Project Plan
Project Background
 Implementation of Digital Time Pulse Conversion method
 Application of ABB 6.6KV breaker model (VD41212-40) for the design
implementation
 The cutting-edge features of the VD41212-40 breaker provide excellent
efficiency and dependability.
Project Objectives
Developing a digital system that can properly
measure and convert time pulses generated during
circuit breaker timing tests
Project Phases
Project Planning
Integration and
testing of the
system with
existing equipment
Requirements
gathering and
analysis
Validation and
verification of the
system through
real-world testing
scenarios
Design and
development of the
digital time pulse
conversion system
Documentation
and training for
users
Tasks to be implemented for this project
NO. Phase Task Name
Start
(Date)
End (Date)
Duration
(Days)
1
Project
Planning
1.1 Identify Targets 2/19/2023 2/26/2023 7
1.2 Identify the Techniques
2/26/2023 3/3/2023 7
1.3 Identifying the Outputs3/3/2023 2/10/2023 7
1.4 Plan Documentation 3/11/2023 3/18/2023 7
2
Requirements
gathering and
analysis 2.1Giving 50V for the inner source of constant voltage for testing of contacts
3/19/2023 3/26/2023 7
2.2 Assigning 1000V for Galvanic insulation between the meter and the breaker tested
4/2/2023 4/9/2023 7
2.3 Assigning 10 seconds for Range of times measured
4/10/2023 4/17/2023 7
2.4 Provide 0.1 ms Measuring resolution
4/18/2023 4/25/2023 7
2.5Input 60 - 300 V Input of the signal triggering a change in the breaker state.
4/25/2023 5/2/2023 7
3
Design and
development of
the digital time
pulse
conversion
system 3.1 Provide microprocessor-controlled meter
5/2/2023 5/9/2023 7
3.2 Designing Meter & Principle Operation
5/16/2023 5/23/2023 7
3.3 Design the analog-to-time-to-digital pulse conversion
5/24/2023 5/31/2023 7
4
Integration and
testing of the
system with
existing
equipment 4.1 Integrate the voltage –time-converter to analog to digital converter
6/7/2023 6/14/2023 7
4.2 Perform control & timing logic
6/21/2023 6/28/2023 7
5
Validation and
verification of
the system
through real-
world testing
scenarios 5.1 Perform transient performance
6/28/2023 7/4/2023 6
5.2 Perform noise performance
7/9/2023 7/12/2023 3
5.3 Perform linearity 7/12/2023 7/13/2023 1
5.4 Perform scaleability 7/14/2023 7/15/2023 1
6
Documentation
and training for
users 6.1 Document the system performances based on validation & testing
7/16/2023 7/18/2023 2
6.2 Schedule training for users
7/18/2023 7/19/2023 1
Gantt chart
Project Assumptions
 No changes of scope
 Fund will be made available
 Guidelines of plan will be followed
 Changes will be applied if necessary
Project Budget
WBS Task Labor Materials Budget Actual
1 Software
developer
$850 $200 $1050 $1000
2 Engineer
(electrical)
$500 $300 $800 $750
Total: $1750
Roles and Responsibilities of Participants
Role Responsibilities Participant(s)
Software developer  Design the system Insert Name
Electrical engineer  Provides the specifications for voltages needed for the
microprocessor-controlled meter and circuit breaker
Project Manager  Project is managed in accordance with the project plan.
 Acts as the Team.
 Get direction from the steering committee
 Directs consultants
 Watch over the vendor (s)
 Focus on providing overall project guidance
 Motivate team members to work toward project goals
 Deal with problem solving
 Controls project finances
Project manager
Project
Participants/Teams
 Recognize the tasks and user requirements specific to their area.
 Serve as a consumer advocate for their region.
 Throughout the project, inform staff of the objectives, status, and
progress. in their area
 Examine and accept project outputs.
 Produces or assists in producing work goods
 Organizes the involvement of individuals, work groups, and
stakeholders.
 Share your expertise and suggestions
 Aids in identifying and removing project obstacles
 Ensure product quality to satisfy project goals and objectives
 Recognize dangers and problems, and aid in finding solutions.
To be identified teams members in the project
Summary
The 6 months period completion of this project is enough to be achieve
our objective for the completion timeframe.
The application of Gantt chart in this project is a big advantage. Because it
displays delivery dates, it aids in the procurement process. By examining
the actual dates to those projected on the chart, it is possible to keep track
of the project's progress. Also, it makes it simple for division and project
management to synchronize their efforts.
References
 Bowman, J. H. (1980). Property Tax Circuit Breakers Reconsidered:
Continuing Issues Surrounding a Popular Program. The American
Journal of Economics and Sociology, 39(4), 355–372.
https://www.jstor.org/stable/3486271
 Petersen, P. B. (1991). The Evolution Of The Gantt Chart And Its
Relevance Today. Journal of Managerial Issues, 3(2), 131–155.
https://www.jstor.org/stable/40603907

