The Road to Enterprise Architecture Excellence

                                                               ArchiMate 2.0
                                                       The open modelling standard. In
                                                       this training you will learn how to
                                                        describe the architecture of the
                                                        enterprise using the ArchiMate
                                                      framework and language. Creating
                                                        an illustration of the Enterprise
                                                                   Architecture




                                                                      EA
                                                                 VISUALISATION                         TOGAF 9, SOA for EA, EA for Telecoms
Architecture Capability & Maturity                                                                      An Open EA framework. This training will
                                                                                                       teach you how to apply the TOGAF
Assessment                                                                                             framework in your organisation and prepare
This assessment provides a path for                                                    EA              candidates for TOGAF 9 certification.
Enterprise Architecture improvements within                       ENTERPRISE        KNOWLEDGE          Creating open standards and people with
                                                   MEASURE
an organisation. As an Enterprise                                ARCHITECTURE         BASED            transferable skills across the enterprise.
                                                  EA SUCCESS
Architecture matures its effectiveness                            EXCELLENCE        EDUCATION
                                                                                                       Our SOA course is for those who wish to take
improves. Without this regular health check                                                            a SOA approach to EA
there is a high risk that your EA practice will                                                        EA for telecoms gives an example of how
not be effective.                                                      EA
                                                                                                       TOGAF works with other industry standards
                                                                   EXECUTIVE
                                                                     SKILLS
                                                                                                       such as FrameWorx
                                                                 DEVELOPMENT




                                                           Elevating Enterprise
                                                               Architecture
                                                          A leadership and effective
                                                        communication course that is
                                                    designed with the EA professional in-
                                                     mind, so that they may understand
                                                    how to communicate effectively with
                                                    key stakeholders and influence them
                                                     when making recommendations for
                                                    change or implementation. Institute
                                                       of Leadership & Management
                                                       endorsed certification course.




                                                                                                Architecting the Enterprise Limited Copyright © 2012
Commonly heard statements

                                   Myth or Reality?


 “Why should we bother with Enterprise Architecture?”
 “Architecture is a cost overhead we cannot afford.”
 “Architects don’t understand the business and are completely disconnected from our
  world.”
 “Let’s cut to the chase and get straight on with designing the solution we need with
  the best technology.”
 “Not having the business knowledge often kills EA initiatives because the projects
  tend to be done for the sake of technology and not for successful business
  outcomes”.
 “We are in tough economic conditions make more of what you have with less cost
  and overhead – stop all non urgent projects at once!”

      We know                                                               How do I know
  solutions to every                                                          what I want,
  problem? What’s                                                             when I don’t
   your problem?                                                            know what you
                                                                             can do for me



                                                       Architecting the Enterprise Limited Copyright © 2012
Enterprise Architecture excellence requires highly skilled, capable people who
measure success through achieving against agreed business outcomes.


World class Enterprise Architects are assessed on the following critical
  attributes :-
 Leadership – how to move people and the business on.
 Strategic Planning- execution of the company strategic vision into
  execution.
 Technical Expertise – recommend technology investments that will
  create successful business outcomes.
 Financial Management – the ability to view the IT budget as a
  portfolio of assets, with a strategic vision, whilst mitigating against
  risk & increased cost.
 Operational Excellence – evidence of a strong portfolio of
  successfully delivered EA projects.
 Innovation- driving innovation and realising business value by
  architecting the capability.


                                                 Architecting the Enterprise Limited Copyright © 2012
Enterprise Architects plan for success – break through the glass ceiling!

                                                                      Architecture Vision
                                            Company
                                             Vision

.
                                         Values – the                       Architecture Principles
                                       guiding principles


                                                                                   Plan from baseline architecture to
                                   Business Plan – plan for
                                          success                                         target architecture

                                                                                         Align target architecture
                             Strategic and operational objectives -                      objectives with business
                                            Targets                                              outcomes.

                                                                                                   Establish EA -
                          Key Performance Indicators – performance                                 Assign KPI’s
                               measures, targets & initiatives

                                                                                                       Communicate - get
                      Cascading measures – use of 1-1’s meetings to align
                                                                                                       your team ready for
                                individuals with overall goals.                                              success.

                                                                                                            Document your
                  Strategic management systems – linkage to company budgets                                 success in terms
                                         and reports.                                                         of business
                                                                                                                 results

                                                                       Architecting the Enterprise Limited Copyright © 2012
Benefits for creating an Enterprise Architecture
                Education Program

Enterprise Architecture creates the structure for business resources to achieve success in chosen markets.
By enabling the efficient alignment of an organisation’s strategic business goals and capabilities, Enterprise
Architecture empowers the organisation to deliver extra value and achieve substantial success.




                            Investment in developing people through education & training creates thinkers,
                            problem solvers, universal standards and improves communication in the workplace.

