Disclaimer
     • This presentation stems from an internal project conducted
       within Sun Microsystems prior to Sun's acquisition by Oracle.
     • It is intended for information purposes only, and may not be
       incorporated into any contract. It is not a commitment to
       deliver any material, code, or functionality, and should not be
       relied upon in making purchasing decisions.
     • The development, release, and timing of any features or
       functionality described for Oracle’s products remains at the
       sole discretion of Oracle.




May 6, 2010                                                         Slide 2
Objectives:
     • Demonstrate how Enterprise Business
       Architecture (EBA) can be leveraged to
       increase likelihood of success on very large
       scale CRM/ERP implementations
     • Focus is on pragmatic recommendations
       distilled from our experiences on Sun
       Microsystems' “IBIS” project.




May 6, 2010                                           Slide 3
Sun Microsystem's “IBIS” Project
   • Believed to be one of the larger CRP/ERM
     implementations ever attempted.
   • Multi-year, multi-deployment effort aimed at streamlining
     Suns' business and consolidating its application portfolio.
        > Number Business Processes Impacted = 285, spanning virtually all of Sun's core value streams:
              Concept-to-Offering, Campaign-to-Sales Order, Order-to-Cash, Supply Chain Plan-to-Stock, Issue-
              to-Resolution, and Financial Accounting-to-Reporting.
        >     Number of Sun Applications Targeted for EOL = 513 (>50% of Sun's entire portfolio)
        >     Number of Oracle eBusiness Suite (EBS) modules targeted for deployment = 74 (76% of 11i EBS)
        >     Number of RICE Objects > 950, 417 Reports, 213 Interfaces, 88 Conversions, 232 Extensions
        >     Number of program team members (peak) = 1,074
        >     Number of Internal Users > 30,000
        >     Number of Partner Companies Impacted > 3,000 (including Selling Partners, Suppliers, External
              Manufacturers, Logistics Providers, Banks, Export Control, Repairs Partners)
        >     Deployment Architecture: single global instance comprised of Oracle eBusiness Suite (11.5.10):
                > Mid-Tier: 50 Sun Fire T2000 servers (total: 1.6 TB memory)
                > Data Tier: 4 Sun Fire E25K servers + 1 StorEdge 9990 + 1 STK 6540 Storage Array
                > Production OLTP Database Size (>6TB as of 8/1/2009) and growing!
May 6, 2010                                                                                             Slide 4
Beware!
• Large scale CRM/ERP implementations are HIGH RISK
  undertakings due to:
      > Disruptive Effects on Your Entire Business Ecosystem
      > High Cost of Implementation
      > High Likelihood of Schedule and Budget Overruns
• According to Panorama Consulting's 3-year study of more
  than 1,300 ERP implementations published in 2008*:
      > 93% of ERP projects take longer than expected
      > 65% cost more than expected
      > 79% deliver less than half of the expected business benefits

              *Full report available at: http:www.panorama-consulting.com/2008ERPReport.html
May 6, 2010                                                                                    Slide 5
Key Pitfalls
    • Inability to manage the organizational change necessary
      for success
          > Unclear understanding of where you are, where you want to be,
              and why you want to be there (unclear definition of success)
    • Ineffective program organization
          > Teams -- overlaps and gaps between program teams
          > WBS -- failure to understand dependencies in work breakdown
            structure
          > Program information – the information gathered and created by
            the program is not organized for traceability or easy retrieval
    • Late surprises
          > Key business requirements that don't surface until late in the
              game force re-work and schedule delays
May 6, 2010                                                              Slide 6
Leveraging EBA
      • An Enterprise Business Architecture (EBA) provides
        a customer-centric and holistic view of the
        enterprise and a business view of your CRM/ERP
        project
      • This talk will focus on ways to leverage EBA to
              ➢ Manage Organizational Change
              ➢ Organize Your Program for Agility
              ➢ Avoid Late Surprises



May 6, 2010                                                  Slide 7
The Change is LARGER
          Than You Think!
                 ● Metrics targeted for improvement
 The change      ● Applications targeted to replace or introduce
you intended     ● Business Processes targeted for re-engineering



                 ● Metrics which must not be degraded
                 ● Applications upstream from applications being
                   replaced, that must be modified to create
                   different outputs
                 ● Applications downstream from applications
                   being replaced that must deal with different
                   inputs
                 ● New / changed application interfaces (no
                   “dangling wires”!)
Side-effects     ● Business Processes that must be modified to
of the             create different artifacts
implementation   ● Business Processes that must be modified to
itself             handle different artifacts as inputs

An organization's ability to manage change is one
An organization's ability to manage change is one
     of the main gating factors for success
      of the main gating factors for success
Managing Organizational Change
    Managing organizational change requires knowing
     where you are, where you want to be, and why



                          Transition          Transition
                                       Keep
                            From                 To


                                                           Organization's
         Organization's                                    Desired
         Current                                           Capabilities
         Capabilities
                            Where we Where we
                            are today want to be


      Looks pretty simple, right?
May 6, 2010                                                                 Slide 9
The reality at most organizations




                 Transition             Transition
                              Keep
                   From                    To



Organization's
Current                                              Organization's
Capabilities       Where we                          Desired
                                      Where we
                   are today?        want to be?     Capabilities


 You can't clearly define success if you are fuzzy about where
 You can't clearly define success if you are fuzzy about where
              you are and where you want to be
               you are and where you want to be
May 6, 2010                                                           Slide 10
Knowing Where You Are
   • Why Model “As-Is” state?
        > Helps identify opportunities for improvement
        > Helps to identify real problems rather than pet theories
        > Helps bring to light “hidden” requirements
        > Helps identify change targets – i.e., roles that will be impacted by process
          changes
        > Provides a baseline against which changes can be defined – knowing the
          “the deltas” greatly aids business readiness activities
   • Some risks of modeling current state
        > Delays “getting on with the solution”
        > Costs time (delaying value realization) and money
        > Can get bogged down in “analysis paralysis”
        > Modeling current state forces thinking down the same ruts -- may stifle
          innovation
        > Is throw-away – why create a blueprint of a building just before you knock
          it down?
          Recommendation: Initially, model current state
           Recommendation: Initially, model current state
 at Business Architecture level, rather than Business Process level
 at Business Architecture level, rather than Business Process level
               (but leverage Business Process level models if they exist)
                (but leverage Business Process level models if they exist)
May 6, 2010                                                                      Slide 11
1
What's an Enterprise Business Architecture ?
• A single common Enterprise-Wide framework that focuses on how
  value is generated for customers by your company and it's
  partners.
• An Enterprise Business Architecture (EBA) is composed of an
  integrated set of models, expressed through a set of views that
  define your Value Stream Elements and the business artifacts
  required and produced through those value streams.
• These models and views also depict the relationships that Value
  Stream Elements and Business Artifacts have with each other
  and:
      > with External Business Entities (e.g., customers, suppliers)
      > with your internal organization structures (i.e., your org chart)
      > with your business strategies and goals and the change
        programs intended to drive improvements
      > with other elements of your Enterprise Architecture (e.g.,
        Application Architecture, Information Architecture, etc.)
1
Refer to Enterprise Business Architecture: The Formal Link between Strategy and Results, Ralph Whittle and Conrad B.
Myrick for more information about EBA.
May 6, 2010                                                                                                            Slide 12
Building The Enterprise Business
     Architecture
     • The EBA is rigorously derived via an integrated
       set of models, expressed via a set of views.
     • What follows are excerpts from a few of these views
       to illustrate some key points.
        > Enterprise Entity View – the “outside in” view
        > Value Stream Group View – ties “outside in”
          views to the end-to-end flows of how value is
          delivered
        > Value Stream Architecture View – begins to show
          how work flows within your enterprise
        > Sub-Value Stream Architecture View – the
          connection to Business Processes
May 6, 2010                                             Slide 13
EBA Enterprise Entity View is “Outside In”
                                                                           “External Entity”
                                                                            “External Entity”
                                                                           e.g., Customer,
                                                                            e.g., Customer,
 Business Artifacts
  Business Artifacts                                                       Supplier, Selling
    Exchanged                                     Customer                  Supplier, Selling
     Exchanged                                                                 Partner
                                                                                 Partner
 Between Entities
  Between Entities

                                C           R          R          C       R

       <<tangible>>         <<tangible>>           <<tangible>>       <<via phone>>        <<via phone>>
      <<electronic>>       <<electronic>>            Product          <<via web>>          <<via web>>
       Inbound             Sales Order              Shipment           Service          Service Request
    Purchase Order         Confirmation                                Request            Resolution


