Beam Experiments to Investigate Loading
Protocol and Stop Criteria for Load Testing
Eva O.L. Lantsoght1,2, Yuguang Yang2, Dick Hordijk2
1 Politécnico, Universidad San Francisco de Quito, Quito, Ecuador
2 Concrete Structures, Faculty of Civil Engineering and Geosciences, Delft University of Technology, The Netherlands
Proof load testing research:
field testing
Laboratory testing:
beams
Results
Proof load testing in the Netherlands
To explore the possibility of using proof load testing for the assessment of existing
bridges, a number of pilot proof load tests on shear- and flexure-critical bridges,
with and without material degradation, were carried out [2].
Open questions after pilot tests
Which stop criteria should we use? Stop criteria [3, 4] are criteria based on the
structural response measurements. If a criterion is exceeded, the test needs to be
terminated. Further load could cause irreversible damage or collapse.
Which loading protocol should we use? How many load cycles per load level? At
which loading speed?
References
[1] Lantsoght EOL, van der Veen C, de Boer A,
Walraven JC (2013) Recommendations for the
Shear Assessment of Reinforced Concrete Slab
Bridges from Experiments. Structural Engineering
International, Vol. 23, Nr. 4, pp. 418-426
[2] Lantsoght EOL, Van der Veen C, De Boer A,
Hordijk DA (in press) Proof load testing of
reinforced concrete slab bridges in the
Netherlands. Structural Concrete.
[3] Deutscher Ausschuss für Stahlbeton (2000)
DAfStb-Guideline: Load tests on concrete
structures. Deutscher Ausschuss für Stahlbeton.
[4] ACI Committee 437 (2013) Code Requirements
for Load Testing of Existing Concrete Structures
(ACI 437.2M-13) and Commentary Farmington
Hills, MA.
What is proof load testing?
In a proof load test, a load representative of the factored live load is applied to the
bridge. If the structure can withstand the applied load without signs of distress, it
is experimentally shown that the bridge fulfills the loading requirements.
Why proof load testing?
Existing bridges often do not rate sufficient for the current live load models [1].
When uncertainties with regard to material degradation or the structural system
are large, proof load testing can be used.
Fig. 4: Vertical deformation
of a beam test
Fig. 2: Loading protocol followed for proof load
test on viaduct De Beek
Fig. 1: Load application methods: (a) loading
vehicle; (b) steel spreader beam with
counterweights
Fig. 5: Beam with instrumentation: grid of LVDTs,
lasers for vertical displacement, AE sensors
UNCRACKED CRACKED
Flexural
failure
εc < 0.8 ‰ – εc0
wmax ≤ 0.5 mm
wres ≤ 0.1 mm
wres < 0.3wmax
Stiffness reduction ≤ 25 %
Deformation profiles
Load-displacement graph
εc < 0.8 ‰ – εc0
wmax ≤ 0.5 mm
wres ≤ 0.1 mm
wres < 0.2wmax
Stiffness reduction ≤ 5 %
Deformation profiles
Load-displacement graph
Shear
failure
εc < 0.8 ‰ – εc0
wmax ≤ 0.3 mm
Stiffness reduction ≤ 5 %
Deformation profiles
Load-displacement graph
εc < 0.8 ‰ – εc0
Stiffness reduction ≤ 5 %
Deformation profiles
Load-displacement graph
Table 2: Overview of recommended stop criteria based on beam tests
Current
practice
• Codes: German
guideline [3] and ACI
437.2M-13 [4]
• Stop criteria for
flexure, not shear
• Developed for
buildings
Loading
protocol
Cyclic: repeatability and
linearity
Load levels: check linearity,
check measurements
Target proof load as
maximum load level
Parameters
• Loading speed
• Number of load cycles
• Rest time at peak
• Rest time at baseline
load
• Safe approach to higher
load level
Test
No.
Shear
span
(mm)
Effective
depth
(mm)
Shear
capacity
(kN)
Bending
capacity
(kN)
Tested
capacity
(kN)
Failure
mode
P804A1 3000 755 273 199 207 F
P804A2 2500 755 219 248 232 S
P804B1 2500 755 219 248 196 S
P502A2 1000 465 150 154 150 F
Table 1: Overview of tested beams
Fig. 6: Recommended loading protocol
Recommendations
Stop criteria depending on failure mode,
See Table 2.
Four load levels, see Fig. 6: lowest level to
check functioning of sensors, serviceability
limit state, interim level, target proof load
Fig. 3: Stiffness reduction
with load cycles
(a)

