B: Installing & Managing MySQL like a real devops
OSS4B: Installing & Managing MySQL like a real devops
 
Building The Virtual Plant For DeltaV
Building The Virtual Plant For DeltaVBuilding The Virtual Plant For DeltaV
Building The Virtual Plant For DeltaV
 
Data Acquisition System and Data loggers
Data Acquisition System and Data loggersData Acquisition System and Data loggers
Data Acquisition System and Data loggers
 
Ppt on automation
Ppt on automation Ppt on automation
Ppt on automation
 
Data acquisition system (DAS)
Data acquisition system (DAS)Data acquisition system (DAS)
Data acquisition system (DAS)
 
INDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLCINDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLC
 

Similar to Building a (Virtual) Power Station - one day workshop

ACDP Presentation by David Lipschitz - parliament in Cape Town
ACDP Presentation by David Lipschitz - parliament in Cape TownACDP Presentation by David Lipschitz - parliament in Cape Town
ACDP Presentation by David Lipschitz - parliament in Cape TownDavid Lipschitz
 
Let's Build a Power Station
Let's Build a Power StationLet's Build a Power Station
Let's Build a Power StationDavid Lipschitz
 
Iceland Capstone Project
Iceland Capstone ProjectIceland Capstone Project
Iceland Capstone ProjectDaniel Liu
 
Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...
Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...
Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...Gladys Kittony
 
Smart city for developing countries, Algiers, September 2015
Smart city for developing countries, Algiers, September 2015Smart city for developing countries, Algiers, September 2015
Smart city for developing countries, Algiers, September 2015Isam Shahrour
 
What is next for Business and Government Automation?
What is next for Business and Government Automation? What is next for Business and Government Automation?
What is next for Business and Government Automation? paul young cpa, cga
 
Fracking - a modern and biblical view - presentation
Fracking - a modern and biblical view - presentationFracking - a modern and biblical view - presentation
Fracking - a modern and biblical view - presentationDavid Lipschitz
 
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...Smart Villages
 
What's next for Automation| Private and Public Sector
What's next for Automation| Private and Public SectorWhat's next for Automation| Private and Public Sector
What's next for Automation| Private and Public Sectorpaul young cpa, cga
 
Energy hub disaster tech innovation program
Energy hub disaster tech innovation programEnergy hub disaster tech innovation program
Energy hub disaster tech innovation programMilan Sadhwani
 
Solar energy business opportunity
Solar energy business opportunitySolar energy business opportunity
Solar energy business opportunityLokender Yadav
 
131024 oca nzc smart grids cities & consumers
131024 oca nzc smart grids cities & consumers131024 oca nzc smart grids cities & consumers
131024 oca nzc smart grids cities & consumersOlivier CATEURA, PhD
 
Sss14cheung Hitachi Europe
Sss14cheung Hitachi EuropeSss14cheung Hitachi Europe
Sss14cheung Hitachi EuropeJustin Hayward
 
Business Automation: What's next
Business Automation: What's nextBusiness Automation: What's next
Business Automation: What's nextpaul young cpa, cga
 
Managing energy risk in africa presentation
Managing energy risk in africa   presentationManaging energy risk in africa   presentation
Managing energy risk in africa presentationEgmont Ottermann
 
Load Research Concept and Approach _Kolkata.pptx
Load Research Concept and Approach  _Kolkata.pptxLoad Research Concept and Approach  _Kolkata.pptx
Load Research Concept and Approach _Kolkata.pptxRAMAPANDA6
 
Energy as an Opportunity for Telecom Operators
Energy as an Opportunity for Telecom OperatorsEnergy as an Opportunity for Telecom Operators
Energy as an Opportunity for Telecom OperatorsIoTStream
 

Similar to Building a (Virtual) Power Station - one day workshop (20)

ACDP Presentation by David Lipschitz - parliament in Cape Town
ACDP Presentation by David Lipschitz - parliament in Cape TownACDP Presentation by David Lipschitz - parliament in Cape Town
ACDP Presentation by David Lipschitz - parliament in Cape Town
 
Let's Build a Power Station
Let's Build a Power StationLet's Build a Power Station
Let's Build a Power Station
 
Iceland Capstone Project
Iceland Capstone ProjectIceland Capstone Project
Iceland Capstone Project
 
Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...
Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...
Entrepreneurship Forum: Dr. Jay Taneja, Senior Research Scientist at IBM Rese...
 
Smart city for developing countries, Algiers, September 2015
Smart city for developing countries, Algiers, September 2015Smart city for developing countries, Algiers, September 2015
Smart city for developing countries, Algiers, September 2015
 
What is next for Business and Government Automation?
What is next for Business and Government Automation? What is next for Business and Government Automation?
What is next for Business and Government Automation?
 
Fracking - a modern and biblical view - presentation
Fracking - a modern and biblical view - presentationFracking - a modern and biblical view - presentation
Fracking - a modern and biblical view - presentation
 
Re-eh and fracking
Re-eh and frackingRe-eh and fracking
Re-eh and fracking
 
Whats next for Automation?
Whats next for Automation? Whats next for Automation?
Whats next for Automation?
 
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
Kuching | Jan-15 | Role of Existing Self-help Electrification in Off Grid are...
 
What's next for Automation| Private and Public Sector
What's next for Automation| Private and Public SectorWhat's next for Automation| Private and Public Sector
What's next for Automation| Private and Public Sector
 
Energy hub disaster tech innovation program
Energy hub disaster tech innovation programEnergy hub disaster tech innovation program
Energy hub disaster tech innovation program
 
Solar energy business opportunity
Solar energy business opportunitySolar energy business opportunity
Solar energy business opportunity
 
131024 oca nzc smart grids cities & consumers
131024 oca nzc smart grids cities & consumers131024 oca nzc smart grids cities & consumers
131024 oca nzc smart grids cities & consumers
 
NZC - Cateura
NZC - CateuraNZC - Cateura
NZC - Cateura
 
Sss14cheung Hitachi Europe
Sss14cheung Hitachi EuropeSss14cheung Hitachi Europe
Sss14cheung Hitachi Europe
 
Business Automation: What's next
Business Automation: What's nextBusiness Automation: What's next
Business Automation: What's next
 
Managing energy risk in africa presentation
Managing energy risk in africa   presentationManaging energy risk in africa   presentation
Managing energy risk in africa presentation
 
Load Research Concept and Approach _Kolkata.pptx
Load Research Concept and Approach  _Kolkata.pptxLoad Research Concept and Approach  _Kolkata.pptx
Load Research Concept and Approach _Kolkata.pptx
 
Energy as an Opportunity for Telecom Operators
Energy as an Opportunity for Telecom OperatorsEnergy as an Opportunity for Telecom Operators
Energy as an Opportunity for Telecom Operators
 

More from David Lipschitz

Eskom Retail Tariff Application For 2023 onwards Mind map by David Lipschitz
Eskom Retail Tariff Application For 2023 onwards Mind map by David LipschitzEskom Retail Tariff Application For 2023 onwards Mind map by David Lipschitz
Eskom Retail Tariff Application For 2023 onwards Mind map by David LipschitzDavid Lipschitz
 
Energy Crisis Notes by David Lipschitz 25 July 2022
Energy Crisis Notes by David Lipschitz 25 July 2022Energy Crisis Notes by David Lipschitz 25 July 2022
Energy Crisis Notes by David Lipschitz 25 July 2022David Lipschitz
 
Our really big problems (CRISES) Mind Map By David Lipschitz
Our really big problems (CRISES) Mind Map By David LipschitzOur really big problems (CRISES) Mind Map By David Lipschitz
Our really big problems (CRISES) Mind Map By David LipschitzDavid Lipschitz
 
GIIG Global Startup Awards Africa Mind map by David Lipschitz
GIIG Global Startup Awards Africa Mind map by David LipschitzGIIG Global Startup Awards Africa Mind map by David Lipschitz
GIIG Global Startup Awards Africa Mind map by David LipschitzDavid Lipschitz
 
Textiles Industry Market Entry Strategy Mindmap
Textiles Industry Market Entry Strategy MindmapTextiles Industry Market Entry Strategy Mindmap
Textiles Industry Market Entry Strategy MindmapDavid Lipschitz
 
“CashToCash App” App
“CashToCash App” App“CashToCash App” App
“CashToCash App” AppDavid Lipschitz
 
Our really big problems mind map
Our really big problems mind mapOur really big problems mind map
Our really big problems mind mapDavid Lipschitz
 
Comparative Religious Study By David Lipschitz (c) 2020
Comparative Religious Study By David Lipschitz (c) 2020Comparative Religious Study By David Lipschitz (c) 2020
Comparative Religious Study By David Lipschitz (c) 2020David Lipschitz
 
Centre of Green Learning for Cape Town
Centre of Green Learning for Cape TownCentre of Green Learning for Cape Town
Centre of Green Learning for Cape TownDavid Lipschitz
 
