Our Projects
www.bim-me.com
Professional
delivery
Our Vision
To be recognized and respected as the premier and most long term
preferred middle-east engineering technology consultant. We
are committed to being a leading consulting company, exceeding
the expectations of our clients, driven by integrity, teamwork and
innovation.
Our Mission
Complement our clients’ project teams to help them maximize the
return on their investment in latest technologies within the areas of
design, project management and collaboration.
We achieve this in partnership with our customers by reviewing
processes and by the technology applications aimed at increasing
efficiency and minimizing risk across all areas of the project life
cycle.
Achieve
BIM success
Building Information Management-Middle East
BIM-ME
Who are we?
BIM-ME is a leading Consultancy design management firm
providing solutions in Lebanon and the Middle-East specializing
in Implementation, support and training under building information
modeling (BIM).
Since 2006, we have developed a proven process for implementing
Revit software, from Autodesk, through consulting engagements
with thousands of Architects & Engineers.
BIM-ME has established a proven methodology based on Revit
Architecture, Structure and MEP to integrate BIM technology.
BIM-ME succeeded in facing the challenges of the growing demand
for building information modeling and services by maintaining its
development and enhancing its experience and references.
Following multiple years of success stories and experience since 2006,
dealing with leading Multidisciplinary engineering companies, the
company positioned itself as the primary BIM expert in the region.
BIM-ME provides its clients with complete implementation packages,
Project Management, systems integration, high quality services and
professional training. Simply a full optimization of the design process
from the concept phase to construction is offered.
Design Process Consulting
Optimization
Consulting
BIM
BIM-ME’s industry-leading consultants are ready to use their knowledge and experience to help your organization gain the greatest
benefits from BIM technology for design. From initially understanding your organization’s requirements through implementing
systems, processes and standards, BIM-ME’s goal is to collaborate with you to deliver the greatest gains and the best return on your
investment. This is achieved by developing a close working relationship, building mutual goals and sharing knowledge with customers.
Overview
Using the latest technologies and processes within the Building Information Modeling, BIM-ME can bring major benefits
in productivity, quality and efficiency while reducing risk.
From Needs Analysis to Project Delivery
From the initial investigation and analysis of your organization’s needs and goals, through implementation and project management,
BIM-ME’s Consultancy team has the skills and experience to ensure the right processes are introduced effectively.
From Concept to Completion... and beyond
BIM-ME’s vision has always been to view the whole building lifecycle. It delivers solutions from the initial concept stage passing
through the construction phase until reaching the facilities management and completing the whole project. Such a goal is made
achievable by our expertise which covers all design disciplines in BIM and also extends to processes, coordination, collaboration and
data management. These technologies and management techniques support our ability to propose, provide and service a wide range of
BIM tools to the highest standards.
Complete solution from concept phase to construction
BIM-ME’s Consultants
BIM-ME’s consultants which comprise experts in architecture and
engineering (structural and MEP) offer industry-leading expertise.
In addition to technology knowledge, this expertise comes from an
understanding of management and processes. The consultants’
skills are gained from industry experience in BIM-ME and through
working within client organizations. Each consultant is specialized in
particular areas and works as part of a consultancy team to
ensure that a complete solution is achieved.
Consultancy Areas
• Design Processes
• Project & Document Standards
• Software Implementation
• Project Consultancy
What our clients say...
Here are just a few of the comments we’ve received from our
consultancy customers:
“We have worked with BIM-ME on Revit implementation for 8 months.
They were top professionals; they combine business expertise
with participative training know-how that guided our company to
valuable results and improvements.”
[ Erga Group - Walid Badri, Head of Architectural Design Development Department ]
“BIM-ME is made up of true professionals with extensive industry
experience and the ability to get people to work together for optimum
results. They are very dependable and always deliver to expectations.
They also are a pleasure to work with.”
[ Khatib & Alami - Consolidated Engineering Company - Walid Kridly, Project Manager ]
“BIM-ME was instrumental in helping us establish quick wins through their
strategy assessment process and consulting that they did for our company.”,
[ Qualco, Quality Construction Company - Elie Chidiac, Director ]
Ready to
share our
knowledge
BIM-ME has launched its Revit Production Department providing
Revit Architecture, Revit Structure and Revit MEP modeling services
to Consultants, contractors and building owners. BIM-ME now
offers its clients full comprehensive Revit Production services.
BIM-ME is not limited to the creation of Revit Multidisciplinary BIM
model; it seeks information beyond the building. A full advantage of
the BIM technology is taken to construct a virtual digital model just
like the real building BEFORE it is built.
BIM-ME’s team is specialized in Revit production service for all
building trades including Architectural, Structural, Electrical and
Mechanical (HVAC, Piping, fire protection & plumbing).
Its Scope of work includes schematic design, design development ,
construction documentation and shop drawings as well as custom 2-D and 3-D family
content and detail libraries. To date, BIM-ME has worked with consultants
and contractors on more than 5 million square meters of 2D, 3D and 4D
Revit projects throughout the Middle-East.
BIM-ME Revit Production services allow a firm to supplement their
own project production teams efficiently and effectively. Through the
BIM-ME’s production team that acts as an extension of clients’ own in-house
staff, including its regular reports and open communication,
a seamless process is accomplished.
BIMBIM modeling, Clash Report, BIM Standards
CAD to BIM , Revit Family,
As built Shop-drawings, Fabrication Data
Production
Special strategic training
Improving and developing the skills of a workforce is a proven
method of showing your commitment to the continuous learning as
well as increasing productivity.
From consultancy to standard and bespoke training courses and
ongoing skills validation, BIM-ME can make you more productive
and effective. Whether the topic is the new design technology,
on the latest software features or «tips and tricks», the focus is on
achieving the maximum benefit from your investment in training and
learning.
WHY TRAIN WITH BIM-ME?
Coming from BIM implementation consultancy and production
involvement with the major construction companies in the middle
east, BIM-ME training provides unbeatable quality as demonstrated
by our many accreditations, clients and results.
BIM-ME is an Autodesk Auhorized Training Center ,Autodesk
Services Consultancy Partner, Autodesk Certified Consulting
Specialist as well as Autodesk Authorized Developer and
runs accredited courses for Autodesk and many other developers’
software packages.
BM-ME, through its team of experienced professional trainers, is
committed to providing high quality, practical hands-on application
training in its offices in Beirut and Dubai.
WHAT ARE THE KEY BENEFITS?
Keep up with new technologies: A positive learning environment
creates a culture of continuous improvement in your organization.
Get an edge: “Learning architects and engineers” are recognized
as being more competitive and efficient.
Specialist knowledge: By choosing BIM-ME as your preferred
training provider, you will be gaining access to a wide range of
professional industry-specific expertise.
WHAT OUR CLIENTS SAY...
Here are just a few of the comments we have received from our
training customers.
“During his mission, Mr. Moussallem showed great skills in training
and in communication with users. He was always ready to come
up with practical solutions to ensure the smooth progress of the
implementation. We, as Dar, recommend the services he provides
in the field of Revit training, implementation and technical support.”
