1
By
Jonathan A. Pantaleon
Reference: http://nationaldisasterrecovery.org/images/plan-1-
1000x600.jpg
2
Pedro E. Candido Memorial National Library destroyed by typhoon
Haiyan's winds and storm surge.
Reference: http://tinyurl.com/zrk2rzr 3
Central Public Library at Christchurch City, New Zealand
Reference: http://tinyurl.com/jxrvq3y 4
Over 100,000 books burnt by ISIS in Anbar, Iraq
Reference: http://tinyurl.com/hq83rbf
5
Reference: http://tinyurl.com/haf3jfs Reference: http://tinyurl.com/hmov
6
7
http://www.practicefusion.com/blog/ama-asks-onc-to-halt-meaningful-use/
OUTLINE:
I. Hindrances
II. Stages
III. Workshop
II.
I. HINDRANCES
II. STAGES
III.WORKSHOP
8
9
What went
wrong???
Hmm..
Anyare???
???
http://tinyurl.com/h5dvl6e
10http://tinyurl.com/h5dvl6e
Reference: https://alohadharma.files.wordpress.com/2012/12/road-block.jpg
11
Reference: http://tinyurl.com/z79f3da
12
Reference: http://www.ibmsystemsmag.com/getattachment/c9f1bd37-e6cc-47ec-898a-
5cc934ed8fae/ 13
Bahala
na si
Batman
Habit
Reference: http://tinyurl.com/z87mxyj14
Batman Mentality
Not a
Requirement
15
5.4.5 and 7.5.3 provisions of the
2010 PAARL Standards for Academic
Libraries, encourages all academic
libraries to prepare for Natural and
man-made disasters..
16
 5.4 Organization and Care of Materials
 5.4.5 The library should have a
counter-disaster plan to cover minor
and major disasters to include both
damage prevention and damage
recovery.
 7.5 Control and Security Measures
 7.5.3 Guidelines on safety and disaster
preparedness should be established
and implemented.
17
Republic Act No. 10066 :
National Heritage Act of 2009
Article III, Section 7, Item (d) of the Act:
 In times of armed conflict, natural disasters, and
other exceptional events that endanger the
cultural heritage of the country, all National
Cultural Treasures or national historical
landmarks, sites or monuments shall be given
priority protection by the Government. 18
 Expose staff to trainings
related to disaster
management.
 Set-up realistic
expectations
 Be a role model. Be A
catalyst of change!
19
 Facilities Department
 Emergency and Disaster Management
Office
 School Clinic
 HR Office
 Purchasing Office
20
3. Budget Constraints
21
Reference: http://tinyurl.com/hpo9wjd 22
23
https://mir-s3-cdn-
cf.behance.net/project_modules/disp/b30c5341297215.5606f646e01b9.j
pg
24
 Project Committee
 Library Disaster Management
Committee
25
Project Committee
 Planning and building the
disaster management plan.
26
Seniority is not the Basis in
choosing team members
and leaders
27
Team Leader
Reference: http://www.roiinvesting.com/team-leader/
28
 Project secretary
Reference: http://tinyurl.com/jm6d4bw
29
Photographer/
Videographer
Reference: http://tinyurl.com/kvrza6s30
Recovery
specialists
 Archives
Librarian
 Book Binder
 catalogers
 acquisition
librarian
 systems
administrator
Reference: http://tinyurl.com/j7lolmp
31
 Grammar Natzi
(someone who is
really good in
creative writing)
Reference: http://tinyurl.com/hp8bl4l
32
 Researchers(Representatives from each
section )
Reference : http://tinyurl.com/gptsfec 33
Evacuation and Security experts
(Representatives from the security office)
Reference: http://tinyurl.com/hphdnln
34
 First Aid Specialist ( Representatives from the
school clinic)
Reference: http://tinyurl.com/hwpw5sw
35
Representatives from the facilities Office
( Structural Engineer, Electricians)
Reference: http://tinyurl.com/zvaejzt 36
Library Disaster Management Committee
Oversees the implementation of the plan.
