The document provides design loads calculations for a proposed air traffic control tower. It includes dead loads, live loads, and wind loads. Dead loads include structural self-weight, floor slabs, equipment, walls, and antennas. Live loads include stair, floor, and elevator loads. Wind loads were calculated based on ASCE 7-10 for 3 tower sections using exposure category C, occupancy category IV, and 120 mph base wind speed. The total calculated design base shear is 340 kips.
Tutorial VSP Conference 2013, San Luis Obispo, CAHersh Amin
Vehicle Sketch Pad Structure Analysis Module (VSP SAM, http://vspsam.ae.utexas.edu/) tutorial presentation at the 2nd annual VSP (http://openvsp.org/) workshop held in San Luis Obispo, CA from Aug 7-9, 2013.
Tutorial VSP Conference 2013, San Luis Obispo, CAHersh Amin
Vehicle Sketch Pad Structure Analysis Module (VSP SAM, http://vspsam.ae.utexas.edu/) tutorial presentation at the 2nd annual VSP (http://openvsp.org/) workshop held in San Luis Obispo, CA from Aug 7-9, 2013.
Fusio India E-Commerce Website Design & Development Company in IndiaFusio India
FusioIndia, with Website Designs and Development Company InIndia its zealous team of developers and designers, delivers one stop solution for all digital promotion and Branding needs. Keeping up with technology, they pioneer in providing responsive websites, mobile websites and applications, E-commerce Portals etc., thus becoming leading Website Development Company in India.
Website Development Company in India, Web Development, Web Designing.
Fusio India E-Commerce Website Design & Development Company in IndiaFusio India
FusioIndia, with Website Designs and Development Company InIndia its zealous team of developers and designers, delivers one stop solution for all digital promotion and Branding needs. Keeping up with technology, they pioneer in providing responsive websites, mobile websites and applications, E-commerce Portals etc., thus becoming leading Website Development Company in India.
Website Development Company in India, Web Development, Web Designing.
This is the work of my studio Steel Structures in CEPT University in L2. In this studio we did case study of existing steel structure house and we designed a railway station for Vejalpur and did staad analysis and made the architectural and structural drawings of it.
Final Year Project Report on Structural Analysis and Design of Multistorey RCC Building for Earthquake Resistant Design as per IS Codes. - Khwopa College of Engineering - IOE, Tribhuvan university - Civil Engineering Final Report - Bachelor Level Project
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
For the construction of Cable Stayed Bridge at Bardhman, a simulation model was made using LARSA 4D and accordingly design were concluded considering all the possible situation. At the execution stage the profile/geometry control is very important. Accordingly construction stage analysis along with geometry control is being done using LUSAS software. These software are 4D and the fourth dimension is Time. The said presentation covers the LARSA, LUSAS and few pictures on execution at site along with sample of documentation.
This calculation report is relevant to the structural analysis and design of ...ASEngineeringService
This calculation report is relevant to the structural analysis and design of and foundations of
the CONDITIONER. the latest edition for following standards, codes and specifications shall apply.
IS: 456 – 2000 Code of practice for plain and reinforced concrete.
IS: 875 (PART 1) – 2003 Code of Practice for Design Loads (Other than
Earthquake) for buildings and structures: Part-1
Dead Loads - Unit weights of Building materials
and stored material.
IS: 875 (PART 2) - 2003 Code of Practice for Design Loads (Other than
Earthquake) for buildings and structures: Part-2
Imposed Loads.
IS: 875 (PART 3) – 2003 Code of Practice for Design Loads (Other than
Earthquake) for buildings and structures: Part-3
Wind Loads.
SP: 34-1987 Handbook of Concrete Reinforcement and
Detailing
IS: 1904 – 1986 (Reaffirmed 1995) Code of Practice for Design and Construction of
Foundation in soils - General Requirements.
IS: 2502 – 2004 Code of Practice for Bending and Fixing of Bars
for Concrete Reinforcement.
BS 5950-1 Structural use of steel in buildings, Code of
practice for design in simple and continuous
construction, hot rolled sections
BS 6399-1 to 3 Code of Practice for Dead and Imposed Loads,
Wind loads and Imposed Roof Load
BS 8004 Code of Practice for Foundations
BS 8110–1 Structural use of concrete. Code of practice for
design and construction
ASCE 7 -05 Minimum Design Loads Buildings and other
Structures
IBC 2006 International Building Codes
Analysis and design of high rise rc building under seismic loadHtinKyawHloon1
This study is operated for Analysis and Design of High-rise RC Building under Seismic Load for ten-storeyed RC inverted T-shaped building locating in seismic zone 4 and basic wind speed 80 mph. This paper was based on the mini-thesis, which was supervised by Dr.Zaw Min Htun,the chief of faculty of Civil Engineering, when I was a final year student at Technological University (Pakokku). I wanna say "thank" to all of my group-9 members who helped me a lot.
