4/24/2015 BOX TRANSPORT
MECHANISM
AWADHESH SINGH YADAV
IDEAL INSTITUTE OF ENGINEERING & TECHNOLOGY
BOX TRANSPORT MECHANISM
A Project Report submitted
In Partial Fulfillment of the Requirements
for the Degree of
BACHELOR OF TECHNOLOGY
in
Mechanical Engineering
by
Awadhesh Singh Yadav (Roll No.- 1102840031)
Danveer Saini (Roll No.- 1102840036)
Gaurav Sagar (Roll No.- 1102840040)
Mayank Kumar Jain (Roll No.- 1102840052)
Nitesh Kumar Tripathi (Roll No.- 1102840059)
Under the Supervision of
Mr. Dharmendra Singh
(Professor/ Assistant Professor)
Department of Mechanical Engineering
Ideal Institute of Engineering & Technology,
Ghaziabad, Uttar Pradesh.
to the
UTTAR PRADESH TECHNICAL UNIVERSITY
LUCKNOW (U.P.)
April 2015
i
CERTIFICATE
Certified that Awadhesh Singh Yadav (Roll No. 1102840031), Danveer Saini (Roll No.
1102840036), Gaurav Sagar (Roll No. 1102840040), Mayank Kumar Jain (Roll No.
1102840052) and Nitesh Kumar Tripathi (Roll No. 1102840059) has carried out the project work
presented in this report entitled for the award of Bachelor of
Technology from Uttar Pradesh Technical University, Lucknow, (U.P.) under my supervision.
The report embodies results of original work, and studies are carried out by the students
themselves and the contents of the report do not form the basis for the award of any other degree
to the candidate or to anybody else from this or any other University/Institution.
Signature:
Date:
Mr. Dharmendra Singh
(Professor /Assistant Professor)
Mechanical Engineering Department,
Ideal Institute of Technology, Ghaziabad
ii
ABSTRACT
This project aims for the utilization of kinematic synthesis (type, dimensional and
number) to fabricate a working physical model of an eight link transport mechanism. The
mechanism to be developed in its simplest form would perform the function of transporting
boxes/articles which are being fed onto two rails and are moved ahead one by one. The eight bar
mechanism allows moving more than one article as compared to its four bar counterpart.
Transport mechanisms generally move material and their application lies in various industries-
manufacturing, assembly, packaging etc.
In this project we apply the path generation synthesis and coupler curve synthesis and
study to fabricate our model which is an eight link transporter mechanism. The synthesis would
Chebyschev theorem for cognate linkages and parallel motion
generation where we want the output link of the mechanism to follow a particular path without
any rotation of the link as it moves along the path. The final model will be constructed by
modelling in CAD software solid edge that will eliminate the errors that might have crept in
graphical synthesis. In actual fabrication process the model will be refined as the final fitments
are done by tools and processes like welding, drilling, fitting, grinding. The model then
undergoes trial run and is examined for the prescribed motion characteristics.
iii
ACKNOWLEDGEMENT
We would like to express my gratitude to all those who gave me the opportunity to
complete this work. We would like to thank, Mr. Dharmendra Singh Assistant Professor (ME),
for giving guidance, stimulating suggestions and moral support. We are grateful to him for
sharing his time and expertise. His faith in us has always made more confident. It had been our
privilege to work under his guidance.
We would also like to thank Mr. Apurv Yadav Assistant Professor, Mechanical
Engineering Department for moral support, interest and valuable hints.
We are also thankful to all the faculty members of mechanical engineering department
and our colleagues for their cooperation.
We would like to thank our family for their continued support throughout this work. Our
parents have always been there for us and provided the best opportunities. No one has been as
motivating and inspirational to us as our parents. Thank you for your consistent help and support.
Awadhesh Singh Yadav (Roll No. 1102840031)
Nitesh Kumar Tripathi (Roll No.1102840059)
Mayank Kumar Jain (Roll No. 1102840052)
Gaurav Sagar (Roll No. 1102840040)
)
Danveer Saini (Roll No. 1102840036)
iv
TABLE OF CONTENTS
DESCRIPTIONS PAGE NO.
CERTIFICATE .................................................................................................... i
ABSTRACT........................................................................................................ ii
ACKNOWLEDGEMENT ..........................................................................................................iii
TABLE OF CONTENTS ......................................................................................iv
LIST OF FIGURES.....................................................................................................................vi
CHAPTER 1................................................................................................................................ 1
1.1 INTRODUCTION............................................................................................................. 2
1.2 AIM ..................................................................................................................................... 4
1.3 OBJECTIVE ...................................................................................................................... 4
CHAPTER 2................................................................................................................................ 5
2.1 LINKAGE MECHANISM .............................................................................................. 6
2.2 SIMPLE PLANAR LINKAGES .................................................................................... 7
2.3 CRANK-ROCKER MECHANISM ............................................................................... 9
2.4 FUNCTIONS OF LINKAGES ..................................................................................... 10
2.5 FOUR LINK MECHANISMS ...................................................................................... 11
2.6 CLASSIFICATION ........................................................................................................ 15
2.7 TRANSMISSION ANGLE ........................................................................................... 17
2.8 ANALYSIS ...................................................................................................................... 18
CHAPTER 3.............................................................................................................................. 21
3.1 MATERIAL AND DIMENSIONS .............................................................................. 22
3.2 TOOLS.............................................................................................................................. 26
3.3 PROCEDURE .................................................................................................................. 29
v
CHAPTER 4.............................................................................................................................. 31
4.1 LOGIC .............................................................................................................................. 32
4.2 FUTURE WORK ............................................................................................................ 32
CHAPTER 5.............................................................................................................................. 36
CONCLUSION ..................................................................................................................... 37
REFRENCES ....................................................................................................................... 38
APPENDIX ........................................................................................................................... 39
vi
LIST OF FIGURES
Figure 1 Box transport mechanism................................................................................................. 3
Figure 2 Functions of four basic planar linkage mechanisms......................................................... 7
Figure 3 Crank rocker mechanism.................................................................................................. 9
Figure 4 Four bar linkage.............................................................................................................. 11
Figure 5 Crank rocker ................................................................................................................... 13
Figure 6 Walking Beam................................................................................................................ 14
Figure 7 Transmission angle......................................................................................................... 17
Figure 8 Mechanism ..................................................................................................................... 18
Figure 9 Base structure ................................................................................................................. 22
Figure 10 Transporting link & Connecting rod ............................................................................ 23
Figure 11 Couplers........................................................................................................................ 24
Figure 12 Crank and Rocker......................................................................................................... 25
1
2 | P a g e
CHAPTER 1
1.1 INTRODUCTION
There has been a serious demand for intermittent movement of packages in the industries
right from the start. Though the continuous movement is more or less important in the same field
the sporadic motion has become essential .The objective of our project is to produce a
mechanism that delivers this stop and move motion using mechanical linkages. The advantage of
our system over the conveyor system is that the system has a time delay between moving
packages and this delay can be used to introduce any alterations in the package or move the
package for any other purpose and likewise. While in conveyor system such actions cannot be