                                                       C
                                R           C                     R       C
                                                                                   “C” designates
                                                                                    “C” designates
                                                                                 outputs “created”
                                                                                  outputs “created”
            “R” designates
             “R” designates
          inputs “received”
           inputs “received”
                                                     Sun
                                                Microsystems,             The “Enterprise Entity”
                                                                           The “Enterprise Entity”
                                                      Inc                 (i.e., Your Enterprise)
                                                                           (i.e., Your Enterprise)
                                                                         viewed at this level as aa
                                                                          viewed at this level as
                                                                                 “black box”
                                                                                  “black box”

              Focus is on your interactions with your customers...
              Focus is on your interactions with your customers...
                          not your internal processes
                           not your internal processes
May 6, 2010                                                                                           Slide 14
Value Stream Group View
                                                   Customer



                               C           R            R          C             R

     <<tangible>>          <<tangible>>             <<tangible>>           <<via phone>>         <<via phone>>
    <<electronic>>        <<electronic>>             Product               <<via web>>           <<via web>>
     Inbound              Sales Order               Shipment                Service            Service Request
  Purchase Order          Confirmation                                      Request              Resolution

                                               C
                      R            C                                         R             C
      Value
       Value
      Stream                                                                                     “Balancing &
                                                                                                  “Balancing &
       Stream                  $                                       $
                                                                                                   Leveling”
                               This view “peaks inside” the
                                This view “peaks inside” the
                                   VS-22             VS-31
                                                                                                    Leveling”
                                                                                                  ensures all
                                   VS-22              VS-31                                        ensures all
                               Enterprise Entity, mapping
                                Enterprise Entity, mapping
                               Inbound PO
                                Inbound PO            Issue
                                                       Issue                                       Business
                                                                                                    Business
                                    To                  To                                       Artifacts from
Value Stream
 Value Stream
                               inputs and outputs toResolution
                                     To
                                 Shipment
                                  Shipment            Value
                                                         To
                                inputs and outputs to Value
                                                    Resolution
                                                                                                  Artifacts from
                                                                                               Enterprise View
                                                                                                Enterprise View
Group we're
  Group we're
   peaking
                               Streams
                                Streams   $                   $                                are tied to some
                                                                                                are tied to some
    peaking                                                                                            VS
                                                                                                        VS
    inside
     inside                 VG-2 Customer Centric Group
                     Sun Microsystems, Inc

              Value Stream Elements are characterized by the
              Value Stream Elements are characterized by the
               transformations they drive (inputs to outputs)
                transformations they drive (inputs to outputs)
May 6, 2010                                                                                                 Slide 15
Value Stream Architecture View
                                                          Customer


                                                      C                         R
                                          C                          R
                                       <<via phone>>                                         <<via phone>>
                 <<via web>>             Service                         <<via web>>       Service Request
                   Service               Request                  Service Request            Resolution
                   Request                                          Resolution
                                          R                                                   C
                                R                                                   C
 Business
                                $
  Artifacts                         SVS-310                 Intermediate               $
created by                           Service                   Artifact                 SVS-312              Sub-Value
other Value                         Request                                            Accepted               Stream
 Streams                               To                                                 SR
                  Now we will “peak<<electronic>> the Issue-to-
                                C    inside” R
                                    Accepted                                              To
                                                                                       Resolution
                  Resolution ValueAccepted Service reveal how
                              $
                                       SR
                                   Stream to
                                      Request               $

                    work flows within your enterprise
                       R     R                          R C
Value Stream
    we're          <<electronic>>         <<electronic>>                            <<electronic>>
  “Peeking            Install                  Service                               Service
   Inside”             Base                    Contract                             Knowledge

               VS-31 Issue to Resolution
               VS-31 Issue to Resolution


      “Peeking inside” the VS begins to reveal how work flows
        “Peeking inside” the VS begins to reveal how work flows
        within your enterprise in support of your external flows Slide 16
         within your enterprise in support of your external flows
May 6, 2010
Example Data Lexicon
      Product                Install Base                  Service             Contract Level
                                Asset                      Contract
                                                            Line        [0..1]   of Service                         Related
                                                                                                                     Related
                                                                                                                   Business
                                                                                                                    Business
                                                                      entitled [0..1] ▲                           Data Objects
                                                                                                                  Data Objects
               Serviced asset [1] ▲                                   LOS for [0..n] ▼
                      SR's [0..n] ▼
                                                contract [1] ▲
                                                 SR's [0..n] ▼                                               Customer
                                                                                service address [1] ►        Address
                                                                                ◄ address for [0..*]
                                                          Service
                  Business                                Request                                            Customer
                   Business                                                     Primary contact [1] ►
                                                                                                              Contact
                    Data
                     Data
                                                                                ◄ contact for [0..*]
                   Object
                    Object                                                   S:Created

                                            SR Number     [0..1]            S: Accepted
                                                                                                                            Business
                                                                                                                             Business
                                                          [0..1]
                                                                       S: Closed - Resolved                                   Data
                                                                                                                               Data
                                        Request Date
                                                                            S: Canceled
                                                                                                                             States
                                                                                                                              States
                                             Problem      [0..1]
    Business
     Business
                                            Description
                                                                                                Business Data Rules
      Data
        Data                                 Severity     [0..1]
                                                                      Business Term        Definition                   Meaning
    Attributes
     Attributes
                                         Expected    [0..1]           Accepted Service    A Service Request for which   Reflects a state of the Service
                                       Response Time                  Request             Problem Description,          Request in which all necessary
                                                                                          Serviced Asset, Entitled      information has been gathered
                                           Actual    [0..1]                               Level of Service, Service     to begin resolution of that
                                       Response Time                                      Address, and Primary          service request.
DATA LEXICON –                                                                            Contact have been
SERVICE                                   Expected     [0..1]                             determined.
                                       Resolution Time
REQUEST                                                               Service Request
                                                                      Resolution
                                                                                          A Service Request in a
                                                                                          Closed - Resolved state.
                                                                                                                        Reflects a state of the Service
                                                                                                                        Request in which the
Last Modified On: 15-Mar-2010              Actual      [0..1]                                                           customer's issue has been
Last Modified By: Steve Melville
          Precise specification of the informational content of
                                       Resolution Time                                                                  resolved to the customer's
           Precise specification of the informational content of                                                        satisfaction.

          Business Artifacts is defined in Data Lexicon Models.
          Business Artifacts is defined in Data Lexicon Models.
 May 6, 2010                                                                                                                                      Slide 17
Sub-Value Stream Architecture View
                                     Customer
                                                                             This Business Process
                                                                         transforms “Service Requests”
                                                                           received via the phone into
                                                C                         “Accepted Service Requests”
                                 C
                                                    <<via phone>>
                <<electronic>>                         Service
 Business         Service                              Request
                  Request
 Process
                                                           R

                          R                            P-2740
                                                      Accept SR
                                                      Via Phone                                    $
                                                                     C
                     P-1202                                                   <<electronic>>       Accepted
                 “Peaking inside”
                    Accept SR     a Sub-Value Stream Service
                                       C        Accepted
                                                    Request
                                                                                               R
                                                                                                      SR
                                                                                                      To
                     Via Web
                 connects us to the Business Process
                               R    R                                                              Resolution
                                                                                                              $
Sub-Value              R     R   Level
  Stream                      <<electronic>>        <<electronic>>
   We're                             Install          Service
 “Peeking                             Base            Contract
  Inside”
              SVS-310 Service Request To Accepted SR

 The “leaf” of the Value Stream Hierarchy defines the scope (inputs and
  The “leaf” of the Value Stream Hierarchy defines the scope (inputs and
outputs) of your Business Processes (from which BPMN models can start)
outputs) of your Business Processes (from which BPMN models can start)
May 6, 2010                                                                                            Slide 18
Value Stream & Process Hierarchy
                                                   Value Stream Elements may be organized into a
                                                   Value Stream Elements may be organized into a
                                                              Value Stream Hierarchy
                                                              Value Stream Hierarchy

                                                                         Sun Microsystems, Inc. (SMI) Entity                                                                                                                 SMI                                Country/




                                                                                                                                                                                                                                                                                                         Analogous "Google Maps" Level of Detail
                                                                                                                                                                                                                                                                Contintent
             Value Stream Architecture Elements




                                                                                                                                                                               $                                  $                                 $
                                                                                                                     Group                                                                                                                                            Country
                                                                                                                     Aggregates
                                                                                                                                                                                     VG
                                                                                                                                                                                      VG$
                                                                                                                                                                                                                        VG
                                                                                                                                                                                                                         VG$
                                                                                                                                                                                                                                            ...          VG
                                                                                                                                                                                                                                                          VG$
                                4.9"




                                                                                                                                                  $                             $
                                                                          Value Streams                                                               VS                              VS
                                                                                                                                                                                                                                                                                Region
                                                                                                                                                                 $                                $