#Structural Engineering
#Earthquake
1. CONTROL TOWER FOR PROPOSED SOUTH
SUBURBAN AIRPORT
PDR PRESENTATION
10/20/2015
CAE 495
2. TABLE OF CONTENTS
I. WORK BREAKDOWN …………………………………………………………………….................... 3
II. SCHEDULE
a. Proposed Design Schedule vs. Actual Design Schedule ……………………………. 4
III. WORK
a. Structural Design
Structural Plans ..…………………………………………………………………… 7
Loads ……………………………………………………………………………………. 19
Calculations …………………………………………………………………………… 20
b. Mechanical System
Energy Analysis ……………………………………………………………………… 28
c. Electrical System
Electrical Schedule ………………………………………………………………… 35
Lighting Design …………………………………………………………………….. 36
Electrical Plan ……………………………………………………………………….. 37
d. Construction Management
Cost Estimate ………………………………………………………………………… 38
3. CAE 495
WORK BREAKDOWN
NAME RESPONSIBILITY CONTACT INFO
ARCHITECT/ENGINEERS
Martyr, Mitchlie W. Owner mmartyr@hawk.iit.edu
Dagger, Kirsten M. Façade kdagger@hawk.iit.edu
Jung, Yun Joon Mechanical yjung15@hawk.iit.edu
Landon, Ariel A. Electrical alandon@hawk.iit.edu
Tiangson, Jace S. Acoustics/Lighting jtiongso@hawk.iit.edu
Babusci, Alexander Envelope ababusci@hawk.iit.edu
CONCRETE TEAM
Chronowski, Padraic Correspondent/Checker pchronow@hawk.iit.edu
Josefsen, Malin Designer mjosefse@hawk.iit.edu
Lwin, Thu Rain M. Scheduler/CM tlwin@hawk.iit.edu
Abes, Kareem Estimator kabes@hawk.iit.edu
STEEL TEAM
Hui, Jonathan F. Correspondent jhui2@hawk.iit.edu
Bodett, John M. Designer jbodett@hawk.iit.edu
Adan, Daniel E. Scheduler/Estimator/CM dadan@hawk.iit.edu
Pham, Nghia Q. Checker/CM npham2@hawk.iit.edu
5. CAE 495
PERIOD START:
09/07/15
PERIOD END:
10/25/15
*Resources will vary per team
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Owner - Basis of Design Mitchlie
Design Plans/ Facade (Draft) Kirsten
Final Drawings Kirsten
Mechanical Yun Joon To Coordinate with other Teams
Electrical Ariel To Coordinate with other Teams
Acoustics/Lighting Jace To Coordinate with other Teams
Envelope Alex To Coordinate with other Teams
Concrete Concrete Team Members to Coordinate
Steel Steel Team Members to Coordinate
Cost Estimates (For All Divisions) Assigned Members
Compile All Work/Prepare Presentation TBD
PDR TBD
Make Corrections Everyone If Necessary
CDR Presentation TBD
CAE 495
PERIOD START:
09/07/15
PERIOD END:
10/25/15
*Resources will vary per team
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Owner - Basis of Design Mitchlie
Design Plans/ Facade (Draft) Kirsten
Final Drawings Kirsten
Mechanical Yun Joon To Coordinate with other Teams
Electrical Ariel To Coordinate with other Teams
Acoustics/Lighting Jace To Coordinate with other Teams
Envelope Alex To Coordinate with other Teams
Concrete Concrete Team Members to Coordinate
Steel Steel Team Members to Coordinate
Cost Estimates (For All Divisions) Estimators
Compile All Work/Prepare Presentation CMs
PDR CMs
Make Corrections CMs If Necessary
CDR Presentation TBD
OCTOBER OCTOBER OCTOBER
REMARKS/NOTES
ACTIVITY PERSON/GROUP
RESPONSIBLE
ACTUAL DESIGN SCHEDULE
SEPTEMBER SEPTEMBER SEPTEMBER SEP/OCT
OCTOBER OCTOBER
REMARKS/NOTES
PROPOSED DESIGN SCHEDULE
ACTIVITY PERSON/GROUP
RESPONSIBLE
SEPTEMBER SEPTEMBER SEPTEMBER SEP/OCT OCTOBER
19. South Suburban Airport, Air Traffic Control Tower Design Loads Designers Checkers
JB, PC JH, MJ
Common Core Dead Loads Quantity Unit Type
Unit
Wt. Unit Total (kip) Code Comments
Shear Walls, Self Weight 15136 CF RC 150 PCF 2270 * Assume 1 ft thick walls (shear walls up to cab floor); assume 6" for elevator shaft walls that are not part of shear wall
C Level, Floor, Self Weight 2030 CF RC 150 PCF 305 * Assume 12" Slab Thickness
C Level, Roof, Self Weight 2020 CF RC 150 PCF 303 * Assume 8" Slab Thickness
Core Stairs, Self Weight 1792 CF RC 150 PCF 269 * Assume 12" Average Thickness
C Level, Equipment 2030 SF Other 100 PSF 203 * Assumed weight of cab control equipment
1/F-8/F (In Core), Self Weight 912 CF RC 150 PCF 137 * Assume 1 ft thick concrete floors. Calculated using area ouside of stairs and elevator (114 SF per floor)
A Level, Floor (No Core), Self Weight 825 CF RC 150 PCF 124 * Assume 12" Slab Thickness
B Level, Floor (No Core), Self Weight 825 CF RC 150 PCF 124 * Assume 12" Slab Thickness
B Level, Mezzanine Floor, Self Weight 550 SF Steel 150 PSF 83 * assume 150 psf for mechanical and electrical
A, B Level Exterior Walls, Self Weight 4640 SF Glass 17.5 PSF 81 * Assume Walls Non-Load Bearing, Façade Only
Cab Windows 4000 SF Glass 17.5 PSF 70 FAA 70 SF of glass = 1200 lbs as per FAA Specifications
Rooftop Antenna Loads 3030 SF Other 5 PSF 15 FAA For ASDE system: Required for Major Activity Airport
Rotodome Cover 1 Unit Plastic 5000 Lb 5 FAA Plastic dome covering ASDE Antenna
Common Core Dead Load 3989 Does Not Include Steel/Concrete Columns. See Calculations Below.
