M Technologies (Thailand) Ltd
Company Profile
Contents
• Introduction
• Service Partners
• Software Partners
• Subscription
• Consultancy Service
• Training Service
• BIM Adoption
• Project Services
• Clients
• Reference Projects
• Project Gallery
Introduction
MTECH are a leading IT Software and Services
provider focused on the industries of
Architecture, Engineering and Construction
We specialize in the sale and support of high-end,
best in class design software and provide a range
of professional services
With our technical expertise and client centric
approach, we aim to transform and set new
software distribution and training standards.
By offering superior and extensive value
added services we will help our clients adopt
our solutions quickly and effectively to ensure
that they are able to realize the full potential
and benefit from their investments.
Introduction
Summary
Building Information Modeling (BIM) Specialists
Autodesk Specialized Partner: AEC Building
Autodesk Specialized Partner: Consulting
Autodesk Specialized Partner: Product Support
Autodesk Authorized Training and Certification Center
People and Experience
Qualified local and international project team with significant industry experience
Strategic alliance with leading engineering firm Meinhardt (Thailand)
Strategic alliance with the BIM Academy (United Kingdom)
Backed by 20+ years of experience in the AEC sector in Thailand
Highly experienced consultancy team
Direct exposure to the most current industry trends and standards
Provide a comprehensive building information modeling (BIM) training and consultancy service
for all disciplines
Service Partners
Meinhardt (Thailand)
Meinhardt is one of the world's few multidisciplinary and truly integrated engineering,
infrastructure and project management consulting firms. Meinhardt (Thailand) Ltd was
established in 1991, and now has more than 300 staff, providing consultancy services in Civil,
Structural, Electrical, Mechanical and Sanitary Engineering as well as Project Management and
Construction Supervision, Specialist Lighting, Façade Design, Environmentally Sustainable
Designand LEED Consultancy and BIM.
www.meinhardt.net
The BIM Academy
BIM Academy was co-founded by Northumbria University and Ryder Architecture in 2010 with
the vision of creating an international centre of excellence for Building Information Modeling
(BIM), through the complementary activities of research, education and consultancy. Both
organizations are leaders in the field and recognize the benefits which can be delivered to
industry through independent evidence-based innovation, research and learning,
ultimately leading to enhanced business value and growth.
www.bimacademy.ac.uk
Software Partners
Autodesk
Founded in 1982 Autodesk is a worldwide leader in 3D design, engineering, and entertainment
software. Autodesk helps people imagine, design and create a better world. Autodesk's
comprehensive portfolio of virtual construction software supports Building Information Modeling
(BIM) processes.
www.autodesk.com
AGACAD
AGA CAD serves BIM professionals and decision makers throughout the world, adding value
and safety to the Building Information Modeling process that is changing how buildings and
infrastructure are planned, designed, built, and managed.
www.aga-cad.com
Software Partners
Asta Development
Asta Development, part of Eleco, is a leading international developer of project, portfolio and
resource management software. Asta Development provides a complete range of project,
portfolio and resource management solutions for managing any size and any type of project.
The company’s core product, Asta Powerproject, is used across a wide range of industry
sectors across the world.
www.astadev.com
Novade Group
Novade develop software applications for the building industry. Leveraging the latest
technology, including cloud services and mobile access Novade provide enterprise solutions
for project inspection, handover and defect management.
www.novadegroup.com
Software Partners
Autodesk
 Design and build better buildings
 Produce compelling visualizations
 Use integrated simulation and analysis
 Create consistent documentation
 Improve control over project outcomes
Autodesk Specialized Partner: AEC Building
Autodesk Authorized Training and Certification Center
Autodesk Specialized Partner: Consulting
Autodesk Specialized Partner: Product Support
Autodesk BIM solutions
help turn information into
insight, and deliver
business value at every
step of the process.
Asta
 Project Management software for construction and engineering
 Used by 90% of the top UK main contractors
 Suitable for any size of company and any type of project
 Flexible licensing options
 Enabling 4D scheduling (integration with Naviswork’s)
Software Partners
AGACAD
AGACAD create and develop solutions for continuous BIM
acceleration, ensuring that clients can finish their projects on time,
on budget and at the highest quality standards. More than 8,500
Revit users in 129 countries use T4R (Tools 4 Revit) and BIM
solutions for their everyday professional needs.