More Related Content

What's hot

Application of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt BridgeApplication of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt BridgeEva Lantsoght
 
Load testing of reinforced concrete bridges in the Netherlands
Load testing of reinforced concrete bridges in the NetherlandsLoad testing of reinforced concrete bridges in the Netherlands
Load testing of reinforced concrete bridges in the NetherlandsEva Lantsoght
 
Defining loading criteria for proof loading
Defining loading criteria for proof loading Defining loading criteria for proof loading
Defining loading criteria for proof loading Eva Lantsoght
 
Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Eva Lantsoght
 
Proof load testing of the viaduct De Beek
Proof load testing of the viaduct De BeekProof load testing of the viaduct De Beek
Proof load testing of the viaduct De BeekEva Lantsoght
 
Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Eva Lantsoght
 
Improved formulation for compressive fatigue strength of concrete
Improved formulation for compressive fatigue strength of concreteImproved formulation for compressive fatigue strength of concrete
Improved formulation for compressive fatigue strength of concreteEva Lantsoght
 
Proof load testing of viaduct De Beek
Proof load testing of viaduct De BeekProof load testing of viaduct De Beek
Proof load testing of viaduct De BeekEva Lantsoght
 
Load testing of structures
Load testing of structuresLoad testing of structures
Load testing of structuresEva Lantsoght
 
Shear and moment capacity of the Ruytenschildt Bridge
Shear and moment capacity of the Ruytenschildt BridgeShear and moment capacity of the Ruytenschildt Bridge
Shear and moment capacity of the Ruytenschildt BridgeEva Lantsoght
 
Assessment of slab bridges through proof loading in the Netherlands
Assessment of slab bridges through proof loading in the NetherlandsAssessment of slab bridges through proof loading in the Netherlands
Assessment of slab bridges through proof loading in the NetherlandsEva Lantsoght
 
Load testing of structures
Load testing of structuresLoad testing of structures
Load testing of structuresEva Lantsoght
 
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...Eva Lantsoght
 
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...Eva Lantsoght
 
Practical Application of Transverse Load Redistribution in Reinforced Concret...
Practical Application of Transverse Load Redistribution in Reinforced Concret...Practical Application of Transverse Load Redistribution in Reinforced Concret...
Practical Application of Transverse Load Redistribution in Reinforced Concret...Eva Lantsoght
 
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...Eva Lantsoght
 
Shear Assessment of Slab Bridges
Shear Assessment of Slab BridgesShear Assessment of Slab Bridges
Shear Assessment of Slab BridgesEva Lantsoght
 
Shear testing of prestressed concrete girders
Shear testing of prestressed concrete girdersShear testing of prestressed concrete girders
Shear testing of prestressed concrete girdersEva Lantsoght
 
The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...Eva Lantsoght
 

What's hot (20)

Application of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt BridgeApplication of Modified Bond Model to the capacity of Ruytenschildt Bridge
Application of Modified Bond Model to the capacity of Ruytenschildt Bridge
 
Load testing of reinforced concrete bridges in the Netherlands
Load testing of reinforced concrete bridges in the NetherlandsLoad testing of reinforced concrete bridges in the Netherlands
Load testing of reinforced concrete bridges in the Netherlands
 
Defining loading criteria for proof loading
Defining loading criteria for proof loading Defining loading criteria for proof loading
Defining loading criteria for proof loading
 
Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...
 