Total DL: Steel Option 4145 See Calculations below for Non-Core Steel Weight
Total DL: Concrete Option 4339 See Calculations below for Non-Core Concrete Weight
Live Loads Quantity Unit
Unit
Wt. Unit Total (kip) Code Ref. Comments
All Stairs 2560 SF 100 PSF 256 ASCE
C Level 2030 SF 100 PSF 203 ASCE
1/F-8/F 912 SF 150 PSF 137 ASCE 114 SF per floor
Level A floor outside core 550 SF 150 PSF 83 ASCE Assumed to be for mechanical room types loads
Level B floor outside core 550 SF 150 PSF 83 ASCE Assumed to be for mechanical room types loads
B Level, Mezzanine 550 SF 150 PSF 83 ASCE Assumed to be for mechanical room types loads
Elevator 1 Unit 7000 Lb 7 * Estimated Weight: To be determined upon selection of elevator
Total Live Load 852
Non-Core Steel Self-Weight Quantity Unit Type
Unit
Wt. Unit Total (kip)
Columns 640 Ft Steel 120 PLF 77 * Assume W14x120 (4 columns 160ft tall)
Beams, Connection to Shear Walls 360 Ft Steel 54 PLF 19 * Assume W10x54 (8 beams per floor, 7.5' span each, 1/F-6/F)
Beams, Perimeter of Square 840 Ft Steel 72 PLF 60 Assume W12x72 (4 beams per floor, 35' span each, 1/F-6/F)
Total Non-Core Steel Weight 156
Non-Core Concrete Self-Weight Quantity Unit Type
Unit
Wt. Unit Total (kip)
Columns 1132 CF RC 150 PCF 170 * Assume 16" x 16" section (4 columns, 160 feet)
Beams, Connection to Shear Walls 360 CF RC 150 PCF 54 * Assume 1' x 1' section (8 beams per floor, 7.5' span each, 1/F-6/F)
Beams, Perimeter of Square 840 CF RC 150 PCF 126 * Assume 1' x 1' section (4 beams per floor, 35' span each, 1/F-6/F)
Total Non-Core Concrete Weight 350
Snow Load Quantity Unit
Unit
Wt. Unit Total (kip)
Cab Roof Snow Load 3030 SF 25 PSF 76 ASCE
Wind Loads
Total
(kip)
Total (kip-
ft)
Concrete Design Base Shear Reaction 340 ASCE 7-10 See MATHCAD Sheet 'Preliminary Windload calcs -Concrete' for Derivation according to ASCE 7-10 Specifications
Concrete Design Base Moment Reaction 34724 ASCE 7-11 See MATHCAD Sheet 'Preliminary Windload calcs -Concrete' for Derivation according to ASCE 7-10 Specifications
Steel Design Base Shear Reaction 336 ASCE 7-12 See MATHCAD Sheet 'Preliminary Windload calcs -Steel' for Derivation according to ASCE 7-10 Specifications
Steel Design Base Moment Reaction 34378 ASCE 7-13 See MATHCAD Sheet 'Preliminary Windload calcs -Steel' for Derivation according to ASCE 7-10 Specifications
Other Loads
Rotodome shear force 6 FAA specs for 120 mph wind
Rotodome overturning moment 50 FAA KIP FT, specs for 120 mph wind
20. Wind Load Calculations For Shaft Designed By: PC pg 1
Checked By: JH
Concrete Design
Section I is from 0'-80'
Section II is from 80'-160'
Section III is from 160'-180'
Finding the total exposed area of the shaft, including
the "Common Core"
4 Columns with a width of 16" and a length of 80'. Applies to
both Sections I & II
A_columns_I&II =4 ((16 ))
1
12
((80 )) 426.67
2
8 beams width a height of 12" and 32.333' length. These are the beams
connecting the supporting columns. Applies to both I & II
A_beams_I&II =8 +((12 ))
1
12
32.333 ((4 ((1 7.5 )))) 498.66
2
Common Core wall Section I, 20' wide and 80' tall
A_shearwall_I =20 80 1600
2
Common Core wall Section II, 20' wide and 40' tall
A_shearwall_II =20 40 800
2
Octangular Levels, First Level: x' height, y' wide. Second Level: Will assume
square face for this shape. For Section II
A_oct =38 40 1520
2
Section III is the control tower cab
A_cab =53.583 20 1071.7
2
pg 2
21. pg 2
->Exposure category for this ACCT is 'C' and the Occupancy Category for a ACCT is
"IV'.
