The document provides an overview of Building Information Modeling (BIM) including what BIM is, the differences between traditional and BIM approaches, the project life cycle when using BIM, benefits of BIM such as improved collaboration and predictability, potential barriers to BIM implementation like costs and lack of skills, and a case study on a new courthouse project in Temerloh, Pahang, Malaysia that has implemented BIM to help coordinate design and construction.
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
Change Management for Building Information Modelling (BIM) addressing the challenges, advantages, implementation process strictly used for educational purposes.
Current and emerging digital technologies in healthcare engineering.
Movie slide doesn't work on slideshare, use this link; https://youtu.be/6k4HLmzyPj0
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
Change Management for Building Information Modelling (BIM) addressing the challenges, advantages, implementation process strictly used for educational purposes.
Current and emerging digital technologies in healthcare engineering.
Movie slide doesn't work on slideshare, use this link; https://youtu.be/6k4HLmzyPj0
The Role of BIM in Modern Construction ProjectsTawwabKhan4
In the rapidly evolving landscape of modern construction, the integration of technology has become paramount for success. One such technological advancement that has revolutionised the industry is Building Information Modelling, commonly known as BIM. With its digital representation of the physical and functional characteristics of buildings, BIM offers a transformative approach to construction projects.
In this article, we take a look at the significance of BIM, exploring its importance and the multiple levels or stages it encompasses. We will also uncover the role of precision engineering in constructing stronger and more sophisticated buildings.
Understanding the Power of BIM: A Digital Revolution in Construction
At its core, Building Information Modelling (BIM) is a digital representation of a building’s physical and functional attributes. It encompasses a wide range of information, including architectural, structural, mechanical, and electrical details, all stored in a centralised database. This comprehensive model serves as a shared knowledge resource for all stakeholders involved in a construction project.
BIM is a game-changer in the construction industry due to its ability to enhance collaboration, improve communication, and streamline workflows.
How building information modeling (BIM) functions in construction projectsCAD Outsourcing
How building information modeling (BIM) functions in construction projects
https://www.cadoutsourcing.net/cad-outsourcing-services/building-information-modeling-bim.html
BIM Building Information Modeling is much more than model creation, it is human and software collaboration through large volumes of construction data that is communicated at every point in the development life-cycle for a project(s).
5 reasons why bim adoption is important for architectsArpitGautam20
Here are 5 pressing reasons why BIM adoption is important for Architects. Read on to know the exciting benefits that BIM brings for Architects. https://rdttech.co/5-reasons-why-bim-adoption-is-important-for-architects/
BIM Dominating The Future of Architectural Design.pptxTop BIM Company
Building Information Modeling technology supports architects throughout the design process. Architects use Building Information Modeling (BIM) throughout the design process to help improve quality and accelerate design processes with integrated workflows for concept design, modeling, multidiscipline coordination, and construction documentation.
To know more about Architectural BIM Design, visit our website: https://www.topbimcompany.com/architectural-bim-services/
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsUnited-BIM
A BIM model can be utilized for pre-defined specific purposes, commonly known as use-cases. According to project stage requirements and project complexity, specific parameters are added to the existing information contained in BIM. These additions of pre-defined used cases can be described as BIM dimensions.
These dimensions enhance the data associated with a model to share a greater level of understanding of a construction project.
In the modern era, BIM technology has evolved from basic 3D & 4D dimensions to more sophisticated 5D, 6D & 7D dimensions that are poised to change the future of the AEC industry.
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D, and 8D, Understanding the Different Dimensions of Building Information Modeling in Construction. Building Information Modeling (BIM) brought about a radical change in the architecture, engineering, and construction (AEC) sectors by providing 3D digital versions of reality. BIM's capabilities are more than just geometry. The 3D to 8D dimensions of BIM are excellent aspects that allow professionals to visualize not just the physical but also the temporal and cost stages, as well as the operations and management of the facility lifecycle, sustainability, and operation of the building. Every dimension (of data) allows for better decision-making and performance analysis during the project life cycle.
The Building Information Modeling (BIM) is a technology that is rapidly gaining popularity in the world of of Architecture Engineering and Construction. This presentation shows a complete history of the BIM and highlights its applications during Building Life Cycle and finally provides its advantages and limitations.