Preparation for a meeting at Eskom Megawatt Park
Preparation for a meeting at Eskom Megawatt ParkPreparation for a meeting at Eskom Megawatt Park
Preparation for a meeting at Eskom Megawatt ParkDavid Lipschitz
 
South Africa SONA 2 2019
South Africa SONA 2 2019South Africa SONA 2 2019
South Africa SONA 2 2019David Lipschitz
 
South Africa SONA 2019 speech 1
South Africa SONA 2019 speech 1South Africa SONA 2019 speech 1
South Africa SONA 2019 speech 1David Lipschitz
 
Trevor Manuel at Christel House School
Trevor Manuel at Christel House SchoolTrevor Manuel at Christel House School
Trevor Manuel at Christel House SchoolDavid Lipschitz
 
Social Capital in an African Energy System
Social Capital in an African Energy SystemSocial Capital in an African Energy System
Social Capital in an African Energy SystemDavid Lipschitz
 
Global Perspective on Water Scarcity
Global Perspective on Water ScarcityGlobal Perspective on Water Scarcity
Global Perspective on Water ScarcityDavid Lipschitz
 
Our Really Big Problems Mind Map By David Lipschitz
Our Really Big Problems Mind Map By David LipschitzOur Really Big Problems Mind Map By David Lipschitz
Our Really Big Problems Mind Map By David LipschitzDavid Lipschitz
 

More from David Lipschitz (20)

Eskom Retail Tariff Application For 2023 onwards Mind map by David Lipschitz
Eskom Retail Tariff Application For 2023 onwards Mind map by David LipschitzEskom Retail Tariff Application For 2023 onwards Mind map by David Lipschitz
Eskom Retail Tariff Application For 2023 onwards Mind map by David Lipschitz
 
Energy Crisis Notes by David Lipschitz 25 July 2022
Energy Crisis Notes by David Lipschitz 25 July 2022Energy Crisis Notes by David Lipschitz 25 July 2022
Energy Crisis Notes by David Lipschitz 25 July 2022
 
The Eskom War Room 2015
The Eskom War Room 2015The Eskom War Room 2015
The Eskom War Room 2015
 
Our really big problems (CRISES) Mind Map By David Lipschitz
Our really big problems (CRISES) Mind Map By David LipschitzOur really big problems (CRISES) Mind Map By David Lipschitz
Our really big problems (CRISES) Mind Map By David Lipschitz
 
GIIG Global Startup Awards Africa Mind map by David Lipschitz
GIIG Global Startup Awards Africa Mind map by David LipschitzGIIG Global Startup Awards Africa Mind map by David Lipschitz
GIIG Global Startup Awards Africa Mind map by David Lipschitz
 
Textiles Industry Market Entry Strategy Mindmap
Textiles Industry Market Entry Strategy MindmapTextiles Industry Market Entry Strategy Mindmap
Textiles Industry Market Entry Strategy Mindmap
 
“CashToCash App” App
“CashToCash App” App“CashToCash App” App
“CashToCash App” App
 
Our really big problems mind map
Our really big problems mind mapOur really big problems mind map
Our really big problems mind map
 
Textiles ERP System
Textiles ERP SystemTextiles ERP System
Textiles ERP System
 
Comparative Religious Study By David Lipschitz (c) 2020
Comparative Religious Study By David Lipschitz (c) 2020Comparative Religious Study By David Lipschitz (c) 2020
Comparative Religious Study By David Lipschitz (c) 2020
 
Centre of Green Learning for Cape Town
Centre of Green Learning for Cape TownCentre of Green Learning for Cape Town
Centre of Green Learning for Cape Town
 
Preparation for a meeting at Eskom Megawatt Park
Preparation for a meeting at Eskom Megawatt ParkPreparation for a meeting at Eskom Megawatt Park
Preparation for a meeting at Eskom Megawatt Park
 
South Africa SONA 2 2019
South Africa SONA 2 2019South Africa SONA 2 2019
South Africa SONA 2 2019
 
South Africa SONA 2019 speech 1
South Africa SONA 2019 speech 1South Africa SONA 2019 speech 1
South Africa SONA 2019 speech 1
 
Citizen Power Station
Citizen Power StationCitizen Power Station
Citizen Power Station
 
Trevor Manuel at Christel House School
Trevor Manuel at Christel House SchoolTrevor Manuel at Christel House School
Trevor Manuel at Christel House School
 
Rise for the Climate
Rise for the ClimateRise for the Climate
Rise for the Climate
 
Social Capital in an African Energy System
Social Capital in an African Energy SystemSocial Capital in an African Energy System
Social Capital in an African Energy System
 
Global Perspective on Water Scarcity
Global Perspective on Water ScarcityGlobal Perspective on Water Scarcity
Global Perspective on Water Scarcity
 
Our Really Big Problems Mind Map By David Lipschitz
Our Really Big Problems Mind Map By David LipschitzOur Really Big Problems Mind Map By David Lipschitz
Our Really Big Problems Mind Map By David Lipschitz
 

Recently uploaded

MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 

Recently uploaded (20)

MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 

Building a (Virtual) Power Station - one day workshop

  • 1. Building a Virtual Power Station One Day Workshop By David Lipschitz My Power Station Technology 8th April 2013 Phone: 021 551 9935; 074 119 3246 Email: david@mypowerstation.biz; skype: MyPowerStation (c) My Power Station Technology (Pty) Ltd 2013 Permission is given to copy parts of this presentation as long as the Author is referenced 1
  • 2. Wildpoldsreid • Make twice as much energy as you need • Clever Energy – How? • Work together • http://www.youtube.com/watch?v=Tzc77Lqkl dk (aa1) (c) My Power Station Technology 2013 2
  • 3. Wildpoldsreid • A city wide learning centre that makes the citizens money and helps everyone understand the technology and its social impact • Storage – Hydrogen (H) + CO2 = Methane CH4 & Oxygen (c) My Power Station Technology 2013 3
  • 4. Work Smarter • Smarter Grid • Distributed Storage • Active Participation • http://www.youtube.com/watch?v=5_J97qpF 0I4 (aa2) (c) My Power Station Technology 2013 4
  • 5. Introduction Setting the context Developing the framework for a Virtual Power Station Systems Thinking (c) My Power Station Technology 2013 5
  • 6. Virtual Power Station • Power Station (Plant): Producing electricity (and heat) • Virtual: Simulated(not in one place) • Power Station – Centralised • Virtual Power Station – Decentralised; integrated; smart (c) My Power Station Technology 2013 6
  • 7. © Orbital Renewable Energy 2009 Power Supply Today: A Few Power Plants For Many Users Downsides: Use of un-renewable resources Air pollution Ozone hole Global warming More natural disasters Health risks Loss of life quality Dependence on OPEC, governments and corporations Nuclear danger Nuclear waste High costs for governments and end-users due to results of natures’ abuse
  • 8. © Orbital Renewable Energy 2009 Power Supply Tomorrow: Many Private Power Producers Benefits: Use of renewable resources No air pollution Turn around of global warming Healing of the planet Creating a future No health risks Enhancement of life quality No dependence on OPEC, governments & corporations No nuclear danger No nuclear waste Affordable, healthy and environmentally friendly energy for everybody, everywhere
  • 9. My Power Station • My Power Station helps you power your life, internally and externally • Software, Energy, Power • Internal Energy – What keeps us going internally – Sport, Exercise, Learning, Health, Family – Power comes from sharing, trusting and working together • External Energy – External inputs to ourselves; Money, Work, Jobs(c) My Power Station Technology 2013 9
  • 10. Eskom 49m Energy Saving Campaign (c) My Power Station Technology 2013 10
  • 11. Why are you here? • What would you like to get out of this workshop? • Why? (c) My Power Station Technology 2013 11
  • 12. Why I’m here • I’d like you to leave here with the essential toolset to convince yourself and your board of directors and customers of the possibility of solving our electricity crisis – And reducing our cost of living • For ourselves • For our home, planet earth – And making money and profits, sustainably • What electricity crisis? (c) My Power Station Technology 2013 12
  • 13. We’re in trouble!! • South Africa – No new base load power station build in the past 20 years – vs: China: >1 GW per week added to their grid!!! – China installed 18 GW of Wind in 2011; 40 GW was installed worldwide. Zero in South Africa – By end of 2012, China had 75.5 GW of Wind (growing 80% per annum since 2007) – In 2012 China produced more wind energy (100 TWh) than Nuclear (98 TWh) (c) My Power Station Technology 2013 13
  • 14. We’re in trouble!! • Can you see where South Africa’s going? • New Coal Power Stations: only 10 GW – Electricity is already sold!! – 10.5 GW will be decommissioned in 2020’s (c) My Power Station Technology 2013 14
  • 15. Electricity Build and Decommissioning (c) My Power Station Technology 2013 15 From White Paper on Renewable Energy, 2003 2008 Load Shedding Spare Capacity
  • 16. Money • Existing or New? • Can’t we use existing money to finance our new build? (c) My Power Station Technology 2013 16
  • 17. News on 15th May 2012 • “Work to begin on 68km R5.2 billion in Nov 2012 (R5,200,000,000) railway line to supply Majuba Power Station with 14 million tons of Coal per annum” (Actual Start March 2013?) – http://www.engineeringnews.co.za/article/work-on-r52bn-majuba-rail-line-to-begin-in- nov-eskom-2012-05-14 • R100 billion being spent on new coal mines • At least R2 Trillion on New Power Stations – & R166 bn on The Grid (Eskom Transmission Plan) • 5,000 x 1,200 kWh per month houses can be permanently “removed” from the grid per R1bn, so R2 Trillion is at least 10 million houses (c) My Power Station Technology 2013 17
  • 18. What happened at Majuba? • Majuba built in 1980’s. Majuba coal mine had certain geological deficiencies, so coal is trucked in from up to 68 km away. (c) My Power Station Technology 2013 18 Photo from Bloomberg
  • 19. BRICS Brazil, Russia, India, China, South Africa • Page 69: NPC Report (Nov 2011): “Brazil, China, India, Indonesia, South Korea and Russia will account for more than half of all global growth, growing by an average of 4.7% a year to 2025, by which time their share of global GDP will have grown from 36% to 45%.” – My Comment: [It is time for South Africa and Africa to shed its association with its colonial masters, England, France, Germany, Portugal, Spain, and the USA, which are part of the dying Western Empire, and change to a much closer association with the Asian Tigers, BRICS (China (9.5%)), Indonesia, South Korea, and of-course the African Tigers: Ghana (13.5%)(2nd highest), Mozambique (7.2%), Ethiopia (7.5%), Nigeria (6.9%), Botswana (6.2%), South Africa (3.4%). 36 Africa countries growing faster than the RSA. – Qatar (18.7%), India (7.8%), Russia (4.3%), Brazil (2.8%), Germany (2.7%), USA (1.5%), UK (1.1%), Portugal (-2-2%), Greece (-6%)] – Growth rates in % are net growth after inflation. (c) My Power Station Technology 2013 19
  • 20. China’s 12th 5-year plan tabled in 2011 • “Has a striking change from the past” • “From – A focus on investment-driven, high energy and low-cost manufacturing” • “To – Low-carbon industries, new energy, next generation information technology and high-end manufacturing – China’s goal is to achieve 15% global share of these industries, compared with 3% now (in 2011)” (c) My Power Station Technology 2013 20 South Africa is still stuck here! Note that the Chinese quote comes from the NPC document! Page 69, NPC Plan 2020
  • 21. Money will be borrowed • Reason for the BRICS Development Bank! • The BRIC will lend money to the S! • The BRIC needs South Africa’s resources • A no-brainer for them • But the resource curse for us: – The resource curse (Paradox of Plenty) refers to the paradox that countries and regions with an abundance of natural resources, specifically point-source non-renewable resources like minerals and fuels, tend to have less economic growth and worse development outcomes than countries with fewer natural resources. – https://en.wikipedia.org/wiki/Resource_curse (c) My Power Station Technology 2013 21
  • 22. News on 28th March 2012; and 27th March 2013 • President Jacob Zuma at the BRICS conference seeking R1 trillion for the next 20 years infrastructure expansion program • Other BRICS countries growing at 10% per annum after inflation; SA at 2% – 10% + 5% inflation = R450 billion this year! • Does government need to borrow this R1 trillion with us citizens (and countryside) as surety? – 1 million new jobs; R1,000,000 debt per job! – 50 mil to 57 mil people by 2020: need 3.15 mil jobs! • Is there a better way? Using VPS Ideas? (c) My Power Station Technology 2013 22
  • 23. R1 bn = 5,000 houses(VPS & Jobs) • What is R1 bn anyway? – Electrify 5,000 * 1,200 kWh per month houses – 5,000 Smart Electricity Meters – 5,000 inverters – 5,000 solar water heaters – 200,000 solar panels (Photovoltaic PV) – Circuit Breakers; Cable; Fuses; Grounding Rods – People • 250 installers per year for the PV – 25,000 installers employed for at least 20 years for entire country • Manufacturers; designers; support people; etc (c) My Power Station Technology 2013 23
  • 24. And Only govt loan guarantees are required – Supported by the Trevor Manuel and National Planning Commission (NPC Plan 2030) No subsidies No government borrowing No new regulations, in fact deregulation is required And best of all: – Electricity plus People plus Resources enables: • Clean Economic GROWTH -> more money for govt • Massive Employment (c) My Power Station Technology 2013 24
  • 25. “Breaking the Code of History” • Eskom have said (email) that they “will support private people working together to look like a big customer to Eskom.” This customer can be called a Virtual Power Station. • For fast growth, an economy needs: • By David Murrin in “Breaking the Code of History” book – Population Growth – Resources – Electricity – South Africa has the first two, but the 3rd is stagnant (c) My Power Station Technology 2013 25
  • 26. Our Environment: GDP • World GDP Growth (c) My Power Station Technology 2013 26
  • 27. Our Environment: Wind (c) My Power Station Technology 2013 27 In 2011 Capacity Installed: China 18GW; Doubled every year 2005 to 2009; Total Installed Wind Capacity Worldwide in 2011: 41,000 MW! World Wide Wind Total Installed Capacity: 238,000 MW (238 GW)
  • 28. Our Environment • Photovoltaic (PV) Production (c) My Power Station Technology 2013 28