->The base wind speed is 120 mph as shown on 26.5-1B in ASCE 7-10
->Kd will be equal to 0.85 per Table 26.6-1 in 7-10
->Kzt will be equal to 1.00 per Table 26.801 in 7-10
->Gust Effect Factor, G, is equal to UNKNOWN, requires completetion of SAP model,
however these calculations will assume Gf=1.3 for a conservative estimation
Velocity Pressure (qz)
qz 0.00256 kz kzt kd V
2
For Section I, 0'-80' elevation:
kz 1.17 kzt 1.00 kd 0.85 V 120 mph Gf 1.3
Cp 0.8
qz =0.00256 kz kzt kd V
2
36.7 GCpi 0.18
qz =qz ((1 )) 36.7
p =qz Gf Cp qz GCpi 44.7
Area_I =++A_columns_I&II A_shearwall_I A_beams_I&II 2525.3
2
Resultant on Section 1
F_SectionI =
((p Area_I))
1000
112.9
pg 3
23. Wind Load Calculations For Shaft Designed By: PC pg 1
Steel Design
Checked By: JH
Section I is from 0'-80'
Section II is from 80'-160'
Section III is from 160'-180'
Finding the total exposed area of the shaft, including
the "Common Core"
4 Columns with a Depth of 16" and a length of 80'. Applies to
both Sections I & II
A_columns_I&II =4 ((16 ))
1
12
((80 )) 426.67
2
8 beams with a Depth of 10" and 32.333' length. These are the beams
connecting the supporting columns. Applies to both I & II
A_beams_I&II =8 +((10 ))
1
12
32.333 ((4 ((1 7.5 )))) 455.55
2
Common Core wall Section I, 20' wide and 80' tall
A_shearwall_I =20 80 1600
2
Common Core wall Section II, 20' wide and 40' tall
A_shearwall_II =20 40 800
2
Octangular Levels, First Level: x' height, y' wide. Second Level: Will assume
square face for this shape. For Section II
A_oct =38 40 1520
2
Section III is the control tower cab
A_cab =53.583 20 1071.7
2
pg 2
24. pg 2
->Exposure category for this ACCT is 'C' and the Occupancy Category for a ACCT is
"IV'.
->The base wind speed is 120 mph as shown on 26.5-1B in ASCE 7-10
->Kd will be equal to 0.85 per Table 26.6-1 in 7-10
->Kzt will be equal to 1.00 per Table 26.801 in 7-10
->Gust Effect Factor, G, is equal to UNKNOWN, requires completetion of SAP model,
however these calculations will assume Gf=1.3 for a conservative estimation
Velocity Pressure (qz)
qz 0.00256 kz kzt kd V
2
For Section I, 0'-80' elevation:
kz 1.17 kzt 1.00 kd 0.85 V 120 mph
qz =0.00256 kz kzt kd V
2
36.7
Gf 1.3
Cp 0.8
GCpi 0.18
qz =qz ((1 )) 36.7
p =qz Gf Cp qz GCpi 44.7
Area_I =++A_columns_I&II A_shearwall_I A_beams_I&II 2482.2
2
Resultant on Section 1
F_SectionI =
((p Area_I))
1000
111
pg 3
25. pg 3
For Section II, 80'-160' elevation:
kz 1.36 kzt 1.00 kd 0.85 V 120 mph
qz =0.00256 kz kzt kd V
2
42.6
Gf 1.3
qz =qz ((1 )) 42.6
Cp 0.8
GCpi 0.18
p =qz Gf Cp qz GCpi 52
Area_II =+++A_columns_I&II A_shearwall_II A_beams_I&II A_oct 3202.2
2
Resultant on Section II
F_SectionII =
((p Area_II))
((1000))
166.5
For Section III, 160'-180' elevation:
kz 1.43 kzt 1.00 kd 0.85 V 120 mph
qz =0.00256 kz kzt kd V
2
44.8
Gf 1.3
Cp 0.8
GCpi 0.18
qz =qz ((1 )) 44.8
p =qz Gf Cp qz GCpi 54.7
Area_III =A_cab 1071.7
2
Resultant on Section 1
F_SectionIII =
((p Area_III))
1000
58.6
Total_Shear =++F_SectionI F_SectionII F_SectionIII 336
Total_Moment ++((F_SectionI 40 )) ((F_SectionII 120 )) ((F_SectionIII 170 ))
=Total_Moment 34378 (( ))
Note: these laod are subject to change once the correct natural frequency, and thus the
correct gust factor have been determined
28. 1
Energy Analysis Report
CAE 495 - RE Analysis
Analyzed 10/16/2015
Energy Analysis Result
Building Performance Factors
Energy Use Intensity
Life Cycle Energy Use/Cost
Renewable Energy Potential
38. Foundations Qty C.Y. Notes
Piles 36 60.00 No info reguarding reinforcement.
Footing 4 28.44 No info reguarding reinforcement.
Foundation Mat 1 1333.33 7 foot foundation mat seems excessive
Structural Concrete
Lvl 1
Column (C) 4 5.27 No info reguarding reinforcement.
Shear Wall (W) 1 69.63 No info reguarding reinforcement.
Slab (1st Floor) 1 48.00 No info reguarding reinforcement.
Lvl 2-6
Column (C) 20 26.34 No info reguarding reinforcement.
Shear Wall (W) 5 348.15 No info reguarding reinforcement.