                                                               Sub-Value                                              $                   $                                $                         $
                                                                                                                                                                                                                                                                                         State
                                                                                                                          SVS             SVS                                  SVS                    SVS
                                                               Streams                                                              $                 $                                       $                        $




                                                     Business                                    BP                                               BP                                                                                                                                             City
                                                     Process                                      BP                                               BP


                                                  Process                                                                                                                                                                                                                                    Neighborhood
                                                                                                 BP-80 Level 1                                                                                            BP-80 Level 1
 Process
 Models




                                                                                                 (+)                (+)                                                                                   (+)                 (+)
                                                                                  Role




                                                                                                                                                                                           Role




                                                  Steps                                          1.2                1.3                                                                                   1.2                 1.3
  2.34"




                                                                                  Role




                                                                                                                                                                                           Role




                                                                                                              (+)                                                                                                      (+)
                                                                                                              1.7                                                                                                      1.7




                                                               BP-80 Level 2..n                                     BP-80 Level 2..n                                 BP-80 Level 2..n                                         BP-80 Level 2..n                                               Blocks /
           Process
                                                                                                                                                                                                                                                                                             Houses
                                                        Role




                                                                                                                                                          Role
                                                                                                       Role




                                                                                                                                                                                                                Role




                                                                 1.2.1                   1.2.3                            1.2.1           1.2.3                        1.2.1                      1.2.3                             1.2.1               1.2.3


           Sub-Steps
                                                        Role




                                                                                                                                                          Role
                                                                                                       Role




                                                                                                                                                                                                                Role




                                                                          1.2.2                                                   1.2.2                                            1.2.2                                                    1.2.2




May 6, 2010                                                                                                                                                                                                                                                                                             Slide 19
Upper Levels of a Value Stream Hierarchy
                                                                                 Sun
                                                                            Microsystems,
                                                                                  Inc




                  $                                        $                                                          $                                          $


                     VG-1
                     VG-2
                      VG-1
                      VG-2
                                                             VG-2
                                                             VG-2
                                                              VG-2
                                                              VG-2
                                                                                                                        VG-3
                                                                                                                        VG-2
                                                                                                                         VG-3
                                                                                                                         VG-2
                                                                                                                                                                      VG-4
                                                                                                                                                                      VG-2
                                                                                                                                                                       VG-4
                                                                                                                                                                       VG-2
                  Strategic
                  Customer
                   Strategic
                   Customer                                Customer
                                                           Customer
                                                           Customer
                                                            Customer                                                  Business
                                                                                                                      Customer
                                                                                                                      Business
                                                                                                                       Customer                                      People
                                                                                                                                                                    Customer
                                                                                                                                                                      People
                                                                                                                                                                     Customer
                    Centric
                  Visioning
                     Centric                                Centric
                                                            Centric
                                                             Centric                                                   Centric
                                                                                                                      Enabling
                                                                                                                        Centric                                      Centric
                                                                                                                                                                     Caring
                                                                                                                                                                      Centric
                   Visioning                                 Centric                                                   Enabling                                          Caring
                                  $                                   $                                                            $                                              $




   $              $                   $                                            $                        $                  $                $
    VS-10           VS-11                  VS-12                                    VS-32                       VS-50              VS-51         VS-55
    Insight        Concept                Initiative                               Resolution                   Strategy            Plan        Accounting
      to               to                     to                                      to                           to                 to            to
   Strategy       Retirement               Results                                 Knowledge                      Plan              Stock       Reporting
              $               $                        $                                          $                        $                $                $




       $                  $    VS-21              $  VS-22       $    VS-23            $                                                              $                     $
         VS-20                                                                              VS-31                                                         VS-80                  VS-81
                              Campaign             Sales Order         Order
       Relationship                                                                          Issue                                                        Recruit                 Hire
                                 to                     to           Fulfillment
            to                                                                                 to                                                           to                     to
                                Sales               Fulfilled             to
       Partnership                                                                         Resolution                                                      Hire                 Separate
                      $         Order $               Lines $          Cash $                           $                                                            $                     $




May 6, 2010                                                                                                                                                                           Slide 20
Function Hierarchy vs. Value Stream Architecture

    “Function Hierarchies”               Value Stream Architecture
       > Can be used to classify          > Can be used to classify
         processes into buckets.            processes into buckets.
       > Functional Hierarchies are       > Value Stream Hierarchies* are
         imposed                            rigorously derived
       > Don't explicitly demonstrate:    > Value Stream Architecture
          > How value is delivered to       Models explicitly show:
            the customer                      > How value is delivered to the
          > How work flows through              customer
            your organization                 > How work flows through your
          > Dependencies between                organization
            processes                         > Dependencies between
                                                processes

                                             *using EBA balancing and leveling techniques
May 6, 2010                                                                       Slide 21
Knowing Where You Want to Go



                  #1 Reason CRM Initiatives Fail:
                  #1 Reason CRM Initiatives Fail:
    Companies Can't Effectively Define Success11
    Companies Can't Effectively Define Success




Top 3 Reasons CRM Initiatives (Still) Fail – And How to Avoid Them, Pivotal CRM,
1

http://www.bitpipe.com/detail/RES/1244603771_296.html?asrc=HR_HRL



May 6, 2010                                                                        Slide 22
Clearly Define Success
     • Don't just list the possible benefits, be specific about which
       benefits you are committed to achieving
     • Baseline current state
              > Define clear, specific, measurable metrics for each Value Stream.
              > Value Stream Architecture models aid in the transformation of
                Value Stream metrics to process KPI's
                 > The rigorous decomposition of Value Streams into Sub-Value
                   Streams and of Sub-Value Streams to Business Processes
                   allows identification of finer-grained measures and performance
                   indicators with clear traceability to the higher level metrics
              > Use current measures against those metrics as your baseline.
     • Define success in terms of specific, measurable changes
       in these key metrics.




May 6, 2010                                                                          Slide 23
Example: Value Streams and Metrics
                $                         $                             $


                  VS-11
                   VS-11                     VS-21
                                             VS-21                    VS-31
                                                                      VS-31
                 Concept
                 Concept                   Campaign
                                           Campaign                   Issue
                                                                       Issue
                     to
                      to                      To
                                               To                       To
                                                                         To
                Retirement
                Retirement                Sales Order
                                          Sales Order               Resolution
                                                                    Resolution
                             $                         $                              $




                    Time-to-Market Quote Conversion Rate                    Issues Per Product
                                   Quote-to-PO Duration (Sales Cycle)       Delivery Cost per Service Request
                                   Margin                                   % of SR's with Response Time
      Key Metrics                                                           Within SLA
                                    Booking Time                            % of SR's with Resolution Time
                                                                            Within SLA
                                    Booking Transactional Cost
 ●
  ●Metrics organized by Value Stream
    Metrics organized by Value Stream
 ● Establish Baseline and Target Values for Key Metrics the project is intended to
  ● Establish Baseline and Target Values for Key Metrics the project is intended to
   impact as a more precise definition of “success”
    impact as a more precise definition of “success”
     > Example: Improve “% of SR's with Response Time Within SLA” by 20%
      > Example: Improve “% of SR's with Response Time Within SLA” by 20%
        without increase in “Delivery Cost Per Service Request.”
        without increase in “Delivery Cost Per Service Request.”
 ● Traceability between Value Streams, Sub-Value Streams, and Business Processes
  ● Traceability between Value Streams, Sub-Value Streams, and Business Processes
   allows these high-level targets to be decomposed into lower level KPI's
    allows these high-level targets to be decomposed into lower level KPI's
May 6, 2010                                                                                            Slide 24
Leveraging EBA
      • An Enterprise Business Architecture (EBA) Provides
        a customer-centric and holistic view of the
        enterprise and a business view of your CRM/ERP
        project
      • This talk will focus on three ways to leverage EBA
              ✔ Manage Organizational Change

              ☞Organize Your Program for Agility
              ➢ Avoid Late Surprises



May 6, 2010                                                  Slide 25
Organizing Your Program For Agility
   • To be effective, the team members, work activities, and
     information associated with large scale CRM/ERP projects
     must be organized effectively
   • Ineffective program organization results in:
        > Overlaps and gaps between program teams = churn, rework
        > Work Breakdown Structure (WBS) fails to reflect dependencies =
          unrealistic schedules, delays, rework
        > Information gathered and created by the program is not organized for
          traceability or easy retrieval = inefficiency, rework
        > “Unstable” organizing principle -- teams, WBS, and information
          groupings get out of sync every time business changes = lack of agility,
          higher cost, strands investment
   • Can we organize program information effectively to avoid
     these consequences?



