The document introduces the Binh Hung water treatment plant in Ho Chi Minh City, Vietnam. It discusses the large volumes of wastewater generated in the city from domestic, medical, and industrial sources, with the majority untreated. It then describes the Dong Dieu pumping station that transports wastewater to the Binh Hung plant and provides an overview of the plant's design and operations. The plant uses activated sludge technology to treat 141,000 cubic meters of wastewater per day to meet national standards. It is staffed by 50 engineers and technicians and has been operating successfully since 2008.