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...Clarkson Alliance
Presentation given at BIM Procurement and Practice for Collaboration Oxford in November 2013 by Professor John Lorimer, Local Government Liaison for the Government’s BIM Task Group and former Capital Programme Director who has delivered 5 projects using Building Information Modelling including the £95million refurbishment of Manchester Central Library
About Collaboration Oxford:
Through Collaboration Oxford, construction consultants The Clarkson Alliance, AKS Ward and Hoare Lea aim to help overcome the challenges of providing world class, low carbon buildings whilst preserving Oxfordshire’s heritage.
Building Information Modelling (BIM) has radically changed the way architectural, engineering and constructional design and documentation is implemented.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
More Related Content
Similar to BIM G e t t i n g S t a r t e d G u i d e.pptx
The Role of BIM in Modern Construction ProjectsTawwabKhan4
In the rapidly evolving landscape of modern construction, the integration of technology has become paramount for success. One such technological advancement that has revolutionised the industry is Building Information Modelling, commonly known as BIM. With its digital representation of the physical and functional characteristics of buildings, BIM offers a transformative approach to construction projects.
In this article, we take a look at the significance of BIM, exploring its importance and the multiple levels or stages it encompasses. We will also uncover the role of precision engineering in constructing stronger and more sophisticated buildings.
Understanding the Power of BIM: A Digital Revolution in Construction
At its core, Building Information Modelling (BIM) is a digital representation of a building’s physical and functional attributes. It encompasses a wide range of information, including architectural, structural, mechanical, and electrical details, all stored in a centralised database. This comprehensive model serves as a shared knowledge resource for all stakeholders involved in a construction project.
BIM is a game-changer in the construction industry due to its ability to enhance collaboration, improve communication, and streamline workflows.
How building information modeling (BIM) functions in construction projectsCAD Outsourcing
How building information modeling (BIM) functions in construction projects
https://www.cadoutsourcing.net/cad-outsourcing-services/building-information-modeling-bim.html
BIM Building Information Modeling is much more than model creation, it is human and software collaboration through large volumes of construction data that is communicated at every point in the development life-cycle for a project(s).
5 reasons why bim adoption is important for architectsArpitGautam20
Here are 5 pressing reasons why BIM adoption is important for Architects. Read on to know the exciting benefits that BIM brings for Architects. https://rdttech.co/5-reasons-why-bim-adoption-is-important-for-architects/
BIM Dominating The Future of Architectural Design.pptxTop BIM Company
Building Information Modeling technology supports architects throughout the design process. Architects use Building Information Modeling (BIM) throughout the design process to help improve quality and accelerate design processes with integrated workflows for concept design, modeling, multidiscipline coordination, and construction documentation.
To know more about Architectural BIM Design, visit our website: https://www.topbimcompany.com/architectural-bim-services/
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsUnited-BIM
A BIM model can be utilized for pre-defined specific purposes, commonly known as use-cases. According to project stage requirements and project complexity, specific parameters are added to the existing information contained in BIM. These additions of pre-defined used cases can be described as BIM dimensions.
These dimensions enhance the data associated with a model to share a greater level of understanding of a construction project.
In the modern era, BIM technology has evolved from basic 3D & 4D dimensions to more sophisticated 5D, 6D & 7D dimensions that are poised to change the future of the AEC industry.
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D, and 8D, Understanding the Different Dimensions of Building Information Modeling in Construction. Building Information Modeling (BIM) brought about a radical change in the architecture, engineering, and construction (AEC) sectors by providing 3D digital versions of reality. BIM's capabilities are more than just geometry. The 3D to 8D dimensions of BIM are excellent aspects that allow professionals to visualize not just the physical but also the temporal and cost stages, as well as the operations and management of the facility lifecycle, sustainability, and operation of the building. Every dimension (of data) allows for better decision-making and performance analysis during the project life cycle.
The Building Information Modeling (BIM) is a technology that is rapidly gaining popularity in the world of of Architecture Engineering and Construction. This presentation shows a complete history of the BIM and highlights its applications during Building Life Cycle and finally provides its advantages and limitations.