[ Dar Al-handasah Shair & Partners - Joseph Hajjar, Director of
Architecture Department. Sonia Haddad, IT Manager ]
“Very well presented training course. All discussed items were
helpful and we will benefit from this information to enhance our
productivity.” [ Erga Group - Walid Badri, Head of Architectural
Design Development Department ]
“Training was extremely useful and targeted to my particular
requirement. I feel confident that my use of Revit will be greatly
enhanced by the training given.” [ Khatib & Alami - Consolidated
Engineering Company - Walid Kridly, Project Manager ]
“The course was structured well with hands on experience and
clear demonstration, and was thus successful.”. [ Qualco - Quality
Construction Company - Elie Chidiac, Director ]
“Our engagement with BIM-ME following Revit Implementation was
invaluable.” [ WSP Middle East - Gerry McFadden, CAD Manager ]
“With BIM-ME help, we made more progress in 4 days than we
were able to do in 4 months.” [ KEO International Consultants,
Kuwait - David Ross, Head of Structural Engineering ]
TRAINING COURSES
BIM COURSES
Autodesk Revit Architecture Essentials	 40H
Autodesk Revit Architecture Advanced	 40H
Autodesk Revit Architecture Conceptual Design Advanced	 20H
Autodesk Revit Structural Essentials	 40H
Autodesk Revit Structural Advanced	 40H
Autodesk Revit MEP Essentials	 36H
Autodesk Revit MEP Advanced	 36H
Autodesk Navisworks Manage	 35H
Autodesk Navisworks Simulate 	 24H
INTERACTIVE ANIMATION COURSES
Adobe After Effects (Visual Effects -3D Architectural Animation)	20H
Adobe Premiere (Video Editing -3D Architectural Animation)	20H
INDUSTRIAL DESIGN COURSES
Autodesk Inventor Essentials	 20H
Autodesk Inventor Advanced	 20H
RhinoCeros (Nurbs Modeling) Essentials	 26H
RhinoCeros (Nurbs Modeling) Advanced	 26H
RhinoCeros -Grasshopper - generative modeling	 24H
STRUCTURE COURSES
Autodesk Robot Structural Analysis Essentials	 24H
Autodesk Robot Structural Analysis Advanced	 24H
Advance Structural Analysis Using Robot & Etabs	50H
TEKLA	 26H
ETABS 	 24H
SAFE	16H
SAP	16H
Autodesk Advance Concrete 20H
Autodesk Advance Steel 20H
CIVIL COURSES
Autodesk Infrastructure Modeler	 30H
Autodesk Civil 3D	 30H
Autodesk Map 3D	 30H
Autodesk Plant 3D 30H
PROJECT MANAGEMENT COURSES
Primavera P6	 22H
Microsoft Project - Essentials	 24H
Project Management Professional 36H	
LAYOUT DESIGN
Adobe Photoshop Essentials (Architectural Visualization-layout design)	24H
Adobe Photoshop Advanced (Architectural Visualization-layout design)	24H
Adobe illustrator Essentials (Architectural Visualization-layout design)	24H
Adobe illustrator Advanced (Architectural Visualization-layout design)	24H
Adobe In Design (Architectural Visualization-layout design)	24H
ARCHITECTURAL MODELING AND VISUALIZATION
Autodesk 3ds Max 	 30H
Autodesk 3ds Max -Conceptual Design	 30H
Autodesk 3ds Max -Mastering Modeling	 30H
Autodesk 3ds Max -Mastering Animation	 30H
V-Ray - 3ds Max (Architectural Visualization)	 24H
Autodesk Showcase	 24H
Autodesk Maya Essentials (Architectural Visualization)	 30H
Autodesk Maya Advanced (Architectural Visualization)	 30H
Lumion (3D Rendering Architectural Visualization) 20H
Vue xStream (3D Landscape Visualization)	 24H
Bryce (3D Landscape Visualization)	 24H
Google sketchup Essentials	 24H
Google sketchup Advanced	 24H
RhinoCeros (Nurbs Modeling) Essentials	 26H
V-Ray for RhinoCeros	 20H
RhinoCeros -Grasshopper - Generative modeling	 26H
We, as BIM-ME, provide our clients with complete BIM
implementation packages, Project Management, systems
Integration, high quality services and professional training.
Simply a full optimization of the design process from the concept
phase up to construction is offered.
SUSTAINABILITY COURSES
LEED ACCREDITATION TRAINING
LEED Green Associate	 30H
LEED Accredited Professional	 50H
(Exam eligibility requirement fulfilled through this course)
BUILDING PERFORMANCE SIMULATION
eQuest - Essentials	 24H
eQuest - Advanced	 24H
Autodesk Ecotect Analysis - Essentials	 24H
Autodesk Ecotect Analysis - Advanced	 24H
EnergyPlus - Essentials	 24H
EnergyPlus - Advanced	 24H
ANSYS FLUENT CFD Essentials	 30H
ANSYS FLUENT CFD Advanced	 30H
IES <Virtual environment> - Essentials 	 40H
IES <Virtual environment> - Advanced 	 40H
Sustainability courses are managed by
www.seeds-intl.com
API
Autodesk Revit Architecture API Essentials 	 30H
Autodesk Revit Architecture API Advanced	 30H
Autodesk Revit Structural API Essentials	 30H
Autodesk Revit Structural API Advanced	 30H
Autodesk Revit MEP API Essentials	 30H
Autodesk Revit MEP API Advanced	 30H
Autodesk Navisworks Manage API	 30H
MECHANICAL DESIGN
Air Conditioning System Design	 35H
Fundamentals of HVAC Systems	 30H
HAP v4.51 Hourly Analysis Program	 24H
ELECTRICAL COURSES
Dialux	20H
ETAP – Essentials	 20H
ETAP – Advanced 	 20H
Ecodial 	 20H
Latest version of software
BIM-ME
Clients
A Careful planning saves money and time !
Better productivity
Flexibility in design
Sustainable design
Development
BIM-ME, as an Autodesk Authorized Developer, does custom
development work for individual companies who have specific
needs for BIM solutions. We are specialized in linking customers
ERP systems to BIM and Revit based products.
Our software engineers can develop plug-ins and add-ons that
smoothly integrate the Autodesk Revit environment to seamlessly
create various production, data analysis and decision helping
tools.
Automatically distributes family instances along a continuous path-Array On Path In Revit
Works With Autodesk Revit 2017 (Architecture, Structure and MEP)
Target Customers
All users that work with Autodesk Revit 2017 (Architecture, Structure and MEP)
Product Description
This plugin prompts the user to select a set of continuous curves (lines, arcs or splines) ,select a family instance and define “distribution settings” (offset and distance).
It then copies the selected family instance along the selected path; the distance between consecutive family instances will be according to the “distribution settings” and
the families will be oriented in a way to match with the curve’s derivative at the insertion point.
Benefits
Implements a feature not readily available in Revit®.
Features
• Works with lines, arcs, ellipses and splines
• Family instances orientation can be linked to the curve’s derivative
• Use of predefined patterns
Distance between consecutive family instances will be according to the
“distribution settings” and the families will be oriented in a way to match
with the curve’s derivative at the insertion point.