                            A structured approach by using open source best practices such as TOGAF® &
                            ArchiMate® ensures senior executives see tangible results, aligned to the business
                            strategy for their commitment to the Enterprise Architecture practice.

                            Encouraging the development of best practices standards and competencies enables
                            interoperability at all levels of the organisation.

                            Employing TOGAF® as a best practice gives a full audit trail of your business
                            improvement and processes in line with your statutory requirements, business goals and
                            strategies.

                            The standards have been specifically developed to be vendor neutral, not locking you
                            into one vendor or set of solutions & allowing you full control of your systems as you
                            evolve your Enterprise Architecture.

                            Organisations promote a climate of continuous business evolution, improving
                            everyone’s quality of work and deliverables.



       SLIDE 7 of                                                          Architecting the Enterprise Limited Copyright © 2012
Create a winning team

                          Educate & train for
                              success
Enterprise Architecture Professional Development Services
► Elevating Enterprise Architecture.

► Education & Certification Workshops.
   ► TOGAF® 9 for Enterprise Architects.
   ► ArchiMate® 2 for Practitioners.
   ► SOA for Enterprise Architects.

► Getting Started with Enterprise Architecture.

► Architecture Capability & Maturity Assessment.




                                                  Architecting the Enterprise Limited Copyright © 2012
Elevating Enterprise Architecture

              Elevating Enterprise
                  Architecture


EA        Business
                                 Objective of the course:


                           To equip the Enterprise Architect (EA)
                              with a defined ‘toolbox’ of business
                              skills to compliment their technical
                               knowledge, which enhances their
                              personal and professional function
                              and enables them to communicate
                                and present ideas to business.




                                     Architecting the Enterprise Limited Copyright © 2012
Why are business skills important?
                            Elevating Enterprise
                                Architecture

► EA is a structured and integrated approach to business
                    and IT transformation.
► Enterprise Architects are key agents of such change and
   their performance is critically dependent on soft skills
  around leadership, communications and empowerment.
► These softer skills plus an effective partnership with the
   business will lead to a successful use of EA in business
                        transformation.




                                                   Architecting the Enterprise Limited Copyright © 2012
What is the value?

  Elevating Enterprise
      Architecture


 ► By pitching a value proposition to Business
   Leaders and other key stakeholders in their
   language, the Architects will be viewed as a
   partner, rather than “just the technical
   specialist”.
 ► The Softer Skills increasingly prevalent as a deal
   breaker in many hiring decisions.
 ► Executives are measured on their ability to
   motivate an organisation, to make clear and
   well-balanced decisions and their ability to
   develop and communicate ideas and visions.




                         Architecting the Enterprise Limited Copyright © 2012
What are the objectives and benefits for delegates?

                                   Elevating Enterprise
                                       Architecture

                     Enhance effective engagement with key stakeholders.




                   Facilitate communication flows in complex environments.




                  Gain commitment from key stakeholders and contributors.




        Harness technical skills and assets to create significant business value.

For more information and to book onto this training visit our website at:-http://www.architecting-the-
enterprise.com/training/elevating_enterprise_architecture.php


                                                                Architecting the Enterprise Limited Copyright © 2012
Education & Certification Workshops
                                  TOGAF 9 training




                                    Objective of the course:
                                    The Architecting the Enterprise TOGAF 9 for Practitioners
                                    Training Products introduce all of the topics you will need to
                                    cover in order to use the latest version of TOGAF in your
                                    organization and to prepare to take The Open Group's
Available formats:                  examination(s).

   Instructor led
   Webinar
   Online learning

Supported by:
   Comprehensive materials
   Exam practise
   Workbooks
   Access to recorded webinars
   World class Instructors



                                                            Architecting the Enterprise Limited Copyright © 2012
What are the objectives and benefit for the delegate?
This training is for organisations and individuals who wish implement TOGAF ® as a methodology. Courses are available at
      foundation and certified levels .
The training courses cover all of the features that are common to TOGAF® 8 and TOGAF® 9:
        The business rationale for Enterprise Architecture and TOGAF®
        The TOGAF® Architecture Development Method and its deliverables, including Business, Data, Applications and Technology
         Architecture
        The Enterprise Continuum
        Enterprise Architecture Governance
        Architecture Principles and their development
        Architecture Views and Viewpoints
        Requirements Engineering using Business Scenarios
        Architecture Maturity Assessments
        Architecture Skills Framework
        An Introduction to Building Blocks
The courses also cover the many new features added in TOGAF® 9:
        Architecture Partitioning
        Content Framework and Meta Model
        Capability Based Planning
        Business Transformation Readiness
        Using TOGAF® to develop Security Architectures
        Architecture Repository
In addition to the training modules, the course makes extensive use of exercises and questions based around a case study to
     develop understanding of TOGAF®.
Successful completion of the TOGAF® examinations leads to TOGAF® 9 Certification.
For more information and to book onto this training visit our website at:-
                                http://www.architecting-the-enterprise.com/training/TOGAF_9.php