May 6, 2010                                                                    Slide 26
What's Your Organizing Principle?
Some Candidate        Pro's                        Con's
Organizing Principles
by Application       + more natural for developers -- doesn't match business flows,
(Module) Groups                                    -- high likelihood of gaps
                                                   -- unstable (apps come and go!)
by Business          + more natural for "sponsors" -- doesn't match business flows,
Organizational Unit                                -- high likelihood of gaps,
                                                   -- unstable (reorg's happen!)
by Business Function + often close to "sponsors" -- doesn't match business flows
                     view                          -- high likelihood of gaps
                     + more stable than org
                     structure
by Value Stream      + matches business flows,     -- cross-functional may not be as
Element              + matches effective “units of natural for sponsors, especially
                     implementation”               in functionally siloed
                     + gaps much less likely       organizations
                     + stable
May 6, 2010                                                                    Slide 27
Value Stream Hierarchy is Backbone
     • The upper (architectural) levels of the Value Stream Hierarchy
       are quite stable – changing only as a result of specific, large-
       scale process re-engineering efforts (whereas re-orgs only
       require pushing around lines on the org chart!)
     • The Value Stream Hierarchy provides the backbone to which
       other elements can be attached.
     • Value Stream Elements:
              > are realized by Business Processes
              > are expected to meet Program objectives, Metrics and Measures
              > are supported by Logical Software Components (i.e., applications
                  and services)
              >   address Business Requirements
              >   have contributions from and are stewarded by Organizational
                  Units
              >   are tested by Test Plans and Test Scripts
              >   and provide organization for Project Plan Work-Breakdown
                  Structures (WBS) and Program Teams
May 6, 2010                                                                        Slide 28
Leverage Your Investment
     • Large Scale CRM/ERP projects require you to make a
       significant investment in understanding your organization
       and your solution
              >   Business Process Models and Requirements
              >   Design Specs
              >   Technical Specs
              >   Functional, Technical, and Deployment Architectures
              >   Project Plans, Work Breakdown Structures
              >   Program Rosters, Teams
              >   Test Plans, Scripts, Results
              >   Success Criteria
     • Is this work “throw-away” or can we leverage this
       investment throughout and beyond the life-cycle of
       the project?


May 6, 2010                                                             Slide 29
Our initial approach to managing this info
      • Via hundreds (literally) of disconnected documents...
        > Impacts:
              > little traceability between levels
              > expensive to build high-level views (so we rarely do!)
              > little or no navigation across relationships
              > tie to goals/requirements is ad hoc and hard to visualize or
                analyze
              > very difficult to analyze from multiple viewpoints.
              > rippling changes (e.g., to goals) through multiple documents is
                prohibitively expensive and time-consuming
      • ... and a handful of disconnected repositories and tools
         > Impacts:
              > little traceability between levels
              > little or no navigation across relationships
              > redundant data entry (= higher cost + time)
May 6, 2010                                                                       Slide 30
Transform How You Manage Info
        From                                   To
        • Document-Centric                     • Model-Centric
              Information is “hostaged” in      While the need for documents
              documents – making re-use and     won't go away...focus on managing
              analysis of this information
              difficult                         models rather then publishing
                                                documents.



        • Leverage Enterprise Architecture Tool(s) to maintain models in a
          common repository capable of generating multiple viewpoints. Use
          web publishing to enable broad distribution.
        • On IBIS we defined an Info Map to define the structure and semantics
          for program information
        • An EBA Meta-Model White Paper is being worked on jointly by Steve
          Melville and Ralph Whittle, expected to be published in May, 2010.


May 6, 2010                                                                    Slide 31
Organizing Information with Info Map
                                                                   <- tested by [0..n]
                                                                      tests {1..n] ->           <- supports [1..n]                                              Business                       publish
                                      Business                                                supported by{1..n] ->
                                                                                                                                  <- applies to [0..1]        Requirement                                    Master
                                       Goals                                                                                    should address{1..n] ->       (and Fit/Gap)                              Reqmt & Gaps
                                                                                                                                                                                                          List (MRGL)




                                                                                                                                                                                     addressed by ->
                                                                                               Master                                                          ( Reqm Name)




                                                                                                                                                                                      <- addresses
                                            <-has goals
                                                                                                                             <- gap resolved by [0..1]


                                             goal for ->
                                                                                           Process Scope
                E2E                                                                             List                             resolves {1..n] ->
                                                                            publish
              Process
               Flows

                  link                                                                                                                                         Application
                                         Business                                   <- implemented by [1..n]                                                     System
                                      Process Element                                  implements [1..n]->        Gap                                           (non 11i)
                                         (e.g., Value Stream                   <-plays role in [1..n]           Resolution
                                         Workflow, Process)                       actors [1..n]->                 (GR Name)


                                                                                                                                                                Oracle 11i
                   <- test case for


                                      <- input for




                                                           <- output from




                                                                                         Process
                     test case ->


                                       input ->




                                                                                                                                                                 Module
                                                              output ->




                                                                             link         Role                        link
                                                                                                                                           Configuration
                                                                                                                 Gap                          Spec
                                                                                                               Resolution                    BR.100
                                                                                     Process                    BR.030
                                          Business                                                                                                                                                               MD-120
                                                                                     Definition
                                           Artifact                                   BP.080                                       implemented by [1..n] ->                                                  MD-70
                                      (Data or Physical)                                                                             <- implements [1..n]        RICE
                                                                                                                                                                                                            MD-51
                                                                                                                                                               Elements
                                                                                                                                                                                          link
                                                                                                    test case ->                                                 Report                               MD-120
                                                   Test                                            <- test case for
                                                                   Test                                                                                                                           MD-70
                                                Scenario or                                                                                                                                      MD-50
                                                  Script    link Scripts &                                                                                      Interface     link
                                                                 Scenarios
                                                                                    (TE-40)                                                                                                                    MD-120
                                                                                                                                                                 Data                                       CV-60
                                                                                                                                             publish           Conversion            link                 CV-40
                                                                                                                                  Master
                                                                                        LEGEND                                  RICE Scope
                                                                                      Source of Truth:
                                                                                                                                   List                         Extension
        Info Map                                                                         EA Tool                                                                              link
                                                                                                                                                                                                  MD-120
                                                                                                                                                       link                                   MD-70
        Last Revised: 08-Sep-2009                                                                                                        RICE
        By: Steve Melville                                                                                                                                                                   MD-50
                                                                                                                                        Tracker
        Version 2.0                                                                   Source of Truth:
                                                                                      Collab Library



May 6, 2010                                                                                                                                                                                                               Slide 32
Leveraging EBA
      • An Enterprise Business Architecture (EBA) Provides
        a customer-centric and holistic view of the
        enterprise and a business view of your CRM/ERP
        project
      • This talk will focus on three ways to leverage EBA
              ✔ Manage Organizational Change
              ✔ Organize Your Program for Agility

              ☞Avoid Late Surprises


May 6, 2010                                                  Slide 33
Use Outside-In Approach
 • Application-Centric, Organization Centric, or Process Centric
   approaches are Inside-Out.
   > They make it easy to plunge into detailed designs...
   > But they make it difficult to see the things you should be
     working on, but aren't!
   > Gaps don't surface until late in test cycles – when they are
     expensive to correct and cause schedule delays
 • As noted earlier, EBA is Outside-In
   > Value Streams provide an End-to-End view of how value is
     delivered.
   > End-to-End views reduce risk of gaps – and also are helpful in
     constructing end-to-end test cases




May 6, 2010                                                    Slide 34
Define Primary Scope of Your Program in
  Clear
Terms of Value Stream Elements
                                                                                      Sun
                                                                                                                                                         = In Scope
                                                                                 Microsystems,
                                                                                       Inc
                                                                                                                                                         = Out of Scope



                       $                                        $                                                          $                                          $


                         VG-1
                         VG-2
                          VG-1
                          VG-2
                                                                  VG-2
                                                                  VG-2
                                                                   VG-2
                                                                   VG-2
                                                                                                                             VG-3
                                                                                                                             VG-2
                                                                                                                              VG-3
                                                                                                                              VG-2
                                                                                                                                                                           VG-4
                                                                                                                                                                           VG-2
                                                                                                                                                                            VG-4
                                                                                                                                                                            VG-2
                      Strategic
                      Customer
                       Strategic
                       Customer                                 Customer
                                                                Customer
                                                                Customer
                                                                 Customer                                                  Business
                                                                                                                           Customer
                                                                                                                            Business
                                                                                                                            Customer                                      People
                                                                                                                                                                         Customer
                                                                                                                                                                           People
                                                                                                                                                                          Customer
                        Centric
                      Visioning
                         Centric                                 Centric
                                                                 Centric
                                                                  Centric                                                   Centric
                                                                                                                           Enabling
                                                                                                                             Centric                                      Centric
                                                                                                                                                                          Caring
                                                                                                                                                                           Centric
                       Visioning                                  Centric                                                   Enabling                                          Caring
                                       $                                   $                                                            $                                              $