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...Clarkson Alliance
Presentation given at BIM Procurement and Practice for Collaboration Oxford in November 2013 by Professor John Lorimer, Local Government Liaison for the Government’s BIM Task Group and former Capital Programme Director who has delivered 5 projects using Building Information Modelling including the £95million refurbishment of Manchester Central Library
About Collaboration Oxford:
Through Collaboration Oxford, construction consultants The Clarkson Alliance, AKS Ward and Hoare Lea aim to help overcome the challenges of providing world class, low carbon buildings whilst preserving Oxfordshire’s heritage.
Building Information Modelling (BIM) has radically changed the way architectural, engineering and constructional design and documentation is implemented.
Similar to BIM G e t t i n g S t a r t e d G u i d e.pptx (20)
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
2. Building Information Modeling
is a process, that involves an
integration of the various
project participants at various
levels.
What is BIM?
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |2
4. What is BIM?
“Building Information Modeling (BIM) is a digital representation of
physical and functional characteristics of a facility. BIM is a shared
knowledge resource for information about a facility forming a reliable basis for
decisions during its life-cycle; defined as existing from earliest conception to
demolition.”
The National Building Information Model Standard Project Committee (March, 2012)
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |4
5. minimizes risk
and promote
quality
Staub-French & Khanzode (2007)
3D & 4D
Modeling
BIM
will be accepted
as industry copes
with realities of
tight labor market
minimizes risk
and promotes
quality
• eliminate field interferences
• less rework
• increased productivity
• fewer RFI
• fewer change orders
• less cost growth
• decrease construction to facility turnover
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |5
6. BIM – PROJECT LIFE CYCLE
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |6
7. Intelligent design information in 3D –
‘model-based process’; building will be
built virtually before physical building is
constructed
Contractor’s Guide to BIM – Edition One
AGC of America 2007
New technology and new way of working,
beginning to make an impact to
construction industry (has been used for a while
in manufacturing & engineering industries)
At a strategic level, BIM
addresses many of the
industries failures: waste
reduction, value creation
while improving productivity.
Provides a common single and
coordinated source of structured
information to support all parties involved
in the delivery process -design, construct,
operation – reducing loss of information
BIM can be used to
demonstrate the entire
building lifecycle from
construction through to facility
operation.
Contains representations of the actual
parts and pieces - includes building
shape, design and construction time,
costs, physical performance, logistics
and more
WHAT IS
BIM?
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |7
9. Lack of project co-ordination
Time & Cost
over-runs
Manual bill of quantities or no
integration
No accuracy in Job Costing
& Budgeting
Not feasible to integrate with facility
management applications and
preventive, corrective maintenance
Further investment needed
for data procurement &
incurring cost per year
MAJOR ISSUES IN A CONSTRUCTION PROJECT
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |9
10. IPD
-
BIM
Deliverables
• 3D modelling & Outputs
• Clash detection
• Clash Resolution
• Quantity take off
• 2D Extraction
• Construction simulation – 4D & 5D
• Facility Management Solutions
To provide IPD (Integrated Project Delivery) using BIM technology
to manage and maintain projects effectively
BIM IPD
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |10
12. BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |12
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
13. 1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM All project partners – uses a
single, shared 3D model,
cultivating collaborative
working relationships.
This ensures everyone is
focused on achieving best
value, from project inception
to eventual decommissioning.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |13
14. BIM makes possible swift and
accurate comparison of different
design options.
enabling development of
more efficient, cost-effective
and sustainable solutions.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |14
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
15. Through deployment of new
generative modeling
technologies, solutions can be
cost-effectively optimized
against agreed parameters.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |15
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
16. Projects can be visualized at an
early stage - giving owners and
operators a clear idea of design
intent and allowing them to
modify the design to achieve the
outcomes they want.
