Reducing risk to personnel
and business operations.
Electrical Arc Flash
Arc Flash Hazards
In the fraction of a second that it takes
copper to expand to vapor, an arc flash
can generate skin-searing heat — four
times hotter than the surface of the sun.
Recent revisions to NFPA70E require
that an Arc Flash Hazard Analysis be
performed prior to working on or near
electrical equipment containing exposed
energized conductors. The analysis
determines the arc flash boundaries
(AFB), incident energy levels and the
required level of personal protective
equipment (PPE). The recommendations
in the analysis can be used to determine
hazards in your workplace. Implementing
the recommendations will help protect
your workers and help you satisfy OSHA
requirements.
The Siemens solution
to minimize risks from
arc flash hazards
Working within NFPA and IEEE guidelines,
our experienced power systems engineers
will perform systematic and accurate Arc
Flash Hazard Studies as follows:
1 Short Circuit Calculations
Siemens will either use your data, or
make calculations for you, to identify
bolted and arcing fault levels at key
points in a power distribution system.
2 Protective Device Coordination
Using the customer’s electrical systems
coordination study, Siemens determines
the duration of the arcing faults.
3 Arc Flash Hazard Calculations
The incident energy level, the flash
hazard boundary, and the PPE required
are then calculated for each location.
4 Documentation
The information above is compiled
for you into a comprehensive report,
which contains information necessary to
comply with regulatory requirements.
5 Unsafe Work Locations
The report will identify work locations
having incident energy levels in excess
of available PPE ratings.
6 Arc Flash Hazard Mitigation
Recommendations will be made to
minimize Arc Flash Hazards by changes
in system protection or operational
procedures.
7 Arc Flash Hazard Labels
In addition to the report, our customers
will receive a field label containing the
flash hazard boundary distance, incident
energy level, PPE category and shock
hazard for each location.
Implementing
recommendations from a
Siemens Arc Flash Hazard
Study can bring you the
following benefits:
 Improve employee safety
 Improve your electrical system
 Provide safety information to
subcontractors
 Assist in compliance with regulations
 Provide you with documentation that
may bring about reductions in workers
compensation and insurance rates
Turn to Siemens for Arc Flash
Hazard Studies, comprehensive
safety training and other related
services that will enhance the
safety of your personnel and
the reliability of your operation.
Siemens Energy & Automation, Inc.
Siemens Industrial Services
3333 Old Milton Parkway
Alpharetta, GA 30005
1-800-241-4453 or 1-800-964-4114
seainfo@sea.siemens.com
Siemens Energy and Automation, Inc. is a GSA contract holder.
WEFL-00206-0504 New 5M0504PS
© 2004 Siemens Energy & Automation, Inc. All Rights Reserved
The Siemens logo is a registered trademark of Siemens AG. Product names mentioned may be trademarks or registered trademarks
of their respective companies. Specifications are subject to change without notice.
SARRACS — Complete arc flash
protection for switchgear racking.
Racking medium voltage circuit
breakers (>1000V) into and out of
a live bus is one instance where the
PPE required may not be adequate
to protect personnel from arc
flash. Siemens SARRACS effectively
removes the operator from the
arc flash boundary by allowing for
remote installation or removal. In
addition, SARRACS provides torque
monitoring to detect improper
breaker connection.

More Related Content

What's hot

Electrical maintenance and its relationship to safety
Electrical maintenance and its relationship to safetyElectrical maintenance and its relationship to safety
Electrical maintenance and its relationship to safety
Engr. Ashikur Rahman
 
Why arc flashes occur—and nine other things you need to know about the risk o...
Why arc flashes occur—and nine other things you need to know about the risk o...Why arc flashes occur—and nine other things you need to know about the risk o...
Why arc flashes occur—and nine other things you need to know about the risk o...
Eaton Electrical
 
2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling
guestf8e1f7
 
Electrical maintenance Question and answer
Electrical maintenance Question and answerElectrical maintenance Question and answer
Electrical maintenance Question and answer
Carl Tim Lapinig
 