Plugins
Automatically Distributes Supports
Elements for Networks of Pipes, Ducts
and Cable Tray In Revit
Product Description
This plugin prompts the user to: select a duct or a pipe network, define a pattern (distance between
consecutive support elements, minimum distance and other rules….) and select an architecture or
structure Revit® Link; afterwards, the plugin automatically distributes support elements for the se-
lected network, the width of the support is adjusted to match with the duct width, the location of the
nearest slab (in the Revit link) is taken into consideration to adjust each support’s element height.
Benefits
This plugin automates the process of distributing support elements for ducts and pipes and drasti-
cally reduces the effort and time it requires.
Features
• Works with Revit® links
• Works with pipes (both rectangular and circular)
• Support position/ dimensions / orientation are automatically adjusted
Documentation
User’s manual, step by step movie
Support and Training
Support is available via email and dedicated training sessions can be scheduled upon request
-CAD to Revit Conversion
-Export to Dialux
-Automatic Wall/Floor Opening for pipe/duct penetration
-Manage your selections
-Array of objects along defined path
-Export to MS Project
-Export to Primavera P6
-Roof to Floor Converter
-Revision Cloud Manager
-Clash Detection Professional Manager
-Automated distribution of duct supports
-Revit Layout Translator
-Revit Formula manager
-Dynamic Legend
-AutoJoin Geometry tools
-Roof to Slab Converter
-Create Finish slab based on room boundary
-Create line with text
-Create hatch that can be applied to pipes
-Create Advanced graphical column schedule
-Create graphical beam schedule
-Site Management
Collaboration between
multidisciplines
Other available Plug-ins
RESEARCH & DEVELOPMENT : COMPLEX GEOMETRY
SOM
Sweden’s
Tallest Tower
ZAHA HADID CHANEL
PAVILION
ZAHA HADID
ZAHA HADID
REM
KOOLHAAS
MAD Architects
Adrian Smith + Gordon
Gill Architecture
RESEARCH & DEVELOPMENT : COMPLEX GEOMETRY
ZAHA HADID
ZAHA HADID
SOM Norman Foster
MAD Architects
RESEARCH & DEVELOPMENT : COMPLEX GEOMETRY
REVIT
DYNAMO
RHINO
GRASSHOPPER
SANTIAGO CALATRAVA
Norman Foster
SOM
List of Projects and Clients
National Bank of Kuwait
Kingdom Tower
Abu Dhabi Midfield Terminal Complex
The Address Sky View Residence
Habtoor Aqua Theater
ABC Verdun
DEWA
Abraj Al Bait
Boqaata Dam
Dar Al Handasah (Shair & Partners - Lebanon Office)
Houara Project
Plus Towers
Office Towers
Sama Beirut
Al Ajlan Tower
Alghazawi Tower
Zahra Hospital
Raouche Residential
Sky Gate Tower
St. Regis Hotel
Etc...
Client : Imaar Trading
Project Location : Kuwait
National Bank Of Kuwait
Date | 2015 - Present
Scope | BIM Production (Architecture & Structure)
Remark | Interior works & fit-outs BIM deliverables from LOD 300 till LOD 500 including shop drawings - 4D and 5D Simulation and clash reports
Date | 2013 - Present
Scope | BIM Modeling
Remark | Shop drawings under REVIT with 4D Simulation Animation.
Client : Saudi Binladin Group
Project Location : SAUDI ARABIA
KINGDOM TOWER
World’s Tallest Building
1Km+
Date | 2014 - Present
Scope | BIM Production (Architecture & Structure)
Remark | Geometry analysis and integration with CNC machines to fabricate all the ceilings packages
Client : Cloisall - Gulf
Project Location : United Arab Emirates
Abu Dhabi Midfield Terminal
BIM geometry analysis and integration
with CNC machines for more than 360,000
unique geometry shape
ceiling panels
and their supporting structures
The Address Residence
Date | 2015 - Present
Scope | BIM Production
Remark | MEP Shop drawing, Composite Drawing and asbuilt drawing with architecture and Structure modeling of the tower - 4D Simulation.
Client : ACC
Project Location : United Arab Emirates
4D SIMULATION
Habtoor Aqua Theater
Client : Habtoor group
Project Location : United Arab Emirates
Date | 2015 - 2017
Scope | BIM Production
Remark | MEP Shop drawing, Composite Drawing and asbuilt drawing with architecture and Structure modeling.
WASL TOWER
Client : ALEC
Project Location : United Arab Emirates
KSA PAVILION EXPO 2020
Client : ALEC
Project Location : United Arab Emirates
DOHA METRO
Date | 2015 - 2016
Scope | BIM Production
Client : IMAR
Project Location : QATAR
RW8
Client : MZ ARCHITECT
Project Location : UAE _ ABU DHABI
MEYDAN BEACH HOTEL
Client : EETS ( MEP )
Project Location : UAE _ DUBAI
Date | 2018 - Present
Scope | BIM Production -Shop Drawings MEP
FORTE
Client : TARGET ( ARC-STR ) - EETS ( MEP )
Project Location : UAE _ DUBAI
Date | 2018 - Present
Scope | BIM Production -Shop Drawings ARC-STR -MEP
ACT1 ACT2
Client : CSCEC ( ARC-STR -MEP )
Project Location : UAE _ DUBAI
Date | 2018 - Present
Scope | BIM Production -Shop Drawings ARC-STR -MEP
RIYADH METRO
Client : BACS
Project Location : KSA
Scope | BIM Production
BLF
Client : Nabilg Holam Architects
Project Location : LEBANON
Scope | BIM Implementation
SEEF Lusail D1 & D2 LuxuryClient : rodolphematta
Project Location : QATAR
Scope | BIM Implementation
ABC VERDUN
Date | 2015 - Present
Scope | BIM Production
Remark | 4D Simulation.
Client : Man Enterprise
Project Location : Lebanon
4D SIMULATION
ABC VERDUN
DEWA
Date | 2016 - Present
Scope | BIM Production
Remark | BIM Architecture & Engineering Modeling and Shop Drawings - Creating the BIM Models for all the different phases of the project till the As-built Model
Client : Site Technology
Project Location : United Arab Emirates
Kuwait Gulf Oil Company
(KGOC) Headquarters
Client : Al Hamra Kuwait Co. w.l.l.