performed unless programmed module is used to produce intermittent stopping of the belt which
basically is costly. The prototype design requires electric motor, shafts and the frame of which
the frame and platform on which the packages are moved is fabricated. All the links are being
made of Wood which reduces the weight of the whole system including the head which has a
direct contact with the boxes being moved. The system is expected to move as heavy packages as
2 - 3kgs approximately.
3 | P a g e
Figure 1 Box transport mechanism
The walking beam (in blue) pushes articles (in red) forward, and the material is left
stationary in the return stroke of the walking beam until the next cycle. The mechanism is for
moving articles with intermittent advancement. The eight-bar mechanism allows moving more
than one article, as compared to a four bar walking beam.
4 | P a g e
1.2 AIM
The aim of this project is to fabricate the box moving mechanism, which can make easier
to move boxes from one section to the other while processing in the factories.
In a workstation, an assembly line in order to obtain the required production rate and to
achieve a minimum amount of idle time.
1.3 OBJECTIVE
Fabricate a Box transport mechanism which can move things from one place to another
Understand project planning and execution.
Understand the fabrication techniques in a mechanical workshop.
Understand the usage of various mechanical machine tools and also measuring tools.
5 | P a g e
6 | P a g e
CHAPTER 2
2.1 LINKAGE MECHANISM
A linkage is a mechanism formed by connecting two or more levers together. Linkages
can be designed to change the direction of a force or make two or more objects move at the same
time. Many different fasteners are used to connect linkages together yet allow them to move
freely such as pins, end-threaded bolts with nuts, and loosely fitted rivets. There are two general
classes of linkages: simple planar linkages and more complex specialized linkages; both are
capable of performing tasks such as describing straight lines or curves and executing motions at
differing speeds. The names of the linkage mechanisms given here are widely but not universally
accepted in all textbooks and references.
Linkages can be classified according to their primary functions:
ed to the frame
7 | P a g e
2.2 SIMPLE PLANAR LINKAGES
Four different simple planar linkages shown in Fig. 8 are identified by function:
Reverse-motion linkage:
Fig. 2, can make objects or force move in opposite directions; this can be done by
using the input link as a lever. If the fixed pivot is equidistant from the moving pivots, output
link movement will equal input link movement, but it will act in the opposite direction. However,
if the fixed pivot is not centered, output link movement will not equal input
link movement. By selecting the position of the fixed pivot, the linkage can be designed to
produce specific mechanical advantages. This linkage can also be rotated through 360°.
Push-pull linkage:
Fig. 8b, can make the objects or force move in the same direction; the output link
moves in the same direction as the input link. Technically classed as a four-bar linkage, it can be
rotated through 360° without changing its function.
Figure 2 Functions of four basic planar linkage mechanisms
8 | P a g e
Parallel-motion linkage:
Fig. 2, can make objects or forces move in the same direction, but at a set distance
apart. The moving and fixed pivots on the opposing links in the parallelogram must be
equidistant for this linkage to work correctly. Technically classed as a four-bar linkage, this
linkage can also be rotated through 360° without changing its function. Pantographs that obtain
power for electric trains from overhead cables are based on parallel-motion linkage. Drawing
pantographs that permit original drawings to be manually copied without tracing or
photocopying are also adaptations of this linkage; in its simplest form it can also keep tool trays
in a horizontal position when the toolbox covers are opened.
Bell-crank linkage:
Fig. 2, can change the direction of objects or force by 90°. This linkage rang doorbells
before electric clappers were invented. More recently this mechanism has been adapted for
bicycle brakes. This was done by pinning two bell cranks bent 90° in opposite directions together
to form tongs. By squeezing the two handlebar levers linked to the input ends of each crank, the
output ends will move together. Rubber blocks on the output ends of each crank press against the
wheel rim, stopping the bicycle. If the pins which form a fixed pivot are at the midpoints of the
cranks, link movement will be equal. However, if those distances vary, mechanical advantage
can be gained
9 | P a g e
2.3 CRANK-ROCKER MECHANISM FOR BOX TRANSPORT MECHANISM
The four bar linkage is the simplest and often times, the most useful mechanism. As we
mentioned before, a mechanism composed of rigid bodies and lower pairs is called
a linkage (Hunt 78). In planar mechanisms, there are only two kinds of lower pairs --- revolute
pairs and prismatic pairs.
The simplest closed-loop linkage is the four bar linkage which has four members, three
moving links, one fixed link and four pin joints. A linkage that has at least one fixed link is a
mechanism.
Figure 3 Crank rocker mechanism
10 | P a g e
This mechanism has four moving links. Two of the links are pinned to the frame which is
not shown in this picture. In Sims Design, links can be nailed to the background thereby making
them into the frame.
How many DOF does this mechanism have? If we want it to have just one, we can
impose one constraint on the linkage and it will have a definite motion. The four bar linkage is
the simplest and the most useful mechanism.
Reminder: A mechanism is composed of rigid bodies and lower pairs called
linkages (Hunt 78). In planar mechanisms there are only two kinds of lower pairs: turning pairs
and prismatic pairs.
2.4 FUNCTIONS OF LINKAGES
The function of a link mechanism is to produce rotating, oscillating, or reciprocating
motion from the rotation of a crank or vice versa (Ham et al. 58). Stated more specifically
linkages may be used to convert:
1. Continuous rotation into continuous rotation, with a constant or variable angular velocity
ratio.
2. Continuous rotation into oscillation or reciprocation (or the reverse), with a constant or
variable velocity ratio.
3. Oscillation into oscillation, or reciprocation into reciprocation, with a constant or variable
velocity ratio.
Linkages have many different functions, which can be classified according on the
primary goal of the mechanism:
Function generation: the relative motion between the links connected to the frame,
Path generation: the path of a tracer point, or
Motion generation: the motion of the coupler link.
11 | P a g e
2.5 FOUR LINK MECHANISMS
One of the simplest examples of a constrained linkage is the four-link mechanism. A
variety of useful mechanisms can be formed from a four-link mechanism through slight
variations, such as changing the character of the pairs, proportions of links, etc. Furthermore,
many complex link mechanisms are combinations of two or more such mechanisms. The
majority of four-link mechanisms fall into one of the following two classes:
1. The four-bar linkage mechanism, and
2. The slider-crank mechanism.
Definitions:
In the range of planar mechanisms, the simplest group of lower pair mechanisms are four
bar linkages. A four bar linkage comprises four bar-shaped links and four turning pairs as shown
in figure 4.
Figure 4 Four bar linkage
12 | P a g e
The link opposite the frame is called the coupler link, and the links which are hinged to
the frame are called side links. A link which is free to rotate through 360 degree with respect to a
second link will be said to revolve relative to the second link (not necessarily a frame). If it is
possible for all four bars to become simultaneously aligned, such a state is called a change point.
Some important concepts in link mechanisms are:
1. Crank: A side link which revolves relative to the frame is called a crank.
2. Rocker: A side link which does not revolve is called a rocker.
3. Coupler: The link which connect the crank and rocker are called as coupler.
4. Crank-Rocker mechanism: In a four bar linkage if one of the side link revolve and other
side link oscillate then the mechanism known as Crank-Rocker Mechanism where shortest link is
the input link (crank). (fig 4-a)
5. Rocker-Crank Mechanism: if the shortest link is the output link (follower) then the
mechanism known as Rocker-Crank Mechanism.
6. Double-Crank mechanism: In a four bar linkage, if both of the side links revolve, it is
known as Double-Crank Mechanism where the shortest link is the ground link (frame).
7. Double-Rocker mechanism: In a four bar linkage, if both of the side links rock, it is
known as Double-Rocker Mechanism where the shortest link is the floating link (coupler).
Fig 4-a fig 4-b fig 4-c
13 | P a g e
WORKING PRINCIPLE:
Crank-Rocker Mechanism: A 4-bar linkage mechanism has a crank that rotates at a
constant angular speed. The crank is connected to the coupler which is connected to the
rocker. The frame does not move.
Fig 5 crank rocker
14 | P a g e
Straight-Line Walking Beam Eight-bar Transport Mechanism:
Fig 6 Walking Beam
Info: The walking beam (in blue) pushes articles (in pink) forward, and the material is
left stationary in the return stroke of the walking beam until the next cycle. The
mechanism is for moving articles with intermittent advancement. The eight-bar
mechanism allows moving more than one article, as compared to four bar walking beam.
Source: This Working Model file is adapted from Figure P3.7 on p.150 in Design of
Machinery, 3rd ed. by Norton, R.L., McGraw-Hill, 2004.
Credits: This Working Model file was first developed by Jie (Jeff) Yang.
15 | P a g e
2.6 CLASSIFICATION
Before classifying four-bar linkages, we need to introduce some basic nomenclature.
In a four-bar linkage, we refer to the line segment between hinges on a given link as a bar where:
