This document discusses construction take-off software. It provides an overview of the purpose of construction take-off in estimating project costs. Traditionally, take-offs were done by hand using blueprints, rulers and calculators. Now, contractors can use specialized software to simplify and improve the take-off process. The document then discusses specific take-off software programs, their features, costs, advantages and disadvantages compared to doing take-offs manually or in Excel. Integrated Autodesk programs are highlighted as providing precise results and tools, but requiring training and regular updates.
Estimation and Evaluation of G+3 Residential Buildingvivatechijri
Any construction project to begin with starts with the Layout of the building or structure followed by
Design and Analysis of the structure which is succeeded by cost estimation and planning for the said project. This
project involves the layout, design, analysis, planning and cost estimation of a G+3 residential building located
in Bhiwandi. The layout of the proposed G+3 residential building is based on a plot of size 18X15M. Previously
the plot was being used as a commercial complex, but according to the new plan it will be used as a multi-storied
residential building. The ground floor of the building will be used as parking while the remaining 3 floors will be
divided into 6 apartments each having an area of 2BHK & 1BHK 60.97sqm & 48.25sqm. Each apartment is of
2BHK and 1BHK configuration.
Estimation and Evaluation of G+3 Residential Buildingvivatechijri
Any construction project to begin with starts with the Layout of the building or structure followed by
Design and Analysis of the structure which is succeeded by cost estimation and planning for the said project. This
project involves the layout, design, analysis, planning and cost estimation of a G+3 residential building located
in Bhiwandi. The layout of the proposed G+3 residential building is based on a plot of size 18X15M. Previously
the plot was being used as a commercial complex, but according to the new plan it will be used as a multi-storied
residential building. The ground floor of the building will be used as parking while the remaining 3 floors will be
divided into 6 apartments each having an area of 2BHK & 1BHK 60.97sqm & 48.25sqm. Each apartment is of
2BHK and 1BHK configuration.
2014-2015 new release about AutoCAD. Ph +91 99153-37448 for AutoCAD movie editing and more training in autocad like mechanical , electrical and autocad max.
CAD program is being used on extensive foundation by a number of technological innovation experts and organizations for various programs.
The most common program of these programs is developing and creating. Here are some of the advantages of applying techniques in the companies
CAD is one part of the whole Digital Product Development (DPD) activity within the Product Lifecycle Management (PLM) processes, and as such is used together with other tools, which are either integrated modules or stand-alone products, such as:
• Computer-aided engineering (CAE) and Finite element analysis (FEA)
• Computer-aided manufacturing (CAM) including instructions to Computer Numerical Control (CNC) machines
• Photo realistic rendering and Motion Simulation.
• Document management and revision control using Product Data Management (PDM).
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Online aptitude test management system project report.pdfKamal Acharya
The purpose of on-line aptitude test system is to take online test in an efficient manner and no time wasting for checking the paper. The main objective of on-line aptitude test system is to efficiently evaluate the candidate thoroughly through a fully automated system that not only saves lot of time but also gives fast results. For students they give papers according to their convenience and time and there is no need of using extra thing like paper, pen etc. This can be used in educational institutions as well as in corporate world. Can be used anywhere any time as it is a web based application (user Location doesn’t matter). No restriction that examiner has to be present when the candidate takes the test.
Every time when lecturers/professors need to conduct examinations they have to sit down think about the questions and then create a whole new set of questions for each and every exam. In some cases the professor may want to give an open book online exam that is the student can take the exam any time anywhere, but the student might have to answer the questions in a limited time period. The professor may want to change the sequence of questions for every student. The problem that a student has is whenever a date for the exam is declared the student has to take it and there is no way he can take it at some other time. This project will create an interface for the examiner to create and store questions in a repository. It will also create an interface for the student to take examinations at his convenience and the questions and/or exams may be timed. Thereby creating an application which can be used by examiners and examinee’s simultaneously.
Examination System is very useful for Teachers/Professors. As in the teaching profession, you are responsible for writing question papers. In the conventional method, you write the question paper on paper, keep question papers separate from answers and all this information you have to keep in a locker to avoid unauthorized access. Using the Examination System you can create a question paper and everything will be written to a single exam file in encrypted format. You can set the General and Administrator password to avoid unauthorized access to your question paper. Every time you start the examination, the program shuffles all the questions and selects them randomly from the database, which reduces the chances of memorizing the questions.
1. Engineering College
Civil Engineering Department
Estimate the ownership cost
Issued date 03/03/2020
Prepared by
SAUD SELFIG SAUD ALSHLIKHI
IBRAHIM ALASMAR FAYYADH ALANAZI
BEDAIWI ISMAIL BEDAIWI ALRUWAILI
Northern Border University
2. • Abstract
• Name of program.
• How to use it.
• Advantage & Disadvantage.
• Take off software.
• General Advantage & Disadvantage for the Software.
Contents
3. Abstract
Construction take-off is a necessary step toward estimating costs in a
construction project. Contractors and project managers use
blueprints to calculate the quantity and measure of materials and
supplies needed for the project. That information is then used in cost
estimates, project proposals, and supply order forms.
However, the process of generating the take-off data — pulling this
detailed information from project plans — can be a very time
consuming process for contractors. Traditionally, contractors have
done this by hand using printed plans, rulers, calculators, and
pencils. Fortunately for the modern contractor, companies have
created take-off software to simplify and improve this process.
4. Name of program.
Excel / Estimating Software Integration – Most businesses and many
contractors make use of Excel templates and other software to manage
the estimating bidding process. Some take-off products, like Plan Swift,
allow integration with Excel and some third party estimating software, so
users can easily pull or send data from other programs , and nowadays the
most desirable software is BIM software which can generate very precise
take-off in appropriate construction way .
5. How to Use it
Start : Open QS File from
your Drive.
Click on the button
to enter the
program.
Select what kind of
take-off you need .
For Example
:Footings.
Click on the Footings
icon.
Then , Find the take-
off formulated
Sheet.
Launch to insert the
footings parameters
values such as : length ,
width , depth ..etc. .
Then, the result will be
appeared automatically to
find out the required values .
The result is showing the following : Weight of
reinforcement (Ton, Kg) , volume of R.C & PC
concrete(m3) related to the construction
footings .
Then, You can use the same process of
footings take-off to repeat use the work flow
for other disciplines such as : beams ,
columns , slabs .
Afterthought, you can start inserting the cost value in order to measure the
total construction budget for further project financiering requirements
accordingly .
Closing process
6. Advantage & Disadvantage.
Disadvantage ExcelAdvantage Excel
Not Integrated to the Autodesk directlyEasy to use it .
The result will be accurate , however might not be precise for
somehow .
Cheap in price , could everyone could accommodate the
program cost .
Could not easily find out the mistakes , so you need to
search one by one to over come the errors occurred
Simple in format , so everyone could understand it .
User could not modify the formulas to manage the
calculations.
Direct forward program ,so ,simple and humble to insert the
construction elements parameters with relevant values.
8. Take Off Software cost
construction take-off tools are some of the most transparently priced technologies a
buyer will research. While broader construction project management solutions may
have intricate pricing schemes, take-off providers will typically charge a flat fee to
download the product or a monthly licensing fee for access to online products.
9. General Advantage & Disadvantage for the Software
Disadvantage Integrated with AutodeskAdvantage Integrated with Autodesk
Expensive in price .Easy to use it and understandable .
Required expert to use it with proper trainingIntegrated with all relevant associated Autodesk program
Required always updating so , it needs always PDU’s to
follow the update
Wide and vary tools with smart interfaces
User could not modify the formulas to manage the take-off .Precise results with related construction budgetary