Beam Outer 20 24.94 No info reguarding reinforcement.
Beam Inner 40 10.37 No info reguarding reinforcement.
Lvl 7-8
Column (C) 8 10.53 No info reguarding reinforcement.
Shear Wall (W) 2 139.26 No info reguarding reinforcement.
Beam Outer 8 9.98 No info reguarding reinforcement.
Beam Inner 16 4.15 No info reguarding reinforcement.
T-Beam (TB) & (WB) 16 5.33 T-Beams cross sections may not have been correct.
T-Beam (TB) & (WB) 8 1.04 T-Beams cross sections may not have been correct.
Lvl 9
Column (C) 4 5.27 No info reguarding reinforcement.
Shear Wall (W) 1 69.63 No info reguarding reinforcement.
Beam Outer 4 4.99 No info reguarding reinforcement.
Beam Inner 8 2.07 No info reguarding reinforcement.
T-Beam (TB) & (WB) 8 2.67 T-Beams cross sections may not have been correct.
T-Beam (TB) 24 2.78 T-Beams cross sections may not have been correct.
T-Beam (TB) 8 0.47 T-Beams cross sections may not have been correct.
T-Beam (TX) 4 1.00 T-Beams cross sections may not have been correct.
Roof
Slab (Roof) 1 102.95 No info reguarding reinforcement.
Total 2316.58 No info reguarding reinforcement.
CONCRETE ESTIMATE
39. Stories Count (L.F.):
Building Type:
Square Foot Cost Estimate Report
Location:
Stories Height
Data Release:
Basement Included:
Year 2015 Quarter 4
SOUTH SUBURBAN, IL
80,000.00Floor Area (S.F.):
LaborType
10.00
18.00
STD
Office, 5-10 Story with Precast Concrete Panel / R/Conc. Frame
SSA Control Tower
No
Cost Per Square Foot $237.41
Total Building Cost $18,993,013.83
Estimate Name:
Costs are derived from a building model with basic components. Scope
differences and market conditions can cause costs to vary significantly.
Date: 10/20/2015
CostCost Per
SF
% of
Total
A Substructure $221,607.63$2.771.6%
Standard FoundationsA1010 $114,469.83$1.43
Strip footing, concrete, reinforced, load 18.4 KLF, soil bearing capacity 6 KSF, 12" deep x
40" wide
$27,871.83$0.35
Spread footings, 3000 PSI concrete, load 600K, soil bearing capacity 6 KSF, 10' - 6" square
x 33" deep
$86,598.00$1.08
Slab on GradeA1030 $56,637.12$0.71
Slab on grade, 4" thick, non industrial, reinforced $56,637.12$0.71
Basement ExcavationA2010 $3,701.76$0.05
Excavate and fill, 10,000 SF, 4' deep, sand gravel, or common earth, on site storage $3,701.76$0.05
Basement WallsA2020 $46,798.92$0.58
Foundation wall, CIP, 4' wall height, direct chute, .148 CY/LF, 7.2 PLF, 12" thick $46,798.92$0.58
B Shell $5,989,703.03$74.8741.8%
Floor ConstructionB1010 $1,975,299.84$24.69
Cast-in-place concrete column, 20" square, tied, 800K load, 12' story height, 394 lbs/LF,
6000PSI
$206,152.56$2.58
Cast-in-place concrete column, 20" square, tied, 900K load, 12' story height, 394 lbs/LF,
6000PSI
$217,274.40$2.72
Cast-in-place concrete column, 20", square, tied, minimum reinforcing, 500K load, 10'-14'
story height, 375 lbs/LF, 4000PSI
$125,610.48$1.57
Flat plate, concrete, 9" slab, 20" column, 20'x25' bay, 75 PSF superimposed load, 188 PSF
total load
$1,426,262.40$17.83
Roof ConstructionB1020 $155,932.00$1.95
Roof, concrete, beam and slab, 20'x25' bay, 40 PSF superimposed load, 18" deep beam,
8.5" slab, 146 PSF total load
$155,932.00$1.95
Exterior WallsB2010 $3,061,467.36$38.27
Exterior wall, precast concrete, ribbed, 6" thick, 20' x 10', aggregate finish, 2" rigid
insulation, high rise
$3,061,467.36$38.27
11-800-334-3509 customersupport@rsmeans.com® 2015
40. CostCost Per
SF
% of
Total
Exterior WindowsB2020 $703,809.79$8.80
Windows, aluminum, sliding, insulated glass, 5' x 3' $703,809.79$8.80
Exterior DoorsB2030 $25,851.95$0.32
Door, aluminum & glass, with transom, narrow stile, double door, hardware, 6'-0" x 10'-0"
opening
$21,620.25$0.27
Door, steel 18 gauge, hollow metal, 1 door with frame, no label, 3'-0" x 7'-0" opening $4,231.70$0.05
Roof CoveringsB3010 $67,342.09$0.84
Roofing, asphalt flood coat, gravel, base sheet, 3 plies 15# asphalt felt, mopped $31,655.68$0.40
Insulation, rigid, roof deck, composite with 2" EPS, 1" perlite $19,331.84$0.24
Roof edges, aluminum, duranodic, .050" thick, 6" face $13,458.82$0.17