s = length of shortest bar
l = length of longest bar
p, q = lengths of intermediate bar
Grashof's theorem states that a four-bar mechanism has at least one revolving link if
s + l <= p + q
(5-1)
And all three mobile links will rock if
s + l > p + q
(5-2)
The inequality 5-1 is Grashof's criterion.
16 | P a g e
All four-bar mechanisms fall into one of the four categories listed in Table 5-1:
Case (l + s varies p + q) Shortest Bar Type
1 < Frame Double-crank
2 < Side Rocker-crank
3 < Coupler Double rocker
4 = Any Change point
5 > Any Double-rocker
Table 1 Classification of Four-Bar Mechanisms
From Table 5-1 we can see that for a mechanism to have a crank, the sum of the length of
its shortest and longest links must be less than or equal to the sum of the length of the other two
links. However, this condition is necessary but not sufficient. Mechanisms satisfying this
condition fall into the following three categories:
1. When the shortest link is a side link, the mechanism is a crank-rocker mechanism. The
shortest link is the crank in the mechanism.
2. When the shortest link is the frame of the mechanism, the mechanism is a double-crank
mechanism.
3. When the shortest link is the coupler link, the mechanism is a double-rocker mechanism.
17 | P a g e
2.7 TRANSMISSION ANGLE
In Figure 5, if AB is the input link, the force applied to the output link, CD, is
transmitted through the coupler link BC. (That is, pushing on the link CD imposes a force on the
link AB, which is transmitted through the link BC.) For sufficiently slow motions (negligible
inertia forces), the force in the coupler link is pure tension or compression (negligible bending
action) and is directed along BC. For a given force in the coupler link, the torque transmitted to
the output bar (about point D) is maximum when the angle between coupler bar BC and output
bar CD is /2. Therefore, angle BCD is called transmission angle.
(5-3)
Figure 7 Transmission angle
When the transmission angle deviates significantly from /2, the torque on the output
bar decreases and may not be sufficient to overcome the friction in the system. For this reason,
the deviation angle =| /2- | should not be too great. In practice, there is no definite upper
limit for , because the existence of the inertia forces may eliminate the undesirable force
relationships that is present under static conditions.
18 | P a g e
2.8 ANALYSIS
FOR A GIVEN DISPLACEMENT DETERMINE THE RADIUS OF CRANK
Fig 8 mechanism
In the given fig value of d is the predetermined value and we have to determine the
crank radius r for a given radius value of rocker R
Let the oscillation of rocker is Q degree at point B
From the triangle ABC
d = 2 AC
d = 2 R Sin (Q/2) 1
Q/2 = Sin-1
(d/2R)
19 | P a g e
Q = 2 Sin-1
(d/2R)
From Crank and Rocker motion
2 r = R*Q*3.14321/180
On putting the value of Q from equation 1, we get
r = (R*3.14321/180)* Sin-1
(d/2R)
Example: Calculate the dimension (radius) of crank for displacement of 215 mm at the rocker
radius of 250 mm.
Solution:
Given that:
R = 250 & d = 215
Put the value of R & d in equation 3
r = (250*3.14321/180)* Sin-1
(215/2*250)
r = 111.18 Ans.
20 | P a g e
DETERMINING DEGREE OF FREEDOM:
The minimum number of independent variables required to define the position and
motion of the system is known as degree of freedom of the system.
OR
Degree of freedom is the number of input required to get constrained output in a chain.
F = 3(L - 1) - 2J - H
Where
F = degree of freedom
L = no of links
J = no of binary joint
H = no of higher pair
Hence,
F = 3(8 - 1) - 2*10 - 0
F = 1
21 | P a g e
22 | P a g e
CHAPTER 3
3.1 MATERIAL AND DIMENSIONS
All the links are made up of MDF sheet and structure made up of solid wooden block.
The dimension of the different links are as bellow:
Fig 9 Base structure
23 | P a g e
Figure 10 Transporting link & Connecting rod
24 | P a g e
Figure 11 Couplers
25 | P a g e
Figure 12 Crank & Rocker
26 | P a g e
3.2 TOOLS
MDF Wooden plate Wooden plate cutter
Welding machine Lathe Machine
27 | P a g e
Drill machine Electric motor
Iron angles
28 | P a g e
Steel file tool measuring tape
Vices Cutting shearing pliers
29 | P a g e
3.3 PROCEDURE
1. First of all we have prepared the drawing for the machine transporter machine.
2. Then we make the measurement for the bed of the box transport machine.
3. We took the wooden block and cut them in the given measurements using the cutting
machine.
4. Then we took that pieces and fitting them in the prepared shaped drawing.
5. After making the fit of wooden block bed for the machine was ready.
6. Then we took the MDF sheet plate and then taking the measurement of box transport
machine we cut the pieces in the given length.
7. After cutting the plate in the given size we put a shaft in the lathe machine for giving it
the shape of shaft.
8. After preparing the shaft, hanger and crank we take it over the drill machine to make the
holes in them as the given dimension in the drawing.
9. After this we had prepared the shaft which is going move the boxes to the next level with
using it edges on the top of it. We cut the MDF sheet plate in the given dimensions and
then edges also, after cutting we make the fitting to attach these edges with the plate on
the given distance dimensions.
10. Now all of the things for the machine are prepared.
11. On this step we took the electric motor and fix that on the bed of the machine on the
given place.
12. After fixing the motor we fixed the crank with it from one side and other side was
attached to the shaft 1.
30 | P a g e
13. Then we took the hanger link and attach it with the shaft 1, while the other edge of the
hanger link is attached to the shaft 2.
14. Then both of the shafts were attached to the transporting shaft.
15. Two other hanger links was also attached to the shafts.
16. Other two hanger link and transporting shaft was attached to the top of the bed in the
bearing gear.
17. Out box transporting machine is ready now.
18. We give the current to the electric motor and put the boxes on the top of the machine for
testing it.
19. It was working well and boxes are moving to the next level.
31 | P a g e
32 | P a g e
CHAPTER 4
4.1 LOGIC
The Box transporting machine is a new skill that we have learned to make a Box
transporting machine. At the same time, we learn to use a right tools and materials when doing
work at Box transporting machine. Box transporting machine is also giving us more skills and
preparation when we work outside later. When we see a result from the work that we have done
together, we are very grateful when we have finish our work in a sharp time that have given by
our lecturer.
The talent that our lecturer have given to us is bring us to a new experience about Box
transporting machine. These practical also give us advantage when we work together with our
team and we also can learn many information through share knowledge together.
4.2 FUTURE WORK
APPLICATION:
Transferring the boxes from one place to another for the requirement of worker within the
industry.
Heavy tools easily transport to one work station to another work station.
Creating a balance line in the assembly line.
33 | P a g e
What is assembly-line balancing?
To a workstation within an assembly line in order to meet the required production rate
and to achieve a minimum amount of idle time.
Line balancing is the procedure in which tasks along assigning each task the assembly
line are assigned to work station so each has approximately same amount of work.
Steps FOR Balancing an Assembly Line:
1. List the sequential relationships among tasks and then draw a precedence diagram.
2. Calculate the required workstation cycle time.
3. Calculate the theoretical minimum number of workstations.
4. Choose a primary rule that will determine how tasks are to be assigned to workstations.
5. Beginning with the first workstation, assign each task, one at a time, until the sum of the
task times is equal to the workstation cycle time or until no other tasks can be assigned
due to sequence or time restrictions.
6. Repeat step 5 for the remaining workstations until all the tasks have been assigned to a
workstation.
7. Evaluate the efficiency of the line balance.
8. Rebalance if necessary.
34 | P a g e
Unbalanced Line and its Effect:
High work load in some stages (Overburden).
Maximizes wastes (over-processing, inventory, waiting, rework, transportation, motion).
High variation in output.
Restrict one piece flow.
Maximizes idle time.
Poor efficiency.
Balanced Line and its Effect:
Promotes one piece flow.
Avoids excessive work load in some stages (overburden).
Minimizes wastes (over-processing, inventory, waiting, rework, transportation, motion).
Reduces variation.
Increased Efficiency.
Minimizes idle time.
W ork
Station 1
W ork
S tation 4
W ork
S tation 3
W ork
S tation 2
35 | P a g e
How Can Balancing line help in Organization?
Time Saving.
Money Saving (Time Is Money, make changes in virtual world).
Simplifies complex assembly line balancing problems.
Increased efficiency.
Increased productivity.
Potential increase in profits and decrease in costs.
36 | P a g e
37 | P a g e
CHAPTER 5
CONCLUSION
In this project, we learn about how to prepare the Box transporting machine. Other than
that we also have been teach by our lecturer how to use the lathe machine. Besides that, our
teacher always remains us to stay alert in safety while doing a work before and after finish the
practice. Conclusion is, we want to thanks to lecturer and my friend during learning of Box
transporting machine. However, these practical we will never ever forget because these talents
are bring us to learn new things in our studying at this college.
38 | P a g e
REFRENCES
Source: This Working Model file is adapted from Figure P3.7 on p.150 in Design of
Machinery, 3rd ed. by Norton, R.L., McGraw-Hill, 2004.
Credits: This Working Model file was first developed by Jie (Jeff) Yang.
http://www.mekanizmalar.com/transport01.html
http://projectseminars.org/report-box-transport-mechanism-project-report-in-pdf
http://seminarprojects.com/s/box-transport-mechanism
https://www.youtube.com/watch?v=tDLof06nBjU