  • 29. Video We Live in Exponential Times • 5 minutes • http://www.youtube.com/watch?v=lUMf7FW GdCw • This exponential growth depends on exponential availability of inexpensive electricity – For reference: watch later (c) My Power Station Technology 2013 29
  • 30. The Virtual Power Station / Plant • "Virtual power plants represent an ‘Internet of Energy,’" says senior analyst Peter Asmus of Pike Research. "These systems tap existing grid networks to tailor electricity supply and demand services for a customer. VPPs maximize value for both the end user and the distribution utility using a sophisticated set of software-based systems. They are dynamic, deliver value in real time, and can react quickly to changing customer load conditions.” – http://en.wikipedia.org/wiki/Virtual_power_plant • Estimated growth $5.2 billion worldwide in 2010 to between $7.4 billion and $12.7 billion by 2015 • IT + ET = EI (Information Technology + Energy Tech = Energy Internet) – Thomas Friedman, in Hot, Flat and Crowded (pg 224 onwards) (c) My Power Station Technology 2013 30
  • 31. The Smart Grid • vs The Dumb Grid – Doesn’t know what its customers are doing and when they will need something – Uses historical information gathering • The Grid interacts with its stakeholders – “knows” the future • Re customers • Re suppliers • Re pricing (c) My Power Station Technology 2013 31
  • 32. Systems Thinking • What exactly is a system? A system is a group of interacting, interrelated, and interdependent components that form a complex and unified whole – http://www.pegasuscom.com/systems-thinking.html • We need to consider the big picture, not just parts of it (c) My Power Station Technology 2013 32
  • 33. Video: A bigger System • a: Amory Lovins: a new fire (first 5 mins of 27) – We can watch more later in the day if there is time – Video available on TED • http://www.ted.com/talks/amory_lovins_a_50_year_pl an_for_energy.html (c) My Power Station Technology 2013 33
  • 34. What benefits do big electricity users get? (c) My Power Station Technology 2013 34
  • 35. What benefits do big electricity users get? • Member of Electricity Intensive User Group • High Level Meetings with Eskom • Involved in Daily Eskom Scheduling • Time of Use Tariffs • ESCO Rebates; Demand Response • Lower Electricity Charges • Ability to export energy to the grid (Mondi) • They are taken seriously by Eskom. They have power (c) My Power Station Technology 2013 35
  • 36. How can these benefits be made available to small / all electricity users? (c) My Power Station Technology 2013 36
  • 37. How can these benefits be made available to small / all electricity users? • Build a Virtual Power Station – a cluster of small users which looks like a big customer to Eskom • The Nine Dots Model – Solving the “Reverse Feed Problem” – EV’s to “soak up” excess production and to provide electricity at peak time (c) My Power Station Technology 2013 37
  • 38. Virtual Power Station Videos b: conEdison Smart Grid 5 mins http://youtu.be/QPWCCz_OTGU c: GE 8 mins (perhaps later) http://youtu.be/ztw3aYLX4_U d: Duke 4 mins http://youtu.be/E1Jrdt1OV8s (c) My Power Station Technology 2013 38
  • 39. End of Introduction Beginning of Technologies (c) My Power Station Technology 2013 39
  • 40. Our workshop • Looking at electricity as the core missing enabler to get our economy moving • What tools do we need? • What types of technologies are available? • How can benefits that big business get be made available to small business? (c) My Power Station Technology 2013 40
  • 41. Riaan Smit @ Wind Energy Conference, Cape Town, Tuesday 29th May 2012 • South Africa needs a – “New Future Vision” • Riaan is Chief Engineer in National Planning at Eskom (c) My Power Station Technology 2013 41
  • 42. Thinking Differently • Should we think differently? – Do we need cars? How many? What sort? Can they be shared? – Do people need to go to work or can they telework? – Should our systems stay centralised or can they be decentralised? – How would we design the system if there was no coal or nuclear energy? (c) My Power Station Technology 2013 42
  • 43. Our problems • Everything going UP • Government taxing infrastructure instead of growing the economy and getting money from taxation • Infrastructure – Electricity; water; rates; fuel taxes; transport – E-tolls; carbon taxes; electricity levies – Exporting raw materials; importing finished goods • Bad balance of payments / rand depreciation / inflation (c) My Power Station Technology 2013 43
  • 44. Petrol Price Increases since 2002 (c) My Power Station Technology 2013 44 Petrol price at pump; Oil = Rand $ in January each year * Brent Crude Converted to litres
  • 45. Buying and Producing Electricity Graph in Rand per kwh ex VAT (c) My Power Station Technology 2013
  • 46. Government’s Problem • Get’s large amounts of revenue from electricity generation • Electricity makes a loss at peak time – Eg Ankerlig: R4 to R13 per kWh – Eg City of Cape Town Peak Demand: 72c (to R2.47) per kWh + Demand Charge – Means all Eskom’s rebates are based on removing peak load so that they can be more profitable – PV doesn’t fit into this! Or does it? (c) My Power Station Technology 2013 46
  • 47. Ankerlig • Near Atlantis • 9 x 150 MW Combined Cycle Turbines – Can use Diesel or gas; currently diesel • 25,000 litres of diesel per minute – X 60 minutes * R12 per litre = R18 million per hour • R18 million / 1,350,000 MW • = R13 per kWh! (c) My Power Station Technology 2013 47 Photo: ESBi Engineering
  • 48. What knowledge do you have? • Technical Terms • Quick Recap? (c) My Power Station Technology 2013 48
  • 49. This is what a Renewable Energy System (without batteries) Looks Like … (c) My Power Station Technology 2013 49 PV Array Combiner Box Grid Tie Inverter DB Board Mains Utility [Schematic excludes Grounding Systems; DC & AC Disconnect; Fuses; etc.] Start here … The grid is the “battery” (backup) Eskom say Grid Tie is unsafe because what if there is load shedding or if the grid is switched off?
  • 50. Anti-Islanding • Used when the grid supply is shut off: – “Since 1999, the standard for anti-islanding protection in the United States has been UL 1741, harmonized with IEEE 1547. Any inverter which is listed to the UL 1741 standard may be connected to a utility grid without the need for additional anti-islanding equipment, anywhere in the United States or other countries where UL standards are accepted.” (c) My Power Station Technology 2013 50 http://en.wikipedia.org/wiki/Solar_inverter
  • 51. This is what a Renewable Energy System (with batteries) Looks Like … (c) My Power Station Technology 2013 51 PV Array Combiner Box Solar Charge Controller Battery Bank Inverter / Charger (Island System) DB Board Mains DB Board Backup Loads Utility [Schematic excludes Grounding Systems; DC & AC Disconnect; Fuses; etc.] Start here … Generator
  • 52. Grid Tie Island Schematic (c) My Power Station Technology 2013 52
  • 53. Battery Only System (c) My Power Station Technology 2013 53 Watch Battery System Installation Video http://www.youtube.com/watch?v=LT1AF4ycAQY
  • 54. Terminology • Grid Tie: an electrical system that is connected to the government electricity grid • Reverse Feed / Embedded Generation: where someone besides Eskom sells electricity to the Grid • Net Metering: where the consumer buys and sells electricity at the same price • Feed In Tariff: where the Grid Operator / Utility pays the “Embedded Generator” a higher rate to feed the grid • Time of Use Metering: where electricity is bought (and sold) at different rates depending on grid demand (during off- peak, standard time, and peak-time, or in the future on a second by second basis) • Inverter / Grid Tied Inverter: Changes DC to AC electricity • Island: allows a grid-tie inverter to operate during a power failure, whilst isolating it from the grid (c) My Power Station Technology 2013 54
  • 55. The Toolset (c) My Power Station Technology 2013 55
  • 56. “Night” and Peak Demand • Start with “the battery”, the most difficult component – Because Eskom doesn’t want us to export energy – They and the Cities allow “Parallel Feed” which is essentially what Solar Water Heaters (and heat pumps) do, except that Solar Water Heaters remove peak demand. Same for Timers and Demand Response (DR). (c) My Power Station Technology 2013 56
  • 57. “Night” • What does it cost to build more generation (to oversupply) vs how to store and manage energy? – Ie over generation vs energy storage – This might change due to storage costs coming down, carbon taxes, environmental legislation – http://www.renewableenergyworld.com/rea/news/article/2013/04/e nergy-storage-series-why-we-need-it-and-why-we-dont (c) My Power Station Technology 2013 57
  • 58. “Night”? • For Night and Cloudy Days customers will need batteries, energy storage, and will need to import electricity from the Eskom / Munipalities, preferably at “off peak time” • We need Behaviour Change (Toolset) • AND we need Energy Efficiency (Toolset) • Customers can save up to 77% of their electricity requirement – and Eskom has incentives for this (c) My Power Station Technology 2013 58
  • 59. Toolset: EV – Nissan Leaf • Available for $200 a month in Austin, Texas on rental • Battery pack should last 5 to 7 years in Austin • 4.7km per kWh at R1.50 per kWh or 31 cents per km in Cape Town • 14 km per litre for 1.4 litre car at R12.73 per litre or 91 cents per km • Nissan Leaf is 1/3rd of the cost to run. Repayments are about the same per month. (c) My Power Station Technology 2013 59 EV = Electric Vehicle (there are also Hybrids)