Flashing, aluminum, no backing sides, .019" $2,895.75$0.04
C Interiors $2,780,943.41$34.7619.4%
PartitionsC1010 $594,175.57$7.43
Metal partition, 5/8" water resistant gypsum board face, no base layer, 3-5/8" @ 24" OC
framing ,same opposite face, no insulation
$169,618.67$2.12
1/2" fire rated gypsum board, taped & finished, painted on metal furring $424,556.90$5.31
Interior DoorsC1020 $266,488.60$3.33
Door, single leaf, kd steel frame, hollow metal, commercial quality, flush, 3'-0" x 7'-0" x
1-3/8"
$266,488.60$3.33
FittingsC1030 $67,699.26$0.85
Toilet partitions, cubicles, ceiling hung, plastic laminate $67,699.26$0.85
Stair ConstructionC2010 $393,926.25$4.92
Stairs, steel, cement filled metal pan & picket rail, 12 risers, with landing $393,926.25$4.92
Wall FinishesC3010 $112,607.25$1.41
Painting, interior on plaster and drywall, walls & ceilings, roller work, primer & 2 coats $26,627.41$0.33
Vinyl wall covering, fabric back, medium weight $85,979.84$1.07
Floor FinishesC3020 $562,683.28$7.03
Carpet, tufted, nylon, roll goods, 12' wide, 36 oz $298,706.88$3.73
Carpet, padding, add to above, 2.7 density $65,789.76$0.82
Vinyl, composition tile, maximum $80,934.96$1.01
Tile, ceramic natural clay $117,251.68$1.47
Ceiling FinishesC3030 $783,363.20$9.79
Acoustic ceilings, 3/4"mineral fiber, 12" x 12" tile, concealed 2" bar & channel grid,
suspended support
$783,363.20$9.79
D Services $5,342,095.99$66.7837.3%
Elevators and LiftsD1010 $1,197,024.00$14.96
Traction, geared passenger, 3500 lb, 8 floors, 12' story height, 2 car group, 200 FPM $1,197,024.00$14.96
Plumbing FixturesD2010 $227,407.95$2.84
Water closet, vitreous china, bowl only with flush valve, wall hung $87,844.03$1.10
Urinal, vitreous china, wall hung $22,292.10$0.28
Lavatory w/trim, vanity top, PE on CI, 20" x 18" $42,806.95$0.54
Service sink w/trim, PE on CI,wall hung w/rim guard, 24" x 20" $49,388.40$0.62
Water cooler, electric, wall hung, 8.2 GPH $15,165.74$0.19
Water cooler, electric, wall hung, wheelchair type, 7.5 GPH $9,910.73$0.12
Domestic Water DistributionD2020 $45,279.36$0.57
Gas fired water heater, commercial, 100< F rise, 200 MBH input, 192 GPH $45,279.36$0.57
Rain Water DrainageD2040 $27,362.09$0.34
Roof drain, CI, soil,single hub, 5" diam, 10' high $10,418.40$0.13
Roof drain, CI, soil,single hub, 5" diam, for each additional foot add $16,943.69$0.21
Terminal & Package UnitsD3050 $1,572,840.00$19.66
Rooftop, multizone, air conditioner, offices, 25,000 SF, 79.16 ton $1,572,840.00$19.66
21-800-334-3509 customersupport@rsmeans.com® 2015
41. CostCost Per
SF
% of
Total
SprinklersD4010 $276,102.45$3.45
Wet pipe sprinkler systems, steel, light hazard, 1 floor, 10,000 SF $41,693.40$0.52
Wet pipe sprinkler systems, steel, light hazard, each additional floor, 10,000 SF $224,462.70$2.81
Standard High Rise Accessory Package 8 story $9,946.35$0.12
StandpipesD4020 $89,526.19$1.12
Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, 1 floor $22,314.96$0.28
Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, additional floors $34,871.26$0.44
Fire pump, electric, with controller, 5" pump, 100 HP, 1000 GPM $28,936.80$0.36
Fire pump, electric, for jockey pump system, add $3,403.17$0.04
Electrical Service/DistributionD5010 $135,334.71$1.69
Overhead service installation, includes breakers, metering, 20' conduit & wire, 3 phase, 4
wire, 120/208 V, 1600 A
$36,685.75$0.46
Feeder installation 600 V, including RGS conduit and XHHW wire, 60 A $2,207.11$0.03
Feeder installation 600 V, including RGS conduit and XHHW wire, 200 A $5,618.85$0.07
Feeder installation 600 V, including RGS conduit and XHHW wire, 1600 A $48,318.10$0.60
Switchgear installation, incl switchboard, panels & circuit breaker, 120/208 V, 1600 A $42,504.90$0.53
Lighting and Branch WiringD5020 $1,212,695.21$15.16
Receptacles incl plate, box, conduit, wire, 16.5 per 1000 SF, 2.0 W per SF, with transformer $477,012.80$5.96
Miscellaneous power, 1.2 watts $34,800.00$0.44
Central air conditioning power, 4 watts $62,593.60$0.78
Motor installation, three phase, 460 V, 15 HP motor size $12,925.90$0.16
