BEAM
- SAGAR GOTAWALA
- MIKIL VANKAWALA
- KAUSHAL PATEL
- MALINI GAJJAR
- ARMI RAVANI
BEAM
• LOCATION – DEV BHOOMI,VESU
• BEAM - FIRST FLOOR LEVEL
Beam (R grinda) heavy main support element made of CONCRETE , steel,
or wood and running horizontally between columns or load bearing walls.
It may be supported at one, two or more points, but not throughout its length.
• wood in planks or
strips used as a
temporary
structure to
contain setting
concrete, to
support the sides
of trenches, or
similar.
SHUTTERING
CENTERING
• The action or process of placing something in
the middle of something else.
Topi
Bottom
Shikanja
Lafa
sides
Element of beam formwork
Cover
Cover mm
Botto
m
25mm
Side 15mm
PROCESS OF BEAM CASTING
 DAY -1
 Formwork for beam
 Topi fixed at column.
 Support with bottom.
DAY -2
• fixing of beam sides ,
• fixing of pins for depth of beam ,
DAY -3
• fixing of plates of slab ,
• with surrounding sides of beam ,
• Bentup bar
800 mm
• stirrups
• DAY -4
• preparation of steel frame of beam,
top steel bar,
bottom steel bar,
bentup bar ,
extra bar ,
or fixing in the formwork
of beam with covering.
Top Bar
20 mm Stirrups
8mm
Bottom
Steel detail of beam
5. Centering for slab steel
main steel,
distribution steel,
bentup steel with covering.
6. Check by architect or engineer
then POURING of concrete.
7. After next day remove sides of
beam,
after 7 days, remove plates of
slab
after 10 days remove bottom
of beam.
HOW TO
MAINTAIN
DEPTH
OF BEAM

Beam

  • 1.
    BEAM - SAGAR GOTAWALA -MIKIL VANKAWALA - KAUSHAL PATEL - MALINI GAJJAR - ARMI RAVANI
  • 2.
    BEAM • LOCATION –DEV BHOOMI,VESU • BEAM - FIRST FLOOR LEVEL
  • 3.
    Beam (R grinda)heavy main support element made of CONCRETE , steel, or wood and running horizontally between columns or load bearing walls. It may be supported at one, two or more points, but not throughout its length.
  • 4.
    • wood inplanks or strips used as a temporary structure to contain setting concrete, to support the sides of trenches, or similar. SHUTTERING
  • 5.
    CENTERING • The actionor process of placing something in the middle of something else.
  • 7.
    Topi Bottom Shikanja Lafa sides Element of beamformwork Cover Cover mm Botto m 25mm Side 15mm
  • 8.
    PROCESS OF BEAMCASTING  DAY -1  Formwork for beam  Topi fixed at column.  Support with bottom.
  • 9.
    DAY -2 • fixingof beam sides , • fixing of pins for depth of beam ,
  • 10.
    DAY -3 • fixingof plates of slab , • with surrounding sides of beam ,
  • 11.
  • 12.
  • 13.
    • DAY -4 •preparation of steel frame of beam, top steel bar, bottom steel bar, bentup bar , extra bar , or fixing in the formwork of beam with covering. Top Bar 20 mm Stirrups 8mm Bottom
  • 14.
  • 15.
    5. Centering forslab steel main steel, distribution steel, bentup steel with covering. 6. Check by architect or engineer then POURING of concrete. 7. After next day remove sides of beam, after 7 days, remove plates of slab after 10 days remove bottom of beam.
  • 16.