                                                                                  Architecting the Enterprise Limited Copyright © 2012
Education & Certification Workshops
                                    ArchiMate® 2.0
                                       training



                                    Objective of the course:
                                    The Architecting the Enterprise ArchiMate® 2.0 training for
                                    practitioners course provides training on ArchiMate® 2.0, an
                                    open and independent modeling language that compliments
                                    the TOGAF® Enterprise Architecture Framework and other
                                    modeling languages such as UML and BPMN. It will prepare
                                    the delegate to take The Open Groups ArchiMate® 2.0
Available formats:                  examination & modeling assessment leading to ArchiMate® 2.0
                                    certification.
   Instructor led
   Webinar
   Virtual learning

Supported by:
   Comprehensive materials
   Exam practise
   Archi tool
   Modelling exercises
   World class Instructors


                                                           Architecting the Enterprise Limited Copyright © 2012
Five facts you need to know about ArchiMate®


  1. Open, common standard language.
  2. Good for visualizations!
          Represent different stakeholders' views, especially those impacted by the change process.

  3. Affords visibility of IT resources
          Identifies use of IT, their dependencies, and reuse.

  4. Facilitates analysis
          Support gap analyses, and impact-of-change.

  5. Articulates your EA value proposition
       For a specific business transformation change, or any other strategic initiative, i.e., use of Stakeholder
          Viewpoints.




                                                                   Architecting the Enterprise Limited Copyright © 2012
What are the objectives and benefit for the delegate?

The training is for those individuals who require an understanding of ArchiMate® and its application
     with Enterprise Architecture - particularly if using best practice TOGAF®
The courses cover all the features in ArchiMate® 2.0 and leads to ArchiMate® 2.0 Certification.
      Access to Archi–modeling tool
      ArchiMate Business/Application/Technology Layer descriptions
      Modeling Exercises
      Quizzes
      Extensions (Motivation, Implementation & Migration Layers)
      Cross-Layer Dependencies & Domain Relationships
      ArchiMate Viewpoints
Examination Day
      Examination Preparation & Recap
      Assessment of Practical Modeling Exercise(s)
      Practice tests
      Certification examination
Successful assessment of the ArchiMate modeling exercise and completion of the examination leads
     to ArchiMate® 2.0 Certification.
For those who do not wish to take the examination an Architecting the Enterprise Gold Award will
     be issued upon successful completion of the course and modeling assessment.
For more information and to book onto this training visit our website at:-
                       http://www.architecting-the-enterprise.com/training/archimate.php


                                                                  Architecting the Enterprise Limited Copyright © 2012
Education & Certification Workshops
                                           SOA for Enterprise
                                              Architects



                                                 Objective of the course:
                                                 Our Service-Oriented Architecture (SOA) for Enterprise
                                                 Architects training solution is designed for Enterprise Architects
                                                 and IT Professionals who want to take an architected approach
                                                 to the development of SOA in their enterprises.

Available formats:

   Instructor led – customised workshop only.
   Virtual learning

Supported by:
   Comprehensive materials
   Online Quizzes
   World class subject matter experts.




                                                                          Architecting the Enterprise Limited Copyright © 2012
What are the objectives and benefit for the delegate?

The course develops and fosters a common understanding of SOA in order to facilitate alignment between
    the business and information technology communities. It takes a top down business approach, as
    supported by TOGAF® and other standards developed in The Open Group and emphasize the need for
    integration in a holistic Enterprise Architecture environment.

    This course is based on the work achieved in The Open Groups SOA Work Group and
    describes how TOGAF® is used to define SOA.

          Describe and define Service-oriented Architecture
          Set the scene for using Service Oriented Architecture as a particular "style" and as part of an
           overall Enterprise Architecture
          Define how you can make Best Practice Enterprise Architecture and SOA work together for your
           organization
          Describe in some detail how TOGAF® Version 9.1 can be adapted for the purposes of
           implementing solutions as SOA

   Successful completion of the multiple choice question tests and completion of the course competency
      assessment module (65% pass mark) will lead to an Architecting the Enterprise Gold Award .
                 For more information and to book onto this training visit our website at:-
                          http://architecting-the-enterprise.com/training/soa.php



                                                                   Architecting the Enterprise Limited Copyright © 2012
Getting Started with Enterprise Architecture

                                  Program of
                                  workshops
This program will develop the Enterprise Architecture for your
   organisation using an EA framework. It will establish an
   Enterprise Architecture practice in your organisation, aligning
   the IT strategy and delivery projects to your business goals
   and objectives. By the end of this program you will have
   customised the framework to meet the needs of your
   organisation, selected and evaluated your architecture tools
   and established a governance framework for ensuring IT
   delivery projects conform to the enterprise architecture
   principles for your organisation.




