CANTILEVER BRIDGE
• A cantilever bridge is a bridge built
using cantilevers, structures that project
horizontally into space, supported on only one end.
For small footbridges, the cantilevers may be
simple beams; however, large cantilever bridges
designed to handle road or rail traffic
use trusses built from structural steel, or box
girders built from prestressed concrete.
• A cantilever bridge is a specific type of bridge. It is
called a cantilever bridge because it is built using
cantilevers.
• A cantilever is a structure that is only anchored at
one of its ends. Its other end projects horizontally
into space, and it is this end that helps support the
bridge.
TYPES OF CANTILEVER BRIDGE
• BALANCED CANTILEVER BRIDGES
• CONTINUOUS CANTILEVER BRIDGES
BALANCED CANTILEVER BRIDGE
• The Balanced Cantilever Method refers to a construction
method that does not install scaffolding systems under the
bridge and completes the superstructure of the bridge by
sequentially joining the segments to form a span by post-
tensioning and balancing them left and right from each
pier using special erection equipment.
• The balanced cantilever method can be largely classified as
Cast-in-Place Cantilever Method and Precast Cantilever
Method.
• Due to lack of supporting piers in the Cantilever Bridges, it
gives extra flexibility to the style and geometry of the
highway supported by this Bridge.
CONTINUOUS CANTILEVER BRIDGES
• The continuous cantilever bridge is a truss type of
bridge that extends across three or more supports
without hinges or joints.
• It is highly simplified but it will explain the basic
concepts, similar to a normal beam.
• Analysis of a cantilever span with a back span is
illustrated to expose the load distribution.
OBJECTIVES
To reduce the total weight of the long-span
cantilever bridges, lightweight concrete is also
sometimes used in the construction of the
Cantilever Bridges.
FUNCTIONS
Cantilever Bridge.- A structure at least one
portion of which acts as an anchorage for
sustaining another portion which extends
beyond the supporting pier. A simple cantilever
span is formed by two cantilever arms
extending from opposite sides of an obstacle to
be crossed, meeting at the center.
THE PROS OF CANTILEVER BRIDGES
In the construction of the Cantilever bridges, the falsework is not required.
Cantilever bridges can higher withstand the effects of Thermal Expansion.
Cantilever bridges are suitable for the longest span.
Due to lack of supporting piers in the Cantilever Bridges, it gives extra flexibility to the style and geometry of the highway
supported by this Bridge.
The cantilever bridges are suitable for deep Rocky valleys and flood-prone areas where falsework is not possible.
In the construction of cantilever bridges, support is required on only one side of its cantilever.
THE CONS OF CANTILEVER BRIDGES
Cantilever Bridges experience a high amount of tension during the construction,
which is known as a Negative moment.
Cantilever bridges to take care of its stability by balancing between compressive
as well as tensile forces acting on it.
Cantilever bridges are heavy, so it required larger and stronger support.
Cantilever bridges are not suitable for Earthquake-prone areas.
Construction of cantilever bridges is not suitable for excessive climate conditions.
Construction and the Maintenance of the Cantilever bridges are complex.
USES OF CANTILEVER BRIDGE
This type of bridge has been used for pedestrians, trains,
and motor vehicles. Cantilevers are especially useful for
spanning a waterway without dividing it with river piers.
But here this bridge is used for crossing the Metro viaduct
over railway tracks.
BALANCED CANTILEVER
METRO BRIDGE
• The Balanced Cantilever Bridge
near Anand Talkies has a length of
231.2 meter and has 3 spans.
• The cantilever Bridge is at a height
of 22 meter from ground.
• Original proposal for the railway
crossing was 87meter span with
Open Web Girder (OWG).
• Central Railway asked Maha
Metro to increase the span to 100
meter so that their future
expansion plans were not
affected.
• Due to the increased length, the alignment of
OWG came on the curved portion, which requires
several temporary staging supports and
temporary land OWG requires heavy cranes,
trained manpower and longer traffic and power
blocks of minimum 4 to 5 hour duration.
• Maha Metro then came out with a solution of
replacing the OWG with Balanced Cantilever
Bridge Work on the balanced cantilever was
started on May 1, 2019.
• It was completed on September 27, 2021.
• Covid-19 pandemic led to exodus of construction
workers in 2020 and 2021.
• However, Maha Metro continued its work under
adverse circumstances Railway blocks were
available for 3 hours at night due to heavy
traffic.
• Maha Metro completed necessary work within
this short duration.
• Insulation sheets and fire blankets were used at
the time of construction work to prevent mishaps
due to railway’s high tension (HT) lines.
• The construction of the cantilever including
movement of form travelers during railway
blocks was completely mishap free.
THANK YOU
References taken from
https://themetrorailgu
y.com/
https://civiljungle.com
/
https://en.wikipedia.or
g/