Motor feeder systems, three phase, feed to 200 V 5 HP, 230 V 7.5 HP, 460 V 15 HP, 575 V
20 HP
$2,838.97$0.04
Motor connections, three phase, 200/230/460/575 V, up to 5 HP $169.89$0.00
Motor connections, three phase, 200/230/460/575 V, up to 100 HP $748.69$0.01
Fluorescent fixtures recess mounted in ceiling, 1.6 watt per SF, 40 FC, 10 fixtures @32watt
per 1000 SF
$621,605.36$7.77
Communications and SecurityD5030 $464,560.90$5.81
Telephone wiring for offices & laboratories, 8 jacks/MSF (cost per MSF) $170,808.90$2.14
Communication and alarm systems, fire detection, addressable, 100 detectors, includes
outlets, boxes, conduit and wire
$92,428.50$1.16
Fire alarm command center, addressable with voice, excl. wire & conduit $13,222.00$0.17
Internet wiring, 8 data/voice outlets per 1000 S.F. $188,101.50$2.35
Other Electrical SystemsD5090 $93,963.13$1.17
Generator sets, w/battery, charger, muffler and transfer switch, diesel engine with fuel
tank, 100 kW
$42,006.50$0.53
Uninterruptible power supply with standard battery pack, 15 kVA/12.75 kW $51,956.63$0.65
E Equipment & Furnishings $0.00$0.000.0%
Other EquipmentE1090 $0.00$0.00
F Special Construction $0.00$0.000.0%
G Building Sitework $0.00$0.000.0%
Sub Total
Contractor's Overhead & Profit
Architectural Fees
User Fees
Total Building Cost
$14,334,350.06100%
25.0 % $3,583,587.52
6.0 % $1,075,076.25
0.0 % $0.00
$18,993,013.83
$179.18
$44.79
$13.44
$0.00
$237.41
** Indicates Assemblies or Components have been customized.
31-800-334-3509 customersupport@rsmeans.com® 2015
42. 1234 N. Something St
Unit Detail Report with Subcontracted Lines
Mitchlie Martyr
Ray Lemming
MWRD
Prepared By:
Peotone, IL, 60468
SSA Control Tower
Year 2015 Quarter 4
Date: 10/20/2015
Line Number Quantity UnitDescription Total Incl.
O&P
Ext. Total Incl. O&P
(Sub-Contracted)
Ext. Total Incl.
O&P
Existing Conditions02
023213100800 60.00 L.F.Subsurface investigation, boring and
exploratory drilling, cased borings in
earth, with samples, 2-1/2" diameter
$71.93 4,315.80 0.00
4,315.80 0.00Existing Conditions Subtotal02
Concrete03
033053400300 21.88 C.Y.Structural concrete, in place, beam
(3500 psi), 5 kip per LF, 10' span,
includes forms(4 uses), Grade 60
rebar, concrete (Portland cement Type
I), placing and finishing
$1,880.61 41,147.75 0.00
033053400350 65.57 C.Y.Structural concrete, in place, beam
(3500 psi), 5 kip per LF, 25' span,
includes forms(4 uses), Grade 60
rebar, concrete (Portland cement Type
I), placing and finishing
$1,669.26 109,453.38 0.00
033053400820 47.41 C.Y.Structural concrete, in place, column
(4000 psi), square, 2% - 3%
reinforcing, 16" x 16", includes
forms(4 uses), Grade 60 rebar,
concrete (Portland cement Type I),
placing and finishing
$2,434.25 115,407.79 0.00
033053403850 28.44 C.Y.Structural concrete, in place, spread
footing (3000 psi), over 5 C.Y.,
includes forms(4 uses), Grade 60
rebar, concrete (Portland cement Type
I), placing and finishing
$399.46 11,360.64 0.00
033053404050 1,333.33 C.Y.Structural concrete, in place,
foundation mat (3000 psi), over 20
C.Y., includes forms(4 uses), Grade 60
rebar, concrete (Portland cement Type
I), placing and finishing
$441.93 589,238.53 0.00
033053404900 4,082.06 S.F.Structural concrete, in place, slab on
grade (3500 psi), over 10000 S.F., 12"
thick, includes concrete (Portland
cement Type I), placing and finishing,
excludes forms and reinforcing
$7.85 32,044.17 0.00
033053405950 0.00 C.Y.Structural concrete, in place, pile cap
(3000 psi), square or rectangular, over
10 C.Y., includes forms(4 uses), Grade
60 rebar, concrete (Portland cement
Type I), placing and finishing
$362.88 0.00 0.00
898,652.26 0.00Concrete Subtotal03
Thermal and Moisture Protection07
077123200200 18.00 Ea.Elbows, aluminum, embossed, .025"
thick, 3" x 4"
$15.17 273.06 0.00
273.06 0.00Thermal and Moisture Protection Subtotal07
11-800-334-3509 customersupport@rsmeans.com® 2015
43. Line Number Quantity UnitDescription Total Incl.
O&P
Ext. Total Incl. O&P
(Sub-Contracted)
Ext. Total Incl.