More Related Content

What's hot

STRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCH
STRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCHSTRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCH
STRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCHSumit Nagar
 
report on electromagnetic breaking system
report on electromagnetic breaking systemreport on electromagnetic breaking system
report on electromagnetic breaking systemVishal Singh
 
Steering gears - worm and wheel steering gear
Steering gears - worm and wheel steering gearSteering gears - worm and wheel steering gear
Steering gears - worm and wheel steering gearBASURI NIKHIL
 
Report of design and development of multi purpose mechanical machine
Report of design and development of multi purpose mechanical machine Report of design and development of multi purpose mechanical machine
Report of design and development of multi purpose mechanical machine Jitendra Jha
 
elliptical Trammel micro-project report
elliptical Trammel micro-project reportelliptical Trammel micro-project report
elliptical Trammel micro-project reportsurajshinde118
 
Automobile chassis and classification (frames)
Automobile chassis and classification (frames) Automobile chassis and classification (frames)
Automobile chassis and classification (frames) PEC University Chandigarh
 
hydraulic brake ppt
hydraulic brake ppthydraulic brake ppt
hydraulic brake pptMohit Sharma
 
Rope brake dynamometer
Rope brake dynamometerRope brake dynamometer
Rope brake dynamometerpurvansh_v
 
Project report on Chainless Bicycle
Project report on Chainless BicycleProject report on Chainless Bicycle
Project report on Chainless BicycleAlok Prakash Singh
 
Project Motorized Scotch Yoke Mechanism
Project Motorized Scotch Yoke MechanismProject Motorized Scotch Yoke Mechanism
Project Motorized Scotch Yoke MechanismNAUMAN NAEEM
 
Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)
Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)
Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)University of Windsor
 
Epicyclic gear train
Epicyclic gear train Epicyclic gear train
Epicyclic gear train kamallalu
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway stationdurgesh pathak
 
Types and application of gears
Types and application of gearsTypes and application of gears
Types and application of gearsDipaliMore6
 
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...Shubham Dhaneshree
 
Air breaking system in indian railway
Air breaking system in indian railwayAir breaking system in indian railway
Air breaking system in indian railwaysandip senapati
 

What's hot (20)

STRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCH
STRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCHSTRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCH
STRESS ANALYSIS OF SPUR GEAR BY USING ANSYS WORKBENCH
 
5 shock absorbers
5 shock absorbers5 shock absorbers
5 shock absorbers
 
report on electromagnetic breaking system
report on electromagnetic breaking systemreport on electromagnetic breaking system
report on electromagnetic breaking system
 
Steering gears - worm and wheel steering gear
Steering gears - worm and wheel steering gearSteering gears - worm and wheel steering gear
Steering gears - worm and wheel steering gear
 
Report of design and development of multi purpose mechanical machine
Report of design and development of multi purpose mechanical machine Report of design and development of multi purpose mechanical machine
Report of design and development of multi purpose mechanical machine
 
elliptical Trammel micro-project report
elliptical Trammel micro-project reportelliptical Trammel micro-project report
elliptical Trammel micro-project report
 
Automobile chassis and classification (frames)
Automobile chassis and classification (frames) Automobile chassis and classification (frames)
Automobile chassis and classification (frames)
 
hydraulic brake ppt
hydraulic brake ppthydraulic brake ppt
hydraulic brake ppt
 
Rope brake dynamometer
Rope brake dynamometerRope brake dynamometer
Rope brake dynamometer
 
Project report on Chainless Bicycle
Project report on Chainless BicycleProject report on Chainless Bicycle
Project report on Chainless Bicycle
 
Low cost automation
Low cost automationLow cost automation
Low cost automation
 
Project Motorized Scotch Yoke Mechanism
Project Motorized Scotch Yoke MechanismProject Motorized Scotch Yoke Mechanism
Project Motorized Scotch Yoke Mechanism
 
Differential Gear Box
Differential Gear BoxDifferential Gear Box
Differential Gear Box
 
Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)
Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)
Kinemetic chains, Pairs, Joints, Four bar Mechanisms (KOM)
 
Epicyclic gear train
Epicyclic gear train Epicyclic gear train
Epicyclic gear train
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway station
 
Types and application of gears
Types and application of gearsTypes and application of gears
Types and application of gears
 
MACHINE TOOL GEAR BOX
MACHINE TOOL GEAR BOXMACHINE TOOL GEAR BOX
MACHINE TOOL GEAR BOX
 
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
 
Air breaking system in indian railway
Air breaking system in indian railwayAir breaking system in indian railway
Air breaking system in indian railway
 

Viewers also liked

Transfer machines
Transfer machines Transfer machines
Transfer machines Suresh Lal
 
Transfer devices and feeders
Transfer devices and feedersTransfer devices and feeders
Transfer devices and feedersGopal Saini
 
Automatic-gear-shift-mechanism
 Automatic-gear-shift-mechanism Automatic-gear-shift-mechanism
Automatic-gear-shift-mechanismveeresh844
 
Work part transport method
Work part transport methodWork part transport method
Work part transport methodCALM-SUTRA
 
Design and fabrication of stair climber trolley
Design and fabrication of stair climber trolleyDesign and fabrication of stair climber trolley
Design and fabrication of stair climber trolleySunilKr94
 
Ppt automobile
Ppt automobile  Ppt automobile
Ppt automobile suhas kale
 
Pneumatic Sheet cutter ppt for engg. students
Pneumatic Sheet cutter ppt for engg. studentsPneumatic Sheet cutter ppt for engg. students
Pneumatic Sheet cutter ppt for engg. studentsSmrutipiyush Sahoo
 
Paper cutting & rewinding machine project report SREESANGH P GHOSH
Paper cutting & rewinding machine   project report SREESANGH P GHOSHPaper cutting & rewinding machine   project report SREESANGH P GHOSH
Paper cutting & rewinding machine project report SREESANGH P GHOSHSreesangh P Ghosh
 
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...Mohammed Naseeruddin Shah
 
102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)
102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)
102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)平原 謝
 
Permeable Paving: A New Tool for Sustainable Site Development
Permeable Paving: A New Tool for Sustainable Site DevelopmentPermeable Paving: A New Tool for Sustainable Site Development
Permeable Paving: A New Tool for Sustainable Site DevelopmentTom Barrett
 
Study of charge transport mechanism in organic and organicinorganic hybrid sy...
Study of charge transport mechanism in organic and organicinorganic hybrid sy...Study of charge transport mechanism in organic and organicinorganic hybrid sy...
Study of charge transport mechanism in organic and organicinorganic hybrid sy...Tauqueer Khan
 
90 Degree Side Mirrors
90 Degree Side Mirrors90 Degree Side Mirrors
90 Degree Side Mirrorskktv
 
007a velocity by instantaneousaxis
007a velocity by instantaneousaxis007a velocity by instantaneousaxis
007a velocity by instantaneousaxisphysics101
 
006a velocity by resolution and composition
006a velocity by resolution and composition006a velocity by resolution and composition
006a velocity by resolution and compositionphysics101
 

Viewers also liked (20)

Transfer machines
Transfer machines Transfer machines
Transfer machines
 
Transport mechanism
Transport mechanismTransport mechanism
Transport mechanism
 
Theory of machines
Theory of machinesTheory of machines
Theory of machines
 
Transfer devices and feeders
Transfer devices and feedersTransfer devices and feeders
Transfer devices and feeders
 