More Related Content

Similar to Assessment_4.pptx

EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
yashchotaliyael21
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
festockton
 
PMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time managementPMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time management
Abdullah Ahmed, PMP, RMP
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
RISHABHSIINGH
 
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docxScope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
kenjordan97598
 
Project-Management.pptx
Project-Management.pptxProject-Management.pptx
Project-Management.pptx
TecnicoItca
 
MonaliPhatak_Resume
MonaliPhatak_ResumeMonaliPhatak_Resume
MonaliPhatak_Resume
Monali Phatak
 
MGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.comMGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.com
jonhson237
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
Carla Fair-Wright
 
Business Case _ PM.pptx
Business Case _ PM.pptxBusiness Case _ PM.pptx
Business Case _ PM.pptx
vaibhavverma749167
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
Suyog Kajavadekar
 
MGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/SnaptutorialMGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/Snaptutorial
williamtrumpz4k
 
MGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/SnaptutorialMGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/Snaptutorial
williamtrumpz2F
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
braycarissa250
 
Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675
all2com
 
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
Pamela Garrett
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
Ravi Nakulan
 
PROCESS MODELS.ppt
PROCESS MODELS.pptPROCESS MODELS.ppt
PROCESS MODELS.ppt
DrTThendralCompSci
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
Golam Bitonsir
 

Similar to Assessment_4.pptx (20)

EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
 
PMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time managementPMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time management
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docxScope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
 
Project-Management.pptx
Project-Management.pptxProject-Management.pptx
Project-Management.pptx
 
MonaliPhatak_Resume
MonaliPhatak_ResumeMonaliPhatak_Resume
MonaliPhatak_Resume
 
MGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.comMGT 402 Effective Communication/tutorialrank.com
MGT 402 Effective Communication/tutorialrank.com
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Business Case _ PM.pptx
Business Case _ PM.pptxBusiness Case _ PM.pptx
Business Case _ PM.pptx
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 
MGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/SnaptutorialMGT 402 help Successful Learning/Snaptutorial
MGT 402 help Successful Learning/Snaptutorial
 
MGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/SnaptutorialMGT 402 help A Guide to career/Snaptutorial
MGT 402 help A Guide to career/Snaptutorial
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
 
Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675
 
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
 
PROCESS MODELS.ppt
PROCESS MODELS.pptPROCESS MODELS.ppt
PROCESS MODELS.ppt
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 

Recently uploaded

Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
my Pandit
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 

Recently uploaded (20)

Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 

Assessment_4.pptx

  • 1. P R E S E N T A T I O N Project Plan
  • 2. Project Background  Implementation of Digital Time Pulse Conversion method  Application of ABB 6.6KV breaker model (VD41212-40) for the design implementation  The cutting-edge features of the VD41212-40 breaker provide excellent efficiency and dependability.
  • 3. Project Objectives Developing a digital system that can properly measure and convert time pulses generated during circuit breaker timing tests
  • 4. Project Phases Project Planning Integration and testing of the system with existing equipment Requirements gathering and analysis Validation and verification of the system through real-world testing scenarios Design and development of the digital time pulse conversion system Documentation and training for users
  • 5. Tasks to be implemented for this project NO. Phase Task Name Start (Date) End (Date) Duration (Days) 1 Project Planning 1.1 Identify Targets 2/19/2023 2/26/2023 7 1.2 Identify the Techniques 2/26/2023 3/3/2023 7 1.3 Identifying the Outputs3/3/2023 2/10/2023 7 1.4 Plan Documentation 3/11/2023 3/18/2023 7 2 Requirements gathering and analysis 2.1Giving 50V for the inner source of constant voltage for testing of contacts 3/19/2023 3/26/2023 7 2.2 Assigning 1000V for Galvanic insulation between the meter and the breaker tested 4/2/2023 4/9/2023 7 2.3 Assigning 10 seconds for Range of times measured 4/10/2023 4/17/2023 7 2.4 Provide 0.1 ms Measuring resolution 4/18/2023 4/25/2023 7 2.5Input 60 - 300 V Input of the signal triggering a change in the breaker state. 4/25/2023 5/2/2023 7 3 Design and development of the digital time pulse conversion system 3.1 Provide microprocessor-controlled meter 5/2/2023 5/9/2023 7 3.2 Designing Meter & Principle Operation 5/16/2023 5/23/2023 7 3.3 Design the analog-to-time-to-digital pulse conversion 5/24/2023 5/31/2023 7 4 Integration and testing of the system with existing equipment 4.1 Integrate the voltage –time-converter to analog to digital converter 6/7/2023 6/14/2023 7 4.2 Perform control & timing logic 6/21/2023 6/28/2023 7 5 Validation and verification of the system through real- world testing scenarios 5.1 Perform transient performance 6/28/2023 7/4/2023 6 5.2 Perform noise performance 7/9/2023 7/12/2023 3 5.3 Perform linearity 7/12/2023 7/13/2023 1 5.4 Perform scaleability 7/14/2023 7/15/2023 1 6 Documentation and training for users 6.1 Document the system performances based on validation & testing 7/16/2023 7/18/2023 2 6.2 Schedule training for users 7/18/2023 7/19/2023 1
  • 7. Project Assumptions  No changes of scope  Fund will be made available  Guidelines of plan will be followed  Changes will be applied if necessary
  • 8. Project Budget WBS Task Labor Materials Budget Actual 1 Software developer $850 $200 $1050 $1000 2 Engineer (electrical) $500 $300 $800 $750 Total: $1750
  • 9. Roles and Responsibilities of Participants Role Responsibilities Participant(s) Software developer  Design the system Insert Name Electrical engineer  Provides the specifications for voltages needed for the microprocessor-controlled meter and circuit breaker Project Manager  Project is managed in accordance with the project plan.  Acts as the Team.  Get direction from the steering committee  Directs consultants  Watch over the vendor (s)  Focus on providing overall project guidance  Motivate team members to work toward project goals  Deal with problem solving  Controls project finances Project manager Project Participants/Teams  Recognize the tasks and user requirements specific to their area.  Serve as a consumer advocate for their region.  Throughout the project, inform staff of the objectives, status, and progress. in their area  Examine and accept project outputs.  Produces or assists in producing work goods  Organizes the involvement of individuals, work groups, and stakeholders.  Share your expertise and suggestions  Aids in identifying and removing project obstacles  Ensure product quality to satisfy project goals and objectives  Recognize dangers and problems, and aid in finding solutions. To be identified teams members in the project
  • 10. Summary The 6 months period completion of this project is enough to be achieve our objective for the completion timeframe. The application of Gantt chart in this project is a big advantage. Because it displays delivery dates, it aids in the procurement process. By examining the actual dates to those projected on the chart, it is possible to keep track of the project's progress. Also, it makes it simple for division and project management to synchronize their efforts.
  • 11. References  Bowman, J. H. (1980). Property Tax Circuit Breakers Reconsidered: Continuing Issues Surrounding a Popular Program. The American Journal of Economics and Sociology, 39(4), 355–372. https://www.jstor.org/stable/3486271  Petersen, P. B. (1991). The Evolution Of The Gantt Chart And Its Relevance Today. Journal of Managerial Issues, 3(2), 131–155. https://www.jstor.org/stable/40603907

Editor's Notes

  1. This project is a system design implementation for a certain method which we call as digital time pulse conversion. This includes the implementation and integration of voltage-time-converter to analog-time-converter. ABB, a global leader in the power and automation technology industries, is the manufacturer of the 6.6 kilovolt (kV) medium voltage circuit breaker with model number VD41212-40. For switching, managing, and safeguarding electrical equipment in a variety of applications, this breaker model is suitable. It is designed to be used in distribution networks for low- and medium-voltage power. The cutting-edge features of the VD41212-40 breaker provide excellent efficiency and dependability. These features include a compact and durable construction, trustworthy trip units, and a high breaking power. Furthermore, it boasts a flexible and modular design that facilitates easy installation and maintenance. The completion of this project is 6 months.
  2. Developing a digital system that can properly measure and convert time pulses generated during circuit breaker timing tests is the goal of this research. The system will be created such that it can interface with current testing equipment and provide the operator with results in real-time. Also, the project will involve developing data processing and visualization software that will make it easier to understand test results.
  3. Shown above the sic phases for this project. Each phases has tasks to be done and been presented in the Gantt chart as reported and presented in this presentation. We have project planning that includes project objectives, scope, milestone, and etc. Identifying the desired requirements and specifications needed for the design of digital time pulse conversion, including volts measurements, integrating the voltage –time-converter to analog to digital converter. Validate the results and testing and documenting the result of performances of the system and train users after successful implementation.
  4. We have here the lists of Tasks per Phases. This can be seen in our submitted written report (assessment 4) for a clear figure. These tasks has designated period of time (Start date and end Date).
  5. The presented Gantt chart above shows the flow of tasks completion.
  6. The project assumed that: The project's requirements didn't change. Upon submission of an application, funds would be made available. The guidelines in this plan must be followed by each project member. The Project Plan may be changed as new information and issues are discovered. If draft deliverable adjustments are not made by the deadline specified in the project schedule, project delays will result.
  7. This project required $1750 for overall completion.
  8. Shown above are the defined roles and responsibilities of project team and project manager.