Occupational Health And Safety - Electrical Equipment In The Workplace
Occupational Health And Safety - Electrical Equipment In The WorkplaceOccupational Health And Safety - Electrical Equipment In The Workplace
Occupational Health And Safety - Electrical Equipment In The Workplace
Darabi
 
10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysis10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysis
Eaton Electrical
 
Electrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk ManagementElectrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk Management
Schneider Electric
 
Oilfield technology article
Oilfield technology articleOilfield technology article
Oilfield technology article
Louise Green
 
hazardous energies
hazardous energieshazardous energies
hazardous energies
Lyks Mae Cadena
 
Why electric engineers should check emr
Why electric engineers should check emrWhy electric engineers should check emr
Why electric engineers should check emrRad Meters
 
Basic Safety Procedure in High Risk Activities and Industries
Basic Safety Procedure in High Risk Activities and IndustriesBasic Safety Procedure in High Risk Activities and Industries
Basic Safety Procedure in High Risk Activities and Industries
James Tolentino
 
Using Advanced Weather Intelligence to Restore Power Faster
Using Advanced Weather Intelligence to Restore Power FasterUsing Advanced Weather Intelligence to Restore Power Faster
Using Advanced Weather Intelligence to Restore Power Faster
Schneider Electric
 
Arc Flash Training
Arc Flash TrainingArc Flash Training
Arc Flash Training
Arc Flash Training
 
Nema locking cable
Nema locking cableNema locking cable
Nema locking cable
nelsonsmith910
 

What's hot (17)

Electrical maintenance and its relationship to safety
Electrical maintenance and its relationship to safetyElectrical maintenance and its relationship to safety
Electrical maintenance and its relationship to safety
 
Why arc flashes occur—and nine other things you need to know about the risk o...
Why arc flashes occur—and nine other things you need to know about the risk o...Why arc flashes occur—and nine other things you need to know about the risk o...
Why arc flashes occur—and nine other things you need to know about the risk o...
 
Arc flash q
Arc flash qArc flash q
Arc flash q
 
Cv Fran O'Toole
Cv Fran O'TooleCv Fran O'Toole
Cv Fran O'Toole
 
2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling
 
Electrical maintenance Question and answer
Electrical maintenance Question and answerElectrical maintenance Question and answer
Electrical maintenance Question and answer
 
Occupational Health And Safety - Electrical Equipment In The Workplace
Occupational Health And Safety - Electrical Equipment In The WorkplaceOccupational Health And Safety - Electrical Equipment In The Workplace
Occupational Health And Safety - Electrical Equipment In The Workplace
 
Summary Thesis
Summary ThesisSummary Thesis
Summary Thesis
 
10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysis10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysis
 
Electrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk ManagementElectrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk Management
 
Oilfield technology article
Oilfield technology articleOilfield technology article
Oilfield technology article
 
hazardous energies
hazardous energieshazardous energies
hazardous energies
 
Why electric engineers should check emr
Why electric engineers should check emrWhy electric engineers should check emr
Why electric engineers should check emr
 
Basic Safety Procedure in High Risk Activities and Industries
Basic Safety Procedure in High Risk Activities and IndustriesBasic Safety Procedure in High Risk Activities and Industries
Basic Safety Procedure in High Risk Activities and Industries
 
Using Advanced Weather Intelligence to Restore Power Faster
Using Advanced Weather Intelligence to Restore Power FasterUsing Advanced Weather Intelligence to Restore Power Faster
Using Advanced Weather Intelligence to Restore Power Faster
 
Arc Flash Training
Arc Flash TrainingArc Flash Training
Arc Flash Training
 
Nema locking cable
Nema locking cableNema locking cable
Nema locking cable
 

Similar to Arc flash analysis siemens

What is an arc flash?
What is an arc flash? What is an arc flash?
What is an arc flash?
Trace Software International
 
Arc flash application guide
Arc flash application guideArc flash application guide
Arc flash application guide
Souvik Dutta
 