Automatic-gear-shift-mechanism
 Automatic-gear-shift-mechanism Automatic-gear-shift-mechanism
Automatic-gear-shift-mechanism
 
MECHANICAL PROJECT
MECHANICAL PROJECTMECHANICAL PROJECT
MECHANICAL PROJECT
 
Work part transport method
Work part transport methodWork part transport method
Work part transport method
 
Design and fabrication of stair climber trolley
Design and fabrication of stair climber trolleyDesign and fabrication of stair climber trolley
Design and fabrication of stair climber trolley
 
Beam engine
Beam engineBeam engine
Beam engine
 
Ppt automobile
Ppt automobile  Ppt automobile
Ppt automobile
 
Pneumatic Sheet cutter ppt for engg. students
Pneumatic Sheet cutter ppt for engg. studentsPneumatic Sheet cutter ppt for engg. students
Pneumatic Sheet cutter ppt for engg. students
 
Paper cutting & rewinding machine project report SREESANGH P GHOSH
Paper cutting & rewinding machine   project report SREESANGH P GHOSHPaper cutting & rewinding machine   project report SREESANGH P GHOSH
Paper cutting & rewinding machine project report SREESANGH P GHOSH
 
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
 
102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)
102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)
102.12.25 中正大學資管系古政元教授 屏東科技大學演講(2013-12-25)
 
Permeable Paving: A New Tool for Sustainable Site Development
Permeable Paving: A New Tool for Sustainable Site DevelopmentPermeable Paving: A New Tool for Sustainable Site Development
Permeable Paving: A New Tool for Sustainable Site Development
 
Study of charge transport mechanism in organic and organicinorganic hybrid sy...
Study of charge transport mechanism in organic and organicinorganic hybrid sy...Study of charge transport mechanism in organic and organicinorganic hybrid sy...
Study of charge transport mechanism in organic and organicinorganic hybrid sy...
 
90 Degree Side Mirrors
90 Degree Side Mirrors90 Degree Side Mirrors
90 Degree Side Mirrors
 
007a velocity by instantaneousaxis
007a velocity by instantaneousaxis007a velocity by instantaneousaxis
007a velocity by instantaneousaxis
 
006a velocity by resolution and composition
006a velocity by resolution and composition006a velocity by resolution and composition
006a velocity by resolution and composition
 
Paper Cutting Machine
Paper Cutting MachinePaper Cutting Machine
Paper Cutting Machine
 

Similar to Box transport mechanism

Design and fabrication of Automatic Trolley
Design and fabrication of Automatic TrolleyDesign and fabrication of Automatic Trolley
Design and fabrication of Automatic TrolleyAyush Rawat
 
Automatic power hacksaw
Automatic power hacksawAutomatic power hacksaw
Automatic power hacksawGlobalLogic
 
MEng Report Merged - FINAL
MEng Report Merged - FINALMEng Report Merged - FINAL
MEng Report Merged - FINALAmit Ramji ✈
 
MEng Report Merged - FINAL
MEng Report Merged - FINALMEng Report Merged - FINAL
MEng Report Merged - FINALAmit Ramji ✈
 
mechenical engineering project
mechenical engineering project mechenical engineering project
mechenical engineering project Ashish Rathore
 
Final Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State UniversityFinal Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State UniversityHitesh Sharma
 
14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMS
14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMS14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMS
14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMSAniket Patel
 
Automatic liquid filling and mixing process using PLC
Automatic liquid filling and mixing process using PLCAutomatic liquid filling and mixing process using PLC
Automatic liquid filling and mixing process using PLCAMIT KUMAR SINGH
 
Online Cab Booking (EpicRide 24x7)
Online Cab Booking (EpicRide 24x7)Online Cab Booking (EpicRide 24x7)
Online Cab Booking (EpicRide 24x7)Shadan Khan
 
Training report for nbc
Training report for nbcTraining report for nbc
Training report for nbcHitesh Sharma
 
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...LUMENSPORTS
 
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...LUMENSPORTS
 
Colour ball major_project
Colour ball major_projectColour ball major_project
Colour ball major_projectRajan Pasi
 
AUTOMATED FOOTBALL MANAGEMENT SYSTEM
AUTOMATED FOOTBALL MANAGEMENT SYSTEMAUTOMATED FOOTBALL MANAGEMENT SYSTEM
AUTOMATED FOOTBALL MANAGEMENT SYSTEMAbhishek Kumar
 
front, certificate, acknolodgement of diesel shed izzatnagar, part1
front, certificate, acknolodgement of diesel shed izzatnagar, part1front, certificate, acknolodgement of diesel shed izzatnagar, part1
front, certificate, acknolodgement of diesel shed izzatnagar, part1Mechanical Engineering Student
 

Similar to Box transport mechanism (20)

FYP Thesis
FYP ThesisFYP Thesis
FYP Thesis
 
Design and fabrication of Automatic Trolley
Design and fabrication of Automatic TrolleyDesign and fabrication of Automatic Trolley
Design and fabrication of Automatic Trolley
 
Automatic power hacksaw
Automatic power hacksawAutomatic power hacksaw
Automatic power hacksaw
 
Report
ReportReport
Report
 
MEng Report Merged - FINAL
MEng Report Merged - FINALMEng Report Merged - FINAL
MEng Report Merged - FINAL
 
MEng Report Merged - FINAL
MEng Report Merged - FINALMEng Report Merged - FINAL
MEng Report Merged - FINAL
 
mechenical engineering project
mechenical engineering project mechenical engineering project
mechenical engineering project
 
Final Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State UniversityFinal Year Project Report Sample for Engineers - IIT and State University
Final Year Project Report Sample for Engineers - IIT and State University
 
Thesis
ThesisThesis
Thesis
 
14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMS
14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMS14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMS
14259_MODIFICATION_OF_TWO_WHEELER_TO_OVERCOME_EXISTING_PROBLEMS
 
Automatic liquid filling and mixing process using PLC
Automatic liquid filling and mixing process using PLCAutomatic liquid filling and mixing process using PLC
Automatic liquid filling and mixing process using PLC
 
Cover page
Cover pageCover page
Cover page
 
Online Cab Booking (EpicRide 24x7)
Online Cab Booking (EpicRide 24x7)Online Cab Booking (EpicRide 24x7)
Online Cab Booking (EpicRide 24x7)
 
Training report for nbc
Training report for nbcTraining report for nbc
Training report for nbc
 
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
 
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
Design and construction of a solar powered metro vehicle. (update) (2).docx 3...
 
Colour ball major_project
Colour ball major_projectColour ball major_project
Colour ball major_project
 
THOMSON MECHANISM
THOMSON MECHANISM THOMSON MECHANISM
THOMSON MECHANISM
 
AUTOMATED FOOTBALL MANAGEMENT SYSTEM
AUTOMATED FOOTBALL MANAGEMENT SYSTEMAUTOMATED FOOTBALL MANAGEMENT SYSTEM
AUTOMATED FOOTBALL MANAGEMENT SYSTEM
 
front, certificate, acknolodgement of diesel shed izzatnagar, part1
front, certificate, acknolodgement of diesel shed izzatnagar, part1front, certificate, acknolodgement of diesel shed izzatnagar, part1
front, certificate, acknolodgement of diesel shed izzatnagar, part1
 