                                                   Architecting the Enterprise Limited Copyright © 2012
Program of workshops


Objectives:
 Set your Architecture Scope
 Develop your architecture principles
 Define your architecture footprint
 Customise the framework in Kroger EA Framework
 Evaluate, Select and implement EA toolset.
 Establish the Enterprise Architecture Practice




                                     Architecting the Enterprise Limited Copyright © 2012
Program of workshops


Outcomes:
 Enterprise Architecture vision document
 A complete set of agreed and documented architecture principles
 Documented stakeholder management matrix
 Documented communications plan
 Enterprise architecture RACI matrix
 Documented enterprise architecture governance framework
 The organisation specific architecture framework documented
 Enterprise architecture tool strategy identified and documented
 Documented baseline for enterprise architecture maturity
 Architecture practise development program
 Documented Skills Matrix with identified skills requirements
 Phased training plan

                                        Architecting the Enterprise Limited Copyright © 2012
Architecting the Enterprise – Measure your success.




   Architecture Capability Maturity Assessments




                                     Architecting the Enterprise Limited Copyright © 2012
The Value To An Organisation


Organisations continually face pressures to gain and retain competitive
advantage, identify ways of cutting costs, improve quality, reduce time to
market, etc. Maturity models have been developed to assist organisations
in this endeavour.

Enables greater efficiency in the utilization of resources and prioritizes
projects by creating a roadmap for a target Enterprise Architecture
maturity level. Good Enterprise Architecture develops effective change
management, maximises re-use of data, identifies and corrects
inefficiencies with compliance to governance and best practice standards.

A standard methodology enables a stable state of maturity development
to be reached and for incremental improvements to be made over time.




                                               Architecting the Enterprise Limited Copyright © 2012
The Value To An Organisation


   Increases an organisation's capability for Enterprise Architecture.
   Successful EA programs are viewed as critical to business
   sustainability.

   Gives an indication of compliance with governance policies and
   procedures across the enterprise. Thus giving key stakeholders an
   early indication of governance issues.

   Financial benefits can be derived from reduced redundancy,
   improved time to delivery, reduced support costs and reduced
   acquisition costs.

   Our consultative approach involves all stakeholders and ensures
   that the focus for improvement is in-line with your key business
   drivers to deliver real and measurable business benefits.



                                              Architecting the Enterprise Limited Copyright © 2012
EXAMPLE: EA evolves and drives EA value at Intel

      2003                     2004                     2005                                2006
  ►   Intel EA efforts      ►   Chief Business       ► Architecture                        ► Enterprise
         launched                Architect and        discipline unified as                 Architecture
 ► Chief Architects                Business                EA Practice                     Principles and
     assigned to data,        architecture group      ► Enterprise                      policies published
     applications, and               added           Architecture extends             ► Building codes
    technical domains      ► Enterprise broken          to IT (traditional)                  published
  ► Application                 into 7 solution    ► EA training extended           ► Governance Process
   architecture broken              domains                 across IT                        revamped
       out to include     ► Solution principles    ► Business Modeling               ► Business and Data
  solution architecture           and project                training                  cross alignment and
► Centralise all Data             architecture                                                 training
                                  compliance        ► Domain reference
          Analysts                                         architecture              ► Adopt a common
                                  scorecards
 ► Tackled EA Data                established               published                    Intel Architecture
          problem                                   ► Business domain                       development
                          ► Industry recognised                                        methodology (IADM)
► EA Data model with             for meta data        specific future state
        Data quality                solution              architectures             ► Combine innovation
 ► ~$15M in re-use                                          developed                   and research with
                          ► Bluebook published                                             the Enterprise
                                                    ► ~$53M in re-use
                            ► ~$35M in re-use                                          Architecture practice
                                                                                     ► ~$147M in re-use




                                  Source: Gregg Wyant, Intel WW Lead Architect, EA Re-use Efforts


                                                              Architecting the Enterprise Limited Copyright © 2012
ACMA - Structure



                              20
                           Process
               Change       Areas
             Management                Decomposed to




                                           78
               Goals
                                        Practices



               Enables
             Achievement             Each measured by
                           Metrics




                                          Architecting the Enterprise Limited Copyright © 2012
Module 2 Consensus Workshop - Radar Diagram




                             Architecting the Enterprise Limited Copyright © 2012
How can we shape your future?


…we have to talk about….



                                                                               …and we have addressed it by....