 Less stress in daily work
 Faster design completion
 Continuous BIM acceleration
 Easier BIM
 Savings of time and money
 Increased profitability of projects
 Satisfaction with ROI
Save time and money by eliminating unnecessary BIM tasks,
allowing you to focus on work that creates real value.
Software Partners
Novade
Developed on a Virtual Design Construction (VDC) platform:
 Scalable, secure, and reliable platform
 Real time synchronization with mobile devices
 Our solutions cover the entire building lifecycle from design to handover
 Leverage technology to improve productivity
Software Partners
Novade Virtual Design and Construction Platform
RFI, formal/informal
Collaborate
Inspection & Handover
Track
Building life cycle
Safety procedures
Check
Equipment
Assets
Value Added Services
With our technical expertise and client centric approach, we aim to transform and set new software
distribution and service standards.
By offering superior and extensive value added services we will help our clients adopt our solutions
quickly and effectively to ensure that they are able to realize the full potential and benefit from their
investments.
 Supply and installation of computer hardware and networking infrastructure
 Full installation and network support for new licenses and upgrades
 Set up and administration of cloud services (access and basic training)
 Dedicated local technical support
 Delivered remotely or on-site
 Email / Web Form / Hotline / Social Apps
 “BIM Guru” – Exclusive access to our BIM Specialists
 Marketing support – PR / reference project
Subscription
Training Service
Training Center
With the increased adoption of Building Information Modeling (BIM) in the
construction industry, technical skills are becoming increasingly relevant and
important, to both employers and clients . To meet these requirements MTECH’s
Autodesk Authorized Training and Certification Center offers a full range of
standard and advanced courses to our clients in Thailand. All of our instructors
are certified in each software and possess several years of industry
experience.
 Autodesk Certified Instructors and BIM Specialists
 State of the Art Training Facility with Dell Workstations
 Full range of standard and advanced courses (Revit: Arch., MEP, Struc; Navisworks, 3ds Max….)
 Revit Professional Certification
 BIM Team Workshops
 BIM Awareness (1 day)
 BIM Virtual Project (2-3 days)
 Flexible Day, Weekend or Evening Courses
Professional Services
MTECH have developed a range of professional services that help our clients adopt our solutions
quickly and effectively, ensuring they get the very best return on their investment. From initial
installation and configuration through to full project roll out we offer a comprehensive range of services
that can support the entire building lifecycle.
Project Management
We provide Project Management Services specifically for the design and construction industries
ranging from BIM management plans to project-specific process workflows, clash detection and 4D
scheduling.
BIM Services
Our products and services are engineered to suit Building Information Modeling (BIM) workflows and
are customized according to clients project or organizational requirements and we provide
Professional Consulting and Training Services that help our clients realize the benefits of BIM.
ICT Services
Our IT department provides ICT consultancy and specializes in the supply, installation and deployment
of the computer hardware and networking infrastructure required to implement and operate modern
software packages and data management systems.
Consultancy Service
BIM Services
Our services can be provided as a complete implementation plan, or you can select which services
best suit the needs of your organization or project. We can offer a comprehensive building information
modeling (BIM) training and consultancy service for all disciplines.
BIM Training 3D Model Management
BIM Implementation and Deployment 4D BIM Scheduling
BIM Pilot Project / Project Support 5D BIM (Cost / QTO / BOQ)
BIM Consulting 6D BIM (Facilities Management)
BIM Training
Getting everyone in your office up to speed with the latest BIM software and processes is
essential. We can create a custom training schedule for your employees based on your projects and
deliverables. We have worked with architects, engineers, contractors, and owners to educate their
staff not only in BIM software, but also the new integrated process that is vital to the success of the
BIM.
 BIM Software Training (Autodesk)
 BIM Team Workshop
 BIM Awareness Workshop
 BIM Virtual Project
BIM Adoption
BIM Adoption
BIM Implementation and Deployment
Our BIM Implementation service is engineered to assist the client to design, develop, manage and
implement BIM standards and practices to ensure that upon completion of which, the client will have
the knowledge and capabilities to deliver all of their future projects using BIM technologies and
processes.