Proof load testing of the viaduct De Beek
Proof load testing of the viaduct De BeekProof load testing of the viaduct De Beek
Proof load testing of the viaduct De Beek
 
Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...
 
Improved formulation for compressive fatigue strength of concrete
Improved formulation for compressive fatigue strength of concreteImproved formulation for compressive fatigue strength of concrete
Improved formulation for compressive fatigue strength of concrete
 
Proof load testing of viaduct De Beek
Proof load testing of viaduct De BeekProof load testing of viaduct De Beek
Proof load testing of viaduct De Beek
 
Load testing of structures
Load testing of structuresLoad testing of structures
Load testing of structures
 
Shear and moment capacity of the Ruytenschildt Bridge
Shear and moment capacity of the Ruytenschildt BridgeShear and moment capacity of the Ruytenschildt Bridge
Shear and moment capacity of the Ruytenschildt Bridge
 
Assessment of slab bridges through proof loading in the Netherlands
Assessment of slab bridges through proof loading in the NetherlandsAssessment of slab bridges through proof loading in the Netherlands
Assessment of slab bridges through proof loading in the Netherlands
 
Load testing of structures
Load testing of structuresLoad testing of structures
Load testing of structures
 
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
Assessment of the Shear Capacity of Existing Reinforced Concrete Solid Slab B...
 
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
Applying Experimental Results to the Shear Assessment Method for Solid Slab B...
 
Practical Application of Transverse Load Redistribution in Reinforced Concret...
Practical Application of Transverse Load Redistribution in Reinforced Concret...Practical Application of Transverse Load Redistribution in Reinforced Concret...
Practical Application of Transverse Load Redistribution in Reinforced Concret...
 
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
Recommendations for the Shear Assessment of Reinforced Concrete Solid Slab Br...
 
Shear Assessment of Slab Bridges
Shear Assessment of Slab BridgesShear Assessment of Slab Bridges
Shear Assessment of Slab Bridges
 
Shear testing of prestressed concrete girders
Shear testing of prestressed concrete girdersShear testing of prestressed concrete girders
Shear testing of prestressed concrete girders
 
Lekenpraatje
Lekenpraatje Lekenpraatje
Lekenpraatje
 
The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...The adventures of a concrete researcher - or how I ended up breaking bridges ...
The adventures of a concrete researcher - or how I ended up breaking bridges ...
 

Similar to Beam experiments to investigate loading protocol and stop criteria for load testing

Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...Eva Lantsoght
 
Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Sirris
 
Challenges in Heavy Manufacturing Part III: Fatigue Performance
Challenges in Heavy Manufacturing Part III: Fatigue PerformanceChallenges in Heavy Manufacturing Part III: Fatigue Performance
Challenges in Heavy Manufacturing Part III: Fatigue PerformanceEWI
 
Capacity ruytenschildtbrug
Capacity ruytenschildtbrug Capacity ruytenschildtbrug
Capacity ruytenschildtbrug Eva Lantsoght
 
Non destructive test
Non destructive test   Non destructive test
Non destructive test NIRAV SHAH
 
Non destructive test in building construction
Non destructive test in building construction Non destructive test in building construction
Non destructive test in building construction Aditya Sanyal
 
Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...
Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...
Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...Eva Lantsoght
 
Shear and Moment Capacity of the Ruytenschildt Bridge
Shear and Moment Capacity of the Ruytenschildt BridgeShear and Moment Capacity of the Ruytenschildt Bridge
Shear and Moment Capacity of the Ruytenschildt BridgeEva Lantsoght
 
Shear band test procedure
Shear band test procedureShear band test procedure
Shear band test procedurelasinthadeba
 
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...IRJET Journal
 
MastersCreepMachinesReport_v1
MastersCreepMachinesReport_v1MastersCreepMachinesReport_v1
MastersCreepMachinesReport_v1Tobias Reichold
 
Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...
Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...
Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...IRJET Journal
 