        $             $                    $                                            $                        $                  $                $
         VS-10          VS-11                   VS-12                                    VS-32                       VS-50              VS-51         VS-55
         Insight       Concept                 Initiative                               Resolution                   Strategy            Plan        Accounting
           to              to                      to                                      to                           to                 to            to
        Strategy      Retirement                Results                                 Knowledge                      Plan              Stock       Reporting
                  $                $                        $                                          $                        $                $                $




              $                $    VS-21              $  VS-22       $    VS-23            $                                                              $                     $
                VS-20                                                                            VS-31                                                         VS-80                  VS-81
                                   Campaign             Sales Order         Order
              Relationship                                                                        Issue                                                        Recruit                 Hire
                                      to                     to           Fulfillment
                   to                                                                               to                                                           to                     to
                                     Sales                Fulfilled            to
              Partnership                                                                       Resolution                                                      Hire                 Separate
                           $         Order $               Lines $          Cash $                           $                                                            $                     $




      Of course, this can and should be extended to Sub-Value
      Of course, this can and should be extended to Sub-Value
                Stream and Business Process levels
                 Stream and Business Process levels
May 6, 2010                                                                                                                                                                                         Slide 35
Leverage Model Relationships
• The interconnection of Value Stream Elements via the Business
  Artifacts they create and require forms a dependency graph.
• Use this dependency graph to derive secondary scope. -- i.e., the
  additional Value Stream Elements and Business Processes on
  which the primary scope depends – or which have dependencies
  on the primary scope.
• Leverage additional model relationships to define primary and
  secondary scope:
     > The Logical Software Components (applications or services) being
       replaced, added, or impacted.
     > The enterprise data (lexicon elements) required or created
     > The organizations affected by the Change Program.
     > The scope of Program Teams responsible for executing the Change
       Program

May 6, 2010                                                               Slide 36
Leveraging EBA to Avoid Waste
     IBIS scope covered ~285 distinct business processes... we needed to
      IBIS scope covered ~285 distinct business processes... we needed to
     understand how they all fit together.
      understand how they all fit together.




      Without Business Architecture            With Business Architecture
 • Overlaps = wasted effort, contention,   • No overlaps = enables teams to work
   re-work                                   in parallel with less integration risk
 • Gaps = schedule risk, rework            • No gaps = avoids late surprises/ re-
                                             work
 • Unclear dependencies =
   schedule/budget risk -- more meetings   • Clear dependencies = teams know
   with more people required to resolve      when/where to integrate, enables
   dependencies, rework if dependencies      construction of E2E scenarios
   not discovered soon enough

May 6, 2010                                                                    Slide 37
Summary
 • An Enterprise Business Architecture (EBA) provides a customer-
   centric and holistic view of your enterprise and a business view of
   your CRM/ERP project
   > Helps you understand and manage organizational change
   > Provides a framework for clear definition of metrics, measures
     and expectations for success
   > Provides a framework for organizing the vast amount of
     information generated by a large CRM/ERP implementation in
     a way that enables you to leverage it both during and after
     your initial implementation.
   > Provides the backbone for traceability between:
              >   Goals and Objectives
              >   Process Definitions
              >   Requirements
              >   End-to-End Test Scenarios
              >   Application Systems / Components
              >   Development Artifacts (Reports, Interfaces, Conversions, Extensions)
      > Helps avoid surprises that cause rework and schedule delays
May 6, 2010                                                                              Slide 38
To Explore Further...
       • Let's connect: http://www.linkedin.com/in/stevemelville
       • Understand Enterprise Business Architecture
              > Enterprise Business Architecture: The Formal Link between Strategy and Results, Ralph Whittle
                and Conrad B. Myrick, Auerbach Publications, CRC Press, 2005
              > IASA Enterprise Business Architecture Training Class, taught by Ralph Whittle.
              > Watch for EBA Meta-Model White Paper by Steve Melville and Ralph Whittle to be published later
                this month (May, 2010)

       • Other areas where Enterprise Business Architecture can be leveraged:
              >   Business Architecture: Scenarios & Use Cases:
                  http://bawg.omg.org/Bus_Arch_Scenario_White_Paper.pdf

       • Understand why, what and how of “Outside In” approaches
              > Customer Expectation Management: Success Without Exception, Terry Schurter & Steve Towers,
                Meghan-Kiffer Press, 2006
              > Reorganize for Resilience: Putting Customers at the Center of Your Business, Ranjay Gulati,
                Harvard Business Press, 2010
              > The “BP Group” on LinkedIn: http://www.linkedin.com/groups?gid=1062077&trk=myg_ugrp_ovr

       • Analysis of ERP/CRM projects:
              > http:www.panorama-consulting.com/2008ERPReport.html
              > Top 3 Reasons CRM Initiatives (Still) Fail – And How to Avoid Them, Pivotal CRM,
                http://www.bitpipe.com/detail/RES/1244603771_296.html?asrc=HR_HRL
May 6, 2010                                                                                                  Slide 39
Enterprise Business Architecture In Practice --
Leveraging EBA for Success on Large-Scale
CRM/ERP Implementations

Enterprise Business Architecture in Practice -- Leveraging EBA for Success on Large-Scale CRM/ERP Implementations