Project Location : Kuwait
Date | From: Q3 2007 To: Q2 2008
Scope | Revit BIM Implementation & production (Architecture, Structure, MEP)
Remark | The Abraj Al Bait Towers, when completed, will be located in Mecca, Saudi Arabia. It will be the biggest
building in the world by mass
Client : Dar Al Handasah (Shair & Partners - Cairo Office)
Project Location : Saudi Arabia
Abraj Al-Bait in Makkah
Beqaata Dam
Client : Khoury Contracting
Project Location : Lebanon
Battoyor Residential Compound
Client : SKP
Project Location : Saudi Arabia
Date | From: Q4 2007 To: Q2 2008
Scope | Revit BIM Implementation & production (Architecture, Structure, MEP)
American University Academic
Building II
Client : Dar Al Handasah (Shair & Partners - Lebanon Office)
Project Location : Sulaimaniya,Iraq
Nishan Office Tower
Client : MZ ARCHITECT
Project Location : Qatar
One Eko Boulevard
Client :MZ ARCHITECT
Project Location : Nigeria
Houara Project
Client : Erga Group(Lebanon)
Project Location : Morocco
Date | From: Q3 2008 To: Q3 2009
Scope | Revit BIM Implementation & production (Architecture) Remark | Project size 2,355,000 square meters
Date | From: Q3 2008 To: Q3 2009
Scope | Revit BIM Implementation & production (Architecture) Remark | Three Iconic Buildings in the heart of downtown Beirut
Plus Towers
Client : Erga Group(Lebanon)
Project Location : Lebanon
Date | From: Q4 2008 To: Q2 2009
Scope | Revit BIM Implementation & production (Architecture)
Office Towers
Client : Erga Group(Lebanon)
Project Location : Nigeria
Date | From: Q1 2009 To: Q3 2009
Scope | Revit BIM Implementation & production (Architecture) Remark | Tallest Tower in Lebanon
Sama Beirut
Client : Erga Group(Lebanon)
Project Location : Lebanon
Date | From: Q1 2009 To: Q4 2009
Scope | Revit BIM Implementation & production (Architecture, Structure, MEP)
Al Ajlan Tower
Client : Khatib &Alami
Project Location : Saudi Arabia
Date | From: Q1 2009 To: Q3 2009
Scope | Revit BIM Implementation & production (Architecture, Structure, MEP)
Alghazawi Tower
Client : Khatib &Alami
Project Location : Saudi Arabia
Date | From: Q4 2009 To: Q2 2010
Scope | Revit BIM Implementation & production (Architecture)
Raouche-Residential
Client : Khatib &Alami
Project Location : Lebanon
Date | From: Q4 2009 To: Q2 2010
Scope | Revit BIM Implementation & production (Architecture)
Zahra Hospital
Client : Khatib &Alami
Project Location : Lebanon
Date | From: Q1 2010 To: Q3 2010
Scope | Revit BIM Implementation & production (Architecture)
Salama Hospital Option 1
Client : Khatib &Alami
Project Location : Saudi Arabia
Date | From: Q1 2010 To: Q3 2010
Scope | Revit BIM Implementation & production (Architecture)
Salama Hospital Option 2
Client : Khatib &Alami
Project Location : Saudi Arabia
Date | Q1 2010
Scope | Revit BIM Implementation & production (Architecture)
Beirut Terraces
Client : Khatib &Alami
Project Location : Lebanon
Date | From: Q4 2009 To: Q2 2010
Scope | Revit BIM Implementation & production (Architecture)
V5-Complex Commercial Center
Client : Khatib &Alami
Project Location : Lebanon
Date | From: Q4 2009 To: Q2 2010
Scope | Revit BIM Implementation & production (Architecture, MEP, Solar analysis)
International School of ChoueifatClient : Khatib &Alami
Project Location : Erbil, Iraq
Date | From: Q1 2006 To: Q1 2007
Scope | Revit BIM Implementation & production (Architecture, Structure, MEP)
Beirut Arab University
Client : Qualco
Project Location : Lebanon
Date | From: Q3 2006 To: Q4 2007
Scope | Revit BIM Implementation & production (Architecture, Structure, MEP)
Beirut Arab University
Client : Qualco
Project Location : Lebanon
Date | From: Q4 2009 To: Q1 2010
Scope | Revit BIM Implementation & production (Architecture, Structure, MEP)
Nafisseh Residential Development
Client : Qualco
Project Location : Lebanon
Date | From: Q4 2009 & Q2 2010
Scope | Revit BIM Implementation & production (Structure)
Lusail-Residential
Client : KEO International Consultants (Kuwait)
Project Location : Qatar
Date | From: Q4 2010 To: Q1 2011
Scope | Revit BIM Production (Architecture, Structure, MEP)
KAP
Client : EK concept (France)
Project Location : Saudi Arabia
Date | From: Q4 2010 To: Q2 2011
Scope | Revit BIM Production (Architecture, Structure, MEP)
Musical Building
Client : EK concept (France)
Project Location : Saudi Arabia
Date | From: Q4 2010 To: Q2 2011
Scope | Revit BIM Production (Architecture, Structure, MEP)
SkyGate TowerClient : MAN Enterprise
Architect : Nabil Gholham
Project Location: Lebanon
Date | From: Q4 2010 To: Q2 2011
Scope | Revit BIM Production (Architecture, Structure, MEP)
SkyGate Tower
Date | From: Q4 2010 To: Q2 2011
Scope | Revit BIM Implementation (MEP)
Water Front City
Client: Barbanel Middle East
Project Location: Lebanon
Date | From: Q3 2012 To: Q4 2012
Scope | Revit BIM Production (Architecture, Structure, MEP)
St. Regis Hotel & Apartments
Client: Al Maabar-Abdoun Real Estate Development
Project Location: Amman - Jordan
Date | From: Q3 2012 To: Q4 2012
Scope | Revit BIM Production (Architecture, Structure, MEP)
St. Regis Hotel & Apartments
Client: Al Maabar-Abdoun Real Estate Development
Project Location: Amman - Jordan
west Corridor
Client: MAN
Project Location: Qatar
BIM For Infrastructure & Civil Engineering
Animation For Infrastructure
& Civil Engineering
Client: Atkins
King Abdulaziz International Airport (Jeddah)
Client: ETEC
BAHRAIN INTERNATIONAL AIRPORT PASSENGER
TERMINAL BUILDING
Client: 109 ARCHITECTS Badarou Residential
Client: 109 ARCHITECTS Secret Garden
Client: MNA
Client: MNA
Schomp Automotive Honda
Schomp Automotive Honda
Client: MNA HighlandsPlace-Residential
Date | From: Q4 2011 To: Q2 2012
Scope | Revit BIM Implementation (Architecture, Structure, MEP)
Building apartments,
Client: Badawi Group
Project Location: Lebanon
Date | Q3 2011
Scope | Revit BIM Production (Architecture)
Badawi Group Head Quarters
Client: Badawi Group
Project Location: Lebanon
Date | From: Q4 2011 To: present
Scope | Revit BIM Implementation (MEP)
Airport OmanClient : Pierre Dammous & Partners
Date | From: Q4 2011 To: present
Scope | Revit BIM Implementation (MEP)
Date | 2018 Scope | Revit BIM Modeling
Client : WESNAE
Location : Denver
BMW SHOROOM
Date | 2019 Scope | Revit BIM Modeling
Client : WESNAE
Location : Denver
TOYOTA SHOWROOM
Date | 2019 Scope | Revit BIM Modeling
Client : WESNAE
Location : OKLAHOMA
VOLVO SHOROOM
Date | Q3 2011
Scope | Revit BIM Production (Architecture)
Client : SEEDS
Date | Q3 2011
Scope | Revit BIM Production (Architecture)-
Theater
Residential
Client : SEEDS
Mkalles Roundabout, Dekwaneh Entrance, Georges Matta Street,
Near Vincci Home Gallery, Irani Building, 3rd Floor
+961 1 499998 | info@bim-me.com
www.bim-me.com
Dubai, Business Bay,
Executive towers, Aspect Tower, Office No.902, 9th floor
+971 4 2767162 | info@bim-me.com
www.bim-me.com
/bim.middleeast

BIM_ME_EBrochure

  • 1.
