This document contains details and specifications for a new stair and roof structure upgrade project. It includes dimensions and material specifications for stringers, treads, risers and other stair components. It also provides section views, elevations and schedules for steel truss types and ladder details. All drawings must be read in conjunction with other project drawings.
Revit Architecture Training Topics and Notes of Days-11-20 in Revit Platinum ...Subair Shamsudheen
Dear Friend, a word about these slides.
These slides are...
- Hand written
- Captures of white board writings
- Created on the fly while discussing topics in Revit class
- Contains screen shots and annotations
- Contains rough sketches
- Enjoy! Thank you!
-------------------------------------------------------------------------
Topics discussed
-------------------------------------------------------------------------
Offset tool and its weird nature
How offset works in Revit
How to match properties
OTA (Object Tool Action) method
How to lock position of objects
How to dimension walls
'Entire' option for walls
How to edit dimensions
How to end dimensions
Blue boxes on Dimension lines
How blue boxes behave when clicked
Concept of views in Revit
Types of parameters
Dimension: witness line gap to element
Closing views
How to create multiple copies of a view
Types of duplications
Hiding objects in views
Applying visibility settings to many views
Creating view templates
Applying view templates
How are objects categorized
Editing dimensions between wallls
Wall creation methods
Inscribed - Circumscribed - Arc walls
Two types Start - end - radius
Center - ends - arc
Tangent
How to create rounded corners
Fillet arc
How to create linework
Creating walls with 'pick lines' method
Wall creation method
Flipping walls without changing interior dimensions
Offset: best option for offsetting walls
Offset problem addressed
Offset value treated in Revit
Location to location line
Active view
Reducing project loading time
What is preview
Offsetting walls
Detecting location line used to draft walls
How to trim walls
How are objects categorized
Floor creation
PICK tools
Sketch mode
Big green check mark
Duplicate before creating floors
Editing floors
Splitting elements
Floor creation best practices
Floor behaviour when using pick walls and pick lines tool
Stair creation from pavement to Ground floor
Maximum riser height means
Minimum tread depth means
Stair calculator
Deleting railigns
'Monolithic' means
Removing stringers
Stringer carriage
Height means
Disabling 'End with Riser'
Subtraction: Reveal
Reveal in walls
Sweep: profiles
How to see ref. planes in family Editor
Load into project
How to add information to templates
Hiding objects in Revit
Printing hidden objects
How to detect hidden elements
Detecting elements in temporary hidden mode
Exit from temporary hiding mode
Short keys for temporary hiding and permenant hiding
Base extension for walls
Stacked wall
Parameter types
Top extension for walls
General editing moves
And much more...
Visit www.RevitTrainingLive.com to join.
We are specialized in all kinds of threading jobs, which involves in Major Valve Industries and Specialized in critical machining & fabrication works
CKB Preciway Engineering Pvt. ltd
[Heavy Fabrication & Conventional Machining Division]
DP 32/2 Sidco Industrial Estate,
Thirumazhisai, Chennai,
Tamil Nadu, India- 600 124
MOBILE
+91 98411 24238
EMAIL
marketing@ckbpreci.com,
WEB
http://www.ckbpreci.com/
1. 6
S1-204
(7 No.Equal Treads)
1575
(8No.EqualRisers)
1452
225x10 MS Plate
Stringers
900
A3
A4
11
200200
200
(7 No.Equal Treads)
1826
200
FFL 0.000
Existing Floor Level
432
FFL 1.422
New Grating Level
9000
1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
TS-02
TS-02
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01 TS-01
TS-01
TS-01
TS-01
TS-01
9000
250
250
250
25
25
225
225
182182
25
RSA 40x40x3
Treads:
FLOWFORGE
225
460
7
S1-204
120x220 Steel Angle 120x220 Steel Angle
1452
100x10mm Thk. Steel plate
100mm MS Plate
connected to New
Gantry Beam
120x120x10 Steel Angle
UB178x102x19
1100
EQUALRISERS
Rungs: 20mm Ø bars
DESCRIPTION :
PROJECT :
PROJECT NO :
SCALE :
DRAWING No : REVISION :
R E G I S T E R E D I N E N G L A N D : C O M P A N Y R E G. N o. 7 0 8 3 2 9 9
ARC MC
M I S S I O N C R I T I C A L
140-142 St.John Street, London EC1V 4UB T 020 34112571
ALL RIGHTS RESERVED. ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN
CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF ARC:MC LIMITED AND MAY NOT BE
DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN CONSENT.
DO NOT SCALE FROM DRAWINGS. ALL DISCREPANCIES TO BE REPORTED TO ARC:MC
LIMITED IMMEDIATELY. ALL DIMENSIONS TO BE VERIFIED BY CONTRACTOR PRIOR TO ANY
WORKS COMMENCING ON SITE.
FOR TENDER
NOTES : CLIENT :PROJECT TEAM : KEY / LOCATION PLAN :
As indicated @ A1
#
Barclays 5NC, SW Roof Structure Upgrade
Barclays 5 North Colonnade
L.3025.06
Stair & Truss Details
S1-204
REV. DATE ISSUE BY CH
# 23/08/2016 Issue for Tender AG EU
1 : 20
Section 1 - New Stair
1
1 : 20
Detail 1 - New Stair
2
3D View of Stairs
3
1 : 50
Elevation on Truss
4
1 : 10
Typical Stair Detail
6
TRUSS TYPE 1 Steel
Member Size
TS-01 SHS100x100x5.0 TRUSS1
TS-02 SHS180x180x8.0 TRUSS1
- This drawings must be read in conjunction with the drawing N. S0-100
This drawings must be read in conjunction with the
drawing N. S1-601
Column & Beam Schedules
1 : 10
Plan on Ladder
5
1 : 10
Detail-7.Elevation on Ladder
7
- This drawings must be read in conjunction with the drawing N. S0-100.
Connections TBA Connections TBA