O&P
Heating, Ventilating, and Air Conditioning (HVAC)23
233113130120 520.00 Lb.Metal ductwork, fabricated
rectangular, 500 to 1000 lb., aluminum
alloy 3003-H14, includes fittings,
joints, supports and allow for a
flexible connections field sketches,
excludes as-built drawings and
insulation
$30.30 15,756.00 0.00
233113130120 1.00 Lb.Metal ductwork, fabricated
rectangular, for high pressure
ductwork, add
$11.42 5,940.48 0.00
233113130120 1.00Metal ductwork, fabricated
rectangular, over 40' high, includes
fittings, joints, supports and allow for
a flexible connections field sketches,
excludes as-built drawings &
insulation, add to labor for elevated
installation of fabricated ductwork
$9.42 4,900.90 0.00
235513160100 1.00 Ea.Duct furnace, gas fired, stainless steel
heat exchanger, electric ignition,
interior installation, 120 MBH output,
includes burner and controls
$3,209.75 3,209.75 0.00
236313101800 1.00 Ea.Condenser, ratings are for air cooled,
direct drive, propeller fan, 63 ton
$31,849.10 31,849.10 0.00
61,656.23 0.00Heating, Ventilating, and Air Conditioning (HVAC) Subtotal23
Electrical26
260526800130 20.00 Ea.Grounding rod, copper clad, 15' long,
3/4" diameter
$283.76 5,675.20 0.00
260533135180 1,700.00 L.F.Electric metallic tubing (EMT), 4"
diameter, to 15' high, incl 2
terminations, 2 elbows, 11 beam
clamps, and 11 couplings per 100 LF
$38.75 65,875.00 0.00
260533135180 1.00Conduit, add to labor for higher
elevated installation over 40' high, add
$8.88 15,102.80 0.00
260536103200 210.00 L.F.Cable tray, ladder type, aluminum, 4"
deep, 6" rung spacing, 6" wide, to 15'
elevation, incl fittings & supports
$33.80 7,098.00 0.00
260590106130 11.00 Ea.Lighting outlets, residential, box 4"
and wire (for fixture), EMT & wire,
20'
$112.19 1,234.09 0.00
262213101300 3.00 Ea.Transformer, dry-type, single phase
240/480 V primary 120/240 V
secondary, 15 kVA
$3,433.78 10,301.34 0.00
262413300950 1.00 Ea.Switchboards, distribution section,
aluminum bus bars, 4 W, 120/208 or
277/480 V, 4000 amp, excl breakers
$12,985.18 12,985.18 0.00
262413400600 4.00 Ea.Fusible switch, double, 600 V,
100/100 amp, for feeder section
$1,651.20 6,604.80 0.00
262416302000 5.00Panelboards, 3 phase 4 wire, main
circuit breaker, 120/208 V, NQOD,
incl 20 A 1 pole plug-in breakers
$0.00 0.00 0.00
262416302450 3.00Panelboards, 3 phase 4 wire, main
circuit breaker, 277/480 V, NEHB, incl
20 A 1 pole plug-in breakers
$0.00 0.00 0.00
262726201650 1.00 Ea.Dimmer switch, incandescent, 1 pole,
120 volt, 600 watt
$79.36 79.36 0.00
21-800-334-3509 customersupport@rsmeans.com® 2015
44. Line Number Quantity UnitDescription Total Incl.
O&P
Ext. Total Incl. O&P
(Sub-Contracted)
Ext. Total Incl.
O&P
262726202470 30.00 Ea.Duplex receptacle, grounded, 120 volt,
20 amp
$42.19 1,265.70 0.00
262726202600 20.00 Ea.Wall plates, stainless steel, 1 gang $14.02 280.40 0.00
262816203900 10.00 Ea.Safety switches, heavy duty, 3 pole,
fusible, 240 volt, 600 amp, NEMA 1
$4,678.18 46,781.80 0.00
267113200060 2.00 Ea.Motors, dripproof, premium
efficiency, 1.15 service factor, 1800
RPM, 230/460 V, 60 Hz, 1/4 HP
$383.27 766.54 0.00
267113200100 2.00 Ea.Motors, dripproof, premium
efficiency, 1.15 service factor, 1800
RPM, 230/460 V, 60 Hz, 1 HP
$513.97 1,027.94 0.00
175,078.15 0.00Electrical Subtotal26
Communications27
271323130010 2.00Communications optical Fiber $0.00 0.00 0.00
0.00 0.00Communications Subtotal27
Electronic Safety and Security28
283123508200 1.00 Ea.Detection system, annunciator panel,
16 zone lamp, excluding wires &
conduits
$1,169.12 1,169.12 0.00
1,169.12 0.00Electronic Safety and Security Subtotal28
Earthwork31
316329130200 1,620.00 V.L.F.Uncased drilled concrete piers, thin
wall shell pile, straight sided, 16
ga.10" diameter, 7.3 lb/LF, priced
using 200 piles, 60' long, unless
specified otherwise, excludes pile
caps, mobilization, or reinforcing
$23.48 38,037.60 0.00
38,037.60 0.00Earthwork Subtotal31
Subtotal 1,179,182.22 0.00
General Contractor's Markup on Subs 10.00% $0.00$0.00
Subtotal $1,179,182.22 $0.00
General Conditions
5.00% $58,959.11 $0.00
Subtotal $1,238,141.33 $0.00
15.00% $185,721.20 $0.00
Subtotal $1,423,862.53 $0.00
Grand Total $1,423,862.53
General Contractor's Overhead and Profit
31-800-334-3509 customersupport@rsmeans.com® 2015