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET Journal
 
Non Destructive Test's on Concrete Building
Non Destructive Test's on Concrete BuildingNon Destructive Test's on Concrete Building
Non Destructive Test's on Concrete BuildingAbiramiP6
 
SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...
SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...
SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...SMART Infrastructure Facility
 
Design of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A reviewDesign of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A reviewIRJET Journal
 
Sellountou evalaución integridad de pilotes
Sellountou   evalaución integridad de pilotesSellountou   evalaución integridad de pilotes
Sellountou evalaución integridad de pilotescfpbolivia
 

Similar to Beam experiments to investigate loading protocol and stop criteria for load testing (20)

Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...Load rating using load testing: introducing the new bridge load testing e-cir...
Load rating using load testing: introducing the new bridge load testing e-cir...
 
Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...
 
Challenges in Heavy Manufacturing Part III: Fatigue Performance
Challenges in Heavy Manufacturing Part III: Fatigue PerformanceChallenges in Heavy Manufacturing Part III: Fatigue Performance
Challenges in Heavy Manufacturing Part III: Fatigue Performance
 
Risk Mitigation for Highway and Railway Bridges
Risk Mitigation for Highway and Railway BridgesRisk Mitigation for Highway and Railway Bridges
Risk Mitigation for Highway and Railway Bridges
 
Capacity ruytenschildtbrug
Capacity ruytenschildtbrug Capacity ruytenschildtbrug
Capacity ruytenschildtbrug
 
Non destructive test
Non destructive test   Non destructive test
Non destructive test
 
Non destructive test in building construction
Non destructive test in building construction Non destructive test in building construction
Non destructive test in building construction
 
K04402070075
K04402070075K04402070075
K04402070075
 
J04402063069
J04402063069J04402063069
J04402063069
 
Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...
Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...
Effective Width in Shear of Reinforced Concrete Solid Slab Bridges under Whee...
 
Shear and Moment Capacity of the Ruytenschildt Bridge
Shear and Moment Capacity of the Ruytenschildt BridgeShear and Moment Capacity of the Ruytenschildt Bridge
Shear and Moment Capacity of the Ruytenschildt Bridge
 
Shear band test procedure
Shear band test procedureShear band test procedure
Shear band test procedure
 
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
 
MastersCreepMachinesReport_v1
MastersCreepMachinesReport_v1MastersCreepMachinesReport_v1
MastersCreepMachinesReport_v1
 
Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...
Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...
Analytical study on behaviour of RCC Solid Wall panel and RCC Central opening...
 
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
 
Non Destructive Test's on Concrete Building
Non Destructive Test's on Concrete BuildingNon Destructive Test's on Concrete Building
Non Destructive Test's on Concrete Building
 
SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...
SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...
SMART Seminar Series: "Risk-based bridge assessment under changing load-deman...
 
Design of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A reviewDesign of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A review
 
Sellountou evalaución integridad de pilotes
Sellountou   evalaución integridad de pilotesSellountou   evalaución integridad de pilotes
Sellountou evalaución integridad de pilotes
 

More from Eva Lantsoght

Coneic presentation 2020
Coneic presentation 2020Coneic presentation 2020
Coneic presentation 2020Eva Lantsoght
 
Pruebas de cortante en vigas postensadas
Pruebas de cortante en vigas postensadasPruebas de cortante en vigas postensadas
Pruebas de cortante en vigas postensadasEva Lantsoght
 
Pruebas de carga en puentes de hormigón armado
Pruebas de carga en puentes de hormigón armadoPruebas de carga en puentes de hormigón armado
Pruebas de carga en puentes de hormigón armadoEva Lantsoght
 
El futuro del hormigon
El futuro del hormigonEl futuro del hormigon
El futuro del hormigonEva Lantsoght
 
The road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesThe road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesEva Lantsoght
 
Como evaluar la capacidad de puentes de hormigón existentes?
Como evaluar la capacidad de puentes de hormigón existentes?Como evaluar la capacidad de puentes de hormigón existentes?
Como evaluar la capacidad de puentes de hormigón existentes?Eva Lantsoght
 