    Authoried Developer Building InformationManagement 3D 4D5D 6D BIM& BEYOND Consultancy | Production | Training | Development Authorized Developer
  • 2.
    Professional Delivery Our Mission OurVision Achieve BIM Success BIM Consultancy BIM Production Special Strategic BIM Training Our Clients Plugins Who are we? BIM Development Our Projects www.bim-me.com
  • 3.
    Professional delivery Our Vision To berecognized and respected as the premier and most long term preferred middle-east engineering technology consultant. We are committed to being a leading consulting company, exceeding the expectations of our clients, driven by integrity, teamwork and innovation. Our Mission Complement our clients’ project teams to help them maximize the return on their investment in latest technologies within the areas of design, project management and collaboration. We achieve this in partnership with our customers by reviewing processes and by the technology applications aimed at increasing efficiency and minimizing risk across all areas of the project life cycle.
  • 4.
    Achieve BIM success Building InformationManagement-Middle East BIM-ME Who are we? BIM-ME is a leading Consultancy design management firm providing solutions in Lebanon and the Middle-East specializing in Implementation, support and training under building information modeling (BIM). Since 2006, we have developed a proven process for implementing Revit software, from Autodesk, through consulting engagements with thousands of Architects & Engineers. BIM-ME has established a proven methodology based on Revit Architecture, Structure and MEP to integrate BIM technology. BIM-ME succeeded in facing the challenges of the growing demand for building information modeling and services by maintaining its development and enhancing its experience and references. Following multiple years of success stories and experience since 2006, dealing with leading Multidisciplinary engineering companies, the company positioned itself as the primary BIM expert in the region. BIM-ME provides its clients with complete implementation packages, Project Management, systems integration, high quality services and professional training. Simply a full optimization of the design process from the concept phase to construction is offered.
  • 5.
    Design Process Consulting Optimization Consulting BIM BIM-ME’sindustry-leading consultants are ready to use their knowledge and experience to help your organization gain the greatest benefits from BIM technology for design. From initially understanding your organization’s requirements through implementing systems, processes and standards, BIM-ME’s goal is to collaborate with you to deliver the greatest gains and the best return on your investment. This is achieved by developing a close working relationship, building mutual goals and sharing knowledge with customers. Overview Using the latest technologies and processes within the Building Information Modeling, BIM-ME can bring major benefits in productivity, quality and efficiency while reducing risk. From Needs Analysis to Project Delivery From the initial investigation and analysis of your organization’s needs and goals, through implementation and project management, BIM-ME’s Consultancy team has the skills and experience to ensure the right processes are introduced effectively. From Concept to Completion... and beyond BIM-ME’s vision has always been to view the whole building lifecycle. It delivers solutions from the initial concept stage passing through the construction phase until reaching the facilities management and completing the whole project. Such a goal is made achievable by our expertise which covers all design disciplines in BIM and also extends to processes, coordination, collaboration and data management. These technologies and management techniques support our ability to propose, provide and service a wide range of BIM tools to the highest standards.
  • 6.
    Complete solution fromconcept phase to construction BIM-ME’s Consultants BIM-ME’s consultants which comprise experts in architecture and engineering (structural and MEP) offer industry-leading expertise. In addition to technology knowledge, this expertise comes from an understanding of management and processes. The consultants’ skills are gained from industry experience in BIM-ME and through working within client organizations. Each consultant is specialized in particular areas and works as part of a consultancy team to ensure that a complete solution is achieved. Consultancy Areas • Design Processes • Project & Document Standards • Software Implementation • Project Consultancy What our clients say... Here are just a few of the comments we’ve received from our consultancy customers: “We have worked with BIM-ME on Revit implementation for 8 months. They were top professionals; they combine business expertise with participative training know-how that guided our company to valuable results and improvements.” [ Erga Group - Walid Badri, Head of Architectural Design Development Department ] “BIM-ME is made up of true professionals with extensive industry experience and the ability to get people to work together for optimum results. They are very dependable and always deliver to expectations. They also are a pleasure to work with.” [ Khatib & Alami - Consolidated Engineering Company - Walid Kridly, Project Manager ] “BIM-ME was instrumental in helping us establish quick wins through their strategy assessment process and consulting that they did for our company.”, [ Qualco, Quality Construction Company - Elie Chidiac, Director ]
  • 7.
    Ready to share our knowledge BIM-MEhas launched its Revit Production Department providing Revit Architecture, Revit Structure and Revit MEP modeling services to Consultants, contractors and building owners. BIM-ME now offers its clients full comprehensive Revit Production services. BIM-ME is not limited to the creation of Revit Multidisciplinary BIM model; it seeks information beyond the building. A full advantage of the BIM technology is taken to construct a virtual digital model just like the real building BEFORE it is built. BIM-ME’s team is specialized in Revit production service for all building trades including Architectural, Structural, Electrical and Mechanical (HVAC, Piping, fire protection & plumbing). Its Scope of work includes schematic design, design development , construction documentation and shop drawings as well as custom 2-D and 3-D family content and detail libraries. To date, BIM-ME has worked with consultants and contractors on more than 5 million square meters of 2D, 3D and 4D Revit projects throughout the Middle-East. BIM-ME Revit Production services allow a firm to supplement their own project production teams efficiently and effectively. Through the BIM-ME’s production team that acts as an extension of clients’ own in-house staff, including its regular reports and open communication, a seamless process is accomplished. BIMBIM modeling, Clash Report, BIM Standards CAD to BIM , Revit Family, As built Shop-drawings, Fabrication Data Production
  • 8.
    Special strategic training Improvingand developing the skills of a workforce is a proven method of showing your commitment to the continuous learning as well as increasing productivity. From consultancy to standard and bespoke training courses and ongoing skills validation, BIM-ME can make you more productive and effective. Whether the topic is the new design technology, on the latest software features or «tips and tricks», the focus is on achieving the maximum benefit from your investment in training and learning. WHY TRAIN WITH BIM-ME? Coming from BIM implementation consultancy and production involvement with the major construction companies in the middle east, BIM-ME training provides unbeatable quality as demonstrated by our many accreditations, clients and results. BIM-ME is an Autodesk Auhorized Training Center ,Autodesk Services Consultancy Partner, Autodesk Certified Consulting Specialist as well as Autodesk Authorized Developer and runs accredited courses for Autodesk and many other developers’ software packages. BM-ME, through its team of experienced professional trainers, is committed to providing high quality, practical hands-on application training in its offices in Beirut and Dubai. WHAT ARE THE KEY BENEFITS? Keep up with new technologies: A positive learning environment creates a culture of continuous improvement in your organization. Get an edge: “Learning architects and engineers” are recognized as being more competitive and efficient. Specialist knowledge: By choosing BIM-ME as your preferred training provider, you will be gaining access to a wide range of professional industry-specific expertise. WHAT OUR CLIENTS SAY... Here are just a few of the comments we have received from our training customers. “During his mission, Mr. Moussallem showed great skills in training and in communication with users. He was always ready to come up with practical solutions to ensure the smooth progress of the implementation. We, as Dar, recommend the services he provides in the field of Revit training, implementation and technical support.” [ Dar Al-handasah Shair & Partners - Joseph Hajjar, Director of Architecture Department. Sonia Haddad, IT Manager ] “Very well presented training course. All discussed items were helpful and we will benefit from this information to enhance our productivity.” [ Erga Group - Walid Badri, Head of Architectural Design Development Department ] “Training was extremely useful and targeted to my particular requirement. I feel confident that my use of Revit will be greatly enhanced by the training given.” [ Khatib & Alami - Consolidated Engineering Company - Walid Kridly, Project Manager ] “The course was structured well with hands on experience and clear demonstration, and was thus successful.”. [ Qualco - Quality Construction Company - Elie Chidiac, Director ] “Our engagement with BIM-ME following Revit Implementation was invaluable.” [ WSP Middle East - Gerry McFadden, CAD Manager ] “With BIM-ME help, we made more progress in 4 days than we were able to do in 4 months.” [ KEO International Consultants, Kuwait - David Ross, Head of Structural Engineering ]
  • 9.