Practical solutions guide to arc flash hazards
Practical solutions guide to arc flash hazards Practical solutions guide to arc flash hazards
Practical solutions guide to arc flash hazards
Deal Point
 
6250 application existing_jb-kz_20070214_web
6250 application existing_jb-kz_20070214_web6250 application existing_jb-kz_20070214_web
6250 application existing_jb-kz_20070214_web
Laurence Michael, PE
 
EDS Services
EDS ServicesEDS Services
EDS Services
Arc Flash Training
 
Power Engineering Services
Power Engineering ServicesPower Engineering Services
Power Engineering Services
Premium Power
 
Arc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev bArc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev b
chabchoub Mohamed
 
Arc flash analysis, electrical safety and risk assessment
Arc flash analysis, electrical safety and risk assessmentArc flash analysis, electrical safety and risk assessment
Arc flash analysis, electrical safety and risk assessment
Premium Power
 
Arc_Flash_Labeling_Whitepaper
Arc_Flash_Labeling_WhitepaperArc_Flash_Labeling_Whitepaper
Arc_Flash_Labeling_WhitepaperChristina Elwell
 
Ac drive safety functions ease risk assessment
Ac drive safety functions ease risk assessmentAc drive safety functions ease risk assessment
Ac drive safety functions ease risk assessmentARC Advisory Group
 
Arc flash practical solution guide to arc flash hazards-1
Arc flash practical solution guide to arc flash hazards-1Arc flash practical solution guide to arc flash hazards-1
Arc flash practical solution guide to arc flash hazards-1
Aarjun Singh Panesar
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdf
ssusera5c9a31
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etap
Himmelstern
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done Right
Himmelstern
 
Arc Flash Considerations for Data Center IT Space
Arc Flash Considerations for Data Center IT SpaceArc Flash Considerations for Data Center IT Space
Arc Flash Considerations for Data Center IT Space
Schneider Electric
 
Sadeq abdulwahab management of electrical safety
Sadeq abdulwahab  management of electrical safetySadeq abdulwahab  management of electrical safety
Sadeq abdulwahab management of electrical safetysarah7887
 
Brochure es 2018
Brochure es 2018Brochure es 2018
Brochure es 2018
PabloRifrani
 
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd  Electrical Equipment & Human SafetyMake India Safer with JMV LPS Ltd  Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Mahesh Chandra Manav
 

Similar to Arc flash analysis siemens (20)

Arc Flash Solutions
Arc Flash SolutionsArc Flash Solutions
Arc Flash Solutions
 
What is an arc flash?
What is an arc flash? What is an arc flash?
What is an arc flash?
 
Arc flash application guide
Arc flash application guideArc flash application guide
Arc flash application guide
 
Practical solutions guide to arc flash hazards
Practical solutions guide to arc flash hazards Practical solutions guide to arc flash hazards
Practical solutions guide to arc flash hazards
 
6250 application existing_jb-kz_20070214_web
6250 application existing_jb-kz_20070214_web6250 application existing_jb-kz_20070214_web
6250 application existing_jb-kz_20070214_web
 
EDS Services
EDS ServicesEDS Services
EDS Services
 
Power Engineering Services
Power Engineering ServicesPower Engineering Services
Power Engineering Services
 
Arc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev bArc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev b
 
Arc flash analysis, electrical safety and risk assessment
Arc flash analysis, electrical safety and risk assessmentArc flash analysis, electrical safety and risk assessment
Arc flash analysis, electrical safety and risk assessment
 
Arc_Flash_Labeling_Whitepaper
Arc_Flash_Labeling_WhitepaperArc_Flash_Labeling_Whitepaper
Arc_Flash_Labeling_Whitepaper
 
Ac drive safety functions ease risk assessment
Ac drive safety functions ease risk assessmentAc drive safety functions ease risk assessment
Ac drive safety functions ease risk assessment
 
Arc flash practical solution guide to arc flash hazards-1
Arc flash practical solution guide to arc flash hazards-1Arc flash practical solution guide to arc flash hazards-1
Arc flash practical solution guide to arc flash hazards-1
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdf
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etap
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done Right
 