In advance of construction, BIM
also enables the project team
to ‘build’ the project in a virtual
environment, rehearsing
complex procedures, optimizing
temporary works designs and
planning procurement of
materials, equipment and
manpower.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |16
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
17. Agreeing the design concept early
in project development to eliminate
late stage design changes;
Using standard design elements
when practicable;
Resolving complex construction
details before the project goes on
site;
Avoiding clashes;
Taking advantage of intelligence
and automation within the model to
check design integrity and estimate
quantities;
Producing fabrication and
construction drawings from the
model; and
Using data to control construction
equipment.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |17
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
18. Crowd behavior and fire modeling
capability enable designs to be
optimized for public safety.
Asset managers can use the
3D model to enhance
operational safety.
Contractors can minimize
construction risks by
reviewing complex details or
procedures before going on
site.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |18
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
19. Integrating multidisciplinary
design inputs using a single 3D
model allows
interface issues to be
identified and resolved in
advance of construction
eliminating the cost and
time impacts of redesign.
The model also enables new and
existing assets to be integrated
seamlessly.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |19
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
20. Exact quantity take-offs mean that
materials are not over-ordered.
Precise programme scheduling
enables just-in-time delivery of
materials and equipment, reducing
potential for damage.
Use of BIM for automated
fabrication of equipment and
components enables more efficient
materials handling and waste
recovery.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |20
1. Better outcomes through collaboration
2. Enhanced & optimized performance
3. Optimized solutions
4. Greater predictability
5. Faster project delivery - Time savings
6. Reduced safety risk
7. Fits first time
8. Reduced waste
Benefits of BIM
21. Five Top-Rated Positive
Impacts of BIM
Metrics for the Impact of BIM on Cost. Schedule,
RFIs and Safety
BIM : RETURN ON INVESTMENT
Respondent
Type
% Rating
High or Very
High
Improved Constructability
of Final Design
Contractors 74%
Increased Owner’s
Understanding of
Proposed Design
Solutions
Owners 73%
Improved Quality /
Function of Final Design
Engineers 71%
Generated Better
Construction Documents
Owners 70%
Improved Ability to Plan
Construction Phasing and
Logistics
Owners 70%
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |21
Source : Dodge Data & Analytics – Smart Market Report
Published on 2015 in Associate with Building Smart Alliance
22. BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |22
23. Barriers of BIM Implementation
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |23
24. The effective implementation and use of BIM remains a major
issue for the construction industry. Whilst the technology
underpinning BIM has been around for well over a decade BIM
implementation and take-up has been relatively slow in the
construction industry compared to industries such as
manufacturing and engineering.
(Smith, 2014)
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |24
25. lack of client demand
BIM
BIM application among designers
was limited
Lack
Qualified
Staff
Caroline T. W. Chan (2014)
Hong Kong Experience
Lack
Trainings
Education
government should collaborate with industry, professional
bodies and education institutes to establish clear standard
and guidance on BIM
Government
Hong Kong Government to implement BIM in all public housing projects starting from 2014