More Related Content

Similar to Balanced Cantilever metro bridge.pptx

Southeast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, ChinaSoutheast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
T.Y. Lin International
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
Rajesh Prasad
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
ASHOK KUMAR
 
Seminar on cable stayed bridge
Seminar on cable stayed bridgeSeminar on cable stayed bridge
Seminar on cable stayed bridge
Sujeet Rajput
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptx
SanjeevGupta660170
 
Cable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioningCable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioning
ChinnuNinan
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)
Mohamed Yassin
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge construction
Kundan Sanap
 
Bridge introduction
Bridge introductionBridge introduction
Bridge introduction
Patel Mitulkumar
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
SAI KIRAN
 
Bridge Engg1.ppt
Bridge Engg1.pptBridge Engg1.ppt
Bridge Engg1.ppt
PrashanthKumar491454
 
CHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design engCHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design eng
abdi beder
 
Bridge intr.ppt
Bridge intr.pptBridge intr.ppt
Bridge intr.ppt
MaheshKalyanshetti2
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
Aglaia Connect
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
SauravShahane
 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,b
Mani Das
 
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptxSuspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptx
samratr1103
 
bridges overview.pptx
bridges overview.pptxbridges overview.pptx
bridges overview.pptx
Dr. Ezzat Elsayed Gomaa
 
Bridge introduction-8th-civil
Bridge introduction-8th-civilBridge introduction-8th-civil
Bridge introduction-8th-civil
Assad ULlah
 

Similar to Balanced Cantilever metro bridge.pptx (20)

Southeast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, ChinaSoutheast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
 
Seminar on cable stayed bridge
Seminar on cable stayed bridgeSeminar on cable stayed bridge
Seminar on cable stayed bridge
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptx
 
Cable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioningCable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioning
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge construction
 
Bridge introduction
Bridge introductionBridge introduction
Bridge introduction
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Bridge Engg1.ppt
Bridge Engg1.pptBridge Engg1.ppt
Bridge Engg1.ppt
 
CHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design engCHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design eng
 
Bridge intr.ppt
Bridge intr.pptBridge intr.ppt
Bridge intr.ppt
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,b
 
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptxSuspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptx
 
bridges overview.pptx
bridges overview.pptxbridges overview.pptx
bridges overview.pptx
 
Bridge introduction-8th-civil
Bridge introduction-8th-civilBridge introduction-8th-civil
Bridge introduction-8th-civil
 

Recently uploaded

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 

Recently uploaded (20)