                        EA                          Measure                      EA                   Executive Skills
                     Knowledge                      Success                 Visualisation              Development
                         TOGAF® 9
                   An Open EA framework.
                     This training will teach       Architecture                                      Elevating Enterprise
                      you how to apply the          Capability &             ArchiMate® 2.0               Architecture
                     TOGAF® framework in              Maturity
                     your organisation and          Assessment               The open modelling            A leadership and
                     prepare candidates for                                    standard. In this      effective communication
    Begin Your      TOGAF® 9 certification.
                                                    This assessment         training you will learn    course that is designed
     Enterprise    Creating open standards                                                                                         Enterprise
                                                  provides a path for        how to describe the      with the EA professional
    Architecture
                        and people with
                                                                              architecture of the                                 Architecture
                   transferable skills across           Enterprise                                       in-mind, so that they
      Journey            the enterprise.               Architecture          enterprise using the      may understand how to      Excellence
                                                 improvements within               ArchiMate®         communicate effectively
                         SOA for EA             an organisation. As an           framework and          with key stakeholders
                     Our SOA course is for              Enterprise         language. Creating an          and influence them
                   those who wish to take a      Architecture matures          illustration of the           when making
                     SOA approach to EA             its effectiveness               Enterprise          recommendations for
                                                improves. Without this             Architecture.                change or
                     EA For Telecoms             regular health check                                 implementation. Institute
                   EA for telecoms gives an
                                                   there is a high risk                                     of Leadership &
                   example of how TOGAF®
                   works with other industry     that your EA practice                                 Management endorsed
                      standards such as           will not be effective.                                  certification course.
                          FrameWorx




                                                                                           Architecting the Enterprise Limited Copyright © 2012
Contact us to discuss your future!