Recently uploaded

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Box transport mechanism

  • 1. 4/24/2015 BOX TRANSPORT MECHANISM AWADHESH SINGH YADAV IDEAL INSTITUTE OF ENGINEERING & TECHNOLOGY
  • 2. BOX TRANSPORT MECHANISM A Project Report submitted In Partial Fulfillment of the Requirements for the Degree of BACHELOR OF TECHNOLOGY in Mechanical Engineering by Awadhesh Singh Yadav (Roll No.- 1102840031) Danveer Saini (Roll No.- 1102840036) Gaurav Sagar (Roll No.- 1102840040) Mayank Kumar Jain (Roll No.- 1102840052) Nitesh Kumar Tripathi (Roll No.- 1102840059) Under the Supervision of Mr. Dharmendra Singh (Professor/ Assistant Professor) Department of Mechanical Engineering Ideal Institute of Engineering & Technology, Ghaziabad, Uttar Pradesh. to the UTTAR PRADESH TECHNICAL UNIVERSITY LUCKNOW (U.P.) April 2015
  • 3. i CERTIFICATE Certified that Awadhesh Singh Yadav (Roll No. 1102840031), Danveer Saini (Roll No. 1102840036), Gaurav Sagar (Roll No. 1102840040), Mayank Kumar Jain (Roll No. 1102840052) and Nitesh Kumar Tripathi (Roll No. 1102840059) has carried out the project work presented in this report entitled for the award of Bachelor of Technology from Uttar Pradesh Technical University, Lucknow, (U.P.) under my supervision. The report embodies results of original work, and studies are carried out by the students themselves and the contents of the report do not form the basis for the award of any other degree to the candidate or to anybody else from this or any other University/Institution. Signature: Date: Mr. Dharmendra Singh (Professor /Assistant Professor) Mechanical Engineering Department, Ideal Institute of Technology, Ghaziabad
  • 4. ii ABSTRACT This project aims for the utilization of kinematic synthesis (type, dimensional and number) to fabricate a working physical model of an eight link transport mechanism. The mechanism to be developed in its simplest form would perform the function of transporting boxes/articles which are being fed onto two rails and are moved ahead one by one. The eight bar mechanism allows moving more than one article as compared to its four bar counterpart. Transport mechanisms generally move material and their application lies in various industries- manufacturing, assembly, packaging etc. In this project we apply the path generation synthesis and coupler curve synthesis and study to fabricate our model which is an eight link transporter mechanism. The synthesis would Chebyschev theorem for cognate linkages and parallel motion generation where we want the output link of the mechanism to follow a particular path without any rotation of the link as it moves along the path. The final model will be constructed by modelling in CAD software solid edge that will eliminate the errors that might have crept in graphical synthesis. In actual fabrication process the model will be refined as the final fitments are done by tools and processes like welding, drilling, fitting, grinding. The model then undergoes trial run and is examined for the prescribed motion characteristics.
  • 5. iii ACKNOWLEDGEMENT We would like to express my gratitude to all those who gave me the opportunity to complete this work. We would like to thank, Mr. Dharmendra Singh Assistant Professor (ME), for giving guidance, stimulating suggestions and moral support. We are grateful to him for sharing his time and expertise. His faith in us has always made more confident. It had been our privilege to work under his guidance. We would also like to thank Mr. Apurv Yadav Assistant Professor, Mechanical Engineering Department for moral support, interest and valuable hints. We are also thankful to all the faculty members of mechanical engineering department and our colleagues for their cooperation. We would like to thank our family for their continued support throughout this work. Our parents have always been there for us and provided the best opportunities. No one has been as motivating and inspirational to us as our parents. Thank you for your consistent help and support. Awadhesh Singh Yadav (Roll No. 1102840031) Nitesh Kumar Tripathi (Roll No.1102840059) Mayank Kumar Jain (Roll No. 1102840052) Gaurav Sagar (Roll No. 1102840040) ) Danveer Saini (Roll No. 1102840036)
  • 6. iv TABLE OF CONTENTS DESCRIPTIONS PAGE NO. CERTIFICATE .................................................................................................... i ABSTRACT........................................................................................................ ii ACKNOWLEDGEMENT ..........................................................................................................iii TABLE OF CONTENTS ......................................................................................iv LIST OF FIGURES.....................................................................................................................vi CHAPTER 1................................................................................................................................ 1 1.1 INTRODUCTION............................................................................................................. 2 1.2 AIM ..................................................................................................................................... 4 1.3 OBJECTIVE ...................................................................................................................... 4 CHAPTER 2................................................................................................................................ 5 2.1 LINKAGE MECHANISM .............................................................................................. 6 2.2 SIMPLE PLANAR LINKAGES .................................................................................... 7 2.3 CRANK-ROCKER MECHANISM ............................................................................... 9 2.4 FUNCTIONS OF LINKAGES ..................................................................................... 10 2.5 FOUR LINK MECHANISMS ...................................................................................... 11 2.6 CLASSIFICATION ........................................................................................................ 15 2.7 TRANSMISSION ANGLE ........................................................................................... 17 2.8 ANALYSIS ...................................................................................................................... 18 CHAPTER 3.............................................................................................................................. 21 3.1 MATERIAL AND DIMENSIONS .............................................................................. 22 3.2 TOOLS.............................................................................................................................. 26 3.3 PROCEDURE .................................................................................................................. 29
  • 7. v CHAPTER 4.............................................................................................................................. 31 4.1 LOGIC .............................................................................................................................. 32 4.2 FUTURE WORK ............................................................................................................ 32 CHAPTER 5.............................................................................................................................. 36 CONCLUSION ..................................................................................................................... 37 REFRENCES ....................................................................................................................... 38 APPENDIX ........................................................................................................................... 39
  • 8. vi LIST OF FIGURES Figure 1 Box transport mechanism................................................................................................. 3 Figure 2 Functions of four basic planar linkage mechanisms......................................................... 7 Figure 3 Crank rocker mechanism.................................................................................................. 9 Figure 4 Four bar linkage.............................................................................................................. 11 Figure 5 Crank rocker ................................................................................................................... 13 Figure 6 Walking Beam................................................................................................................ 14 Figure 7 Transmission angle......................................................................................................... 17 Figure 8 Mechanism ..................................................................................................................... 18 Figure 9 Base structure ................................................................................................................. 22 Figure 10 Transporting link & Connecting rod ............................................................................ 23 Figure 11 Couplers........................................................................................................................ 24 Figure 12 Crank and Rocker......................................................................................................... 25
  • 9. 1
  • 10. 2 | P a g e CHAPTER 1 1.1 INTRODUCTION There has been a serious demand for intermittent movement of packages in the industries right from the start. Though the continuous movement is more or less important in the same field the sporadic motion has become essential .The objective of our project is to produce a mechanism that delivers this stop and move motion using mechanical linkages. The advantage of our system over the conveyor system is that the system has a time delay between moving packages and this delay can be used to introduce any alterations in the package or move the package for any other purpose and likewise. While in conveyor system such actions cannot be performed unless programmed module is used to produce intermittent stopping of the belt which basically is costly. The prototype design requires electric motor, shafts and the frame of which the frame and platform on which the packages are moved is fabricated. All the links are being made of Wood which reduces the weight of the whole system including the head which has a direct contact with the boxes being moved. The system is expected to move as heavy packages as 2 - 3kgs approximately.
