Civil Engineering Department
Estimate the ownership cost
Issued date 03/03/2020
Prepared by
SAUD SELFIG SAUD ALSHLIKHI
IBRAHIM ALASMAR FAYYADH ALANAZI
BEDAIWI ISMAIL BEDAIWI ALRUWAILI
Northern Border University
• Abstract
• Name of program.
• How to use it.
• Advantage & Disadvantage.
• Take off software.
• General Advantage & Disadvantage for the Software.
Contents
Abstract
Construction take-off is a necessary step toward estimating costs in a
construction project. Contractors and project managers use
blueprints to calculate the quantity and measure of materials and
supplies needed for the project. That information is then used in cost
estimates, project proposals, and supply order forms.
However, the process of generating the take-off data — pulling this
detailed information from project plans — can be a very time
consuming process for contractors. Traditionally, contractors have
done this by hand using printed plans, rulers, calculators, and
pencils. Fortunately for the modern contractor, companies have
created take-off software to simplify and improve this process.
Name of program.
Excel / Estimating Software Integration – Most businesses and many
contractors make use of Excel templates and other software to manage
the estimating bidding process. Some take-off products, like Plan Swift,
allow integration with Excel and some third party estimating software, so
users can easily pull or send data from other programs , and nowadays the
most desirable software is BIM software which can generate very precise
take-off in appropriate construction way .
How to Use it
Start : Open QS File from
your Drive.
Click on the button
to enter the
program.
Select what kind of
take-off you need .
For Example
:Footings.
Click on the Footings
icon.
Then , Find the take-
off formulated
Sheet.
Launch to insert the
footings parameters
values such as : length ,
width , depth ..etc. .
Then, the result will be
appeared automatically to
find out the required values .
The result is showing the following : Weight of
reinforcement (Ton, Kg) , volume of R.C & PC
concrete(m3) related to the construction
footings .
Then, You can use the same process of
footings take-off to repeat use the work flow
for other disciplines such as : beams ,
columns , slabs .
Afterthought, you can start inserting the cost value in order to measure the
total construction budget for further project financiering requirements
accordingly .
Closing process
Advantage & Disadvantage.
Disadvantage ExcelAdvantage Excel
Not Integrated to the Autodesk directlyEasy to use it .
The result will be accurate , however might not be precise for
somehow .
Cheap in price , could everyone could accommodate the
program cost .
Could not easily find out the mistakes , so you need to
search one by one to over come the errors occurred
Simple in format , so everyone could understand it .
User could not modify the formulas to manage the
calculations.
Direct forward program ,so ,simple and humble to insert the
construction elements parameters with relevant values.
Take Off Software
https://www.stack
ct.com/software/
https://support.blueb
eam.com/updates/
https://www.plans
wift.com/
Link for
download
Take Off Software cost
construction take-off tools are some of the most transparently priced technologies a
buyer will research. While broader construction project management solutions may
have intricate pricing schemes, take-off providers will typically charge a flat fee to
download the product or a monthly licensing fee for access to online products.
General Advantage & Disadvantage for the Software
Disadvantage Integrated with AutodeskAdvantage Integrated with Autodesk
Expensive in price .Easy to use it and understandable .
Required expert to use it with proper trainingIntegrated with all relevant associated Autodesk program
Required always updating so , it needs always PDU’s to
follow the update
Wide and vary tools with smart interfaces
User could not modify the formulas to manage the take-off .Precise results with related construction budgetary
Reference:
• https://proest.com/what-is-a-construction-takeoff/
• https://constructible.trimble.com/construction-industry/how-to-master-the-
takeoff-in-construction-estimating
• https://www.esticom.com/what-is-a-takeoff-in-construction/
• https://www.stackct.com/software/
• https://www.planswift.com/
• https://support.bluebeam.com/updates/
Thank you
Northern Border University

More Related Content

What's hot

An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
Arshad Mohanut
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Waleed Liaqat
 
Scope of work
Scope of workScope of work
Scope of work
Ashish Jain
 
Estimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential BuildingEstimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential Building
vivatechijri
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation
ddscte
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
Lenson Mhango
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
Vj NiroSh
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
anbukkarasi dhuraisamy
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
Eduardo Alves
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
lckr117
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
ila vamsi krishna
 
Factors affeccting cost estimates of a project
Factors affeccting cost estimates of a projectFactors affeccting cost estimates of a project
Factors affeccting cost estimates of a project
Ar.Vijay Kumar
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purposeAbhijeet Bhosale
 
Principles Of Measurement International
Principles Of Measurement International Principles Of Measurement International
Principles Of Measurement International
Sorab Mishra
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
IDHAMUKI
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
Arpit Sethia
 
Estimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rulesEstimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rules
AkshayKamble94
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
R.R.G.S Bandara
 

What's hot (20)

An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Scope of work
Scope of workScope of work
Scope of work
 
Estimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential BuildingEstimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential Building
 
Ecv
EcvEcv
Ecv
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
 
Factors affeccting cost estimates of a project
Factors affeccting cost estimates of a projectFactors affeccting cost estimates of a project
Factors affeccting cost estimates of a project
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
Principles Of Measurement International
Principles Of Measurement International Principles Of Measurement International
Principles Of Measurement International
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
 
Estimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rulesEstimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rules
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 

Similar to Bill of quantities

Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
Hasif Alias
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
Shze Hwa Lee
 
Software
Software Software
Software
Kailyn Lee
 
Software presentation
Software presentationSoftware presentation
Software presentation
Timun Loh
 
Software app slides
Software app slidesSoftware app slides
Software app slides
ahmong4
 
