Automated
 UI Testing
Done Right
Mehdi Khalili
Senior Developer at Readify

Active Open Source Projects:
  • BDDfy
  • Seleno
  • Humanizer

Blog: www.mehdi-khalili.com
Twitter: @MehdiKhalili
These practices are performed by
professional developers and testers.

Please DO try this at home

Authorized and written by Mehdi Khalili
framework agnostic ideas and patterns
can apply these with any
UI and UI Testing framework
… but for this talk we are going to use
Selenium
an awesome automated UI testing
         framework
Selenium
   http://seleniumhq.org/projects/webdriver/




PM> Install-Package Selenium.WebDriver
BDDfy
A simple BDD framework to use and extend!
   BDDfy turns your traditional unit tests
           into BDD behaviours
BDDfy
 http://teststack.github.com/TestStack.BDDfy/




PM> Install-Package TestStack.BDDfy
Seleno
  helps you write
Automated UI Tests
  the RIGHT way!
Seleno
  http://teststack.github.com/TestStack.Seleno/




PM> Install-Package TestStack.Seleno
samples are from Seleno
codebase and can be found at
 https://github.com/TestStack/TestStack.Seleno
In a nutshell


•   UI Testing: a likely failure
•   From horrid to awesome in three steps
•   A few tips (time permitting)
•   Q&A
UI Testing!
a likely failure
speaking of
experience
a lot of teams
      do
  UI Testing
a lot of teams
have a “great start” at
      UI Testing
a lot of teams
then struggle with
    UI Testing
a lot of teams
  then fail at
   UI Testing
because   UI Tests are
because   UI Tests are
hard to maintain
because   UI Tests are
     brittle
but

  you can
mitigate
these issues
If you

 do it
RIGHT
test code
    is
  code
apply
S.R.P.
on your
code?
apply
S.R.P.
on your
tests
apply
D.R.Y.
on your
tests
care about your
tests as much as
you care about your
      code
or you will
waste a lot of time
or you will
   fail
from horrid to awesome
      in four three steps
a quick look
          at the sample

https://github.com/TestStack/TestStack.Seleno
guaranteed to
  fail
procedural
duplicated logic
duplicated selectors
magic strings
Step 1:




your tests with
 Page Object
Page Object
     brings


 OO to tests
a Page Object
 per page under test
a   link on the page
      becomes a
method on the
     Page Object
clicking a link on the page
turns into calling a method
     on the Page Object
instead of


you will get
textbox
     a
on the page becomes a
string property
 on the Page Object
filling a textbox on the
page turns into setting a
 string property on the
        Page Object
instead of


you will get
acheckbox
on the page becomes a
bool property
 on the Page Object
ticking a checkbox on the
 page turns into setting a
   bool property on the
       Page Object
anyaction
on the page becomes a
 method on the
     Page Object
… and you will get another
Page Object as the return
   value of the method
chain your calls
procedural
duplicating logic
duplicating selectors
magic strings
step 2:


    Page
 Components
Compose your Page Objects of
      smaller pieces
some pages are
some pages are

complex
remember

S.R.P.?
would you write



big    and   complex
 classes in your
    code?
care about your
        tests
    as much as
you care about your
        code
do NOT write


big   and complex
 Page Objects
use
Page Components
 to break
        down your
   Page Objects
use
Page Components
        for
panels      menus
       rows in grids
modal pop-ups
Page Components
      D.R.Y.
  your tests even more
instead of


you will get
and you can
compose other
  Page Objects
   using these
Page Components
Page Object &
Page Component
    lead into
    S.R.P.
Page Object &
Page Component
     D.R.Y.
    your test
... but
what about magic strings?
procedural
duplicating logic
duplicating selectors
magic strings
it is not
 only about
magic strings
the code is still
     ugly
step 3:




Strongly typed
 Page Object
you use
view models
 in your code
why not use
view models
in your tests?
(unofficial) step 4:


 Tests as Living
Documentation
write your UI Tests
        based on
acceptance criteria
use a BDD framework
  to implement your
acceptance criteria
use a BDD framework
 to turn your tests into
living documentation
use the
  test results
      as a
progress report
use the
  test results
as a support for
manual testing
A
few
tips
Do NOT use
Thread.Sleep
Thread.Sleep
  is slow
Thread.Sleep
 is brittle
often need to wait a bit
longer for things to load?
use implicit waits
need to wait longer
for specific elements to load?
use explicit waits
need to wait for an
AJAX call to finish?
use javascript
choose
right selectors
page structure
   changes
do
      NOT
     be fuzzy
with your selectors
do
         NOT
rely on the structure
    of your page
do
        NOT
    rely on the
surrounding elements
By.XPath("//ul[@id='album-list']/li[3]/a/span")



             you’re kidding, right?!
we use interfaces and
DI all over our code to
 make it unit testable
do what it takes to
support your tests
be explicit:
  add id on your
   elements to
support your tests
TARGET
your elements
   directly
     when possible
only one
   test
per action
do you have
workflows?
do one test per
 page/action
then do one test
 for entire flow
do NOT setup
 your required
state through UI
that will be
slow and brittle
setup your data
 through code
and navigate to
the page under
  test directly
use strongly typed
 actions for that
design by
interface!
  when you need it
do you support
multiple devices?
do you do
A/B testing?
create interface for
your Page Objects and
 use the interface in
   your test scripts
ISomePage



         A/B testing
PCPage                 iPadPage
           pages
… and use one
test script for all
 page variations
apply

YAGNI
  in your
test code
do

     NOT
      create a
    Page Object
until you need it
do

      NOT
   add an action to
     Page Object
until you need it
do

       NOT
   add a property to
     Page Object
until you need it
do

      NOT
   add a getter to
   your property
until you need it
run and maintain
     your tests
run
  your tests
frequently
fix
  the broken test right

when it breaks
tests you
 do not run
     ===
broken tests
broken tests you
   do not fix
      ===
 ignored tests
… and finally
Confucius says …
UI Testing
 is hard
and could be a
waste of time
so
do NOT do it
     or
do it RIGHT
when   Done Right it is
 well worth it
thanks for
 attending
time for a few Qs
                                  &
                   hopefully few As

Blog:            www.mehdi-khalili.com
Twitter:         @MehdiKhalili


http://www.mehdi-khalili.com/presentations/automated-ui-testing-done-right-at-dddsydney
With thanks to our sponsors
Please complete your feedback
  forms, and return them to the
registration desk for a chance
                       to win a
                  Nokia Lumia

Automated UI testing done right (DDDSydney)

Editor's Notes

  • #9 The framework is called BDDfy because it BDDfies (as in turns into BDD) your otherwise traditional unit tests
  • #11 The framework is called BDDfy because it BDDfies (as in turns into BDD) your otherwise traditional unit tests
  • #53 Some code here + demoWhy it is different from the previous approachBut changing a name still breaks the tests
  • #74 Show a demo of a change on an id that breaks a test
  • #75 Show a demo of a change on an id that breaks a test
  • #82 Showing the demo with Page<T>Showing the differenceShowing that changing a property name gives compile time error
  • #107 UI Tests are no different
  • #109 Add a photo of an element being targetted