1. Objective/ Overview
The Project will establish efficient, cost-effective, environment
friendly, sustainable and safe Urban Transport System (UTS) through
construction of 20 kilometer Bus Rapid Transit (BRT) along the
Gazipur-Tongi-Uttara-Airport corridor.
This pilot project provides a holistic solution for integrated urban
mobility, bearing a demonstration effect as no modern mass-transit
system exists in Bangladesh yet.
1. Objective/ Overview
Name of the Project:
Greater Dhaka Sustainable Urban Transport Project.
Division:
Road Transport and Highways Division
Executing Agency:
Roads and Highways Department (RHD)
Bangladesh Bridge Authority (BBA)
Local Government Engineering Department (LGED)
Construction Period:
December 2012- December 2018
December 2012- June 2020 (Proposed)
Length:
20.50 Kilometers
Stations: Terminal:
25 nos. 02 nos.
Flyovers: Bridge:
06 nos. 01 no.
Travel Time:
50 minutes (Gazipur to Airport)
Frequency of Buses:
2 to 5 minutes
1.1 Map & Some Visual Station
1.2 Photos of BRT Project.
2. Planning
The Planner: Road Transport and Highways Division
The Road Transport and Highways Division was the
planner of BRT (Airport-Gazipur) by Ministry of
Road Transport and Bridge.
The Roads and Highways Department (RHD) will implement
the main corridor restructuring, excluding the elevated
section;
2. Planning
The Planner: Road Transport and Highways Division
The Project is also well aligned with ADB recent
strong focus on urban transport, as outlined in ADB’s
Sustainable Transport Initiative Operational Plan.
3. Organizing
01. As a Implementing Agencies…
 Roads & Highways Department (RHD)
 Bangladesh Bridge Authority (BBA)
 Local Government Engineering Department (LGED)
 Dhaka Bus Rapid Transit Company Ltd. (DBRTCL)
There is several organization and companies In Organizing section.
By two different areas.
3. Organizing
02. As a Project Funding…
 Asian Development Bank (ADB)
 Agence Française de Développent (AFD)
 Government of Bangladesh (GoB)
 Global Environment Facility (GEF)
There is several organization and companies In Organizing section.
By two different areas.
4. Leading
EPCM Consultant:
SMEC & Associates is the Leading section as a Design and
Construction team leader.
Leading in Design section:
Preparation of EIA, EMP. Incorporation of EMP clauses into bidding
documents. Reporting to ADB.
Leading in Construction section:
Monitoring of EMP Implementation, Audit and Reporting to ADB.
5. Controlling
The Controller of BRT Project-
BRT Operator: Special Purpose Organization (SPO)
as a Managing Director in this controlling area.
With the responsibilities of Operation and Maintenance of BRT
Corridor. Implementation of EMP Monitoring during Operation.
5. Controlling
Under the SPO those Consultants are working in Field.
01: Engineering, Procurement and Construction Management(EPCM)
Design, Procurement, Construction, supervision & Contract Management.
02: Project Management Coordination and Capacity Building (PMCCB)
Project Management, Institutional Development, Procurement Support/
Communication, Public Participation etc.
03: Operational Design and Business Model (ODBM)
BRT Operation Plan, Business Model, Service Start up, Specifications for Buses,
Negotiation with the Operators.
04: Christian Commission for the Development of Bangladesh (CCDB)
Preparation of PAP and compensation to them.
References
01: Dhaka Bus Rapid Transit Co. Ltd.
[http://dhakabrt.webappline.com/en/background-objectives]
02: Environmental Monitoring Report :
Greater Dhaka Sustainable Urban Transport Project.
[Project Number: 42169-013. Semi-Annual Report. June 2018]
03. Map. [The Daily Star- https://www.thedailystar.net/news/frontpage/airport-
gazipur-brt-line-cost-doubles-20pc-progress-6-years-1624615]
04. Photos and Visual Details. [SajivSaiful-
https://www.youtube.com/watch?v=10TqVWhKm1M&ab_channel=SajivSaiful]
The End

More Related Content

Similar to BRT Project(Gazipur to Uttara).pptx

Vijay banga
Vijay banga Vijay banga
Vijay banga
VIJAY BANGA
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
Axay Sharma
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
Biswajit 9810983924
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
Babu Mama
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
Akshay Gaikwad
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
Mateti Srinivas
 
Intern final report
Intern final reportIntern final report
Intern final report
Bhanu Prasad Banala
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
Duong Nguyen
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
Muhammad Asad Shahee .
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - Reduced
Benya Manajitt
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
Arnaud Renard
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Life of A Public Auditor
 
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMPERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
IRJET Journal
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro project
SAKSHI AGHI
 
CV Shubham Bhargava
CV  Shubham BhargavaCV  Shubham Bhargava
CV Shubham Bhargava
Shubham Bhargava Slideshares
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
DBTGrupoIndia
 
Hmis newsetter 22
Hmis newsetter 22Hmis newsetter 22
Hmis newsetter 22
DebendraDevKhanal1
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
Uday Maity
 
CV Shubham Bhargava
CV Shubham BhargavaCV Shubham Bhargava
CV Shubham Bhargava
Shubham Bhargava Slideshares
 
Implementation and Systemic Change with UTTIPEC Street Design Guidelines
Implementation and Systemic Change with  UTTIPEC Street Design GuidelinesImplementation and Systemic Change with  UTTIPEC Street Design Guidelines
Implementation and Systemic Change with UTTIPEC Street Design Guidelines
Uttipec Dda
 