  • 11. 3 | P a g e Figure 1 Box transport mechanism The walking beam (in blue) pushes articles (in red) forward, and the material is left stationary in the return stroke of the walking beam until the next cycle. The mechanism is for moving articles with intermittent advancement. The eight-bar mechanism allows moving more than one article, as compared to a four bar walking beam.
  • 12. 4 | P a g e 1.2 AIM The aim of this project is to fabricate the box moving mechanism, which can make easier to move boxes from one section to the other while processing in the factories. In a workstation, an assembly line in order to obtain the required production rate and to achieve a minimum amount of idle time. 1.3 OBJECTIVE Fabricate a Box transport mechanism which can move things from one place to another Understand project planning and execution. Understand the fabrication techniques in a mechanical workshop. Understand the usage of various mechanical machine tools and also measuring tools.
  • 13. 5 | P a g e
  • 14. 6 | P a g e CHAPTER 2 2.1 LINKAGE MECHANISM A linkage is a mechanism formed by connecting two or more levers together. Linkages can be designed to change the direction of a force or make two or more objects move at the same time. Many different fasteners are used to connect linkages together yet allow them to move freely such as pins, end-threaded bolts with nuts, and loosely fitted rivets. There are two general classes of linkages: simple planar linkages and more complex specialized linkages; both are capable of performing tasks such as describing straight lines or curves and executing motions at differing speeds. The names of the linkage mechanisms given here are widely but not universally accepted in all textbooks and references. Linkages can be classified according to their primary functions: ed to the frame
  • 15. 7 | P a g e 2.2 SIMPLE PLANAR LINKAGES Four different simple planar linkages shown in Fig. 8 are identified by function: Reverse-motion linkage: Fig. 2, can make objects or force move in opposite directions; this can be done by using the input link as a lever. If the fixed pivot is equidistant from the moving pivots, output link movement will equal input link movement, but it will act in the opposite direction. However, if the fixed pivot is not centered, output link movement will not equal input link movement. By selecting the position of the fixed pivot, the linkage can be designed to produce specific mechanical advantages. This linkage can also be rotated through 360°. Push-pull linkage: Fig. 8b, can make the objects or force move in the same direction; the output link moves in the same direction as the input link. Technically classed as a four-bar linkage, it can be rotated through 360° without changing its function. Figure 2 Functions of four basic planar linkage mechanisms
  • 16. 8 | P a g e Parallel-motion linkage: Fig. 2, can make objects or forces move in the same direction, but at a set distance apart. The moving and fixed pivots on the opposing links in the parallelogram must be equidistant for this linkage to work correctly. Technically classed as a four-bar linkage, this linkage can also be rotated through 360° without changing its function. Pantographs that obtain power for electric trains from overhead cables are based on parallel-motion linkage. Drawing pantographs that permit original drawings to be manually copied without tracing or photocopying are also adaptations of this linkage; in its simplest form it can also keep tool trays in a horizontal position when the toolbox covers are opened. Bell-crank linkage: Fig. 2, can change the direction of objects or force by 90°. This linkage rang doorbells before electric clappers were invented. More recently this mechanism has been adapted for bicycle brakes. This was done by pinning two bell cranks bent 90° in opposite directions together to form tongs. By squeezing the two handlebar levers linked to the input ends of each crank, the output ends will move together. Rubber blocks on the output ends of each crank press against the wheel rim, stopping the bicycle. If the pins which form a fixed pivot are at the midpoints of the cranks, link movement will be equal. However, if those distances vary, mechanical advantage can be gained
  • 17. 9 | P a g e 2.3 CRANK-ROCKER MECHANISM FOR BOX TRANSPORT MECHANISM The four bar linkage is the simplest and often times, the most useful mechanism. As we mentioned before, a mechanism composed of rigid bodies and lower pairs is called a linkage (Hunt 78). In planar mechanisms, there are only two kinds of lower pairs --- revolute pairs and prismatic pairs. The simplest closed-loop linkage is the four bar linkage which has four members, three moving links, one fixed link and four pin joints. A linkage that has at least one fixed link is a mechanism. Figure 3 Crank rocker mechanism
  • 18. 10 | P a g e This mechanism has four moving links. Two of the links are pinned to the frame which is not shown in this picture. In Sims Design, links can be nailed to the background thereby making them into the frame. How many DOF does this mechanism have? If we want it to have just one, we can impose one constraint on the linkage and it will have a definite motion. The four bar linkage is the simplest and the most useful mechanism. Reminder: A mechanism is composed of rigid bodies and lower pairs called linkages (Hunt 78). In planar mechanisms there are only two kinds of lower pairs: turning pairs and prismatic pairs. 2.4 FUNCTIONS OF LINKAGES The function of a link mechanism is to produce rotating, oscillating, or reciprocating motion from the rotation of a crank or vice versa (Ham et al. 58). Stated more specifically linkages may be used to convert: 1. Continuous rotation into continuous rotation, with a constant or variable angular velocity ratio. 2. Continuous rotation into oscillation or reciprocation (or the reverse), with a constant or variable velocity ratio. 3. Oscillation into oscillation, or reciprocation into reciprocation, with a constant or variable velocity ratio. Linkages have many different functions, which can be classified according on the primary goal of the mechanism: Function generation: the relative motion between the links connected to the frame, Path generation: the path of a tracer point, or Motion generation: the motion of the coupler link.
  • 19. 11 | P a g e 2.5 FOUR LINK MECHANISMS One of the simplest examples of a constrained linkage is the four-link mechanism. A variety of useful mechanisms can be formed from a four-link mechanism through slight variations, such as changing the character of the pairs, proportions of links, etc. Furthermore, many complex link mechanisms are combinations of two or more such mechanisms. The majority of four-link mechanisms fall into one of the following two classes: 1. The four-bar linkage mechanism, and 2. The slider-crank mechanism. Definitions: In the range of planar mechanisms, the simplest group of lower pair mechanisms are four bar linkages. A four bar linkage comprises four bar-shaped links and four turning pairs as shown in figure 4. Figure 4 Four bar linkage
  • 20. 12 | P a g e The link opposite the frame is called the coupler link, and the links which are hinged to the frame are called side links. A link which is free to rotate through 360 degree with respect to a second link will be said to revolve relative to the second link (not necessarily a frame). If it is possible for all four bars to become simultaneously aligned, such a state is called a change point. Some important concepts in link mechanisms are: 1. Crank: A side link which revolves relative to the frame is called a crank. 2. Rocker: A side link which does not revolve is called a rocker. 3. Coupler: The link which connect the crank and rocker are called as coupler. 4. Crank-Rocker mechanism: In a four bar linkage if one of the side link revolve and other side link oscillate then the mechanism known as Crank-Rocker Mechanism where shortest link is the input link (crank). (fig 4-a) 5. Rocker-Crank Mechanism: if the shortest link is the output link (follower) then the mechanism known as Rocker-Crank Mechanism. 6. Double-Crank mechanism: In a four bar linkage, if both of the side links revolve, it is known as Double-Crank Mechanism where the shortest link is the ground link (frame). 7. Double-Rocker mechanism: In a four bar linkage, if both of the side links rock, it is known as Double-Rocker Mechanism where the shortest link is the floating link (coupler). Fig 4-a fig 4-b fig 4-c
  • 21. 13 | P a g e WORKING PRINCIPLE: Crank-Rocker Mechanism: A 4-bar linkage mechanism has a crank that rotates at a constant angular speed. The crank is connected to the coupler which is connected to the rocker. The frame does not move. Fig 5 crank rocker
  • 22. 14 | P a g e Straight-Line Walking Beam Eight-bar Transport Mechanism: Fig 6 Walking Beam Info: The walking beam (in blue) pushes articles (in pink) forward, and the material is left stationary in the return stroke of the walking beam until the next cycle. The mechanism is for moving articles with intermittent advancement. The eight-bar mechanism allows moving more than one article, as compared to four bar walking beam. Source: This Working Model file is adapted from Figure P3.7 on p.150 in Design of Machinery, 3rd ed. by Norton, R.L., McGraw-Hill, 2004. Credits: This Working Model file was first developed by Jie (Jeff) Yang.