  Sales@architecting-the-enterprise.com
   www.architecting-the-enterprise.com




                                     Architecting the Enterprise Limited Copyright © 2012

Architecting the Enterprise

  • 1.
    Architecting the Enterprise EnterpriseArchitecture Education and Professional Development Services. Architecting the Enterprise Limited Copyright © 2012
  • 2.
    Our Vision To ensure the availability of global Enterprise Architecture standards, competencies and professionalism that will enable our customers to realise major value in their business and practices. Architecting the Enterprise Limited Copyright © 2012
  • 3.
    The Road toEnterprise Architecture Excellence ArchiMate 2.0 The open modelling standard. In this training you will learn how to describe the architecture of the enterprise using the ArchiMate framework and language. Creating an illustration of the Enterprise Architecture EA VISUALISATION TOGAF 9, SOA for EA, EA for Telecoms Architecture Capability & Maturity An Open EA framework. This training will teach you how to apply the TOGAF Assessment framework in your organisation and prepare This assessment provides a path for EA candidates for TOGAF 9 certification. Enterprise Architecture improvements within ENTERPRISE KNOWLEDGE Creating open standards and people with MEASURE an organisation. As an Enterprise ARCHITECTURE BASED transferable skills across the enterprise. EA SUCCESS Architecture matures its effectiveness EXCELLENCE EDUCATION Our SOA course is for those who wish to take improves. Without this regular health check a SOA approach to EA there is a high risk that your EA practice will EA for telecoms gives an example of how not be effective. EA TOGAF works with other industry standards EXECUTIVE SKILLS such as FrameWorx DEVELOPMENT Elevating Enterprise Architecture A leadership and effective communication course that is designed with the EA professional in- mind, so that they may understand how to communicate effectively with key stakeholders and influence them when making recommendations for change or implementation. Institute of Leadership & Management endorsed certification course. Architecting the Enterprise Limited Copyright © 2012
  • 4.
    Commonly heard statements Myth or Reality?  “Why should we bother with Enterprise Architecture?”  “Architecture is a cost overhead we cannot afford.”  “Architects don’t understand the business and are completely disconnected from our world.”  “Let’s cut to the chase and get straight on with designing the solution we need with the best technology.”  “Not having the business knowledge often kills EA initiatives because the projects tend to be done for the sake of technology and not for successful business outcomes”.  “We are in tough economic conditions make more of what you have with less cost and overhead – stop all non urgent projects at once!” We know How do I know solutions to every what I want, problem? What’s when I don’t your problem? know what you can do for me Architecting the Enterprise Limited Copyright © 2012
  • 5.
    Enterprise Architecture excellencerequires highly skilled, capable people who measure success through achieving against agreed business outcomes. World class Enterprise Architects are assessed on the following critical attributes :-  Leadership – how to move people and the business on.  Strategic Planning- execution of the company strategic vision into execution.  Technical Expertise – recommend technology investments that will create successful business outcomes.  Financial Management – the ability to view the IT budget as a portfolio of assets, with a strategic vision, whilst mitigating against risk & increased cost.  Operational Excellence – evidence of a strong portfolio of successfully delivered EA projects.  Innovation- driving innovation and realising business value by architecting the capability. Architecting the Enterprise Limited Copyright © 2012
  • 6.
    Enterprise Architects planfor success – break through the glass ceiling! Architecture Vision Company Vision . Values – the Architecture Principles guiding principles Plan from baseline architecture to Business Plan – plan for success target architecture Align target architecture Strategic and operational objectives - objectives with business Targets outcomes. Establish EA - Key Performance Indicators – performance Assign KPI’s measures, targets & initiatives Communicate - get Cascading measures – use of 1-1’s meetings to align your team ready for individuals with overall goals. success. Document your Strategic management systems – linkage to company budgets success in terms and reports. of business results Architecting the Enterprise Limited Copyright © 2012
  • 7.
    Benefits for creatingan Enterprise Architecture Education Program Enterprise Architecture creates the structure for business resources to achieve success in chosen markets. By enabling the efficient alignment of an organisation’s strategic business goals and capabilities, Enterprise Architecture empowers the organisation to deliver extra value and achieve substantial success. Investment in developing people through education & training creates thinkers, problem solvers, universal standards and improves communication in the workplace. A structured approach by using open source best practices such as TOGAF® & ArchiMate® ensures senior executives see tangible results, aligned to the business strategy for their commitment to the Enterprise Architecture practice. Encouraging the development of best practices standards and competencies enables interoperability at all levels of the organisation. Employing TOGAF® as a best practice gives a full audit trail of your business improvement and processes in line with your statutory requirements, business goals and strategies. The standards have been specifically developed to be vendor neutral, not locking you into one vendor or set of solutions & allowing you full control of your systems as you evolve your Enterprise Architecture. Organisations promote a climate of continuous business evolution, improving everyone’s quality of work and deliverables. SLIDE 7 of Architecting the Enterprise Limited Copyright © 2012
  • 8.
    Create a winningteam Educate & train for success Enterprise Architecture Professional Development Services ► Elevating Enterprise Architecture. ► Education & Certification Workshops. ► TOGAF® 9 for Enterprise Architects. ► ArchiMate® 2 for Practitioners. ► SOA for Enterprise Architects. ► Getting Started with Enterprise Architecture. ► Architecture Capability & Maturity Assessment. Architecting the Enterprise Limited Copyright © 2012
  • 9.
    Elevating Enterprise Architecture Elevating Enterprise Architecture EA Business Objective of the course: To equip the Enterprise Architect (EA) with a defined ‘toolbox’ of business skills to compliment their technical knowledge, which enhances their personal and professional function and enables them to communicate and present ideas to business. Architecting the Enterprise Limited Copyright © 2012
  • 10.
    Why are businessskills important? Elevating Enterprise Architecture ► EA is a structured and integrated approach to business and IT transformation. ► Enterprise Architects are key agents of such change and their performance is critically dependent on soft skills around leadership, communications and empowerment. ► These softer skills plus an effective partnership with the business will lead to a successful use of EA in business transformation. Architecting the Enterprise Limited Copyright © 2012