Inspeccion, mantenimiento y evaluacion de puentes de hormigon
Inspeccion, mantenimiento y evaluacion de puentes de hormigonInspeccion, mantenimiento y evaluacion de puentes de hormigon
Inspeccion, mantenimiento y evaluacion de puentes de hormigonEva Lantsoght
 
10 Planning Concepts I wish I'd known Before my PhD
10 Planning Concepts I wish I'd known Before my PhD10 Planning Concepts I wish I'd known Before my PhD
10 Planning Concepts I wish I'd known Before my PhDEva Lantsoght
 
Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Eva Lantsoght
 
Diagnostic load testing of bridges - case studies
Diagnostic load testing of bridges - case studies Diagnostic load testing of bridges - case studies
Diagnostic load testing of bridges - case studies Eva Lantsoght
 
Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...Eva Lantsoght
 
Sound in engineering
Sound in engineeringSound in engineering
Sound in engineeringEva Lantsoght
 
Pruebas de carga en puentes de hormigon armado
Pruebas de carga en puentes de hormigon armado Pruebas de carga en puentes de hormigon armado
Pruebas de carga en puentes de hormigon armado Eva Lantsoght
 
Bridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabsBridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabsEva Lantsoght
 

More from Eva Lantsoght (15)

Coneic presentation 2020
Coneic presentation 2020Coneic presentation 2020
Coneic presentation 2020
 
Pruebas de cortante en vigas postensadas
Pruebas de cortante en vigas postensadasPruebas de cortante en vigas postensadas
Pruebas de cortante en vigas postensadas
 
Pruebas de carga en puentes de hormigón armado
Pruebas de carga en puentes de hormigón armadoPruebas de carga en puentes de hormigón armado
Pruebas de carga en puentes de hormigón armado
 
El futuro del hormigon
El futuro del hormigonEl futuro del hormigon
El futuro del hormigon
 
The road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesThe road to breaking bridges and stereotypes
The road to breaking bridges and stereotypes
 
Como evaluar la capacidad de puentes de hormigón existentes?
Como evaluar la capacidad de puentes de hormigón existentes?Como evaluar la capacidad de puentes de hormigón existentes?
Como evaluar la capacidad de puentes de hormigón existentes?
 
Inspeccion, mantenimiento y evaluacion de puentes de hormigon
Inspeccion, mantenimiento y evaluacion de puentes de hormigonInspeccion, mantenimiento y evaluacion de puentes de hormigon
Inspeccion, mantenimiento y evaluacion de puentes de hormigon
 
10 Planning Concepts I wish I'd known Before my PhD
10 Planning Concepts I wish I'd known Before my PhD10 Planning Concepts I wish I'd known Before my PhD
10 Planning Concepts I wish I'd known Before my PhD
 
Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...
 
Diagnostic load testing of bridges - case studies
Diagnostic load testing of bridges - case studies Diagnostic load testing of bridges - case studies
Diagnostic load testing of bridges - case studies
 
Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...Stop criteria for proof load tests verified with field and laboratory testing...
Stop criteria for proof load tests verified with field and laboratory testing...
 
CV Eva Lantsoght
CV Eva LantsoghtCV Eva Lantsoght
CV Eva Lantsoght
 
Sound in engineering
Sound in engineeringSound in engineering
Sound in engineering
 
Pruebas de carga en puentes de hormigon armado
Pruebas de carga en puentes de hormigon armado Pruebas de carga en puentes de hormigon armado
Pruebas de carga en puentes de hormigon armado
 
Bridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabsBridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabs
 

Recently uploaded

Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 

Recently uploaded (20)

Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 

Beam experiments to investigate loading protocol and stop criteria for load testing