  • 1.
    Enterprise Business Architecturein Practice -- Leveraging EBA for Success on Large-Scale CRM/ERP Implementations Steve Melville May 6, 2010 Denver, Colorado
  • 2.
    Disclaimer • This presentation stems from an internal project conducted within Sun Microsystems prior to Sun's acquisition by Oracle. • It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. • The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle. May 6, 2010 Slide 2
  • 3.
    Objectives: • Demonstrate how Enterprise Business Architecture (EBA) can be leveraged to increase likelihood of success on very large scale CRM/ERP implementations • Focus is on pragmatic recommendations distilled from our experiences on Sun Microsystems' “IBIS” project. May 6, 2010 Slide 3
  • 4.
    Sun Microsystem's “IBIS”Project • Believed to be one of the larger CRP/ERM implementations ever attempted. • Multi-year, multi-deployment effort aimed at streamlining Suns' business and consolidating its application portfolio. > Number Business Processes Impacted = 285, spanning virtually all of Sun's core value streams: Concept-to-Offering, Campaign-to-Sales Order, Order-to-Cash, Supply Chain Plan-to-Stock, Issue- to-Resolution, and Financial Accounting-to-Reporting. > Number of Sun Applications Targeted for EOL = 513 (>50% of Sun's entire portfolio) > Number of Oracle eBusiness Suite (EBS) modules targeted for deployment = 74 (76% of 11i EBS) > Number of RICE Objects > 950, 417 Reports, 213 Interfaces, 88 Conversions, 232 Extensions > Number of program team members (peak) = 1,074 > Number of Internal Users > 30,000 > Number of Partner Companies Impacted > 3,000 (including Selling Partners, Suppliers, External Manufacturers, Logistics Providers, Banks, Export Control, Repairs Partners) > Deployment Architecture: single global instance comprised of Oracle eBusiness Suite (11.5.10): > Mid-Tier: 50 Sun Fire T2000 servers (total: 1.6 TB memory) > Data Tier: 4 Sun Fire E25K servers + 1 StorEdge 9990 + 1 STK 6540 Storage Array > Production OLTP Database Size (>6TB as of 8/1/2009) and growing! May 6, 2010 Slide 4
  • 5.
    Beware! • Large scaleCRM/ERP implementations are HIGH RISK undertakings due to: > Disruptive Effects on Your Entire Business Ecosystem > High Cost of Implementation > High Likelihood of Schedule and Budget Overruns • According to Panorama Consulting's 3-year study of more than 1,300 ERP implementations published in 2008*: > 93% of ERP projects take longer than expected > 65% cost more than expected > 79% deliver less than half of the expected business benefits *Full report available at: http:www.panorama-consulting.com/2008ERPReport.html May 6, 2010 Slide 5
  • 6.
    Key Pitfalls • Inability to manage the organizational change necessary for success > Unclear understanding of where you are, where you want to be, and why you want to be there (unclear definition of success) • Ineffective program organization > Teams -- overlaps and gaps between program teams > WBS -- failure to understand dependencies in work breakdown structure > Program information – the information gathered and created by the program is not organized for traceability or easy retrieval • Late surprises > Key business requirements that don't surface until late in the game force re-work and schedule delays May 6, 2010 Slide 6
  • 7.
    Leveraging EBA • An Enterprise Business Architecture (EBA) provides a customer-centric and holistic view of the enterprise and a business view of your CRM/ERP project • This talk will focus on ways to leverage EBA to ➢ Manage Organizational Change ➢ Organize Your Program for Agility ➢ Avoid Late Surprises May 6, 2010 Slide 7
  • 8.
    The Change isLARGER Than You Think! ● Metrics targeted for improvement The change ● Applications targeted to replace or introduce you intended ● Business Processes targeted for re-engineering ● Metrics which must not be degraded ● Applications upstream from applications being replaced, that must be modified to create different outputs ● Applications downstream from applications being replaced that must deal with different inputs ● New / changed application interfaces (no “dangling wires”!) Side-effects ● Business Processes that must be modified to of the create different artifacts implementation ● Business Processes that must be modified to itself handle different artifacts as inputs An organization's ability to manage change is one An organization's ability to manage change is one of the main gating factors for success of the main gating factors for success
  • 9.
    Managing Organizational Change Managing organizational change requires knowing where you are, where you want to be, and why Transition Transition Keep From To Organization's Organization's Desired Current Capabilities Capabilities Where we Where we are today want to be Looks pretty simple, right? May 6, 2010 Slide 9
  • 10.
    The reality atmost organizations Transition Transition Keep From To Organization's Current Organization's Capabilities Where we Desired Where we are today? want to be? Capabilities You can't clearly define success if you are fuzzy about where You can't clearly define success if you are fuzzy about where you are and where you want to be you are and where you want to be May 6, 2010 Slide 10
  • 11.
    Knowing Where YouAre • Why Model “As-Is” state? > Helps identify opportunities for improvement > Helps to identify real problems rather than pet theories > Helps bring to light “hidden” requirements > Helps identify change targets – i.e., roles that will be impacted by process changes > Provides a baseline against which changes can be defined – knowing the “the deltas” greatly aids business readiness activities • Some risks of modeling current state > Delays “getting on with the solution” > Costs time (delaying value realization) and money > Can get bogged down in “analysis paralysis” > Modeling current state forces thinking down the same ruts -- may stifle innovation > Is throw-away – why create a blueprint of a building just before you knock it down? Recommendation: Initially, model current state Recommendation: Initially, model current state at Business Architecture level, rather than Business Process level at Business Architecture level, rather than Business Process level (but leverage Business Process level models if they exist) (but leverage Business Process level models if they exist) May 6, 2010 Slide 11
  • 12.
    1 What's an EnterpriseBusiness Architecture ? • A single common Enterprise-Wide framework that focuses on how value is generated for customers by your company and it's partners. • An Enterprise Business Architecture (EBA) is composed of an integrated set of models, expressed through a set of views that define your Value Stream Elements and the business artifacts required and produced through those value streams. • These models and views also depict the relationships that Value Stream Elements and Business Artifacts have with each other and: > with External Business Entities (e.g., customers, suppliers) > with your internal organization structures (i.e., your org chart) > with your business strategies and goals and the change programs intended to drive improvements > with other elements of your Enterprise Architecture (e.g., Application Architecture, Information Architecture, etc.) 1 Refer to Enterprise Business Architecture: The Formal Link between Strategy and Results, Ralph Whittle and Conrad B. Myrick for more information about EBA. May 6, 2010 Slide 12
  • 13.
    Building The EnterpriseBusiness Architecture • The EBA is rigorously derived via an integrated set of models, expressed via a set of views. • What follows are excerpts from a few of these views to illustrate some key points. > Enterprise Entity View – the “outside in” view > Value Stream Group View – ties “outside in” views to the end-to-end flows of how value is delivered > Value Stream Architecture View – begins to show how work flows within your enterprise > Sub-Value Stream Architecture View – the connection to Business Processes May 6, 2010 Slide 13
  • 14.
    EBA Enterprise EntityView is “Outside In” “External Entity” “External Entity” e.g., Customer, e.g., Customer, Business Artifacts Business Artifacts Supplier, Selling Exchanged Customer Supplier, Selling Exchanged Partner Partner Between Entities Between Entities C R R C R <<tangible>> <<tangible>> <<tangible>> <<via phone>> <<via phone>> <<electronic>> <<electronic>> Product <<via web>> <<via web>> Inbound Sales Order Shipment Service Service Request Purchase Order Confirmation Request Resolution C R C R C “C” designates “C” designates outputs “created” outputs “created” “R” designates “R” designates inputs “received” inputs “received” Sun Microsystems, The “Enterprise Entity” The “Enterprise Entity” Inc (i.e., Your Enterprise) (i.e., Your Enterprise) viewed at this level as aa viewed at this level as “black box” “black box” Focus is on your interactions with your customers... Focus is on your interactions with your customers... not your internal processes not your internal processes May 6, 2010 Slide 14
  • 15.
    Value Stream GroupView Customer C R R C R <<tangible>> <<tangible>> <<tangible>> <<via phone>> <<via phone>> <<electronic>> <<electronic>> Product <<via web>> <<via web>> Inbound Sales Order Shipment Service Service Request Purchase Order Confirmation Request Resolution C R C R C Value Value Stream “Balancing & “Balancing & Stream $ $ Leveling” This view “peaks inside” the This view “peaks inside” the VS-22 VS-31 Leveling” ensures all VS-22 VS-31 ensures all Enterprise Entity, mapping Enterprise Entity, mapping Inbound PO Inbound PO Issue Issue Business Business To To Artifacts from Value Stream Value Stream inputs and outputs toResolution To Shipment Shipment Value To inputs and outputs to Value Resolution Artifacts from Enterprise View Enterprise View Group we're Group we're peaking Streams Streams $ $ are tied to some are tied to some peaking VS VS inside inside VG-2 Customer Centric Group Sun Microsystems, Inc Value Stream Elements are characterized by the Value Stream Elements are characterized by the transformations they drive (inputs to outputs) transformations they drive (inputs to outputs) May 6, 2010 Slide 15
  • 16.