 Train clients BIM personnel on various BIM software’s including Revit and Navisworks
 Create regimented BIM workflows/processes
 Identify and establish specific roles, duties and responsibilities for individuals working in the clients
BIM Department
 Review and advise on the clients BIM document control and quality control
 Plan model content and workflows for all clients future projects
 Advise on software upgrades and purchases
 Advise on IT requirements for BIM
 Create and setup family library
 Create standard QA/QC checklist form for family creation and model handover
BIM Adoption
BIM Pilot Project / Project Support
MTECH provide both on-site and off-site project consulting services to assist our clients through the
early stages of BIM development through to project delivery. A key phase in testing the capabilities of
your BIM team is to conduct a pilot project. The scope of services we can offer to ensure success in
this phase are as follows:
 Create BIM Plan (to be used by client as a template for their future BIM projects)
 Create BIM delivery program
 Create Revit template
 Manage Revit template file and Revit content creation/model sequencing
 Check Revit models QA/QC
 Manage and instruct clients BIM department
 Mentor and train clients BIM manager
Project Services
Model Building and Management
Developers are increasingly requesting BIM delivery for their projects in order to reduce costs and
improve designs. Due to BIM being a relatively new concept, some organizations find that they do not
have the capabilities or resources available to deliver data rich building information models to the
clients specifications. This is where MTECH can help.
Our staff work in compliance with the most stringent global BIM delivery standards and are trained in
the latest Autodesk software having completed projects in regions including Europe, the Middle East
and Asia Pacific. Our experience covers both the public and private sectors and include high-rise,
low-rise, residential, commercial, healthcare, industrial and mixed use developments.
 Model Building
 Model Management / Coordination
 4D Construction Sequencing Simulations
 5D Cost / QTO / BOQ
 6D BIM 4 FM
Project Services
Model Building
MTECH possess the capabilities and experience to build data rich Building Information Models in
compliance with various standards and Levels of Development/detail (LOD) specifications including:
 AIA BIM Protocol
 AEC (UK) & CIC BIM Protocol
 Singapore BIM Guide
MTECH's Revit modelers are experienced professionals in the production of fully coordinated BIM
models to your specifications for the following disciplines:
 Architecture
 Civil
 Structure
 MEP
Our model building services can be engaged for both design and construction phases of a project or
we can make a straight conversion from your as-built 2D drawings or point cloud survey to a data rich
deliverable as per your requirements.
Project Services
Model Management / Coordination
Once the BIM Models for all disciplines are accurately created, we can perform clash detection and
generates reports for the team to review. Our staff works together with architects, engineers, general
contractors, and various trades to detect and resolve the design conflicts among construction
elements before construction, saving costly rework on-site.
Project Visualization
Experiencing designs before they are real ensures better decisions are made and enables
participation by a wider audience of stakeholders or decision makers. Using visualization in
conjunction with BIM on a project engages more people sooner, leading to broader-reaching feedback
and more predictable outcomes. When the entire team can coordinate their work and share design
inputs, they can easily assess the impacts of design alternatives and hone in on the best options
earlier, and in parallel. This collaborative approach enables designers to respect the requirements of
the other design disciplines and avoid costly and time-consuming conflicts and design rework.
Project Services
Clash Detection
Clash detection is the exercise of checking coordination quality and clearances of and between MEP
services, structure and architecture using BIM software compatible with model building platforms such
as Autodesk Revit. MTECH's services include performing the clash detection on our clients models
and reporting any design or coordination defects. This exercise potentially saves the client substantial
time and money due to early identification of problematic areas early on in the project
minimizing the threat of costly reworking on site.
4D Construction Sequencing Simulations
Data from construction schedules can be combined with the power of BIM to create an animated "4D"
simulation of how an asset is planned to be built in terms of the order each activity is to be carried out.
This can highlight problems with the planned schedule in terms of site efficiency, safety and
accessibility allowing construction managers to make changes in advance. MTECH have experience of
producing such animations on a variety of projects based on both our clients building information
models or models created by ourselves on behalf of our client’s.
Project Services
5D Cost / QTO / BOQ
BIM models can be used to generate accurate quantity takeoffs and assist in the creation of cost
estimates throughout the lifecycle of a project. This enables the project team to see the cost effects of
their design decisions and proposed changes during all phases of the project, and this feedback
supports better design decision-making and can help curb excessive budget overruns due to project
modifications.
To determine a project's construction cost and requirements, contractors traditionally perform material
‘take-offs’ manually, a process fraught with the potential for error. With BIM, the model includes
information that allows a design contractor to accurately and rapidly generate an array of essential
estimating information, such as materials quantities and costs, size and area estimates, and
productivity projections. As changes are made, estimating information automatically adjusts, allowing
greater contractor productivity.