  • 60. Toolset: Pumped Storage a large scale battery (c) My Power Station Technology 2013 60 http://www.eskom.co.za/c/article/207/pumped-storage/
  • 61. Pumped Storage Potential • Lesotho Highlands – 3GW Pumped Storage Potential • USAID Electricity Supply Industry of Lesotho General Information for Potential Investors report in May 2008 • Palmiet / Steenbras Dam (near Cape Town) – 2 x 200 MW reversible Francis pump/turbines • Generator manufactured by Fuji of Japan • Turbine manufactured by Voith of Germany – Construction started 1983 – Commissioned 1988 (c) My Power Station Technology 2013 61
  • 62. Toolset: Battery • CSP (Concentrated Solar Power) • Solar Tower • Storage: – In Salt or Sulphur – Electricity produced in the normal way via steam and turbines • From sun during the day, or molten salt at night • Needs external energy to keep the salt “wet” (liquid) – Runs for 16 hours a day in Spain, eg 5am to 9pm, covering the morning and evening peaks in South Africa (c) My Power Station Technology 2013 62
  • 63. Solar Towers (c) My Power Station Technology 2013 63 http://designbuildsource.com.au/worlds-largest-solar-towers-take-to-the-sun Abengoa and Brightsource’s Palen Solar Tower Project, California
  • 64. Solar Towers (c) My Power Station Technology 2013 64 http://designbuildsource.com.au/worlds-largest-solar-towers-take-to-the-sun Abengoa and Brightsource’s Palen Solar Tower Project, California
  • 65. Toolset: Large Scale Batteries • XTremePower – eg 36 MW • http://www.duke-energy.com/news/releases/2013012301.asp • Flywheel • Ultra-capacitors • Global Key Players – Generalists: ABB, Alstom, GE, S&C Electric, Schneider Electric, Siemens – Purists: A123, BYD, Panasonic, Toshiba, Xtreme Power, ZBB Technologies, etc (c) My Power Station Technology 2013 65 http://zpryme.com/news-room/asian-grid-scale-energy-storage-market-364b-by-2020-zpryme-smart-grid-insights-reports.html
  • 66. Toolset: Water • Hydro – Large Scale and Micro-Hydro • Tidal – Eg Siemens 1.2 MW for 1,500 households in Northern Island • Wave • Ocean Currents – Benguela and Agulhas Currents flowing at up to 3m/s (10km/h), 24 hours a day, 7 days a week (c) My Power Station Technology 2013 66 Also: Desalination
  • 67. Toolset: Biogas (c) My Power Station Technology 2013 67 e.g.: GE Jenbacher Gas Engines
  • 68. Toolset: BioGas GE Jenbacher • Landfill gas – 1 million tons of waste power 1MW plant for more than 15 years – Waste from US city of 1 million can power 8MW plant • Sewerage – Waste water from city of half a million powers 1MW plant; 100% of energy needed for the plant! • BioGas – 5000 cows can power 1 MW plant (c) My Power Station Technology 2013 68
  • 69. Toolset: Local Storage • “Municipal Energy Companies” – Dr Hermann Scheer in The Solar Economy – Every industrial business is also an energy business – Local integration • Local jobs & a stronger local economy – Lower costs with decentralised systems – CHP: Combined Heat and Power, easier because of local electricity production (c) My Power Station Technology 2013 69
  • 70. Toolset: “Summer time” • Windhoek 1 sun hour West of Durban. Could build Solar Tower and PV plants there to provide energy to Durban for the evening peak. • World's largest solar towers being built: 2 at 250 MW each in the Californian Desert. Currently the largest tower is in Abu Dhabi and it is 100 MW. The new design uses 50% less water and 13% less land for a similar Solar Tower plant, and 33% less land than a PV plant. Solar Towers also provide for energy storage and already run for 16 hours a day in Spain. (c) My Power Station Technology 2013 70
  • 71. Toolset: Behaviour Change (c) My Power Station Technology 2013 71
  • 72. Toolset: Energy Efficiency • Examples • Calculations (c) My Power Station Technology 2013 72
  • 73. Energy Efficiency Examples • Energy Efficiency is all about not using or needing electricity in the first place • Eg: – Electricity Meter – Insulation • Ceiling, window, pool cover – Heating / Cooling • Solar Water Heater; Ice Cooler – Energy Efficient Appliances (c) My Power Station Technology 2013 73
  • 74. Simple Electricity Meter (c) My Power Station Technology 2013 74
  • 75. NegaWatts, not MegaWatts (c) My Power Station Technology 2013 75 PV = Photovoltaic System EE = Energy Efficiency: Spend to save ER = Eskom ESCO Rebate (approximate) Price Per Total Monthly %tage watts watt Price Repayments kwh price per kwh Inc VAT PV 100% 8,000 R20.00 R160,000.00 R1,600.00 1,200 R1.33 R1.52 EE 0% 8,000 R20.00 R0.00 PV 30% 8,000 R20.00 R48,000.00 EE 70% 8,000 R12.00 R67,200.00 R115,200.00 R1,152.00 1,200 R0.96 R1.09 ER R290.00 R862.00 1,200 R0.72 R0.82 NegaWatts = Negative Watts
  • 76. RE Example and Effect of EE Figures as at July 2011 (c) My Power Station Technology 2013 76 House Loads 1200 kwh/month Ball Park Number for Grid Tie Rand per kwh Peak Average Sun Hours 5 h with Battery Backup R 60.00 R 1.06 Estimated W installed 7890 Electricity Cost pa R 15,264.00 Estimated Rand Value R 473,424.66 kwh/pa 14400 New Electricity Use Efficiency Electrical Cost Saving Equipment Savings Water Savings Savings pa Awareness R 899.00 15% R 71,013.70 pa R 2,289.60 Insulation - roof / ceiling R 3,000.00 10% R 47,342.47 R 1,526.40 Insulation - pool cover R 36,000.00 7% R 30,772.60 R 1,869.60 R 992.16 Pool Pumps R 3,000.00 10% R 46,800.00 R 1,508.91 Fridge R 5,000.00 4% R 16,800.00 R 541.66 SWH R 30,000.00 25% R 118,356.16 R 3,816.00 Gas cooking Totals R 77,899.00 70% R 331,084.93 R 10,674.73 New Rands New W Rqd New Estimate 473-331k+78k R 220,238.73 R 142,339.73 2372.3 New pool cover every 5 years; Pool Size: 50 sq m; Roof Size: 100 sq m; Elec savings higher if inflation included Inverters life expectancy is 15 yrs. Replacement Not included. Gas Cooking: probably no savings, but reduces peak electricity demand. Battery Inefficiency = 20%; Grid Tie Inefficiency = 6%. R60 per watt incl inefficiencies. For 20 years 20kl Water Usage for Pool Per Month for 6 Months @ R15.58 R 1,869.60 R 37,392.00
  • 77. Haven’t taken into account • Potential sales to the City of Cape Town • Net Metering through the transformer • Retail Wheeling • Time of Use Tariffs • Carbon Credits • Eskom ESCO rebate • DR (Demand Response) (c) My Power Station Technology 2013 77
  • 78. Toolset: Time of Use Tariffs • Give the member of the Virtual Power Station the opportunity to get paid to move their loads outside Peak Time • The member also gets the opportunity to sell electricity at peak time – We’ll see this when we discuss Net Metering (c) My Power Station Technology 2013 78
  • 79. Cape Town Time of Use Tariffs (c) My Power Station Technology 2013 79
  • 80. Cape Town Residential Stepped Tariffs (c) My Power Station Technology 2013 80 http://www.capetown.gov.za/en/electricity/Pages/ElectricityTariffs.aspx
  • 81. Toolset: Computers • Computers and the Internet • Allowing the move: – ET + IT = EI – Energy Technology – Internet Technology – The Energy Internet • Eg: Homeowner tells the utility that she needs the oven for 1 hour during the day • Work Smart (c) My Power Station Technology 2013 81
  • 82. Computers: The ISP Model • The Backbone – Telkom, BCX, Internet Solutions – Sells to ISPs • The ISP: Internet Services Provider – Sells to the public • A relatively small number of backbone suppliers • A large number of public users (c) My Power Station Technology 2013 82
  • 83. The ESP Model • ESP = Electricity Services Provider • Based on the ISP model • Other examples: – Railway grid in Europe – Aviation grids – Telecommunications grid – All shared. Paid for by whom? • Capex payments • Utilisation payments (c) My Power Station Technology 2013 83 ISMO: Independent System and Market Operator = electricity middleman 1998 Electricity White Paper re ISMO & Competition 2003 RE White Paper re Competition ISMO Bill Update in Business Report on 27th March 2013: http://www.iol.co.za/business/business-news/new-electricity-middleman-nears-lift-off-as-ismo-bill-is-finalised-1.1492346#.UVlfEGnlw9B
  • 84. Smart Metering and Control (c) My Power Station Technology 2013 84
  • 85. Measure - SMART energy "If you can not measure it, you can not improve it.", Lord Kelvin (c) My Power Station Technology 2013 85
  • 86. What your electricity measurement should do • Real time reporting • Onboard reporting • Long term data collection • RS-232 communication to database via GSM, Wifi or Ethernet modules • SMART control for geyser heating and pool pumps • Load shifting and DR • SMART geyser element management (c) My Power Station Technology 2013 86
  • 87. ESCO Rebates (c) My Power Station Technology 2013 87
  • 88. ESCO Rebates • Standard Product (specific products) – Lighting – Solar Water Heater (homes) – Showerheads – Timers • Standard Offer (projects) – 70c per kWh deemed rebate for SWH – R1.20 per kWh for first 10MW of NM PV – Eskom IDM Web Site • Other (c) My Power Station Technology 2013 88
  • 89. Demand Response • http://www.eskomidm.co.za/demand- response • It is a dynamic energy infrastructure management programme designed to support the stability of the national electricity grid, and meet South Africa’s growing demand for energy with the assistance of large and very large energy users – in both the industrial and commercial sectors – who agree to switch off certain production processes or turn down certain electrical loads during periods of peak demand. (c) My Power Station Technology 2013 89