    Value Stream ArchitectureView Customer C R C R <<via phone>> <<via phone>> <<via web>> Service <<via web>> Service Request Service Request Service Request Resolution Request Resolution R C R C Business $ Artifacts SVS-310 Intermediate $ created by Service Artifact SVS-312 Sub-Value other Value Request Accepted Stream Streams To SR Now we will “peak<<electronic>> the Issue-to- C inside” R Accepted To Resolution Resolution ValueAccepted Service reveal how $ SR Stream to Request $ work flows within your enterprise R R R C Value Stream we're <<electronic>> <<electronic>> <<electronic>> “Peeking Install Service Service Inside” Base Contract Knowledge VS-31 Issue to Resolution VS-31 Issue to Resolution “Peeking inside” the VS begins to reveal how work flows “Peeking inside” the VS begins to reveal how work flows within your enterprise in support of your external flows Slide 16 within your enterprise in support of your external flows May 6, 2010
  • 17.
    Example Data Lexicon Product Install Base Service Contract Level Asset Contract Line [0..1] of Service Related Related Business Business entitled [0..1] ▲ Data Objects Data Objects Serviced asset [1] ▲ LOS for [0..n] ▼ SR's [0..n] ▼ contract [1] ▲ SR's [0..n] ▼ Customer service address [1] ► Address ◄ address for [0..*] Service Business Request Customer Business Primary contact [1] ► Contact Data Data ◄ contact for [0..*] Object Object S:Created SR Number [0..1] S: Accepted Business Business [0..1] S: Closed - Resolved Data Data Request Date S: Canceled States States Problem [0..1] Business Business Description Business Data Rules Data Data Severity [0..1] Business Term Definition Meaning Attributes Attributes Expected [0..1] Accepted Service A Service Request for which Reflects a state of the Service Response Time Request Problem Description, Request in which all necessary Serviced Asset, Entitled information has been gathered Actual [0..1] Level of Service, Service to begin resolution of that Response Time Address, and Primary service request. DATA LEXICON – Contact have been SERVICE Expected [0..1] determined. Resolution Time REQUEST Service Request Resolution A Service Request in a Closed - Resolved state. Reflects a state of the Service Request in which the Last Modified On: 15-Mar-2010 Actual [0..1] customer's issue has been Last Modified By: Steve Melville Precise specification of the informational content of Resolution Time resolved to the customer's Precise specification of the informational content of satisfaction. Business Artifacts is defined in Data Lexicon Models. Business Artifacts is defined in Data Lexicon Models. May 6, 2010 Slide 17
  • 18.
    Sub-Value Stream ArchitectureView Customer This Business Process transforms “Service Requests” received via the phone into C “Accepted Service Requests” C <<via phone>> <<electronic>> Service Business Service Request Request Process R R P-2740 Accept SR Via Phone $ C P-1202 <<electronic>> Accepted “Peaking inside” Accept SR a Sub-Value Stream Service C Accepted Request R SR To Via Web connects us to the Business Process R R Resolution $ Sub-Value R R Level Stream <<electronic>> <<electronic>> We're Install Service “Peeking Base Contract Inside” SVS-310 Service Request To Accepted SR The “leaf” of the Value Stream Hierarchy defines the scope (inputs and The “leaf” of the Value Stream Hierarchy defines the scope (inputs and outputs) of your Business Processes (from which BPMN models can start) outputs) of your Business Processes (from which BPMN models can start) May 6, 2010 Slide 18
  • 19.
    Value Stream &Process Hierarchy Value Stream Elements may be organized into a Value Stream Elements may be organized into a Value Stream Hierarchy Value Stream Hierarchy Sun Microsystems, Inc. (SMI) Entity SMI Country/ Analogous "Google Maps" Level of Detail Contintent Value Stream Architecture Elements $ $ $ Group Country Aggregates VG VG$ VG VG$ ... VG VG$ 4.9" $ $ Value Streams VS VS Region $ $ Sub-Value $ $ $ $ State SVS SVS SVS SVS Streams $ $ $ $ Business BP BP City Process BP BP Process Neighborhood BP-80 Level 1 BP-80 Level 1 Process Models (+) (+) (+) (+) Role Role Steps 1.2 1.3 1.2 1.3 2.34" Role Role (+) (+) 1.7 1.7 BP-80 Level 2..n BP-80 Level 2..n BP-80 Level 2..n BP-80 Level 2..n Blocks / Process Houses Role Role Role Role 1.2.1 1.2.3 1.2.1 1.2.3 1.2.1 1.2.3 1.2.1 1.2.3 Sub-Steps Role Role Role Role 1.2.2 1.2.2 1.2.2 1.2.2 May 6, 2010 Slide 19
  • 20.
    Upper Levels ofa Value Stream Hierarchy Sun Microsystems, Inc $ $ $ $ VG-1 VG-2 VG-1 VG-2 VG-2 VG-2 VG-2 VG-2 VG-3 VG-2 VG-3 VG-2 VG-4 VG-2 VG-4 VG-2 Strategic Customer Strategic Customer Customer Customer Customer Customer Business Customer Business Customer People Customer People Customer Centric Visioning Centric Centric Centric Centric Centric Enabling Centric Centric Caring Centric Visioning Centric Enabling Caring $ $ $ $ $ $ $ $ $ $ $ VS-10 VS-11 VS-12 VS-32 VS-50 VS-51 VS-55 Insight Concept Initiative Resolution Strategy Plan Accounting to to to to to to to Strategy Retirement Results Knowledge Plan Stock Reporting $ $ $ $ $ $ $ $ $ VS-21 $ VS-22 $ VS-23 $ $ $ VS-20 VS-31 VS-80 VS-81 Campaign Sales Order Order Relationship Issue Recruit Hire to to Fulfillment to to to to Sales Fulfilled to Partnership Resolution Hire Separate $ Order $ Lines $ Cash $ $ $ $ May 6, 2010 Slide 20
  • 21.
    Function Hierarchy vs.Value Stream Architecture “Function Hierarchies” Value Stream Architecture > Can be used to classify > Can be used to classify processes into buckets. processes into buckets. > Functional Hierarchies are > Value Stream Hierarchies* are imposed rigorously derived > Don't explicitly demonstrate: > Value Stream Architecture > How value is delivered to Models explicitly show: the customer > How value is delivered to the > How work flows through customer your organization > How work flows through your > Dependencies between organization processes > Dependencies between processes *using EBA balancing and leveling techniques May 6, 2010 Slide 21
  • 22.
    Knowing Where YouWant to Go #1 Reason CRM Initiatives Fail: #1 Reason CRM Initiatives Fail: Companies Can't Effectively Define Success11 Companies Can't Effectively Define Success Top 3 Reasons CRM Initiatives (Still) Fail – And How to Avoid Them, Pivotal CRM, 1 http://www.bitpipe.com/detail/RES/1244603771_296.html?asrc=HR_HRL May 6, 2010 Slide 22
  • 23.
    Clearly Define Success • Don't just list the possible benefits, be specific about which benefits you are committed to achieving • Baseline current state > Define clear, specific, measurable metrics for each Value Stream. > Value Stream Architecture models aid in the transformation of Value Stream metrics to process KPI's > The rigorous decomposition of Value Streams into Sub-Value Streams and of Sub-Value Streams to Business Processes allows identification of finer-grained measures and performance indicators with clear traceability to the higher level metrics > Use current measures against those metrics as your baseline. • Define success in terms of specific, measurable changes in these key metrics. May 6, 2010 Slide 23
  • 24.
    Example: Value Streamsand Metrics $ $ $ VS-11 VS-11 VS-21 VS-21 VS-31 VS-31 Concept Concept Campaign Campaign Issue Issue to to To To To To Retirement Retirement Sales Order Sales Order Resolution Resolution $ $ $ Time-to-Market Quote Conversion Rate Issues Per Product Quote-to-PO Duration (Sales Cycle) Delivery Cost per Service Request Margin % of SR's with Response Time Key Metrics Within SLA Booking Time % of SR's with Resolution Time Within SLA Booking Transactional Cost ● ●Metrics organized by Value Stream Metrics organized by Value Stream ● Establish Baseline and Target Values for Key Metrics the project is intended to ● Establish Baseline and Target Values for Key Metrics the project is intended to impact as a more precise definition of “success” impact as a more precise definition of “success” > Example: Improve “% of SR's with Response Time Within SLA” by 20% > Example: Improve “% of SR's with Response Time Within SLA” by 20% without increase in “Delivery Cost Per Service Request.” without increase in “Delivery Cost Per Service Request.” ● Traceability between Value Streams, Sub-Value Streams, and Business Processes ● Traceability between Value Streams, Sub-Value Streams, and Business Processes allows these high-level targets to be decomposed into lower level KPI's allows these high-level targets to be decomposed into lower level KPI's May 6, 2010 Slide 24
  • 25.
    Leveraging EBA • An Enterprise Business Architecture (EBA) Provides a customer-centric and holistic view of the enterprise and a business view of your CRM/ERP project • This talk will focus on three ways to leverage EBA ✔ Manage Organizational Change ☞Organize Your Program for Agility ➢ Avoid Late Surprises May 6, 2010 Slide 25
  • 26.
    Organizing Your ProgramFor Agility • To be effective, the team members, work activities, and information associated with large scale CRM/ERP projects must be organized effectively • Ineffective program organization results in: > Overlaps and gaps between program teams = churn, rework > Work Breakdown Structure (WBS) fails to reflect dependencies = unrealistic schedules, delays, rework > Information gathered and created by the program is not organized for traceability or easy retrieval = inefficiency, rework > “Unstable” organizing principle -- teams, WBS, and information groupings get out of sync every time business changes = lack of agility, higher cost, strands investment • Can we organize program information effectively to avoid these consequences? May 6, 2010 Slide 26
  • 27.
    What's Your OrganizingPrinciple? Some Candidate Pro's Con's Organizing Principles by Application + more natural for developers -- doesn't match business flows, (Module) Groups -- high likelihood of gaps -- unstable (apps come and go!) by Business + more natural for "sponsors" -- doesn't match business flows, Organizational Unit -- high likelihood of gaps, -- unstable (reorg's happen!) by Business Function + often close to "sponsors" -- doesn't match business flows view -- high likelihood of gaps + more stable than org structure by Value Stream + matches business flows, -- cross-functional may not be as Element + matches effective “units of natural for sponsors, especially implementation” in functionally siloed + gaps much less likely organizations + stable May 6, 2010 Slide 27