    TRAINING COURSES BIM COURSES AutodeskRevit Architecture Essentials 40H Autodesk Revit Architecture Advanced 40H Autodesk Revit Architecture Conceptual Design Advanced 20H Autodesk Revit Structural Essentials 40H Autodesk Revit Structural Advanced 40H Autodesk Revit MEP Essentials 36H Autodesk Revit MEP Advanced 36H Autodesk Navisworks Manage 35H Autodesk Navisworks Simulate 24H INTERACTIVE ANIMATION COURSES Adobe After Effects (Visual Effects -3D Architectural Animation) 20H Adobe Premiere (Video Editing -3D Architectural Animation) 20H INDUSTRIAL DESIGN COURSES Autodesk Inventor Essentials 20H Autodesk Inventor Advanced 20H RhinoCeros (Nurbs Modeling) Essentials 26H RhinoCeros (Nurbs Modeling) Advanced 26H RhinoCeros -Grasshopper - generative modeling 24H STRUCTURE COURSES Autodesk Robot Structural Analysis Essentials 24H Autodesk Robot Structural Analysis Advanced 24H Advance Structural Analysis Using Robot & Etabs 50H TEKLA 26H ETABS 24H SAFE 16H SAP 16H Autodesk Advance Concrete 20H Autodesk Advance Steel 20H CIVIL COURSES Autodesk Infrastructure Modeler 30H Autodesk Civil 3D 30H Autodesk Map 3D 30H Autodesk Plant 3D 30H PROJECT MANAGEMENT COURSES Primavera P6 22H Microsoft Project - Essentials 24H Project Management Professional 36H LAYOUT DESIGN Adobe Photoshop Essentials (Architectural Visualization-layout design) 24H Adobe Photoshop Advanced (Architectural Visualization-layout design) 24H Adobe illustrator Essentials (Architectural Visualization-layout design) 24H Adobe illustrator Advanced (Architectural Visualization-layout design) 24H Adobe In Design (Architectural Visualization-layout design) 24H ARCHITECTURAL MODELING AND VISUALIZATION Autodesk 3ds Max 30H Autodesk 3ds Max -Conceptual Design 30H Autodesk 3ds Max -Mastering Modeling 30H Autodesk 3ds Max -Mastering Animation 30H V-Ray - 3ds Max (Architectural Visualization) 24H Autodesk Showcase 24H Autodesk Maya Essentials (Architectural Visualization) 30H Autodesk Maya Advanced (Architectural Visualization) 30H Lumion (3D Rendering Architectural Visualization) 20H Vue xStream (3D Landscape Visualization) 24H Bryce (3D Landscape Visualization) 24H Google sketchup Essentials 24H Google sketchup Advanced 24H RhinoCeros (Nurbs Modeling) Essentials 26H V-Ray for RhinoCeros 20H RhinoCeros -Grasshopper - Generative modeling 26H We, as BIM-ME, provide our clients with complete BIM implementation packages, Project Management, systems Integration, high quality services and professional training. Simply a full optimization of the design process from the concept phase up to construction is offered. SUSTAINABILITY COURSES LEED ACCREDITATION TRAINING LEED Green Associate 30H LEED Accredited Professional 50H (Exam eligibility requirement fulfilled through this course) BUILDING PERFORMANCE SIMULATION eQuest - Essentials 24H eQuest - Advanced 24H Autodesk Ecotect Analysis - Essentials 24H Autodesk Ecotect Analysis - Advanced 24H EnergyPlus - Essentials 24H EnergyPlus - Advanced 24H ANSYS FLUENT CFD Essentials 30H ANSYS FLUENT CFD Advanced 30H IES <Virtual environment> - Essentials 40H IES <Virtual environment> - Advanced 40H Sustainability courses are managed by www.seeds-intl.com API Autodesk Revit Architecture API Essentials 30H Autodesk Revit Architecture API Advanced 30H Autodesk Revit Structural API Essentials 30H Autodesk Revit Structural API Advanced 30H Autodesk Revit MEP API Essentials 30H Autodesk Revit MEP API Advanced 30H Autodesk Navisworks Manage API 30H MECHANICAL DESIGN Air Conditioning System Design 35H Fundamentals of HVAC Systems 30H HAP v4.51 Hourly Analysis Program 24H ELECTRICAL COURSES Dialux 20H ETAP – Essentials 20H ETAP – Advanced 20H Ecodial 20H Latest version of software
  • 10.
  • 11.
    A Careful planningsaves money and time !
  • 12.
    Better productivity Flexibility indesign Sustainable design Development BIM-ME, as an Autodesk Authorized Developer, does custom development work for individual companies who have specific needs for BIM solutions. We are specialized in linking customers ERP systems to BIM and Revit based products. Our software engineers can develop plug-ins and add-ons that smoothly integrate the Autodesk Revit environment to seamlessly create various production, data analysis and decision helping tools.
  • 13.
    Automatically distributes familyinstances along a continuous path-Array On Path In Revit Works With Autodesk Revit 2017 (Architecture, Structure and MEP) Target Customers All users that work with Autodesk Revit 2017 (Architecture, Structure and MEP) Product Description This plugin prompts the user to select a set of continuous curves (lines, arcs or splines) ,select a family instance and define “distribution settings” (offset and distance). It then copies the selected family instance along the selected path; the distance between consecutive family instances will be according to the “distribution settings” and the families will be oriented in a way to match with the curve’s derivative at the insertion point. Benefits Implements a feature not readily available in Revit®. Features • Works with lines, arcs, ellipses and splines • Family instances orientation can be linked to the curve’s derivative • Use of predefined patterns Distance between consecutive family instances will be according to the “distribution settings” and the families will be oriented in a way to match with the curve’s derivative at the insertion point. Plugins
  • 14.
    Automatically Distributes Supports Elementsfor Networks of Pipes, Ducts and Cable Tray In Revit Product Description This plugin prompts the user to: select a duct or a pipe network, define a pattern (distance between consecutive support elements, minimum distance and other rules….) and select an architecture or structure Revit® Link; afterwards, the plugin automatically distributes support elements for the se- lected network, the width of the support is adjusted to match with the duct width, the location of the nearest slab (in the Revit link) is taken into consideration to adjust each support’s element height. Benefits This plugin automates the process of distributing support elements for ducts and pipes and drasti- cally reduces the effort and time it requires. Features • Works with Revit® links • Works with pipes (both rectangular and circular) • Support position/ dimensions / orientation are automatically adjusted Documentation User’s manual, step by step movie Support and Training Support is available via email and dedicated training sessions can be scheduled upon request
  • 15.