Arc flash considerations
Arc flash considerationsArc flash considerations
Arc flash considerations
 
Arc Flash Considerations for Data Center IT Space
Arc Flash Considerations for Data Center IT SpaceArc Flash Considerations for Data Center IT Space
Arc Flash Considerations for Data Center IT Space
 
Sadeq abdulwahab management of electrical safety
Sadeq abdulwahab  management of electrical safetySadeq abdulwahab  management of electrical safety
Sadeq abdulwahab management of electrical safety
 
Brochure es 2018
Brochure es 2018Brochure es 2018
Brochure es 2018
 
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd  Electrical Equipment & Human SafetyMake India Safer with JMV LPS Ltd  Electrical Equipment & Human Safety
Make India Safer with JMV LPS Ltd Electrical Equipment & Human Safety
 

Recently uploaded

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

Arc flash analysis siemens

  • 1. Reducing risk to personnel and business operations. Electrical Arc Flash
  • 2. Arc Flash Hazards In the fraction of a second that it takes copper to expand to vapor, an arc flash can generate skin-searing heat — four times hotter than the surface of the sun. Recent revisions to NFPA70E require that an Arc Flash Hazard Analysis be performed prior to working on or near electrical equipment containing exposed energized conductors. The analysis determines the arc flash boundaries (AFB), incident energy levels and the required level of personal protective equipment (PPE). The recommendations in the analysis can be used to determine hazards in your workplace. Implementing the recommendations will help protect your workers and help you satisfy OSHA requirements. The Siemens solution to minimize risks from arc flash hazards Working within NFPA and IEEE guidelines, our experienced power systems engineers will perform systematic and accurate Arc Flash Hazard Studies as follows: 1 Short Circuit Calculations Siemens will either use your data, or make calculations for you, to identify bolted and arcing fault levels at key points in a power distribution system. 2 Protective Device Coordination Using the customer’s electrical systems coordination study, Siemens determines the duration of the arcing faults. 3 Arc Flash Hazard Calculations The incident energy level, the flash hazard boundary, and the PPE required are then calculated for each location. 4 Documentation The information above is compiled for you into a comprehensive report, which contains information necessary to comply with regulatory requirements. 5 Unsafe Work Locations The report will identify work locations having incident energy levels in excess of available PPE ratings. 6 Arc Flash Hazard Mitigation Recommendations will be made to minimize Arc Flash Hazards by changes in system protection or operational procedures. 7 Arc Flash Hazard Labels In addition to the report, our customers will receive a field label containing the flash hazard boundary distance, incident energy level, PPE category and shock hazard for each location. Implementing recommendations from a Siemens Arc Flash Hazard Study can bring you the following benefits:  Improve employee safety  Improve your electrical system  Provide safety information to subcontractors  Assist in compliance with regulations  Provide you with documentation that may bring about reductions in workers compensation and insurance rates Turn to Siemens for Arc Flash Hazard Studies, comprehensive safety training and other related services that will enhance the safety of your personnel and the reliability of your operation. Siemens Energy & Automation, Inc. Siemens Industrial Services 3333 Old Milton Parkway Alpharetta, GA 30005 1-800-241-4453 or 1-800-964-4114 seainfo@sea.siemens.com Siemens Energy and Automation, Inc. is a GSA contract holder. WEFL-00206-0504 New 5M0504PS © 2004 Siemens Energy & Automation, Inc. All Rights Reserved The Siemens logo is a registered trademark of Siemens AG. Product names mentioned may be trademarks or registered trademarks of their respective companies. Specifications are subject to change without notice. SARRACS — Complete arc flash protection for switchgear racking. Racking medium voltage circuit breakers (>1000V) into and out of a live bus is one instance where the PPE required may not be adequate to protect personnel from arc flash. Siemens SARRACS effectively removes the operator from the arc flash boundary by allowing for remote installation or removal. In addition, SARRACS provides torque monitoring to detect improper breaker connection.