Project Services
6D BIM 4 FM
Where a model is created by the designer and updated throughout the construction phase, it will have
the capacity to become an ‘as built’ model record of the building, whilst informing the final AIM. (Asset
Information Model). The model will be able to contain all of the specifications, operation and
maintenance manuals and warranty information, useful for future maintenance. This eliminates the
problems that can currently be experienced if the O&M manual has been misplaced or is kept at a
remote location. Sensors can feed back and record data relevant to the operation phase of a building,
enabling BIM to be used to model and evaluate energy efficiency, monitor a building's life cycle costs
and optimize its cost efficiency. It also enables the owner to evaluate the cost-effectiveness of any
proposed upgrades.
Using BIM facilities managers can effectively explore, track, and manage information using the
powerful parametric capabilities and data embedded in the BIM model to analyze space related data,
track inventory and lifecycle data and perform cost needs analysis.
Client List (selected)
Owners / Developers
Domeland Estate Co., Ltd I Kingdom Properties I IconSiam I LPN Development
Gaysorn Property I Magnolia Development I Life and Living I Siam Cement Group
Contractors
Bouygues Thai I Thai Obayashi I Chuchawal Royal Haskoning I SP Contracting
Thai Takenaka I Thai Kajima I Stoneking I Siphya Construction I Visavapat
Architecture
A Landarch I HB Design I Contour I Innia Décor I Space Matrix
Design Management Insight (D.M.I) I Karapanik I Design Worldwide
Partnership (D.W.P) I Plan Associates I Quintrix Architects I HBO EMTB
4B Architects I Desyn Studio I Innovative I Redland
Engineering
G.M.E I Mitr Technical I Jardine Engineering I SP Contracting
Q.T.C.M.E I McTric Co., Ltd I Teo Hong I Daikin
City Power I Daikin I Taikisha I NEO 727 I uWork999
Meinhardt Group I TTS Engineering
Academic
Khon Kaen University
Thai Obayashi – BIM Implementation (2013)
 BIM implementation plan
 Create and set up company BIM workflow
 BIM training for all disciplines (20 staff)
 BIM pilot project
 BIM coordination
 Clash detection
 Project support on AIA building (Sathorn and Ratchada)
Reference Projects
Reference Projects
Southpoint Pattaya– BIM Implementation (2013)
Condominium project (2 towers)
2 billion baht project
Scheduled completion 2015
 BIM execution plan and project standards
 BIM implementation
 Structural and MEP design consultant
 Project coordination
 Clash detection across all disciplines
 Project support
 Contractor: Bouygues Thai
 Architect: The Beaumont Partnership
 Interior Design: SODA
 MEP: McTric Co., Ltd
Reference Projects
Mahanakorn– BIM Implementation (2013 - 2014)
Thailand tallest building: 314 m / 77 floors
Hotel, retail and residences
Scheduled completion 2015
 BIM execution plan and project standards
 BIM implementation and training
 Site installation of software and hardware
 Revit MEP training
 Project support
 Contractor: Bouygues Thai
 MEP: Teo Hong
Reference Projects
Landmark – BIM Implementation (2014 - )
Mixed use development: GFA 300,000 m2
Hotel, offices, retail and residences
 BIM implementation strategy
 BIM standards and documentation
 BIM execution plan
 MEP and C&S design
 BIM coordination and consulting
 Clash detection
 Project management: chair multi-discipline coordination
meetings
 Create 4D construction sequence for planning approval
and site logistics
 Create Revit model of listed heritage building from site
survey and 3D scan (point cloud)
Reference Projects
Australian Embassy, Bangkok – 4D Construction Sequence (2014)
 BIM 4D construction sequencing simulation
 Link and integrate project schedule to model
 Visualization model for project review
 Visualization model for site logistics, planning approval and EIA
Reference Projects
Q.T.C.M.E – BIM Consultancy (2014)
 Software, hardware and network set up
 BIM consultancy and on site project support
 Chair multi discipline coordination meetings
Plan Associates – BIM Pilot Project (2014)
 Revit training
 Software installation and network set up
 BIM team workshop
 BIM implementation plan
 Pilot project / project support
Project Gallery
Landmark Project, Yangon
Project Gallery
Landmark Project, Yangon
Project Gallery
Landmark Project, Yangon
Project Gallery
Landmark Project, Yangon
Project Gallery
Landmark Project, Yangon
Project Gallery
Landmark Project, Yangon
Project Gallery
Southpoint, Pattaya
Project Gallery
Southpoint, Pattaya
Project Gallery
The Lofts Ekamai, Bangkok
Project Gallery
The Lofts Ekamai, Bangkok
Project Gallery
The Circle Living, Bangkok
Project Gallery
Magnolia Ratchadamri
Boulevard, Bangkok
Project Gallery
Caterpillar Factory, Batam, Indonesia
www.mtechthailand.com

MTECH Company Profile

  • 1.