lack of standards
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |25
26. 1. High cost to implement BIM
2. IT availability (software, hardware, computer)
3. Require Time for training and implementing BIM
4. Readiness organization to change
5. Lack of knowledge in BIM
6. New technology require expertise and training.
7. Lack of information about benefits of BIM
(Ismail, 2014)
Malaysia Context
Barriers of BIM implementation
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |26
28. Case Study
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |28
PEMBINAAN MAHKAMAH BAHARU TEMERLOH, PAHANG
29. Project Details
SCOPE OF SERVICES PMC SERVICES ( BIM COMPLIANCE)
PROJECT DESCRIPTION COMMON INFRASTRUCTURE (5 ACRES) TEMERLOH
COMMON INFRA COST RM80 MILLION
IMPLEMENTATION PERIOD 3 YEARS (Excl DLP)
SCHEDULED OF DEV STAGES 1, 2 AND 3 STAGES
PMC With BIM capability Initiated 2021
Implementation of project with BIM 2022
2D Design 2002 – 2020(conventional)
PEMBINAAN MAHKAMAH BAHARU TEMERLOH, PAHANG, 2021
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |29
30. 1. Secretary
2. Clerk / Doc Controller
F/T
Const. Eng. (C&S)
BIMNS
F/T
Const. Eng. (M&E)
SUB
F/T
Arch. Manager
BIM NS
F/T
Project Director
JKR HIPT
ANS
Construction
Management
Design
Management
Overall
Management
3rd Party Works
1. Soil Investigation
2. Topographical survey
BHEUU
Specialist Consultant
PMC
1. Planner
2. Cost Manager
3. QA/QC & Manager
4. EIA / EMP
5. GBI
6. Infra. Engineer
7. Structure Engineer
8. Geotech Engineer
9. M&E Engineer
10. Interface / Integrated
Head Office Support
Project Manager
Construction Manager
Civil / Structure / Arch
F/T
BIM Manager (Interface)
BIMNS
Landscape
UNITI EMZEX
Contracts Manager
LC
Cost Manager / QS
Planning Control Management
Doc Control
LC
Planning Manager
LC
Scheduler
LC
Contracts Management
LC
Quality Manager
Technical Management
Sr. Engineers & Sub - Professional Support
Civil Manager
UNITI
Electrical
ABS
UNITI
Geotechnical
BIM COORDINATOR
BIM, NS SOLUTION
Document Controller
Engineering
ZAIMMARN
L’scape Manager
Mechanical
ABS & EMZEX
Asst. Project Manager (M&E)
F/T
Interface Management
With BIM
JB CONSULT
F/T
UNITI
Asst. Project Manager (C&S)
F/T
ORGANISATION CHART
M&E Manager
LC
Infrastructures
UNITI
Structural
BIM Manager
LC
F/T
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |30
31. Project Aim
The development carries the promise of a New development of Mahkamah Temerloh that focuses on 4
Key Components: efficient design, Connectivity, Inclusivity and Regional Commercial Centre.
BIMs are ultimately developed to operate the facility after construction completion.
The models will be utilized during the construction stage to monitor;
• work progress
• identify conflicts prior to construction
• manage logistics
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |31
32. Project initially implemented using Non-BIM
BIM
BIM application among designers was
limited (Critical @ time of implementation)
Lack
Qualified
Staff
Lack
Trainings
Education
Client Initiative
lack of standards
[Uses BIM execution plan
Technology transfer from foreign]
On the work Workshops
(Consultants & Contractors)
[Technology transfer from foreign
experience]
Employment of BIM foreign experts
With local inputs
Project Experience
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |32
33. Design Coordination: Using Clash
Detection software during coordination
process to determine field conflicts by
comparing 3D models of building systems.
Design Authoring: BIM software is used to
incorporate design intent input
documentation, metadata and other
requirements and translating them into a
comprehensive BIM.
As-Built Modeling: A process
used to depict an accurate
representation of the actual
condition of the Building in BIM
Site Utilization Planning:
Using construction simulation
based modeling to represent
both permanent and temporary
facilities on site and related
construction activities
4D Modeling: Using 4D
modeling (3D models with
added dimension of time) to
effectively plan phased
occupancy in a renovation,
retrofit, addition, or to show the
construction sequence and
space requirements on a
building site.
Existing Conditions Modeling: Project team develops BIM
to reflect existing conditions on site, including location of
facilities, graded levels etc.
BIM uses
in
Project
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |33
35. Interacts on a regular basis to assess various BIM processes and deliverables
Meeting Title Frequency Praticipants Location
BIM Progress Monitoring
Meeting
weekly
BIM Manager/PM-BIM/BIM
Coordinator
Site Office
Model Update weekly
BIM Coordinators/BIM
Modelers
Site Office
Coordination Meetings weekly
BIM Manager/PM-BIM/BIM
Coordinator / Service
Engineers.
Site Office
Quality Control Meetings Monthly
BIM Manager/PM-BIM/ BIM
Coordinator/QA/QC Manager
Site Office
Site Monitoring Frequency
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |35
36. Construction Simulation
(based on contractors
approved programme)
2D Design
Drawings from
Client
3D Modelling
Clash Analysis
& Detection
Produce Clash Reports
to Identify/ Specify all
Clashes
Resolve all Clashes
Deliverable 1
Deliverable 2
Deliverable 3
3D Design
Drawings from
Client
BIM Coordination
With Consultants
A
B
Deliverable 4
Construction
Phase
Deliverable 5 FM Management
As Built
Model
BIM Process Flow
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |36
37. Enhanced & Optimized Performance &
Solutions: Easier & more accurate
comparison on design options as well as using
clash detection software to mitigate possible
issues – cost effective
Better outcome through collaboration:
collaborative working relationship between
consultants, client and contractors – better
understanding of design intent
Fits First Time:
Reduced Safety Risks: safety
preventive methods being deployed
during early stage
Greater Predictability: better
visualization by using 4D
modeling (3D models with
added dimension of time) -
effectively plan complex
procedures, optimizing
temporary works designs and
planning procurement of
materials, equipment and
manpower.
