Formwork Types and Components for Concrete Construction
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11. All arrangement done to
support the green
concrete till it attains the
strength is known as
form work or temporary
work.
Form work determines
the geometry,shape.size
and finish of the form
work.
12. Part of the form work
which supports the
horizontal surface is
called centering for
example slab
bottom , beam
bottom etc
13. Part of the form work
which supports the
Vertical surface is
called Shuttering for
example column
sides, beam sides,slab
side ,wall side etc.
14. That portion which
support centering &
shuttering is called
Staging. This can be :
Wooden Ballies
Pipes/Props/Jacks
H frames
Space frames using
Coupler / Cup-Lock
system
15. That arrangement which
is meant to be a
supporting platform for
people
( labor , supervisor,
mason
,fitter,painter,carpenter
etc. ) is known as
scaffolding.
16. Shuttering is the temporary ancillary
construction used as a mould for the
structures In which the concrete is placed
and allowed to hardened
17. These are classified
as
steel
wooden plywood
combined woods
steel
18. The material should be cheap and should be
suitable for re use several times
It should be practically water proof so that it
should not observe water from concrete
It should be strong enough to with stand all loads
coming on it
It should be stiff enough so that deflection is
minimum
The surface of the formwork should smooth and it
should afford easy stripping
19. Live load due to labor etc
Dead weight of wet concrete
Hydrostatic pressure of the fluid concrete
Impact due to pouring concrete