    M Technologies (Thailand)Ltd Company Profile
  • 2.
    Contents • Introduction • ServicePartners • Software Partners • Subscription • Consultancy Service • Training Service • BIM Adoption • Project Services • Clients • Reference Projects • Project Gallery
  • 3.
    Introduction MTECH are aleading IT Software and Services provider focused on the industries of Architecture, Engineering and Construction We specialize in the sale and support of high-end, best in class design software and provide a range of professional services With our technical expertise and client centric approach, we aim to transform and set new software distribution and training standards. By offering superior and extensive value added services we will help our clients adopt our solutions quickly and effectively to ensure that they are able to realize the full potential and benefit from their investments.
  • 4.
    Introduction Summary Building Information Modeling(BIM) Specialists Autodesk Specialized Partner: AEC Building Autodesk Specialized Partner: Consulting Autodesk Specialized Partner: Product Support Autodesk Authorized Training and Certification Center People and Experience Qualified local and international project team with significant industry experience Strategic alliance with leading engineering firm Meinhardt (Thailand) Strategic alliance with the BIM Academy (United Kingdom) Backed by 20+ years of experience in the AEC sector in Thailand Highly experienced consultancy team Direct exposure to the most current industry trends and standards Provide a comprehensive building information modeling (BIM) training and consultancy service for all disciplines
  • 5.
    Service Partners Meinhardt (Thailand) Meinhardtis one of the world's few multidisciplinary and truly integrated engineering, infrastructure and project management consulting firms. Meinhardt (Thailand) Ltd was established in 1991, and now has more than 300 staff, providing consultancy services in Civil, Structural, Electrical, Mechanical and Sanitary Engineering as well as Project Management and Construction Supervision, Specialist Lighting, Façade Design, Environmentally Sustainable Designand LEED Consultancy and BIM. www.meinhardt.net The BIM Academy BIM Academy was co-founded by Northumbria University and Ryder Architecture in 2010 with the vision of creating an international centre of excellence for Building Information Modeling (BIM), through the complementary activities of research, education and consultancy. Both organizations are leaders in the field and recognize the benefits which can be delivered to industry through independent evidence-based innovation, research and learning, ultimately leading to enhanced business value and growth. www.bimacademy.ac.uk
  • 6.
    Software Partners Autodesk Founded in1982 Autodesk is a worldwide leader in 3D design, engineering, and entertainment software. Autodesk helps people imagine, design and create a better world. Autodesk's comprehensive portfolio of virtual construction software supports Building Information Modeling (BIM) processes. www.autodesk.com AGACAD AGA CAD serves BIM professionals and decision makers throughout the world, adding value and safety to the Building Information Modeling process that is changing how buildings and infrastructure are planned, designed, built, and managed. www.aga-cad.com
  • 7.
    Software Partners Asta Development AstaDevelopment, part of Eleco, is a leading international developer of project, portfolio and resource management software. Asta Development provides a complete range of project, portfolio and resource management solutions for managing any size and any type of project. The company’s core product, Asta Powerproject, is used across a wide range of industry sectors across the world. www.astadev.com Novade Group Novade develop software applications for the building industry. Leveraging the latest technology, including cloud services and mobile access Novade provide enterprise solutions for project inspection, handover and defect management. www.novadegroup.com
  • 8.
    Software Partners Autodesk  Designand build better buildings  Produce compelling visualizations  Use integrated simulation and analysis  Create consistent documentation  Improve control over project outcomes Autodesk Specialized Partner: AEC Building Autodesk Authorized Training and Certification Center Autodesk Specialized Partner: Consulting Autodesk Specialized Partner: Product Support Autodesk BIM solutions help turn information into insight, and deliver business value at every step of the process.
  • 9.