  • 90. Demand Response • Demand Response is a highly flexible programme that can be customized to the individual financial and energy usage objectives of participating companies. The programme offers: – Energy and capacity incentive payments; – Seamless business continuity; – Information on energy cost reduction; and – Recognition for supporting the national grid and, therefore, the stability of electricity supply to South Africa and its people. • Utilising ground breaking software, hardware and support services that reduce the demand for energy of participating companies, Demand Response allows large and very large energy users to participate for free and, most importantly, without operational interruptions. (c) My Power Station Technology 2013 90
  • 91. Demand Response • Eskom pays customers to reduce load on instruction to balance supply and demand • 3 types – 1 second notice: up to 10 mins – 10 min notice: up to half an hour – 30 min notice: up to 2 hours • Needs “Aggregator” & Customer Services Provider • Eskom pays for measuring and other equipment plus monthly fees • Eskom looking for 500 MW short term and 2 GW long term (c) My Power Station Technology 2013 91
  • 92. Some Eskom DR / ESCO Rebates • ESCO Incentives – 42 cents per kwh for reducing electricity at peak time – 10 cents per kwh for reducing electricity at off- peak time – 70 cents per kwh for water heating – For customers with more than 100 kW to save – Note that I am unsure what the latest numbers are for these rebates (as at 3rd April 2013) (c) My Power Station Technology 2013 92
  • 93. Demand Response (c) My Power Station Technology 2013 93
  • 94. Homeowner DR • Is it possible? • How? • TOU and DR • PV and DR • Taking DR to the people (c) My Power Station Technology 2013 94
  • 95. My Suggestion for the VPS DR • Standard Time Rate: R1.50 per kWh • Peak Time Rate: R3.00 per kWh • Off Peak Rate: 20 cents to 75 cents per kWh • Prices including VAT • And • Using Net Metering – Incentivises people to minimise use at peak time and to try to sell at peak time. (c) My Power Station Technology 2013 95
  • 96. Homeowner VPS DR • ESCO Rebate – 53 cents per kwh for reducing electricity at peak time – 10 cents per kwh for reducing electricity at off- peak time • Homeowner assumption (c) My Power Station Technology 2013 96
  • 97. Carbon Credits (c) My Power Station Technology 2013 97
  • 98. Carbon Credits • Electricity Producer in “developing” country earns carbon credits • Paid for by polluter in “developed” country • ETFs (Exchange Traded Funds) – Allows one to trade Carbon Credits (c) My Power Station Technology 2013 98
  • 99. Net Metering (NEM) • Normal – Buy and sell at the same rate, eg R1.50 per kWh – Bank excess electricity used during the day – Buy back at night • Other – 1: Buy at the normal rate; Sell at a lower rate • In South Africa, this would get NEM going – 2: Sell at the normal rate; Buy at a higher rate • Great for users who can make more electricity than they need. (c) My Power Station Technology 2013 99 The Jargon: http://www.thegreentimes.co.za/stories/energy/item/1130-net-metering-buzz-words
  • 100. Net Metering (NEM) • Avoided Costs • Incl: the sum of all costs that the utility avoids as a result of customer generation to the grid, including: energy purchases; generation capacity or resource adequacy; line losses; transmission and distribution capacity; air pollution permits and offsets; ancillary services; renewable energy purchases (E3, Net Metering Cost-Effectiveness Evaluation, Jan 2000, California Public Utilities Commission) • Facilities Private Investment • If we are at Grid Parity it makes sense • Facilitates Job Growth which in the USA is 10x faster than the economy as a whole; 75% are installation Jobs which are local and cannot be exported (c) My Power Station Technology 2013 100
  • 101. Countries with Net Metering • 13 Countries + 42 USA States • More than 20 years experience – Were already running in 1991 • Government’s White Paper on RE – Nov 2003 – “Government is committed to the introduction of greater levels of competition in electricity markets – The production and distribution of energy should be sustainable and lead to an improvement in standard of living of citizens – Barriers to entry should be lowered” (c) My Power Station Technology 2013 101
  • 102. The Grid (c) My Power Station Technology 2013 102 From Eskom Annual Report 2009
  • 103. Quick Summary • We can do all of this without residential and other end user PV • Although we should allow the utility to buy energy at peak time, eg from battery backup and/or EV’s and/or generators, etc • And the utility and municipality should make TOU tariffs available to small users (c) My Power Station Technology 2013 103
  • 104. Renewable Energies • Solar: SWH, PV, CSP, Solar Tower. + with storage • Water: ocean, tidal, river, wave, pumped storage • Other: Wind, Geo-thermal, Biogas, Sewerage to Gas • Storage: battery, fuel-cell, water, salt, Sulphur, Hydrogen • Non-renewable: coal, oil, gas, nuclear (c) My Power Station Technology 2013 104 Riverside Renewable Energy Holt Logistics Gloucester Marine Terminal New Jersey, USA • 9MW Roof Top PV • $42m • ~ 110,000 square meters • 80% of energy requirement
  • 105. What is PV? Photovoltaic Panels (c) My Power Station Technology 2013 105
  • 106. Can we produce electricity cheaper than we can buy it? Whiteboard / Word • Assumptions: – City of Cape Town – Borrowing at 10% interest rate over 20 years – Rooftop PV Systems – 3 bedroom, 4 person household using 1,200 kwh per month • Homeowner – R1.29 per kwh 16% R1.50 • Business owner – R1.02 per kwh 16% R1.18 + 1 cent (additional) levy + R120 per ton carbon tax, ie 12 cents per kwh R1.31 28% • More Info: R1,800; R182,400; 8 KW; R22.80; R182,400; R20 per watt? How? (c) My Power Station Technology 2013 106
  • 107. The real savings in being energy independent (kw vs kwh) • If you spend R1m a year on electricity • And you can install your own system for R900,000 per year • What would you prefer? • If you buy your own system, then at 10% per annum over 20 years, the R900,000 equates to a capital cost of R7.5M (c) My Power Station Technology 2013 107
  • 108. The Cherry on Top • Once you’ve paid off the system, it is YOURS • Your electricity cost doesn’t increase every year … ☞ … which means that you can plan for the future! • And: you can save 70%+ of your electricity cost over 20 years (c) My Power Station Technology 2013 108
  • 109. Buying and Producing Electricity Graph in Rand per kwh ex VAT (c) My Power Station Technology 2013
  • 110. Fix your price and save (c) My Power Station Technology 2013 110
  • 111. Discussion (c) My Power Station Technology 2013 111
  • 112. Trust & Expectations • Can we rely on the system? • Should we rely on the system? • What is “the system”? • Customers expect – The system to be up – Maybe we expect “load shedding” because of what happened in 2008 – Many private people and businesses installed generators to give themselves security of supply (c) My Power Station Technology 2013 112
  • 113. Opportunity to sell electricity • To Cities, Eskom, other users • Especially at peak time – Average electricity cost to City of Cape Town is 55 cents per kwh – E.g.: Ankerlig near Atlantis produces 1,350 MW, uses 25,000 litres of diesel per minute, at a cost of between R4 and R13 per kwh – So, we can produce at R1.32 per kwh and sell at R3 per kwh! (c) My Power Station Technology 2013 113
  • 114. How to get started? • “Mandelaton” CID – Community Improvement District • Milnerton Proper; Woodbridge Island; Lagoon Beach; Joe Slovo / Phoenix; Sunset Beach • Measure: 2,000 meters * R6,000 each installed – Incl, Voltage, Current, Peak Demand, – Can tell what’s running by looking at “profiles” – Can control Geyser – Can switch loads on and off (DSM and rebates) – Is Wireless, so user needs internet connection • Design, Finance, Implement, Insure, Maintain (c) My Power Station Technology 2013 114
  • 115. Mandelaton CES (c) My Power Station Technology 2013 115
  • 117. Discussion (c) My Power Station Technology 2013 117
  • 118. Social and Technical Factors (c) My Power Station Technology 2013 118
  • 119. Social and Technical Factors • Social – “Belief” – “Myth” • Technical – Prices are dropping 10 to 20% per annum – Energy Storage is possible; cheaper than running peaking power stations – RE allows non-degreed installation and maintenance personnel, appropriate for RSA (c) My Power Station Technology 2013 119
  • 120. Energy Literacy • How literate are South Africans about their energy choices? • The USA has http://www1.eere.energy.gov/education/ener gy_literacy.html and http://www.need.org/ (c) My Power Station Technology 2013 120
  • 121. Do we know the risks & costs? • Of Fossil Fuel Energy – No, even after 150 years of building power stations – Kusile and Medupi: budgetted to cost R79 billion for 4.8 GW each; now R125 billion each and rising – Coal and other fossil fuel costs rising faster than expected • Of Renewable Energy – Yes, and they are decreasing (c) My Power Station Technology 2013 121
  • 122. The Risks • Mainly our 20th Century assumptions • Compare wind and nuclear risks • Donor assistance risks (c) My Power Station Technology 2013 122
  • 123. Assumptions • Our economy has an assumption built into it – Cheap and reliable Electricity ?? • But 150% increase over the past 5 years – Cheap build ?? • But R79 bn quote: R125 bn now; 12 months behind schedule – Cheap raw materials ?? – Reliable Distribution Systems ?? • Transformer life: was 35 years -> now 12.5 years • Decreasing Costs works for IT ✔ – Lets find out if it can work for electricity? • How risky are our assumptions? (c) My Power Station Technology 2013 123