  • 28.
    Value Stream Hierarchyis Backbone • The upper (architectural) levels of the Value Stream Hierarchy are quite stable – changing only as a result of specific, large- scale process re-engineering efforts (whereas re-orgs only require pushing around lines on the org chart!) • The Value Stream Hierarchy provides the backbone to which other elements can be attached. • Value Stream Elements: > are realized by Business Processes > are expected to meet Program objectives, Metrics and Measures > are supported by Logical Software Components (i.e., applications and services) > address Business Requirements > have contributions from and are stewarded by Organizational Units > are tested by Test Plans and Test Scripts > and provide organization for Project Plan Work-Breakdown Structures (WBS) and Program Teams May 6, 2010 Slide 28
  • 29.
    Leverage Your Investment • Large Scale CRM/ERP projects require you to make a significant investment in understanding your organization and your solution > Business Process Models and Requirements > Design Specs > Technical Specs > Functional, Technical, and Deployment Architectures > Project Plans, Work Breakdown Structures > Program Rosters, Teams > Test Plans, Scripts, Results > Success Criteria • Is this work “throw-away” or can we leverage this investment throughout and beyond the life-cycle of the project? May 6, 2010 Slide 29
  • 30.
    Our initial approachto managing this info • Via hundreds (literally) of disconnected documents... > Impacts: > little traceability between levels > expensive to build high-level views (so we rarely do!) > little or no navigation across relationships > tie to goals/requirements is ad hoc and hard to visualize or analyze > very difficult to analyze from multiple viewpoints. > rippling changes (e.g., to goals) through multiple documents is prohibitively expensive and time-consuming • ... and a handful of disconnected repositories and tools > Impacts: > little traceability between levels > little or no navigation across relationships > redundant data entry (= higher cost + time) May 6, 2010 Slide 30
  • 31.
    Transform How YouManage Info From To • Document-Centric • Model-Centric Information is “hostaged” in While the need for documents documents – making re-use and won't go away...focus on managing analysis of this information difficult models rather then publishing documents. • Leverage Enterprise Architecture Tool(s) to maintain models in a common repository capable of generating multiple viewpoints. Use web publishing to enable broad distribution. • On IBIS we defined an Info Map to define the structure and semantics for program information • An EBA Meta-Model White Paper is being worked on jointly by Steve Melville and Ralph Whittle, expected to be published in May, 2010. May 6, 2010 Slide 31
  • 32.
    Organizing Information withInfo Map <- tested by [0..n] tests {1..n] -> <- supports [1..n] Business publish Business supported by{1..n] -> <- applies to [0..1] Requirement Master Goals should address{1..n] -> (and Fit/Gap) Reqmt & Gaps List (MRGL) addressed by -> Master ( Reqm Name) <- addresses <-has goals <- gap resolved by [0..1] goal for -> Process Scope E2E List resolves {1..n] -> publish Process Flows link Application Business <- implemented by [1..n] System Process Element implements [1..n]-> Gap (non 11i) (e.g., Value Stream <-plays role in [1..n] Resolution Workflow, Process) actors [1..n]-> (GR Name) Oracle 11i <- test case for <- input for <- output from Process test case -> input -> Module output -> link Role link Configuration Gap Spec Resolution BR.100 Process BR.030 Business MD-120 Definition Artifact BP.080 implemented by [1..n] -> MD-70 (Data or Physical) <- implements [1..n] RICE MD-51 Elements link test case -> Report MD-120 Test <- test case for Test MD-70 Scenario or MD-50 Script link Scripts & Interface link Scenarios (TE-40) MD-120 Data CV-60 publish Conversion link CV-40 Master LEGEND RICE Scope Source of Truth: List Extension Info Map EA Tool link MD-120 link MD-70 Last Revised: 08-Sep-2009 RICE By: Steve Melville MD-50 Tracker Version 2.0 Source of Truth: Collab Library May 6, 2010 Slide 32
  • 33.
    Leveraging EBA • An Enterprise Business Architecture (EBA) Provides a customer-centric and holistic view of the enterprise and a business view of your CRM/ERP project • This talk will focus on three ways to leverage EBA ✔ Manage Organizational Change ✔ Organize Your Program for Agility ☞Avoid Late Surprises May 6, 2010 Slide 33
  • 34.
    Use Outside-In Approach • Application-Centric, Organization Centric, or Process Centric approaches are Inside-Out. > They make it easy to plunge into detailed designs... > But they make it difficult to see the things you should be working on, but aren't! > Gaps don't surface until late in test cycles – when they are expensive to correct and cause schedule delays • As noted earlier, EBA is Outside-In > Value Streams provide an End-to-End view of how value is delivered. > End-to-End views reduce risk of gaps – and also are helpful in constructing end-to-end test cases May 6, 2010 Slide 34
  • 35.
    Define Primary Scopeof Your Program in Clear Terms of Value Stream Elements Sun = In Scope Microsystems, Inc = Out of Scope $ $ $ $ VG-1 VG-2 VG-1 VG-2 VG-2 VG-2 VG-2 VG-2 VG-3 VG-2 VG-3 VG-2 VG-4 VG-2 VG-4 VG-2 Strategic Customer Strategic Customer Customer Customer Customer Customer Business Customer Business Customer People Customer People Customer Centric Visioning Centric Centric Centric Centric Centric Enabling Centric Centric Caring Centric Visioning Centric Enabling Caring $ $ $ $ $ $ $ $ $ $ $ VS-10 VS-11 VS-12 VS-32 VS-50 VS-51 VS-55 Insight Concept Initiative Resolution Strategy Plan Accounting to to to to to to to Strategy Retirement Results Knowledge Plan Stock Reporting $ $ $ $ $ $ $ $ $ VS-21 $ VS-22 $ VS-23 $ $ $ VS-20 VS-31 VS-80 VS-81 Campaign Sales Order Order Relationship Issue Recruit Hire to to Fulfillment to to to to Sales Fulfilled to Partnership Resolution Hire Separate $ Order $ Lines $ Cash $ $ $ $ Of course, this can and should be extended to Sub-Value Of course, this can and should be extended to Sub-Value Stream and Business Process levels Stream and Business Process levels May 6, 2010 Slide 35
  • 36.
    Leverage Model Relationships •The interconnection of Value Stream Elements via the Business Artifacts they create and require forms a dependency graph. • Use this dependency graph to derive secondary scope. -- i.e., the additional Value Stream Elements and Business Processes on which the primary scope depends – or which have dependencies on the primary scope. • Leverage additional model relationships to define primary and secondary scope: > The Logical Software Components (applications or services) being replaced, added, or impacted. > The enterprise data (lexicon elements) required or created > The organizations affected by the Change Program. > The scope of Program Teams responsible for executing the Change Program May 6, 2010 Slide 36
  • 37.
    Leveraging EBA toAvoid Waste IBIS scope covered ~285 distinct business processes... we needed to IBIS scope covered ~285 distinct business processes... we needed to understand how they all fit together. understand how they all fit together. Without Business Architecture With Business Architecture • Overlaps = wasted effort, contention, • No overlaps = enables teams to work re-work in parallel with less integration risk • Gaps = schedule risk, rework • No gaps = avoids late surprises/ re- work • Unclear dependencies = schedule/budget risk -- more meetings • Clear dependencies = teams know with more people required to resolve when/where to integrate, enables dependencies, rework if dependencies construction of E2E scenarios not discovered soon enough May 6, 2010 Slide 37
  • 38.
    Summary • AnEnterprise Business Architecture (EBA) provides a customer- centric and holistic view of your enterprise and a business view of your CRM/ERP project > Helps you understand and manage organizational change > Provides a framework for clear definition of metrics, measures and expectations for success > Provides a framework for organizing the vast amount of information generated by a large CRM/ERP implementation in a way that enables you to leverage it both during and after your initial implementation. > Provides the backbone for traceability between: > Goals and Objectives > Process Definitions > Requirements > End-to-End Test Scenarios > Application Systems / Components > Development Artifacts (Reports, Interfaces, Conversions, Extensions) > Helps avoid surprises that cause rework and schedule delays May 6, 2010 Slide 38
  • 39.
    To Explore Further... • Let's connect: http://www.linkedin.com/in/stevemelville • Understand Enterprise Business Architecture > Enterprise Business Architecture: The Formal Link between Strategy and Results, Ralph Whittle and Conrad B. Myrick, Auerbach Publications, CRC Press, 2005 > IASA Enterprise Business Architecture Training Class, taught by Ralph Whittle. > Watch for EBA Meta-Model White Paper by Steve Melville and Ralph Whittle to be published later this month (May, 2010) • Other areas where Enterprise Business Architecture can be leveraged: > Business Architecture: Scenarios & Use Cases: http://bawg.omg.org/Bus_Arch_Scenario_White_Paper.pdf • Understand why, what and how of “Outside In” approaches > Customer Expectation Management: Success Without Exception, Terry Schurter & Steve Towers, Meghan-Kiffer Press, 2006 > Reorganize for Resilience: Putting Customers at the Center of Your Business, Ranjay Gulati, Harvard Business Press, 2010 > The “BP Group” on LinkedIn: http://www.linkedin.com/groups?gid=1062077&trk=myg_ugrp_ovr • Analysis of ERP/CRM projects: > http:www.panorama-consulting.com/2008ERPReport.html > Top 3 Reasons CRM Initiatives (Still) Fail – And How to Avoid Them, Pivotal CRM, http://www.bitpipe.com/detail/RES/1244603771_296.html?asrc=HR_HRL May 6, 2010 Slide 39
  • 40.
    Enterprise Business ArchitectureIn Practice -- Leveraging EBA for Success on Large-Scale CRM/ERP Implementations