    Asta  Project Managementsoftware for construction and engineering  Used by 90% of the top UK main contractors  Suitable for any size of company and any type of project  Flexible licensing options  Enabling 4D scheduling (integration with Naviswork’s) Software Partners
  • 10.
    AGACAD AGACAD create anddevelop solutions for continuous BIM acceleration, ensuring that clients can finish their projects on time, on budget and at the highest quality standards. More than 8,500 Revit users in 129 countries use T4R (Tools 4 Revit) and BIM solutions for their everyday professional needs.  Less stress in daily work  Faster design completion  Continuous BIM acceleration  Easier BIM  Savings of time and money  Increased profitability of projects  Satisfaction with ROI Save time and money by eliminating unnecessary BIM tasks, allowing you to focus on work that creates real value. Software Partners
  • 11.
    Novade Developed on aVirtual Design Construction (VDC) platform:  Scalable, secure, and reliable platform  Real time synchronization with mobile devices  Our solutions cover the entire building lifecycle from design to handover  Leverage technology to improve productivity Software Partners Novade Virtual Design and Construction Platform RFI, formal/informal Collaborate Inspection & Handover Track Building life cycle Safety procedures Check Equipment Assets
  • 12.
    Value Added Services Withour technical expertise and client centric approach, we aim to transform and set new software distribution and service standards. By offering superior and extensive value added services we will help our clients adopt our solutions quickly and effectively to ensure that they are able to realize the full potential and benefit from their investments.  Supply and installation of computer hardware and networking infrastructure  Full installation and network support for new licenses and upgrades  Set up and administration of cloud services (access and basic training)  Dedicated local technical support  Delivered remotely or on-site  Email / Web Form / Hotline / Social Apps  “BIM Guru” – Exclusive access to our BIM Specialists  Marketing support – PR / reference project Subscription
  • 13.
    Training Service Training Center Withthe increased adoption of Building Information Modeling (BIM) in the construction industry, technical skills are becoming increasingly relevant and important, to both employers and clients . To meet these requirements MTECH’s Autodesk Authorized Training and Certification Center offers a full range of standard and advanced courses to our clients in Thailand. All of our instructors are certified in each software and possess several years of industry experience.  Autodesk Certified Instructors and BIM Specialists  State of the Art Training Facility with Dell Workstations  Full range of standard and advanced courses (Revit: Arch., MEP, Struc; Navisworks, 3ds Max….)  Revit Professional Certification  BIM Team Workshops  BIM Awareness (1 day)  BIM Virtual Project (2-3 days)  Flexible Day, Weekend or Evening Courses
  • 14.
    Professional Services MTECH havedeveloped a range of professional services that help our clients adopt our solutions quickly and effectively, ensuring they get the very best return on their investment. From initial installation and configuration through to full project roll out we offer a comprehensive range of services that can support the entire building lifecycle. Project Management We provide Project Management Services specifically for the design and construction industries ranging from BIM management plans to project-specific process workflows, clash detection and 4D scheduling. BIM Services Our products and services are engineered to suit Building Information Modeling (BIM) workflows and are customized according to clients project or organizational requirements and we provide Professional Consulting and Training Services that help our clients realize the benefits of BIM. ICT Services Our IT department provides ICT consultancy and specializes in the supply, installation and deployment of the computer hardware and networking infrastructure required to implement and operate modern software packages and data management systems. Consultancy Service
  • 15.
    BIM Services Our servicescan be provided as a complete implementation plan, or you can select which services best suit the needs of your organization or project. We can offer a comprehensive building information modeling (BIM) training and consultancy service for all disciplines. BIM Training 3D Model Management BIM Implementation and Deployment 4D BIM Scheduling BIM Pilot Project / Project Support 5D BIM (Cost / QTO / BOQ) BIM Consulting 6D BIM (Facilities Management) BIM Training Getting everyone in your office up to speed with the latest BIM software and processes is essential. We can create a custom training schedule for your employees based on your projects and deliverables. We have worked with architects, engineers, contractors, and owners to educate their staff not only in BIM software, but also the new integrated process that is vital to the success of the BIM.  BIM Software Training (Autodesk)  BIM Team Workshop  BIM Awareness Workshop  BIM Virtual Project BIM Adoption
  • 16.