    -CAD to RevitConversion -Export to Dialux -Automatic Wall/Floor Opening for pipe/duct penetration -Manage your selections -Array of objects along defined path -Export to MS Project -Export to Primavera P6 -Roof to Floor Converter -Revision Cloud Manager -Clash Detection Professional Manager -Automated distribution of duct supports -Revit Layout Translator -Revit Formula manager -Dynamic Legend -AutoJoin Geometry tools -Roof to Slab Converter -Create Finish slab based on room boundary -Create line with text -Create hatch that can be applied to pipes -Create Advanced graphical column schedule -Create graphical beam schedule -Site Management Collaboration between multidisciplines Other available Plug-ins
  • 16.
    RESEARCH & DEVELOPMENT: COMPLEX GEOMETRY SOM Sweden’s Tallest Tower ZAHA HADID CHANEL PAVILION ZAHA HADID ZAHA HADID REM KOOLHAAS MAD Architects Adrian Smith + Gordon Gill Architecture
  • 17.
    RESEARCH & DEVELOPMENT: COMPLEX GEOMETRY ZAHA HADID ZAHA HADID SOM Norman Foster MAD Architects
  • 18.
    RESEARCH & DEVELOPMENT: COMPLEX GEOMETRY REVIT DYNAMO RHINO GRASSHOPPER SANTIAGO CALATRAVA Norman Foster SOM
  • 19.
    List of Projectsand Clients National Bank of Kuwait Kingdom Tower Abu Dhabi Midfield Terminal Complex The Address Sky View Residence Habtoor Aqua Theater ABC Verdun DEWA Abraj Al Bait Boqaata Dam Dar Al Handasah (Shair & Partners - Lebanon Office) Houara Project Plus Towers Office Towers Sama Beirut Al Ajlan Tower Alghazawi Tower Zahra Hospital Raouche Residential Sky Gate Tower St. Regis Hotel Etc...
  • 20.
    Client : ImaarTrading Project Location : Kuwait National Bank Of Kuwait Date | 2015 - Present Scope | BIM Production (Architecture & Structure) Remark | Interior works & fit-outs BIM deliverables from LOD 300 till LOD 500 including shop drawings - 4D and 5D Simulation and clash reports
  • 21.
    Date | 2013- Present Scope | BIM Modeling Remark | Shop drawings under REVIT with 4D Simulation Animation. Client : Saudi Binladin Group Project Location : SAUDI ARABIA KINGDOM TOWER
  • 22.
  • 23.
    Date | 2014- Present Scope | BIM Production (Architecture & Structure) Remark | Geometry analysis and integration with CNC machines to fabricate all the ceilings packages Client : Cloisall - Gulf Project Location : United Arab Emirates Abu Dhabi Midfield Terminal
  • 24.
    BIM geometry analysisand integration with CNC machines for more than 360,000 unique geometry shape ceiling panels and their supporting structures
  • 26.
    The Address Residence Date| 2015 - Present Scope | BIM Production Remark | MEP Shop drawing, Composite Drawing and asbuilt drawing with architecture and Structure modeling of the tower - 4D Simulation. Client : ACC Project Location : United Arab Emirates
  • 27.
  • 28.
    Habtoor Aqua Theater Client: Habtoor group Project Location : United Arab Emirates
  • 29.
    Date | 2015- 2017 Scope | BIM Production Remark | MEP Shop drawing, Composite Drawing and asbuilt drawing with architecture and Structure modeling.
  • 30.
    WASL TOWER Client :ALEC Project Location : United Arab Emirates
  • 31.
    KSA PAVILION EXPO2020 Client : ALEC Project Location : United Arab Emirates
  • 32.
    DOHA METRO Date |2015 - 2016 Scope | BIM Production Client : IMAR Project Location : QATAR
  • 33.
    RW8 Client : MZARCHITECT Project Location : UAE _ ABU DHABI
  • 34.
    MEYDAN BEACH HOTEL Client: EETS ( MEP ) Project Location : UAE _ DUBAI Date | 2018 - Present Scope | BIM Production -Shop Drawings MEP
  • 35.
    FORTE Client : TARGET( ARC-STR ) - EETS ( MEP ) Project Location : UAE _ DUBAI Date | 2018 - Present Scope | BIM Production -Shop Drawings ARC-STR -MEP
  • 36.
    ACT1 ACT2 Client :CSCEC ( ARC-STR -MEP ) Project Location : UAE _ DUBAI Date | 2018 - Present Scope | BIM Production -Shop Drawings ARC-STR -MEP
  • 37.
    RIYADH METRO Client :BACS Project Location : KSA Scope | BIM Production
  • 38.
    BLF Client : NabilgHolam Architects Project Location : LEBANON Scope | BIM Implementation
  • 39.
    SEEF Lusail D1& D2 LuxuryClient : rodolphematta Project Location : QATAR Scope | BIM Implementation
  • 40.
    ABC VERDUN Date |2015 - Present Scope | BIM Production Remark | 4D Simulation. Client : Man Enterprise Project Location : Lebanon
  • 41.
  • 42.
    DEWA Date | 2016- Present Scope | BIM Production Remark | BIM Architecture & Engineering Modeling and Shop Drawings - Creating the BIM Models for all the different phases of the project till the As-built Model Client : Site Technology Project Location : United Arab Emirates
  • 43.
    Kuwait Gulf OilCompany (KGOC) Headquarters Client : Al Hamra Kuwait Co. w.l.l. Project Location : Kuwait
  • 44.
    Date | From:Q3 2007 To: Q2 2008 Scope | Revit BIM Implementation & production (Architecture, Structure, MEP) Remark | The Abraj Al Bait Towers, when completed, will be located in Mecca, Saudi Arabia. It will be the biggest building in the world by mass Client : Dar Al Handasah (Shair & Partners - Cairo Office) Project Location : Saudi Arabia Abraj Al-Bait in Makkah
  • 45.
    Beqaata Dam Client :Khoury Contracting Project Location : Lebanon
  • 46.
    Battoyor Residential Compound Client: SKP Project Location : Saudi Arabia
  • 47.
    Date | From:Q4 2007 To: Q2 2008 Scope | Revit BIM Implementation & production (Architecture, Structure, MEP) American University Academic Building II Client : Dar Al Handasah (Shair & Partners - Lebanon Office) Project Location : Sulaimaniya,Iraq
  • 48.
    Nishan Office Tower Client: MZ ARCHITECT Project Location : Qatar
  • 49.
    One Eko Boulevard Client:MZ ARCHITECT Project Location : Nigeria
  • 50.
    Houara Project Client :Erga Group(Lebanon) Project Location : Morocco
  • 51.
    Date | From:Q3 2008 To: Q3 2009 Scope | Revit BIM Implementation & production (Architecture) Remark | Project size 2,355,000 square meters
  • 52.