 Library Communications Team
 Library Evacuation Team
 Library Medical Team
 Library Recovery Team
37
Library Communications Team
 Coordinates with the Disaster Incident
Command Post and Security Office
regarding evacuation logistics, emergency
announcements, and missing and injured
employees.
 Monitors the status of facilities during
calamities
Reference: http://www.foresolutions.co.uk/wp-
content/uploads/2013/04/forecomms-sidebar-logo.jpg
38
Library Evacuation Team
 Assists Security
Personnel in carrying-
out evacuation
procedures.
reference: http://i.stack.imgur.com/fr662.jpg
39
Library Medical Team
Provides first-aid to
injured personnel
Figure reference: http://orilliafirstaid.com/uploads/logo.jpg
40
Library Recovery Team
 Guides library personnel on the resources and
facilities that needs to be prioritized during
salvage and retrieval operations.
 Distribute the gears/ supplies
needed for salvage and retrieval
operations.
reference: http://cliparts.co/cliparts/riL/xGp/riLxGpjrT.gif41
42
To be presented to the VPAA/ President
Long term benefits:
 Further enhance the preparedness efforts
of the institution.
 Preservation of cultural heritage
43
Initial Proposed Action Plan
ACTIVITIES OBJECTIVES TIME
FRAME
RESPONSIBILTY
Risk Analysis
Survey
Library Personnel
Facilities Office
Capability
Assessment
Survey
Library Personnel
Revised Action
Plan
Library Personnel
Purchasing office
Facilities Office
44
Highlight the importance of community
participation
45
Secure the ff. documents:
 Disaster management protocols of the
institution
 City disaster management protocols
 Local and international disaster preparedness
studies and reports
 International Standards
46
47
Eastern Visayas State University – Tanauan Campus
Library
48
49
50
51
 Project Defense Team
 Recognize the disaster preparedness
program of the institution
52
53
Physical surveys of the institution’s
potential vulnerability to various
risks.
Categories:
External
Internal
54
Conduct Risk analysis studies
under the supervision of a
licensed Civil Engineer
Photo and video documentation is
a must!
55
56
57
58
59
https://acemanianz.files.wordpress.com/2012/03/418219_34205632916903
6_100000940148206_937213_1852115431_n.jpg 60
http://cnnphilippines.com/incoming/ov1jyi-Recto-
fire_2_CNNPH.png/alternates/FREE_640/Recto-fire_2_CNNPH.png
61
62
63
64
Casualties (7.2 Magnitude Earthquake)
Dead : 33,500
Injured : 113,00
65
66
67
http://2.bp.blogspot.com/-
GKYRPGr31KI/UE3mMX_KZiI/AAAAAAAAJUM/tVwZasxOWig/s1600/new+y
ork+tsunami+photoshop.jpg 68
69
70
Internal Risks:
 Furniture and fixture
 Shelves
 Windows and Glass Walls
 Asbestos ceilings tiles
 Locked fire exits
 Electrical Wirings
 Cracks and leaks on the walls
71
http://www.julierodenberg.com/wp-
content/uploads/library.jpg 72
73
74
75
Personnel
Facilities and supplies
Protocols
76
Personnel:
 First-aid:
 Respiratory and cardiac arrest (with AED
training)
 Victim transport
 Trauma care
 Bandaging Techniques
 Use of firefighting equipments
 Two-way/ Ham radio operation
 Preservation and conservation skills
 Institutional and regional disaster
preparedness protocols
77
Facilities:
 Sprinkler system, fire hydrants, fire
extinguishers
 Automatic & manually operated fire alarm
activation system
 Smoke detectors
 Emergency exits
 Emergency lights
 Evacuation Route Maps
 Spacious hallways
 Evacuation Building Maps
 Reinforced beams and pillars
 Anchored bookshelves
78
Supplies:
 Rescue and retrieval tools
 Salvage and preservation
 Disaster Kit
79
Reference:s http://tinyurl.com/h9fjk2p
Rescue and retrieval tools:
 Craw bar / hammer
 Repelling rope
 3M Respirators (N95)
 Leather work gloves
 AED
 Spine board
 Neck brace
 Life Jacket
 Emergency reflector vests
 Etc.