    BIM Adoption BIM Implementationand Deployment Our BIM Implementation service is engineered to assist the client to design, develop, manage and implement BIM standards and practices to ensure that upon completion of which, the client will have the knowledge and capabilities to deliver all of their future projects using BIM technologies and processes.  Train clients BIM personnel on various BIM software’s including Revit and Navisworks  Create regimented BIM workflows/processes  Identify and establish specific roles, duties and responsibilities for individuals working in the clients BIM Department  Review and advise on the clients BIM document control and quality control  Plan model content and workflows for all clients future projects  Advise on software upgrades and purchases  Advise on IT requirements for BIM  Create and setup family library  Create standard QA/QC checklist form for family creation and model handover
  • 17.
    BIM Adoption BIM PilotProject / Project Support MTECH provide both on-site and off-site project consulting services to assist our clients through the early stages of BIM development through to project delivery. A key phase in testing the capabilities of your BIM team is to conduct a pilot project. The scope of services we can offer to ensure success in this phase are as follows:  Create BIM Plan (to be used by client as a template for their future BIM projects)  Create BIM delivery program  Create Revit template  Manage Revit template file and Revit content creation/model sequencing  Check Revit models QA/QC  Manage and instruct clients BIM department  Mentor and train clients BIM manager
  • 18.
    Project Services Model Buildingand Management Developers are increasingly requesting BIM delivery for their projects in order to reduce costs and improve designs. Due to BIM being a relatively new concept, some organizations find that they do not have the capabilities or resources available to deliver data rich building information models to the clients specifications. This is where MTECH can help. Our staff work in compliance with the most stringent global BIM delivery standards and are trained in the latest Autodesk software having completed projects in regions including Europe, the Middle East and Asia Pacific. Our experience covers both the public and private sectors and include high-rise, low-rise, residential, commercial, healthcare, industrial and mixed use developments.  Model Building  Model Management / Coordination  4D Construction Sequencing Simulations  5D Cost / QTO / BOQ  6D BIM 4 FM
  • 19.
    Project Services Model Building MTECHpossess the capabilities and experience to build data rich Building Information Models in compliance with various standards and Levels of Development/detail (LOD) specifications including:  AIA BIM Protocol  AEC (UK) & CIC BIM Protocol  Singapore BIM Guide MTECH's Revit modelers are experienced professionals in the production of fully coordinated BIM models to your specifications for the following disciplines:  Architecture  Civil  Structure  MEP Our model building services can be engaged for both design and construction phases of a project or we can make a straight conversion from your as-built 2D drawings or point cloud survey to a data rich deliverable as per your requirements.
  • 20.
    Project Services Model Management/ Coordination Once the BIM Models for all disciplines are accurately created, we can perform clash detection and generates reports for the team to review. Our staff works together with architects, engineers, general contractors, and various trades to detect and resolve the design conflicts among construction elements before construction, saving costly rework on-site. Project Visualization Experiencing designs before they are real ensures better decisions are made and enables participation by a wider audience of stakeholders or decision makers. Using visualization in conjunction with BIM on a project engages more people sooner, leading to broader-reaching feedback and more predictable outcomes. When the entire team can coordinate their work and share design inputs, they can easily assess the impacts of design alternatives and hone in on the best options earlier, and in parallel. This collaborative approach enables designers to respect the requirements of the other design disciplines and avoid costly and time-consuming conflicts and design rework.
  • 21.
    Project Services Clash Detection Clashdetection is the exercise of checking coordination quality and clearances of and between MEP services, structure and architecture using BIM software compatible with model building platforms such as Autodesk Revit. MTECH's services include performing the clash detection on our clients models and reporting any design or coordination defects. This exercise potentially saves the client substantial time and money due to early identification of problematic areas early on in the project minimizing the threat of costly reworking on site. 4D Construction Sequencing Simulations Data from construction schedules can be combined with the power of BIM to create an animated "4D" simulation of how an asset is planned to be built in terms of the order each activity is to be carried out. This can highlight problems with the planned schedule in terms of site efficiency, safety and accessibility allowing construction managers to make changes in advance. MTECH have experience of producing such animations on a variety of projects based on both our clients building information models or models created by ourselves on behalf of our client’s.
  • 22.
    Project Services 5D Cost/ QTO / BOQ BIM models can be used to generate accurate quantity takeoffs and assist in the creation of cost estimates throughout the lifecycle of a project. This enables the project team to see the cost effects of their design decisions and proposed changes during all phases of the project, and this feedback supports better design decision-making and can help curb excessive budget overruns due to project modifications. To determine a project's construction cost and requirements, contractors traditionally perform material ‘take-offs’ manually, a process fraught with the potential for error. With BIM, the model includes information that allows a design contractor to accurately and rapidly generate an array of essential estimating information, such as materials quantities and costs, size and area estimates, and productivity projections. As changes are made, estimating information automatically adjusts, allowing greater contractor productivity.