    Date | From:Q3 2008 To: Q3 2009 Scope | Revit BIM Implementation & production (Architecture) Remark | Three Iconic Buildings in the heart of downtown Beirut Plus Towers Client : Erga Group(Lebanon) Project Location : Lebanon
  • 53.
    Date | From:Q4 2008 To: Q2 2009 Scope | Revit BIM Implementation & production (Architecture) Office Towers Client : Erga Group(Lebanon) Project Location : Nigeria
  • 54.
    Date | From:Q1 2009 To: Q3 2009 Scope | Revit BIM Implementation & production (Architecture) Remark | Tallest Tower in Lebanon Sama Beirut Client : Erga Group(Lebanon) Project Location : Lebanon
  • 55.
    Date | From:Q1 2009 To: Q4 2009 Scope | Revit BIM Implementation & production (Architecture, Structure, MEP) Al Ajlan Tower Client : Khatib &Alami Project Location : Saudi Arabia
  • 56.
    Date | From:Q1 2009 To: Q3 2009 Scope | Revit BIM Implementation & production (Architecture, Structure, MEP) Alghazawi Tower Client : Khatib &Alami Project Location : Saudi Arabia
  • 58.
    Date | From:Q4 2009 To: Q2 2010 Scope | Revit BIM Implementation & production (Architecture) Raouche-Residential Client : Khatib &Alami Project Location : Lebanon
  • 59.
    Date | From:Q4 2009 To: Q2 2010 Scope | Revit BIM Implementation & production (Architecture) Zahra Hospital Client : Khatib &Alami Project Location : Lebanon
  • 60.
    Date | From:Q1 2010 To: Q3 2010 Scope | Revit BIM Implementation & production (Architecture) Salama Hospital Option 1 Client : Khatib &Alami Project Location : Saudi Arabia
  • 61.
    Date | From:Q1 2010 To: Q3 2010 Scope | Revit BIM Implementation & production (Architecture) Salama Hospital Option 2 Client : Khatib &Alami Project Location : Saudi Arabia
  • 62.
    Date | Q12010 Scope | Revit BIM Implementation & production (Architecture) Beirut Terraces Client : Khatib &Alami Project Location : Lebanon
  • 63.
    Date | From:Q4 2009 To: Q2 2010 Scope | Revit BIM Implementation & production (Architecture) V5-Complex Commercial Center Client : Khatib &Alami Project Location : Lebanon
  • 64.
    Date | From:Q4 2009 To: Q2 2010 Scope | Revit BIM Implementation & production (Architecture, MEP, Solar analysis) International School of ChoueifatClient : Khatib &Alami Project Location : Erbil, Iraq
  • 65.
    Date | From:Q1 2006 To: Q1 2007 Scope | Revit BIM Implementation & production (Architecture, Structure, MEP) Beirut Arab University Client : Qualco Project Location : Lebanon
  • 66.
    Date | From:Q3 2006 To: Q4 2007 Scope | Revit BIM Implementation & production (Architecture, Structure, MEP) Beirut Arab University Client : Qualco Project Location : Lebanon
  • 67.
    Date | From:Q4 2009 To: Q1 2010 Scope | Revit BIM Implementation & production (Architecture, Structure, MEP) Nafisseh Residential Development Client : Qualco Project Location : Lebanon
  • 68.
    Date | From:Q4 2009 & Q2 2010 Scope | Revit BIM Implementation & production (Structure) Lusail-Residential Client : KEO International Consultants (Kuwait) Project Location : Qatar
  • 69.
    Date | From:Q4 2010 To: Q1 2011 Scope | Revit BIM Production (Architecture, Structure, MEP) KAP Client : EK concept (France) Project Location : Saudi Arabia
  • 70.
    Date | From:Q4 2010 To: Q2 2011 Scope | Revit BIM Production (Architecture, Structure, MEP) Musical Building Client : EK concept (France) Project Location : Saudi Arabia
  • 71.
    Date | From:Q4 2010 To: Q2 2011 Scope | Revit BIM Production (Architecture, Structure, MEP) SkyGate TowerClient : MAN Enterprise Architect : Nabil Gholham Project Location: Lebanon
  • 72.
    Date | From:Q4 2010 To: Q2 2011 Scope | Revit BIM Production (Architecture, Structure, MEP) SkyGate Tower
  • 73.
    Date | From:Q4 2010 To: Q2 2011 Scope | Revit BIM Implementation (MEP) Water Front City Client: Barbanel Middle East Project Location: Lebanon
  • 74.
    Date | From:Q3 2012 To: Q4 2012 Scope | Revit BIM Production (Architecture, Structure, MEP) St. Regis Hotel & Apartments Client: Al Maabar-Abdoun Real Estate Development Project Location: Amman - Jordan
  • 75.
    Date | From:Q3 2012 To: Q4 2012 Scope | Revit BIM Production (Architecture, Structure, MEP) St. Regis Hotel & Apartments Client: Al Maabar-Abdoun Real Estate Development Project Location: Amman - Jordan
  • 76.
    west Corridor Client: MAN ProjectLocation: Qatar BIM For Infrastructure & Civil Engineering Animation For Infrastructure & Civil Engineering
  • 77.
    Client: Atkins King AbdulazizInternational Airport (Jeddah)
  • 78.
    Client: ETEC BAHRAIN INTERNATIONALAIRPORT PASSENGER TERMINAL BUILDING
  • 79.
    Client: 109 ARCHITECTSBadarou Residential
  • 80.
  • 81.
    Client: MNA Client: MNA SchompAutomotive Honda Schomp Automotive Honda
  • 82.
  • 83.
    Date | From:Q4 2011 To: Q2 2012 Scope | Revit BIM Implementation (Architecture, Structure, MEP) Building apartments, Client: Badawi Group Project Location: Lebanon
  • 84.
    Date | Q32011 Scope | Revit BIM Production (Architecture) Badawi Group Head Quarters Client: Badawi Group Project Location: Lebanon
  • 85.
    Date | From:Q4 2011 To: present Scope | Revit BIM Implementation (MEP) Airport OmanClient : Pierre Dammous & Partners
  • 86.
    Date | From:Q4 2011 To: present Scope | Revit BIM Implementation (MEP)
  • 87.
    Date | 2018Scope | Revit BIM Modeling Client : WESNAE Location : Denver BMW SHOROOM
  • 88.
    Date | 2019Scope | Revit BIM Modeling Client : WESNAE Location : Denver TOYOTA SHOWROOM
  • 89.
    Date | 2019Scope | Revit BIM Modeling Client : WESNAE Location : OKLAHOMA VOLVO SHOROOM
  • 90.
    Date | Q32011 Scope | Revit BIM Production (Architecture) Client : SEEDS
  • 91.
    Date | Q32011 Scope | Revit BIM Production (Architecture)- Theater Residential Client : SEEDS
  • 92.
    Mkalles Roundabout, DekwanehEntrance, Georges Matta Street, Near Vincci Home Gallery, Irani Building, 3rd Floor +961 1 499998 | info@bim-me.com www.bim-me.com Dubai, Business Bay, Executive towers, Aspect Tower, Office No.902, 9th floor +971 4 2767162 | info@bim-me.com www.bim-me.com /bim.middleeast