http://tinyurl.com/zgvwjj4
80
Supplies for salvage and retrieval:
 Trash bags
 Balikbayan boxes and archival boxes
 Plastic twines
 Clothes line
 Water buckets
 Supplies for preservation and treatment of
wet and partially burned paper based
resources
81
Disaster Kit:
Rule of 3
82
3 minutes without air
3 days without water
3 weeks without Food
RIP=
 N95 respirators
 Whistle (pealess)
 Emergency Radio
 Flashlight (head lamp)
 Extra batteries
 Emergency Blanket
 Hard hat
 Life jacket
 Utility Cutter
 2 way Radio
 Food (crackers, chocolate bars)
 Aquatabs
 Medical Kit
http://tinyurl.com/jqwegjd
83
 Medical Kit:
( survey the special needs of personnel)
 Bandages
 Elastic Bandages
 Micropore tape
 Sponge Guaze
 Tourniquet
 CPR mask
 Medical Gloves
 Medications
 Others (Nebulizer, etc.)
http://tinyurl.com/j857zc6
84
Do you have Written Protocols on the
following:
 Minor Emergencies
 Major Disasters
 Preservation and conservation
85
86
ACTIVITIES TIME
FRAME
RESPONSIBILTY
Library Disaster
Preparedness Manual
Development
Training Program
Proposed budget
87
88
I. Introduction
II. Committee Responsibilities
III. Emergency Contact Numbers
 Library personnel
 Key departments
 Government/ NGO Offices
89
IV. Protocols:
A. Minor Emergencies
B. Major Disasters:
1. Earthquake/ Tsunami
2. Fire
3. Storms
90
4. Terrorism
 Bomb Treats
(thru Phone, Email, Written Letter)
 Armed intrusion/ Invasion
91
C. Salvage and Recovery
 Salvage Priorities
 Water damaged collection
 Burned collection
92
D. Inventory and refurbish of
supplies
93
V. Supplies and Equipment
A. Conservation tools, equipment and
supplies
B. Emergency Survival Kit
VI. Maps
A. Library Evacuation Route Plan
B. Location of Fire Extinguishers and
Fire Alarm Device
C. Institutional Evacuation Map
94
Appendices:
 PHIVOLCS Earthquake Intensity Scale (PEIS)
 PAGASA Weather Warning Signals
 PAGASA Color Coded Rainfall Advisories
 Inventory of facilities/ equipment
 Supplies and Equipment Inventory Forms
95
96
Competencies:
 First-aid
 Use of firefighting equipments
 Two-way/ Amateur Radio operation
 Preservation and conservation skills
Implementation Plan:
 Training of library staff on the protocols
of the disaster preparedness plan.
97
98
 Coordinate with the Purchasing Office
 NGO’s (Red Cross, WISAR, etc.)
 Use the budget format of your institution
99
10
0
Documents to be presented:
 Risk and Capability Analysis Study
 Proposed Library Disaster Manual
 Proposed Training Program
10
1
10
2
A. Acquisition of supplies and equipment
B. Training Program
C. Plan Simulation every sembreak
 Grading system
 Special award/ incentives to the best
performing team
 Evaluation of the Plan
10
3
Stages in building a Modern Day Ark :
Stage 1: Committee
Stage 2: Project Proposal Development
Stage 3: Initial project defense
Stage 4: Risk Analysis Survey
Stage 5: Capability Assessment Survey
Stage 6: Revised Action Plan
Stage 7: Library Disaster Preparedness
Plan Development
Stage 8: Training Program Development
Stage 9: Budget Proposal Development
Stage 10: Final Project Defense
Stage 11: Implementation
10
4
Reference: http://jewishcurrents.org/wp-content/uploads/2016/06/noahs-ark.jpg 10
5
10
6
https://www.facebook.com/groups/
LibDisasterPreparednessPhil
/
http://www.vmh.co.uk/sites/all/themes/sea_breeze/images/pages-img/vmh-join-us.jpg
10
7http://www.projectation.com/wp-content/uploads/2012/11/question-mark.jpg

Building a library disaster preparedness plan