Faster Project Delivery: Less design issues by early
coordination & using standard detailing (where possible)
BIM
benefits in
Project
Reduce Waste:
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |37
45. Knowledge: Basic IT knowledge (basic 3D)
and BIM knowledge in various stakeholders –
consultants & contractors
Cost: Initial capital to be utilized
No precedent studies:
The process of BIM
implementation is at
learning stage – trial and
error
Issues on liabilities: during
transfer of information between
designers and contractors
(different stages)
Awareness: understanding on
the importance of BIM –
initiated by PMC, without prior
awareness from Kwasa
Damansara’s BOD (need to be
convinced)
Application of BIM
Management: Issues during
initial coordination for pre, during
& post construction
Barriers &
Challenges in
Project
Transfer of Technology:
Need to refer consultants
from overseas to train,
having workshops etc
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |45
47. (IEM, 2014)
Malaysia Context – Steps to increase pace of BIM
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |47
48. The Main Question is HOW?
CHANGE
MANAGEMENT
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |48
49. Change Management
• The set of tools, processes, skills
and principles for managing the
people side of change to achieve the
required outcomes of the project or
initiative.
• Strategic change become necessary when
opportunities or threats arise in the
following main areas:
Environment
Diversification
Technology
People
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |49
50. People in Change Management
Organization
Team
Me
• How does change impact people
across the organization?
• How do we make this work for all
of us?
• How does each one show up
(Acceptance, fear, anger,
resistance)
• What can I do to help them cope?
• How do I show up?
• Can I cope?
• What do I need to help me cope?
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |50
51. Change Management
Strategy Tools
Situational
Awareness
• Understand the change and who is
impacted. i.e : Change characteristics,
impacted group, organizational attributes
Supporting
Structures
• Team and sponsor structures
Strategy
Analysis
• Risk, resistance and
special tactic
Formulating the
change management
strategy is the first
critical step in
implementing a change
management
methodology.
The strategy provide
direction and results
in informed decision
making throughout the
change process.
A well formulated
strategy really brings the
project or change to life,
describing who and how
it will impact the
organization.
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |51
52. Change Management Process
UNFREEZING CHANGING REFREEZING
LEWIN’s Change
Management
Model
Make sure the change stick as
part of the new routine
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |52
53. Kotter’s 8 Steps Change Management
Model
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |53
54. Possible barriers to Change
Barriers to
Change
Culture
Developmenta
l
Psychological
Social
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |54
55. Evaluation of a Change Strategy
Determine
objectives
Describe Objectives
Measure effects
Establish baseline
points
Control Extraneous
factors
Detect unanticipated
consequences
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |55
56. Strategies to overcome the barriers
Change Agent PMC
Establish Urgency Powerful Coalition Remove Obstacles Create Vision
Communicate Vision Create Quick Wins Build on the Change Make it Stick
• Importance of
coordinating for FM
• Request from the
client
• PMC initiated
coalition between
consultants,
specialists and
contractors
• Create awareness in
BIM implementation
• Training given to
stakeholders (staff,
contractors, clients, LA)
• Highlighting
advantages of BIM
(time, cost, quality)
• Consistent monitoring
– meeting & updates
to obtain similar goals
• Establish sequence
• Visualization prior to
implementation (at
different stages)
• Trial and error –
learning curve
• Practice makes
perfect
• Continuous
improvements
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |56
57. Conclusion
• BIM is an important management tool in mitigating most
construction issues
• BIM is seen to be a technology that might be mandatory
implementation in the construction industry in Malaysia
BIMNS® BIM® G e t t i n g S t a r t e d G u i d e |57