  • 1. Beam Experiments to Investigate Loading Protocol and Stop Criteria for Load Testing Eva O.L. Lantsoght1,2, Yuguang Yang2, Dick Hordijk2 1 Politécnico, Universidad San Francisco de Quito, Quito, Ecuador 2 Concrete Structures, Faculty of Civil Engineering and Geosciences, Delft University of Technology, The Netherlands Proof load testing research: field testing Laboratory testing: beams Results Proof load testing in the Netherlands To explore the possibility of using proof load testing for the assessment of existing bridges, a number of pilot proof load tests on shear- and flexure-critical bridges, with and without material degradation, were carried out [2]. Open questions after pilot tests Which stop criteria should we use? Stop criteria [3, 4] are criteria based on the structural response measurements. If a criterion is exceeded, the test needs to be terminated. Further load could cause irreversible damage or collapse. Which loading protocol should we use? How many load cycles per load level? At which loading speed? References [1] Lantsoght EOL, van der Veen C, de Boer A, Walraven JC (2013) Recommendations for the Shear Assessment of Reinforced Concrete Slab Bridges from Experiments. Structural Engineering International, Vol. 23, Nr. 4, pp. 418-426 [2] Lantsoght EOL, Van der Veen C, De Boer A, Hordijk DA (in press) Proof load testing of reinforced concrete slab bridges in the Netherlands. Structural Concrete. [3] Deutscher Ausschuss für Stahlbeton (2000) DAfStb-Guideline: Load tests on concrete structures. Deutscher Ausschuss für Stahlbeton. [4] ACI Committee 437 (2013) Code Requirements for Load Testing of Existing Concrete Structures (ACI 437.2M-13) and Commentary Farmington Hills, MA. What is proof load testing? In a proof load test, a load representative of the factored live load is applied to the bridge. If the structure can withstand the applied load without signs of distress, it is experimentally shown that the bridge fulfills the loading requirements. Why proof load testing? Existing bridges often do not rate sufficient for the current live load models [1]. When uncertainties with regard to material degradation or the structural system are large, proof load testing can be used. Fig. 4: Vertical deformation of a beam test Fig. 2: Loading protocol followed for proof load test on viaduct De Beek Fig. 1: Load application methods: (a) loading vehicle; (b) steel spreader beam with counterweights Fig. 5: Beam with instrumentation: grid of LVDTs, lasers for vertical displacement, AE sensors UNCRACKED CRACKED Flexural failure εc < 0.8 ‰ – εc0 wmax ≤ 0.5 mm wres ≤ 0.1 mm wres < 0.3wmax Stiffness reduction ≤ 25 % Deformation profiles Load-displacement graph εc < 0.8 ‰ – εc0 wmax ≤ 0.5 mm wres ≤ 0.1 mm wres < 0.2wmax Stiffness reduction ≤ 5 % Deformation profiles Load-displacement graph Shear failure εc < 0.8 ‰ – εc0 wmax ≤ 0.3 mm Stiffness reduction ≤ 5 % Deformation profiles Load-displacement graph εc < 0.8 ‰ – εc0 Stiffness reduction ≤ 5 % Deformation profiles Load-displacement graph Table 2: Overview of recommended stop criteria based on beam tests Current practice • Codes: German guideline [3] and ACI 437.2M-13 [4] • Stop criteria for flexure, not shear • Developed for buildings Loading protocol Cyclic: repeatability and linearity Load levels: check linearity, check measurements Target proof load as maximum load level Parameters • Loading speed • Number of load cycles • Rest time at peak • Rest time at baseline load • Safe approach to higher load level Test No. Shear span (mm) Effective depth (mm) Shear capacity (kN) Bending capacity (kN) Tested capacity (kN) Failure mode P804A1 3000 755 273 199 207 F P804A2 2500 755 219 248 232 S P804B1 2500 755 219 248 196 S P502A2 1000 465 150 154 150 F Table 1: Overview of tested beams Fig. 6: Recommended loading protocol Recommendations Stop criteria depending on failure mode, See Table 2. Four load levels, see Fig. 6: lowest level to check functioning of sensors, serviceability limit state, interim level, target proof load Fig. 3: Stiffness reduction with load cycles (a)