  • 23.
    Project Services 6D BIM4 FM Where a model is created by the designer and updated throughout the construction phase, it will have the capacity to become an ‘as built’ model record of the building, whilst informing the final AIM. (Asset Information Model). The model will be able to contain all of the specifications, operation and maintenance manuals and warranty information, useful for future maintenance. This eliminates the problems that can currently be experienced if the O&M manual has been misplaced or is kept at a remote location. Sensors can feed back and record data relevant to the operation phase of a building, enabling BIM to be used to model and evaluate energy efficiency, monitor a building's life cycle costs and optimize its cost efficiency. It also enables the owner to evaluate the cost-effectiveness of any proposed upgrades. Using BIM facilities managers can effectively explore, track, and manage information using the powerful parametric capabilities and data embedded in the BIM model to analyze space related data, track inventory and lifecycle data and perform cost needs analysis.
  • 24.
    Client List (selected) Owners/ Developers Domeland Estate Co., Ltd I Kingdom Properties I IconSiam I LPN Development Gaysorn Property I Magnolia Development I Life and Living I Siam Cement Group Contractors Bouygues Thai I Thai Obayashi I Chuchawal Royal Haskoning I SP Contracting Thai Takenaka I Thai Kajima I Stoneking I Siphya Construction I Visavapat Architecture A Landarch I HB Design I Contour I Innia Décor I Space Matrix Design Management Insight (D.M.I) I Karapanik I Design Worldwide Partnership (D.W.P) I Plan Associates I Quintrix Architects I HBO EMTB 4B Architects I Desyn Studio I Innovative I Redland Engineering G.M.E I Mitr Technical I Jardine Engineering I SP Contracting Q.T.C.M.E I McTric Co., Ltd I Teo Hong I Daikin City Power I Daikin I Taikisha I NEO 727 I uWork999 Meinhardt Group I TTS Engineering Academic Khon Kaen University
  • 25.
    Thai Obayashi –BIM Implementation (2013)  BIM implementation plan  Create and set up company BIM workflow  BIM training for all disciplines (20 staff)  BIM pilot project  BIM coordination  Clash detection  Project support on AIA building (Sathorn and Ratchada) Reference Projects
  • 26.
    Reference Projects Southpoint Pattaya–BIM Implementation (2013) Condominium project (2 towers) 2 billion baht project Scheduled completion 2015  BIM execution plan and project standards  BIM implementation  Structural and MEP design consultant  Project coordination  Clash detection across all disciplines  Project support  Contractor: Bouygues Thai  Architect: The Beaumont Partnership  Interior Design: SODA  MEP: McTric Co., Ltd
  • 27.
    Reference Projects Mahanakorn– BIMImplementation (2013 - 2014) Thailand tallest building: 314 m / 77 floors Hotel, retail and residences Scheduled completion 2015  BIM execution plan and project standards  BIM implementation and training  Site installation of software and hardware  Revit MEP training  Project support  Contractor: Bouygues Thai  MEP: Teo Hong
  • 28.
    Reference Projects Landmark –BIM Implementation (2014 - ) Mixed use development: GFA 300,000 m2 Hotel, offices, retail and residences  BIM implementation strategy  BIM standards and documentation  BIM execution plan  MEP and C&S design  BIM coordination and consulting  Clash detection  Project management: chair multi-discipline coordination meetings  Create 4D construction sequence for planning approval and site logistics  Create Revit model of listed heritage building from site survey and 3D scan (point cloud)
  • 29.
    Reference Projects Australian Embassy,Bangkok – 4D Construction Sequence (2014)  BIM 4D construction sequencing simulation  Link and integrate project schedule to model  Visualization model for project review  Visualization model for site logistics, planning approval and EIA
  • 30.
    Reference Projects Q.T.C.M.E –BIM Consultancy (2014)  Software, hardware and network set up  BIM consultancy and on site project support  Chair multi discipline coordination meetings Plan Associates – BIM Pilot Project (2014)  Revit training  Software installation and network set up  BIM team workshop  BIM implementation plan  Pilot project / project support
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.