Similar to BRT Project(Gazipur to Uttara).pptx (20)

Vijay banga
Vijay banga Vijay banga
Vijay banga
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Intern final report
Intern final reportIntern final report
Intern final report
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - Reduced
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
 
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMPERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro project
 
CV Shubham Bhargava
CV  Shubham BhargavaCV  Shubham Bhargava
CV Shubham Bhargava
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
 
Hmis newsetter 22
Hmis newsetter 22Hmis newsetter 22
Hmis newsetter 22
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
 
CV Shubham Bhargava
CV Shubham BhargavaCV Shubham Bhargava
CV Shubham Bhargava
 
Implementation and Systemic Change with UTTIPEC Street Design Guidelines
Implementation and Systemic Change with  UTTIPEC Street Design GuidelinesImplementation and Systemic Change with  UTTIPEC Street Design Guidelines
Implementation and Systemic Change with UTTIPEC Street Design Guidelines
 

Recently uploaded

Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 

Recently uploaded (20)

Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 

BRT Project(Gazipur to Uttara).pptx

  • 1. WELCOME PRESENTATION ON Greater Dhaka Sustainable Urban Transport Project. (BRT Gazipur-Airport)
  • 2. Group Information Present By – Structural Group (Project BRT) Batch- 16th Department of Civil Engineering (Evening) Uttara University. Name of the Group Member:  Suraya Akhter - 2161391065  Md Jahir Uddin - 2173391004  Md Rahat Hosen Arafat - 2173391017  Md Abi Abdullah - 2173391024  Md Mozaharul Islam - 2173391030
  • 3. 1. Objective/ Overview The Project will establish efficient, cost-effective, environment friendly, sustainable and safe Urban Transport System (UTS) through construction of 20 kilometer Bus Rapid Transit (BRT) along the Gazipur-Tongi-Uttara-Airport corridor. This pilot project provides a holistic solution for integrated urban mobility, bearing a demonstration effect as no modern mass-transit system exists in Bangladesh yet.
  • 4. 1. Objective/ Overview Name of the Project: Greater Dhaka Sustainable Urban Transport Project. Division: Road Transport and Highways Division Executing Agency: Roads and Highways Department (RHD) Bangladesh Bridge Authority (BBA) Local Government Engineering Department (LGED) Construction Period: December 2012- December 2018 December 2012- June 2020 (Proposed) Length: 20.50 Kilometers Stations: Terminal: 25 nos. 02 nos. Flyovers: Bridge: 06 nos. 01 no. Travel Time: 50 minutes (Gazipur to Airport) Frequency of Buses: 2 to 5 minutes
  • 5. 1.1 Map & Some Visual Station
  • 6. 1.2 Photos of BRT Project.
  • 7. 2. Planning The Planner: Road Transport and Highways Division The Road Transport and Highways Division was the planner of BRT (Airport-Gazipur) by Ministry of Road Transport and Bridge. The Roads and Highways Department (RHD) will implement the main corridor restructuring, excluding the elevated section;
  • 8. 2. Planning The Planner: Road Transport and Highways Division The Project is also well aligned with ADB recent strong focus on urban transport, as outlined in ADB’s Sustainable Transport Initiative Operational Plan.
  • 9. 3. Organizing 01. As a Implementing Agencies…  Roads & Highways Department (RHD)  Bangladesh Bridge Authority (BBA)  Local Government Engineering Department (LGED)  Dhaka Bus Rapid Transit Company Ltd. (DBRTCL) There is several organization and companies In Organizing section. By two different areas.
  • 10. 3. Organizing 02. As a Project Funding…  Asian Development Bank (ADB)  Agence Française de Développent (AFD)  Government of Bangladesh (GoB)  Global Environment Facility (GEF) There is several organization and companies In Organizing section. By two different areas.
  • 11. 4. Leading EPCM Consultant: SMEC & Associates is the Leading section as a Design and Construction team leader. Leading in Design section: Preparation of EIA, EMP. Incorporation of EMP clauses into bidding documents. Reporting to ADB. Leading in Construction section: Monitoring of EMP Implementation, Audit and Reporting to ADB.
  • 12. 5. Controlling The Controller of BRT Project- BRT Operator: Special Purpose Organization (SPO) as a Managing Director in this controlling area. With the responsibilities of Operation and Maintenance of BRT Corridor. Implementation of EMP Monitoring during Operation.
  • 13. 5. Controlling Under the SPO those Consultants are working in Field. 01: Engineering, Procurement and Construction Management(EPCM) Design, Procurement, Construction, supervision & Contract Management. 02: Project Management Coordination and Capacity Building (PMCCB) Project Management, Institutional Development, Procurement Support/ Communication, Public Participation etc. 03: Operational Design and Business Model (ODBM) BRT Operation Plan, Business Model, Service Start up, Specifications for Buses, Negotiation with the Operators. 04: Christian Commission for the Development of Bangladesh (CCDB) Preparation of PAP and compensation to them.
  • 14. References 01: Dhaka Bus Rapid Transit Co. Ltd. [http://dhakabrt.webappline.com/en/background-objectives] 02: Environmental Monitoring Report : Greater Dhaka Sustainable Urban Transport Project. [Project Number: 42169-013. Semi-Annual Report. June 2018] 03. Map. [The Daily Star- https://www.thedailystar.net/news/frontpage/airport- gazipur-brt-line-cost-doubles-20pc-progress-6-years-1624615] 04. Photos and Visual Details. [SajivSaiful- https://www.youtube.com/watch?v=10TqVWhKm1M&ab_channel=SajivSaiful]