  • 124. Riskscontinued • Environmental Risks – Water, health, pollution, jobs, GDP growth • Security of Supply – Coal, oil, nuclear: Wind, sun: • Cost of Supply – Coal, oil, nuclear: Wind, Sun: • The Cost of Unserved Energy – Energy Security; what is the cost of being out of action? • For a business; for a homeowner who doesn’t know they are off? – R75 per kWh • Nuclear Waste Management (c) My Power Station Technology 2013 124
  • 125. Risks (c) My Power Station Technology 2013 125 IRP2010 v8 (nothing re PV; nothing re Net Metering) Cheap? Reliable?
  • 126. Risks: The “Nuclear Fleet” Cost • 9.6 GW • What’s it going to cost? • With such widely varying costs, would you do this project? • Can we remove 9.6 GW from the grid at peak / any time? • How? (c) My Power Station Technology 2013 126
  • 127. Risk of “old thinking” • South Africa might miss out on the 21st Century “Gold Rush” (c) My Power Station Technology 2013 127
  • 128. Risks Section – New Build (c) My Power Station Technology 2013 128
  • 129. World Energy Growth Rates by Source Percent Annual Average Growth (c) My Power Station Technology 2013 129
  • 130. Solar Insolation Map (c) My Power Station Technology 2013 130 Germany: 2.4 ave peak sun hours per day; SA 5.9 (5 after derate factor)
  • 131. Risks Section - Wind Power (c) My Power Station Technology 2013 131 http://www.earth-policy.org/data_highlights/2013/highlights37
  • 132. Risk Section – Chinese Wind vs Nuclear Generation (c) My Power Station Technology 2013 132
  • 133. Risk Thinking – Chinese Wind Power Potential (c) My Power Station Technology 2013 133
  • 134. The Big Energy Myth • From Dr Hermann Scheer’s Book – “The Solar Economy” pp 169 to 170 – “Once the fear of the small scale has been dispelled, once RE has demonstrated that it can replace fossil energy in its entirety, then the aura of the centralised nuclear/fossil industry will quickly fade. While fossil mythology remains unchallenged, humanity is faced with the absurd prospect of choosing death over a solution it is afraid to embrace. … Ordinary people are caught up in the myth of big technology … We need an active and engaged society” (c) My Power Station Technology 2013 134
  • 135. Seven Crises(video) - caused by our energy system • Climate crisis • Fossil fuel availability crisis • Social (3rd World) crisis • Health crisis • Nuclear crisis • Water crisis • Food (agricultural) crisis Dr Hermann Scheer, Member of the German Government, President of EUROSOLAR, General Chairman World Council for Renewable Energy (WCRE) Photo: “For Work and Environment”, from Dr Scheer’s Facebook Page. (c) My Power Station Technology 2013 135
  • 136. Show Dr Scheer Video http://youtu.be/w_KZ01ps6gI (c) My Power Station Technology 2013 136
  • 137. Crises / Risks of the Fossilised Fuel Industry Dr Scheer at Retech Conference, February 2009, Las Vegas, USA • [3rd world]: – 40 countries are unable to pay their energy bill – Their oil import bill is more than their total export earnings • COP 17 and global treaties – How do we organise the technological revolution? – Which technological revolution happened as a result of a global treaty? Not One! • We should do it because it is an advantage of us (c) My Power Station Technology 2013 137
  • 138. The [3rd world] My brackets ([]) • The so called “third world” is where the new empires are starting – Where development is happening • The “third world” – Has population growth – Has resources • Most of the Developed World is stagnating – Has growth potential • The Developed (1st) world – Stuck in an old paradigm? (c) My Power Station Technology 2013 138
  • 139. The “Downturn” • Is it possible that we’re creating it ourselves? – By focusing on cost savings instead of growth? • Just something to think about – I’m not saying we’ve created our recession, but I wonder if its in our minds, as a self-fulfilling prophesy – Also in South Africa: • One has to do the same thing over and over again • A huge waste of resources, time and energy (c) My Power Station Technology 2013 139
  • 140. What’s electricity for anyway? • It’s like ICT, except ICT depends on Electricity • It’s an enabler to get the country moving • Fast, cheap, reliable pathways from a to b will get our economy going – Communications (Infrastructure) – Electricity, Population Growth, Resources • David Murrin: “Breaking the Code of History” • Can the “Energy Internet” finally happen? – Thomas Friedman in “Hot, Flat and Crowded” (c) My Power Station Technology 2013 140
  • 141. Donor Assistance Risks (DAR) BRICS Dev Bank? • What are the risks? – Dependence on outside funding – If the exchange rate weakens, repayments get higher – Little capacity building – An expected “repayment” for donor assistance • What chance is there that we can build our future infrastructure needs without DAR? (c) My Power Station Technology 2013 141
  • 142. Some of the Rules • See application Form – Embedded Generation for City of Cape Town’s rules (c) My Power Station Technology 2013 142
  • 143. Government and Citizens • Is making our own electricity legal? • “Embedded Energy” Generation Legislation Already Exists • SABS: NRS 097-01-2010 (December, 2010) • NERSA: Embedded Generation (2011) • Waiting for: – Eskom adoption – City adoption – Business and Homeowner adoption (c) My Power Station Technology 2013 143
  • 144. Red Tape • City of Cape Town – Red Tape to Red Carpet Process • South Africa – 15 laws; 10 standards; 10 documents – Just for “parallel feed”! • USA – 2 laws; 3 standards; 1 document • Germany – Install; inspect; FITs 8 days later (c) My Power Station Technology 2013 144
  • 145. How to convince Govt of The Five Winners? • The Five Winners http://youtu.be/I7W6kn9M8pI – Customers • eg the homeowner (electricity generator & consumer) • Eg the business owner (and employees) – Suppliers • Installers; Designers; Maintenance People; Call Centres; Inspectors; Manufacturers – Cities – Eskom – The Environment • Fast economic growth. “Base Load” can’t keep up! (c) My Power Station Technology 2013 145
  • 146. Reaching Grid Parity (c) My Power Station Technology 2013 146
  • 147. Reaching Grid Parity • Feed in Tariffs and their purpose • Rebates and their purpose • Net Metering (c) My Power Station Technology 2013 147
  • 148. Why FITs? Why any kind of incentive? • Introduced in Germany in 1991 – In 1993, the FIT was $1.34 per kWh – In 1993 Rands, this was R4.57 per kWh – In 2012 Rands, this was R11.32 per kWh – In 2001 in South Africa: • Per kWh: Domestic 24.59c; Manu and Mining 12.32c • The FIT had three principles – The Utility must connect anyone to the grid – They must buy all the energy that is produced – They must buy at a fixed price for the length of the contract, ie 15 to 20 years (c) My Power Station Technology 2013 148
  • 149. So what did FITs do? • Brought down the cost of Renewable Energy • Note that the FIT contract is similar to the contract the government signs with Eskom to build a power station – An agreement to buy a certain amount of electricity – At a certain price – For a certain period of time • There are “FITs” in our car production system – Government gives R5 billion of incentives to car companies annually – The Joule needed R9.5 billion. And South Africa would have had its own electrical car! (c) My Power Station Technology 2013 149
  • 150. What do Rebates do? • Kickstarted Renewable Energy • Benchmark: 30% – A utility’s “avoided cost” • Germany: 50% – Higher incentive • Different kinds – Rebate – Tax Credit (c) My Power Station Technology 2013 150
  • 151. EQUALITY • How did we get to Equality (Grid Parity)? • Who helped? – Germany (G): Feed In Tariffs since 1991 – Still the largest installed base of PV panels (roof top, building integrated, farm, etc) – 370,000 people employed in RE in G in 2010 – Targeted 20% RE by 2020 • Achieved this in 2011! • Now targeting 35% by 2020 • Solved the “Grid Destabilisation” problem in 2011 (c) My Power Station Technology 2013 151
  • 152. Retail Wheeling (c) My Power Station Technology 2013 152
  • 153. Retail Wheeling • Selling electricity across the grid • Similar to – Airways – Railways – Telecommunications • Pay the Grid Operator a Wheeling Tariff for using the grid • Needs an Independent System Operator? (c) My Power Station Technology 2013 153
  • 154. Next Steps • Contact me for training, consulting and to set up Virtual Power Stations • Contact me for Financial ICT Solutions (c) My Power Station Technology 2013 154
  • 155. Contacts • David Lipschitz, My Power Station – Phone • 021 551 9935 (W); 074 119 3246 (C) – Email • david@mypowerstation.biz – Web • http://www.mypowerstation.biz (c) My Power Station Technology 2013 155
  • 156. • End of presentation • The rest is for reference (c) My Power Station Technology 2013 156
  • 157. Virtual Power Station Agenda • See hand out • I’d like us to brainstorm and develop a solution • We will consider: – Systems Thinking – What benefits do big electricity users get? – How can these benefits be made available to small / all electricity users? – Reaching Grid Parity – how did we get here – Feed In Tariffs and their purpose (c) My Power Station Technology 2013 157
  • 158. Agenda continued – Rebates and their purpose – Net Metering – Time of Use Tariffs – Demand Response – Energy Efficiency – Smart Metering – Social Factors – Technical Factors (c) My Power Station Technology 2013 158
  • 159. Agenda Continued – Types of technologies that can be used in a Virtual Power Station • Photovoltaic Systems; Concentrated Solar Power; CSP Tower; BioGas • Pumped Storage • Battery, ultra-capacitors, hydrogen storage, fuel-cell – Dealing with peak demand – What about rainy days and night? – Government’s role. NRS 097-2-1:2010 and NERSA. Embedded Generation and its Rules. Laws, Policy. (c) My Power Station Technology 2013 159