Software app slides
Software app slidesSoftware app slides
Software app slides
Pui Chun Shian
 
Software report-complete-final
Software report-complete-finalSoftware report-complete-final
Software report-complete-final
Yong Sy
 
Autocad plant-3d
Autocad plant-3dAutocad plant-3d
Autocad plant-3d
Vinnie Rocx
 
Case study(i)
Case study(i)Case study(i)
Case study(i)
Mohseen Khan
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
BIMLABS GLOBAL
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
Hasif Alias
 
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRANComputer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
IRJET Journal
 
5 benefits of using cad program
5 benefits of using cad program5 benefits of using cad program
5 benefits of using cad program
kavita thete
 
6 weeks software training report
6 weeks software training report    6 weeks software training report
6 weeks software training report
sucha soorma designs
 
Software Report
Software ReportSoftware Report
Software Report
Arissa Loh
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
Haziq1511
 
PP1 report
PP1 reportPP1 report
PP1 report
Kailyn Lee
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
Shze Hwa Lee
 
Software Application report
Software Application reportSoftware Application report
Software Application report
Kailyn Lee
 
Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02
Jun Keat
 

Similar to Bill of quantities (20)

Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software
Software Software
Software
 
Software presentation
Software presentationSoftware presentation
Software presentation
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software report-complete-final
Software report-complete-finalSoftware report-complete-final
Software report-complete-final
 
Autocad plant-3d
Autocad plant-3dAutocad plant-3d
Autocad plant-3d
 
Case study(i)
Case study(i)Case study(i)
Case study(i)
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
 
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRANComputer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
 
5 benefits of using cad program
5 benefits of using cad program5 benefits of using cad program
5 benefits of using cad program
 
6 weeks software training report
6 weeks software training report    6 weeks software training report
6 weeks software training report
 
Software Report
Software ReportSoftware Report
Software Report
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
 
Software Application report
Software Application reportSoftware Application report
Software Application report
 
Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02
 

Recently uploaded

Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 

Recently uploaded (20)

Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 

Bill of quantities

  • 1. Engineering College Civil Engineering Department Estimate the ownership cost Issued date 03/03/2020 Prepared by SAUD SELFIG SAUD ALSHLIKHI IBRAHIM ALASMAR FAYYADH ALANAZI BEDAIWI ISMAIL BEDAIWI ALRUWAILI Northern Border University
  • 2. • Abstract • Name of program. • How to use it. • Advantage & Disadvantage. • Take off software. • General Advantage & Disadvantage for the Software. Contents
  • 3. Abstract Construction take-off is a necessary step toward estimating costs in a construction project. Contractors and project managers use blueprints to calculate the quantity and measure of materials and supplies needed for the project. That information is then used in cost estimates, project proposals, and supply order forms. However, the process of generating the take-off data — pulling this detailed information from project plans — can be a very time consuming process for contractors. Traditionally, contractors have done this by hand using printed plans, rulers, calculators, and pencils. Fortunately for the modern contractor, companies have created take-off software to simplify and improve this process.
  • 4. Name of program. Excel / Estimating Software Integration – Most businesses and many contractors make use of Excel templates and other software to manage the estimating bidding process. Some take-off products, like Plan Swift, allow integration with Excel and some third party estimating software, so users can easily pull or send data from other programs , and nowadays the most desirable software is BIM software which can generate very precise take-off in appropriate construction way .
  • 5. How to Use it Start : Open QS File from your Drive. Click on the button to enter the program. Select what kind of take-off you need . For Example :Footings. Click on the Footings icon. Then , Find the take- off formulated Sheet. Launch to insert the footings parameters values such as : length , width , depth ..etc. . Then, the result will be appeared automatically to find out the required values . The result is showing the following : Weight of reinforcement (Ton, Kg) , volume of R.C & PC concrete(m3) related to the construction footings . Then, You can use the same process of footings take-off to repeat use the work flow for other disciplines such as : beams , columns , slabs . Afterthought, you can start inserting the cost value in order to measure the total construction budget for further project financiering requirements accordingly . Closing process
  • 6. Advantage & Disadvantage. Disadvantage ExcelAdvantage Excel Not Integrated to the Autodesk directlyEasy to use it . The result will be accurate , however might not be precise for somehow . Cheap in price , could everyone could accommodate the program cost . Could not easily find out the mistakes , so you need to search one by one to over come the errors occurred Simple in format , so everyone could understand it . User could not modify the formulas to manage the calculations. Direct forward program ,so ,simple and humble to insert the construction elements parameters with relevant values.
  • 8. Take Off Software cost construction take-off tools are some of the most transparently priced technologies a buyer will research. While broader construction project management solutions may have intricate pricing schemes, take-off providers will typically charge a flat fee to download the product or a monthly licensing fee for access to online products.
  • 9. General Advantage & Disadvantage for the Software Disadvantage Integrated with AutodeskAdvantage Integrated with Autodesk Expensive in price .Easy to use it and understandable . Required expert to use it with proper trainingIntegrated with all relevant associated Autodesk program Required always updating so , it needs always PDU’s to follow the update Wide and vary tools with smart interfaces User could not modify the formulas to manage the take-off .Precise results with related construction budgetary
  • 10. Reference: • https://proest.com/what-is-a-construction-takeoff/ • https://constructible.trimble.com/construction-industry/how-to-master-the- takeoff-in-construction-estimating • https://www.esticom.com/what-is-a-takeoff-in-construction/ • https://www.stackct.com/software/ • https://www.planswift.com/ • https://support.bluebeam.com/updates/