  • 11.
    What is thevalue? Elevating Enterprise Architecture ► By pitching a value proposition to Business Leaders and other key stakeholders in their language, the Architects will be viewed as a partner, rather than “just the technical specialist”. ► The Softer Skills increasingly prevalent as a deal breaker in many hiring decisions. ► Executives are measured on their ability to motivate an organisation, to make clear and well-balanced decisions and their ability to develop and communicate ideas and visions. Architecting the Enterprise Limited Copyright © 2012
  • 12.
    What are theobjectives and benefits for delegates? Elevating Enterprise Architecture Enhance effective engagement with key stakeholders. Facilitate communication flows in complex environments. Gain commitment from key stakeholders and contributors. Harness technical skills and assets to create significant business value. For more information and to book onto this training visit our website at:-http://www.architecting-the- enterprise.com/training/elevating_enterprise_architecture.php Architecting the Enterprise Limited Copyright © 2012
  • 13.
    Education & CertificationWorkshops TOGAF 9 training Objective of the course: The Architecting the Enterprise TOGAF 9 for Practitioners Training Products introduce all of the topics you will need to cover in order to use the latest version of TOGAF in your organization and to prepare to take The Open Group's Available formats: examination(s).  Instructor led  Webinar  Online learning Supported by:  Comprehensive materials  Exam practise  Workbooks  Access to recorded webinars  World class Instructors Architecting the Enterprise Limited Copyright © 2012
  • 14.
    What are theobjectives and benefit for the delegate? This training is for organisations and individuals who wish implement TOGAF ® as a methodology. Courses are available at foundation and certified levels . The training courses cover all of the features that are common to TOGAF® 8 and TOGAF® 9:  The business rationale for Enterprise Architecture and TOGAF®  The TOGAF® Architecture Development Method and its deliverables, including Business, Data, Applications and Technology Architecture  The Enterprise Continuum  Enterprise Architecture Governance  Architecture Principles and their development  Architecture Views and Viewpoints  Requirements Engineering using Business Scenarios  Architecture Maturity Assessments  Architecture Skills Framework  An Introduction to Building Blocks The courses also cover the many new features added in TOGAF® 9:  Architecture Partitioning  Content Framework and Meta Model  Capability Based Planning  Business Transformation Readiness  Using TOGAF® to develop Security Architectures  Architecture Repository In addition to the training modules, the course makes extensive use of exercises and questions based around a case study to develop understanding of TOGAF®. Successful completion of the TOGAF® examinations leads to TOGAF® 9 Certification. For more information and to book onto this training visit our website at:- http://www.architecting-the-enterprise.com/training/TOGAF_9.php Architecting the Enterprise Limited Copyright © 2012
  • 15.
    Education & CertificationWorkshops ArchiMate® 2.0 training Objective of the course: The Architecting the Enterprise ArchiMate® 2.0 training for practitioners course provides training on ArchiMate® 2.0, an open and independent modeling language that compliments the TOGAF® Enterprise Architecture Framework and other modeling languages such as UML and BPMN. It will prepare the delegate to take The Open Groups ArchiMate® 2.0 Available formats: examination & modeling assessment leading to ArchiMate® 2.0 certification.  Instructor led  Webinar  Virtual learning Supported by:  Comprehensive materials  Exam practise  Archi tool  Modelling exercises  World class Instructors Architecting the Enterprise Limited Copyright © 2012
  • 16.
    Five facts youneed to know about ArchiMate® 1. Open, common standard language. 2. Good for visualizations! Represent different stakeholders' views, especially those impacted by the change process. 3. Affords visibility of IT resources Identifies use of IT, their dependencies, and reuse. 4. Facilitates analysis Support gap analyses, and impact-of-change. 5. Articulates your EA value proposition For a specific business transformation change, or any other strategic initiative, i.e., use of Stakeholder Viewpoints. Architecting the Enterprise Limited Copyright © 2012
  • 17.
    What are theobjectives and benefit for the delegate? The training is for those individuals who require an understanding of ArchiMate® and its application with Enterprise Architecture - particularly if using best practice TOGAF® The courses cover all the features in ArchiMate® 2.0 and leads to ArchiMate® 2.0 Certification.  Access to Archi–modeling tool  ArchiMate Business/Application/Technology Layer descriptions  Modeling Exercises  Quizzes  Extensions (Motivation, Implementation & Migration Layers)  Cross-Layer Dependencies & Domain Relationships  ArchiMate Viewpoints Examination Day  Examination Preparation & Recap  Assessment of Practical Modeling Exercise(s)  Practice tests  Certification examination Successful assessment of the ArchiMate modeling exercise and completion of the examination leads to ArchiMate® 2.0 Certification. For those who do not wish to take the examination an Architecting the Enterprise Gold Award will be issued upon successful completion of the course and modeling assessment. For more information and to book onto this training visit our website at:- http://www.architecting-the-enterprise.com/training/archimate.php Architecting the Enterprise Limited Copyright © 2012
  • 18.
    Education & CertificationWorkshops SOA for Enterprise Architects Objective of the course: Our Service-Oriented Architecture (SOA) for Enterprise Architects training solution is designed for Enterprise Architects and IT Professionals who want to take an architected approach to the development of SOA in their enterprises. Available formats:  Instructor led – customised workshop only.  Virtual learning Supported by:  Comprehensive materials  Online Quizzes  World class subject matter experts. Architecting the Enterprise Limited Copyright © 2012
  • 19.
    What are theobjectives and benefit for the delegate? The course develops and fosters a common understanding of SOA in order to facilitate alignment between the business and information technology communities. It takes a top down business approach, as supported by TOGAF® and other standards developed in The Open Group and emphasize the need for integration in a holistic Enterprise Architecture environment. This course is based on the work achieved in The Open Groups SOA Work Group and describes how TOGAF® is used to define SOA.  Describe and define Service-oriented Architecture  Set the scene for using Service Oriented Architecture as a particular "style" and as part of an overall Enterprise Architecture  Define how you can make Best Practice Enterprise Architecture and SOA work together for your organization  Describe in some detail how TOGAF® Version 9.1 can be adapted for the purposes of implementing solutions as SOA Successful completion of the multiple choice question tests and completion of the course competency assessment module (65% pass mark) will lead to an Architecting the Enterprise Gold Award . For more information and to book onto this training visit our website at:- http://architecting-the-enterprise.com/training/soa.php Architecting the Enterprise Limited Copyright © 2012