  • 160. Agenda • Electricity Generation; Assumptions & Risks • Electricity and Infrastructure Challenges • Some Questions & Myths • Our Environment – We live in Exponential Times • Electricity & “The Grid” – Can we rely on The Grid? – Can we make electricity ourselves cost effectively? • How to get started? • Q&A (c) My Power Station Technology 2013 160
  • 161. The Numbers • How to understand the really big numbers? • Should we think differently? – Do we need cars? How many? What sort? Can they be shared? – Do people need to go to work or can they telework? – Should our systems stay centralised or can they be decentralised – How would we design the system if there was no coal or nuclear energy? (c) My Power Station Technology 2013 161
  • 162. R2.3 trillion R2,300,000,000,000 • Repayments – At 10% over 20 years – R23,000,000,000 per month • R23 billion per month is what the people of South Africa will be paying for their new electricity fleet if we follow the old 20th Century technology path – 50 million people; 7 million taxpayers • R3,285 per taxpayer per month – for capex repayments only (c) My Power Station Technology 2013 162
  • 163. R125 billion for Kusile R125,000,000,000 • 12,500,000 * R10,000 Solar Water Heaters – i.e. : 12.5 million R10,000 Solar Water Heaters • Kusile – 4.8GW – 12,500,000 SWH need 20 GW of electricity • SWH can be used to – Heat water & air – Cool water & air – R46 billion (58%) over budget already (c) My Power Station Technology 2013 163
  • 164. Electricity Challenges • For City Dwellers without electricity, NO: – Water, Banking, Petrol, Transport, Food, Life – Only 4 days of food in the supply chain • Everything we do depends on electricity – We need security of supply – We need price certainty • Therefore we need a game plan to make this a reality (c) My Power Station Technology 2013 164
  • 165. Some Questions • http://www.surveymonkey.com/s/NetMeterin g-2012-12-22 • If you could make your own electricity cheaper than you could buy it, would you want to do this? • Do you know what Net Metering is? • Do you want to make money and conserve the environment? (c) My Power Station Technology 2013 165
  • 166. Global Energy Resources (c) My Power Station Technology 2013 166 30 TWH in 2030 10 TWH in 1990 The sun provides 5,000 times the amount of energy required by the entire planet
  • 167. How long do we have? At 3% electricity consumption growth (c) My Power Station Technology 2013 167
  • 168. Buying and Selling Electricity • Normally – We buy electricity • From Eskom • From the Cities, who buy from Eskom • Now – We can produce electricity • We can use it ourselves • We can sell it to The Grid • We can sell it to our own customers! (c) My Power Station Technology 2013 168
  • 169. Producing Electricity (Energy) 1 • History – Before Electricity • Windmills; Pumps; Water-Mills; Steam – “Base Load” (after electricity “invented”) • Coal, Nuclear, Hydro-electric (3) – Now • Sun, wind, river, tide, ocean-current, geo-thermal (6) • Sun: PV, CSP, Tower, Solar Water Heating (+3) – PV = Photovoltaics (like the leaves of a tree) – CSP = Concentrated Solar Power (with or without storage) (c) My Power Station Technology 2013 169
  • 170. Producing Electricity (Energy) 2 • History – Benefits and Costs • Base load electrical systems dramatically reduced our costs and allowed the industrial revolution to happen • But this assumed unlimited, cheap, supply of equipment and raw materials (coal, etc) • But: population growth and industrial growth have put huge constraints on the systems • And: at the same time, maintenance costs have been rising rapidly for power stations, transmission and distribution systems (c) My Power Station Technology 2013 170
  • 171. Reliability of equipment • What happens when there is a problem? • Disruption in power supply – Unplanned and prolonged downtimes – Destruction of equipment – Sudden cut offs • No proper shutdowns • Customer dissatisfaction/frustration (c) My Power Station Technology 2013 171 Uni of Joburg talk at Transformer and SwitchGear Conference Joburg April 2012
  • 172. David Lipschitz • BSc (Honours) MBA • My Power Station Technology: Energy Expert, Software Developer • Grid-Tied Photovoltaics Course: Feb 2009, Phoenix, AZ, USA • NABCEP Level 1 Certification – North American Board of Certified Energy Practitioners • Additional related technical training • Spoke / Chaired Energy Efficiency conference 2010 • Spoke at Various other Energy Conferences • Presented in Parliament re. Climate Change Hearings • Presented to Parliament re. IRP2010 Hearings • Presented at Powering Africa Strategy Summit in November 2011 • Contact Details: – 021 551 9935 (Office) – 074 119 3246 (Cell/Mobile/iPhone) – david@mypowerstation.biz – Mypowerstation (Skype) – http://www.linkedin.com/in/davidlipschitz (LinkedIn) (c) My Power Station Technology 2013 172
  • 173. Designs • We charge R6,800 plus VAT for a design for a private houses and for systems up to 10KW. Above 10 KW we charge R50,000 plus VAT, excludes EIAs, Engineering or Architect Fees. • Why we charge for designs? – A design includes a site visit, a formal design with a parts list, an Efergy electricity meter so that the client can become aware of their electricity use and reduce it, and an energy efficiency exercise – If the client buys a system from us and the value of the system is over R80,000, we discount their installed price by the fee. – This is fair as the design requires experience and designs in IT, Architecture, etc, aren’t free. Designs can take up to 3 days. All prices and equipment needs to be checked. If we do 10 designs and then someone buys from us, we need to constantly increase the prices of the systems to recover our sales cost investment; this means that we either go out of business or run at a loss, which isn’t in our or our clients bests interests – We need to recover our investment of over R4 million so far in ensuring that we install systems that meet electricity needs, are properly grounded, cable sizes are correct, the proper circuit breakers and fuses are used, etc. At the moment we follow the USA NEC article 690 RE guidelines as far as possible as there aren’t guidelines in South Africa, although there are DC guidelines. – Update November 2011: NERSA have published RFD Embedded Generation which refers to NRS 097-2-1:2010 (Grid Interconnection Of Embedded Generation). We are now waiting for implementation by Eskom and the Cities. (c) My Power Station Technology 2013 173
  • 174. Research (c) My Power Station Technology 2013 174
  • 175. Do wind turbines kill birds? (c) My Power Station Technology 2013 175
  • 176. Bibliography - Mindmaps • Renewables and Sustainability Mindmap by David Lipschitz: https://www.mindmeister.com/maps/show/13046747 • Domestic Energy Independence by David Lipschitz: https://www.mindmeister.com/maps/show/47331785 • Living Without Grids – a survival mechanism by David Lipschitz: https://www.mindmeister.com/maps/show/14204830 (c) My Power Station Technology 2013 176
  • 177. Project Video and Example • Gecko Rock – Specification: http://mypowerstation.co.za/2010/09/16/my- power-station-completes-installation-of-power- station-at-gecko-rock-press-release-16th- september-2010/ – Video: http://www.youtube.com/watch?v=LT1AF4ycAQY (c) My Power Station Technology 2013 177
  • 178. Other Resources • Total Installed Electricity Capacity Worldwide: http://www.steamtablesonline.com/electricity /electricity-installed-capacity.aspx • Eco Economy Indicators: http://www.earth- policy.org • Insolation Map: http://www.earth- policy.org/indicators/C49/wind_power_2012 (c) My Power Station Technology 2013 178
  • 179. Other Resources • Books – Hot, Flat and Crowded by Thomas Friedman • 2008 – Bending the Curve by Robert Zipplies • 2008 – Screw Business as Usual by Richard Branson • 2011 – Breaking the Code of History by David Murrin • 2010 (c) My Power Station Technology 2013 179
  • 180. Country Production Graphs • Germany – http://www.agora- energiewende.de/service/aktuelle- stromdaten/stromerzeugung-und-verbrauch/ • Portugal – http://www.centrodeinformacao.ren.pt/PT/Inform acaoExploracao/Paginas/EstatisticaDiariaDiagrama .aspx (c) My Power Station Technology 2013 180
  • 181. Germany Net Exporter of Electricity • http://www.pv- magazine.com/news/details/beitrag/germany- -power-exporter-even-with-fewer-nuclear- plants_100010756 (c) My Power Station Technology 2013 181

Editor's Notes

  1. ----- Meeting Notes (2013/03/30 14:50) ----- Wind 1324 wh / w per annum, ie 3.6 wh per day. Nuclear/Coal, assuming up time of 85% = 20.4 wh per day. Coal at R25 per watt plus supplying it; Wind at R18 per watt?
  2. Watch Micro Grid Video: http://www.youtube.com/watch?v=mwfIVhzn-_8&list=FL0_qrrfdG4Dchd6SYUMLmsg&index=3&feature=plpp_video
  3. See http://www.youtube.com/watch?v=LT1AF4ycAQY and http://www.youtube.com/watch?v=oZFd6_0iIg4
  4. In City of Cape Town: Current ex VAT price is in March 2012 is R1.14 per kwh; R1.29 per kwh inc For business: Current price is R1.02 ex VAT; expected R1.31 ex VAT.
  5. Riverside-Renewable-Energy 9MW; $42m, 110,000 square meters
  6. Costing per watt or per kwh?
  7. PV, Grid Tie Inverters, etc, can use Moore’s Law in ICT to reduce their costs, after all they are ICT!
  8. If we don’t take responsibility for our own energy provision, we will not have enough electricity.
  9. Show photos
  10. Presentations available on request