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 

Balanced Cantilever metro bridge.pptx

  • 1. GOVERNMENT POLYTECHNIC, NAGPUR SEMINAR (SE401E) DEPARTMENT OF CIVIL ENGINEERING (SHIFT 2) Guided By :- A. V. GIRADKAR SIR • Name :- LALIT INGOLE • Enrollment No :- 1921020 • Topic Name :- BALANCED CANTILEVER METRO BRIDGE.
  • 2. CONTENTS INTRODUCTION OBJECTIVES FUNCTIONS PROS AND CONS APPLICATIONS CONCLUSION
  • 3. CANTILEVER BRIDGE • A cantilever bridge is a bridge built using cantilevers, structures that project horizontally into space, supported on only one end. For small footbridges, the cantilevers may be simple beams; however, large cantilever bridges designed to handle road or rail traffic use trusses built from structural steel, or box girders built from prestressed concrete. • A cantilever bridge is a specific type of bridge. It is called a cantilever bridge because it is built using cantilevers. • A cantilever is a structure that is only anchored at one of its ends. Its other end projects horizontally into space, and it is this end that helps support the bridge.
  • 4. TYPES OF CANTILEVER BRIDGE • BALANCED CANTILEVER BRIDGES • CONTINUOUS CANTILEVER BRIDGES
  • 5. BALANCED CANTILEVER BRIDGE • The Balanced Cantilever Method refers to a construction method that does not install scaffolding systems under the bridge and completes the superstructure of the bridge by sequentially joining the segments to form a span by post- tensioning and balancing them left and right from each pier using special erection equipment. • The balanced cantilever method can be largely classified as Cast-in-Place Cantilever Method and Precast Cantilever Method. • Due to lack of supporting piers in the Cantilever Bridges, it gives extra flexibility to the style and geometry of the highway supported by this Bridge.
  • 6. CONTINUOUS CANTILEVER BRIDGES • The continuous cantilever bridge is a truss type of bridge that extends across three or more supports without hinges or joints. • It is highly simplified but it will explain the basic concepts, similar to a normal beam. • Analysis of a cantilever span with a back span is illustrated to expose the load distribution.
  • 7. OBJECTIVES To reduce the total weight of the long-span cantilever bridges, lightweight concrete is also sometimes used in the construction of the Cantilever Bridges.
  • 8. FUNCTIONS Cantilever Bridge.- A structure at least one portion of which acts as an anchorage for sustaining another portion which extends beyond the supporting pier. A simple cantilever span is formed by two cantilever arms extending from opposite sides of an obstacle to be crossed, meeting at the center.
  • 9.
  • 10. THE PROS OF CANTILEVER BRIDGES In the construction of the Cantilever bridges, the falsework is not required. Cantilever bridges can higher withstand the effects of Thermal Expansion. Cantilever bridges are suitable for the longest span. Due to lack of supporting piers in the Cantilever Bridges, it gives extra flexibility to the style and geometry of the highway supported by this Bridge. The cantilever bridges are suitable for deep Rocky valleys and flood-prone areas where falsework is not possible. In the construction of cantilever bridges, support is required on only one side of its cantilever.
  • 11. THE CONS OF CANTILEVER BRIDGES Cantilever Bridges experience a high amount of tension during the construction, which is known as a Negative moment. Cantilever bridges to take care of its stability by balancing between compressive as well as tensile forces acting on it. Cantilever bridges are heavy, so it required larger and stronger support. Cantilever bridges are not suitable for Earthquake-prone areas. Construction of cantilever bridges is not suitable for excessive climate conditions. Construction and the Maintenance of the Cantilever bridges are complex.
  • 12. USES OF CANTILEVER BRIDGE This type of bridge has been used for pedestrians, trains, and motor vehicles. Cantilevers are especially useful for spanning a waterway without dividing it with river piers. But here this bridge is used for crossing the Metro viaduct over railway tracks.
  • 13. BALANCED CANTILEVER METRO BRIDGE • The Balanced Cantilever Bridge near Anand Talkies has a length of 231.2 meter and has 3 spans. • The cantilever Bridge is at a height of 22 meter from ground. • Original proposal for the railway crossing was 87meter span with Open Web Girder (OWG). • Central Railway asked Maha Metro to increase the span to 100 meter so that their future expansion plans were not affected.
  • 14. • Due to the increased length, the alignment of OWG came on the curved portion, which requires several temporary staging supports and temporary land OWG requires heavy cranes, trained manpower and longer traffic and power blocks of minimum 4 to 5 hour duration. • Maha Metro then came out with a solution of replacing the OWG with Balanced Cantilever Bridge Work on the balanced cantilever was started on May 1, 2019. • It was completed on September 27, 2021. • Covid-19 pandemic led to exodus of construction workers in 2020 and 2021. • However, Maha Metro continued its work under adverse circumstances Railway blocks were available for 3 hours at night due to heavy traffic. • Maha Metro completed necessary work within this short duration. • Insulation sheets and fire blankets were used at the time of construction work to prevent mishaps due to railway’s high tension (HT) lines. • The construction of the cantilever including movement of form travelers during railway blocks was completely mishap free.