  • 20.
    Getting Started withEnterprise Architecture Program of workshops This program will develop the Enterprise Architecture for your organisation using an EA framework. It will establish an Enterprise Architecture practice in your organisation, aligning the IT strategy and delivery projects to your business goals and objectives. By the end of this program you will have customised the framework to meet the needs of your organisation, selected and evaluated your architecture tools and established a governance framework for ensuring IT delivery projects conform to the enterprise architecture principles for your organisation. Architecting the Enterprise Limited Copyright © 2012
  • 21.
    Program of workshops Objectives: Set your Architecture Scope  Develop your architecture principles  Define your architecture footprint  Customise the framework in Kroger EA Framework  Evaluate, Select and implement EA toolset.  Establish the Enterprise Architecture Practice Architecting the Enterprise Limited Copyright © 2012
  • 22.
    Program of workshops Outcomes: Enterprise Architecture vision document  A complete set of agreed and documented architecture principles  Documented stakeholder management matrix  Documented communications plan  Enterprise architecture RACI matrix  Documented enterprise architecture governance framework  The organisation specific architecture framework documented  Enterprise architecture tool strategy identified and documented  Documented baseline for enterprise architecture maturity  Architecture practise development program  Documented Skills Matrix with identified skills requirements  Phased training plan Architecting the Enterprise Limited Copyright © 2012
  • 23.
    Architecting the Enterprise– Measure your success. Architecture Capability Maturity Assessments Architecting the Enterprise Limited Copyright © 2012
  • 24.
    The Value ToAn Organisation Organisations continually face pressures to gain and retain competitive advantage, identify ways of cutting costs, improve quality, reduce time to market, etc. Maturity models have been developed to assist organisations in this endeavour. Enables greater efficiency in the utilization of resources and prioritizes projects by creating a roadmap for a target Enterprise Architecture maturity level. Good Enterprise Architecture develops effective change management, maximises re-use of data, identifies and corrects inefficiencies with compliance to governance and best practice standards. A standard methodology enables a stable state of maturity development to be reached and for incremental improvements to be made over time. Architecting the Enterprise Limited Copyright © 2012
  • 25.
    The Value ToAn Organisation Increases an organisation's capability for Enterprise Architecture. Successful EA programs are viewed as critical to business sustainability. Gives an indication of compliance with governance policies and procedures across the enterprise. Thus giving key stakeholders an early indication of governance issues. Financial benefits can be derived from reduced redundancy, improved time to delivery, reduced support costs and reduced acquisition costs. Our consultative approach involves all stakeholders and ensures that the focus for improvement is in-line with your key business drivers to deliver real and measurable business benefits. Architecting the Enterprise Limited Copyright © 2012
  • 26.
    EXAMPLE: EA evolvesand drives EA value at Intel 2003 2004 2005 2006 ► Intel EA efforts ► Chief Business ► Architecture ► Enterprise launched Architect and discipline unified as Architecture ► Chief Architects Business EA Practice Principles and assigned to data, architecture group ► Enterprise policies published applications, and added Architecture extends ► Building codes technical domains ► Enterprise broken to IT (traditional) published ► Application into 7 solution ► EA training extended ► Governance Process architecture broken domains across IT revamped out to include ► Solution principles ► Business Modeling ► Business and Data solution architecture and project training cross alignment and ► Centralise all Data architecture training compliance ► Domain reference Analysts architecture ► Adopt a common scorecards ► Tackled EA Data established published Intel Architecture problem ► Business domain development ► Industry recognised methodology (IADM) ► EA Data model with for meta data specific future state Data quality solution architectures ► Combine innovation ► ~$15M in re-use developed and research with ► Bluebook published the Enterprise ► ~$53M in re-use ► ~$35M in re-use Architecture practice ► ~$147M in re-use Source: Gregg Wyant, Intel WW Lead Architect, EA Re-use Efforts Architecting the Enterprise Limited Copyright © 2012
  • 27.
    ACMA - Structure 20 Process Change Areas Management Decomposed to 78 Goals Practices Enables Achievement Each measured by Metrics Architecting the Enterprise Limited Copyright © 2012
  • 28.
    Module 2 ConsensusWorkshop - Radar Diagram Architecting the Enterprise Limited Copyright © 2012
  • 29.
    How can weshape your future? …we have to talk about…. …and we have addressed it by.... EA Measure EA Executive Skills Knowledge Success Visualisation Development TOGAF® 9 An Open EA framework. This training will teach Architecture Elevating Enterprise you how to apply the Capability & ArchiMate® 2.0 Architecture TOGAF® framework in Maturity your organisation and Assessment The open modelling A leadership and prepare candidates for standard. In this effective communication Begin Your TOGAF® 9 certification. This assessment training you will learn course that is designed Enterprise Creating open standards Enterprise provides a path for how to describe the with the EA professional Architecture and people with architecture of the Architecture transferable skills across Enterprise in-mind, so that they Journey the enterprise. Architecture enterprise using the may understand how to Excellence improvements within ArchiMate® communicate effectively SOA for EA an organisation. As an framework and with key stakeholders Our SOA course is for Enterprise language. Creating an and influence them those who wish to take a Architecture matures illustration of the when making SOA approach to EA its effectiveness Enterprise recommendations for improves. Without this Architecture. change or EA For Telecoms regular health check implementation. Institute EA for telecoms gives an there is a high risk of Leadership & example of how TOGAF® works with other industry that your EA practice Management endorsed standards such as will not be effective. certification course. FrameWorx Architecting the Enterprise Limited Copyright © 2012
  • 30.
    Contact us todiscuss your future! Sales@architecting-the-enterprise.com www.architecting-the-enterprise.com Architecting the Enterprise Limited Copyright © 2012