  • 23. 15 | P a g e 2.6 CLASSIFICATION Before classifying four-bar linkages, we need to introduce some basic nomenclature. In a four-bar linkage, we refer to the line segment between hinges on a given link as a bar where: s = length of shortest bar l = length of longest bar p, q = lengths of intermediate bar Grashof's theorem states that a four-bar mechanism has at least one revolving link if s + l <= p + q (5-1) And all three mobile links will rock if s + l > p + q (5-2) The inequality 5-1 is Grashof's criterion.
  • 24. 16 | P a g e All four-bar mechanisms fall into one of the four categories listed in Table 5-1: Case (l + s varies p + q) Shortest Bar Type 1 < Frame Double-crank 2 < Side Rocker-crank 3 < Coupler Double rocker 4 = Any Change point 5 > Any Double-rocker Table 1 Classification of Four-Bar Mechanisms From Table 5-1 we can see that for a mechanism to have a crank, the sum of the length of its shortest and longest links must be less than or equal to the sum of the length of the other two links. However, this condition is necessary but not sufficient. Mechanisms satisfying this condition fall into the following three categories: 1. When the shortest link is a side link, the mechanism is a crank-rocker mechanism. The shortest link is the crank in the mechanism. 2. When the shortest link is the frame of the mechanism, the mechanism is a double-crank mechanism. 3. When the shortest link is the coupler link, the mechanism is a double-rocker mechanism.
  • 25. 17 | P a g e 2.7 TRANSMISSION ANGLE In Figure 5, if AB is the input link, the force applied to the output link, CD, is transmitted through the coupler link BC. (That is, pushing on the link CD imposes a force on the link AB, which is transmitted through the link BC.) For sufficiently slow motions (negligible inertia forces), the force in the coupler link is pure tension or compression (negligible bending action) and is directed along BC. For a given force in the coupler link, the torque transmitted to the output bar (about point D) is maximum when the angle between coupler bar BC and output bar CD is /2. Therefore, angle BCD is called transmission angle. (5-3) Figure 7 Transmission angle When the transmission angle deviates significantly from /2, the torque on the output bar decreases and may not be sufficient to overcome the friction in the system. For this reason, the deviation angle =| /2- | should not be too great. In practice, there is no definite upper limit for , because the existence of the inertia forces may eliminate the undesirable force relationships that is present under static conditions.
  • 26. 18 | P a g e 2.8 ANALYSIS FOR A GIVEN DISPLACEMENT DETERMINE THE RADIUS OF CRANK Fig 8 mechanism In the given fig value of d is the predetermined value and we have to determine the crank radius r for a given radius value of rocker R Let the oscillation of rocker is Q degree at point B From the triangle ABC d = 2 AC d = 2 R Sin (Q/2) 1 Q/2 = Sin-1 (d/2R)
  • 27. 19 | P a g e Q = 2 Sin-1 (d/2R) From Crank and Rocker motion 2 r = R*Q*3.14321/180 On putting the value of Q from equation 1, we get r = (R*3.14321/180)* Sin-1 (d/2R) Example: Calculate the dimension (radius) of crank for displacement of 215 mm at the rocker radius of 250 mm. Solution: Given that: R = 250 & d = 215 Put the value of R & d in equation 3 r = (250*3.14321/180)* Sin-1 (215/2*250) r = 111.18 Ans.
  • 28. 20 | P a g e DETERMINING DEGREE OF FREEDOM: The minimum number of independent variables required to define the position and motion of the system is known as degree of freedom of the system. OR Degree of freedom is the number of input required to get constrained output in a chain. F = 3(L - 1) - 2J - H Where F = degree of freedom L = no of links J = no of binary joint H = no of higher pair Hence, F = 3(8 - 1) - 2*10 - 0 F = 1
  • 29. 21 | P a g e
  • 30. 22 | P a g e CHAPTER 3 3.1 MATERIAL AND DIMENSIONS All the links are made up of MDF sheet and structure made up of solid wooden block. The dimension of the different links are as bellow: Fig 9 Base structure
  • 31. 23 | P a g e Figure 10 Transporting link & Connecting rod
  • 32. 24 | P a g e Figure 11 Couplers
  • 33. 25 | P a g e Figure 12 Crank & Rocker
  • 34. 26 | P a g e 3.2 TOOLS MDF Wooden plate Wooden plate cutter Welding machine Lathe Machine
  • 35. 27 | P a g e Drill machine Electric motor Iron angles
  • 36. 28 | P a g e Steel file tool measuring tape Vices Cutting shearing pliers
  • 37. 29 | P a g e 3.3 PROCEDURE 1. First of all we have prepared the drawing for the machine transporter machine. 2. Then we make the measurement for the bed of the box transport machine. 3. We took the wooden block and cut them in the given measurements using the cutting machine. 4. Then we took that pieces and fitting them in the prepared shaped drawing. 5. After making the fit of wooden block bed for the machine was ready. 6. Then we took the MDF sheet plate and then taking the measurement of box transport machine we cut the pieces in the given length. 7. After cutting the plate in the given size we put a shaft in the lathe machine for giving it the shape of shaft. 8. After preparing the shaft, hanger and crank we take it over the drill machine to make the holes in them as the given dimension in the drawing. 9. After this we had prepared the shaft which is going move the boxes to the next level with using it edges on the top of it. We cut the MDF sheet plate in the given dimensions and then edges also, after cutting we make the fitting to attach these edges with the plate on the given distance dimensions. 10. Now all of the things for the machine are prepared. 11. On this step we took the electric motor and fix that on the bed of the machine on the given place. 12. After fixing the motor we fixed the crank with it from one side and other side was attached to the shaft 1.
  • 38. 30 | P a g e 13. Then we took the hanger link and attach it with the shaft 1, while the other edge of the hanger link is attached to the shaft 2. 14. Then both of the shafts were attached to the transporting shaft. 15. Two other hanger links was also attached to the shafts. 16. Other two hanger link and transporting shaft was attached to the top of the bed in the bearing gear. 17. Out box transporting machine is ready now. 18. We give the current to the electric motor and put the boxes on the top of the machine for testing it. 19. It was working well and boxes are moving to the next level.
  • 39. 31 | P a g e
  • 40. 32 | P a g e CHAPTER 4 4.1 LOGIC The Box transporting machine is a new skill that we have learned to make a Box transporting machine. At the same time, we learn to use a right tools and materials when doing work at Box transporting machine. Box transporting machine is also giving us more skills and preparation when we work outside later. When we see a result from the work that we have done together, we are very grateful when we have finish our work in a sharp time that have given by our lecturer. The talent that our lecturer have given to us is bring us to a new experience about Box transporting machine. These practical also give us advantage when we work together with our team and we also can learn many information through share knowledge together. 4.2 FUTURE WORK APPLICATION: Transferring the boxes from one place to another for the requirement of worker within the industry. Heavy tools easily transport to one work station to another work station. Creating a balance line in the assembly line.
  • 41. 33 | P a g e What is assembly-line balancing? To a workstation within an assembly line in order to meet the required production rate and to achieve a minimum amount of idle time. Line balancing is the procedure in which tasks along assigning each task the assembly line are assigned to work station so each has approximately same amount of work. Steps FOR Balancing an Assembly Line: 1. List the sequential relationships among tasks and then draw a precedence diagram. 2. Calculate the required workstation cycle time. 3. Calculate the theoretical minimum number of workstations. 4. Choose a primary rule that will determine how tasks are to be assigned to workstations. 5. Beginning with the first workstation, assign each task, one at a time, until the sum of the task times is equal to the workstation cycle time or until no other tasks can be assigned due to sequence or time restrictions. 6. Repeat step 5 for the remaining workstations until all the tasks have been assigned to a workstation. 7. Evaluate the efficiency of the line balance. 8. Rebalance if necessary.
  • 42. 34 | P a g e Unbalanced Line and its Effect: High work load in some stages (Overburden). Maximizes wastes (over-processing, inventory, waiting, rework, transportation, motion). High variation in output. Restrict one piece flow. Maximizes idle time. Poor efficiency. Balanced Line and its Effect: Promotes one piece flow. Avoids excessive work load in some stages (overburden). Minimizes wastes (over-processing, inventory, waiting, rework, transportation, motion). Reduces variation. Increased Efficiency. Minimizes idle time. W ork Station 1 W ork S tation 4 W ork S tation 3 W ork S tation 2
  • 43. 35 | P a g e How Can Balancing line help in Organization? Time Saving. Money Saving (Time Is Money, make changes in virtual world). Simplifies complex assembly line balancing problems. Increased efficiency. Increased productivity. Potential increase in profits and decrease in costs.
  • 44. 36 | P a g e
  • 45. 37 | P a g e CHAPTER 5 CONCLUSION In this project, we learn about how to prepare the Box transporting machine. Other than that we also have been teach by our lecturer how to use the lathe machine. Besides that, our teacher always remains us to stay alert in safety while doing a work before and after finish the practice. Conclusion is, we want to thanks to lecturer and my friend during learning of Box transporting machine. However, these practical we will never ever forget because these talents are bring us to learn new things in our studying at this college.
  • 46. 38 | P a g e REFRENCES Source: This Working Model file is adapted from Figure P3.7 on p.150 in Design of Machinery, 3rd ed. by Norton, R.L., McGraw-Hill, 2004. Credits: This Working Model file was first developed by Jie (Jeff) Yang. http://www.mekanizmalar.com/transport01.html http://projectseminars.org/report-box-transport-mechanism-project-report-in-pdf http://seminarprojects.com/s/box-transport-mechanism https://www.youtube.com/watch?v=tDLof06nBjU