SlideShare a Scribd company logo
1 of 24
Nidec Motor Corporation
Global PLM
Past, Present & Future
2
Agenda
 Nidec overview
– Emerson Motor Company (Pre-Nidec)
– Nidec Corporate
– Nidec Motor Corporation (NMC)
 NMC PLM timeline of events
– Initial driver for each major event
– Complexity
– Challenges tackled
– Lessons learned
 Observational summary
 Aras Innovator at NMC
– So far, so good
– Future implementation possibilities
– Integration vision
“Complexity is not always a difficulty metric, sometimes it is merely descriptive of a solution‟s problem space.”
3
Overview
 Established in 1890 in St. Louis, MO as foundation of Emerson
Electric Manufacturing Company
– 1892 built and distributed first electric fans in US
– Followed quickly by electric sewing machines, electric dental drills, power
tools, and appliance motors
Circa 1898
4
Overview
 Developed advanced technology in 3 areas of motor technology
– Brushless DC
– Induction (blowers, pumps, compressor, gear/belt, direct)
– Switched Reluctance, SR (hybrid and electric vehicle)
5
Overview
 Nidec Motor Corporation formed Sept. 2010 when acquired by
Nidec Corporation of Japan
– Establish North America operations with expanded US sales and customer
base, maintaining St. Louis, MO as North American headquarters
– Leverage supply
chain, operations, products, technology, customers, marketing channels
NMC
Appliance
Washer Motors
Dryer Motors
Dishwasher Motors
Appliance Controls
Automotive Controls
Commercial
(Fractional HP)
Res/Com HVACR
Pool, Spa, Tub Pumps
Mechanical Duty
Variable Speed Control
Industrial
(Integral HP)
Liquid Pumping
Air Compressors
Mechanical Duty
General Purpose
Vehicle Traction
6
Nidec Corporate Profile
 Global Leader in Small and Mid-Sized
Electric Motors, Controls, and Related
Products
 Headquarters in Kyoto, Japan
 2011 Sales $8.5B, Market Cap ~$12B
 Over 100,000 Global Employees
 Stock Listing: NJ on NYSE
Tokyo & Osaka Exchanges
 Company Founded – July 1973
Kyoto Headquarters &
Central R&D Facility
HDD Spindle
Motors
Brushless DC
Motors
Cooling Fan
Motors
7
Shigenobu Nagamori
- Founder & CEO of Nidec Corporation
 Established Nidec Corporation in 1973 as an
Electrical Engineer at age 28
 Select by Barron‟s as one of
“The World‟s Thirty Most Respected CEOs”
 Ranked 3rd in Japan‟s top 100 corporate
leaders by Nikkei Business
 Selected as “Business Statesman of the
Year in Japan” by Harvard Business School
 Author / Co-author
– Definitive Technical Reference Books on
Brushless Motor Technology
– General Management Books on Human Resource
Management and Motivation
8
Nidec PDM/PLM timeline
• Prehistoric
• UniGraphics file manager
• Primitive revision control by folder/filename conventions (for Claris CAD)
• Homegrown ‘Catch & Release’ (for MicroStation files)
• ProIntralink for ProEngineer model/drawing files
• Windchill replaces ‘Catch & Release’
• US Electrical Motors merges with Emerson Motor Company (Oct 2000)
• brings CMS and separate Windchill installation
• 4 systems combined into Teamcenter Engineering
• Aras Innovator replaces TcEng
Prehistoric
UG
Primitive
Aras
Teamcenter Eng
CMS Windchill (USEM)
Windchill
ProIntralink
„Catch‟
1982 1991 1994 1999 2000 2006 2008 20121996
9
Prehistoric
 Drawings created with Tsquares, 4H lead, vellum, sepia prints, etc.
 Processes controlled by policy, managed by people
 Documentation archived in drawing file cabinets, binders and ledgers
 Control of product iteration
10
Early drawing (Prehistoric)
11
UniGraphics managed
 Business driver
– Electronic drawings – CADD
– Good sales people
 Complexity
– Sophisticated workstations for traditional draftspeople
 Challenges
– Training
– Understanding
 Lessons learned
– Provide exposure of tools to end users
– Have actual knowledge of what the tool (hardware & software) is doing
12
Primitive Document Management
 Business driver
– Sanity for all users of Claris CAD
 Complexity
– Basic revision functionality through folder creation with file renaming
 Challenges
– Cementing user practices
 Lessons learned
– “Got to be a better way”
– Hire someone with some practical knowledge
– Knowledge transfer and mentoring
13
„Catch & Release‟
 Business driver
– In-house knowledge/programming skills
 Complexity
– Completely „homegrown‟ system
– Simple interface
– Version management through „Drydock‟
 Challenges
– Original developer left company
 Lessons learned
– CAD tool integration a must
– Watch out for specific platform ties
14
ProIntralink
 Business driver
– Single source management of ProE files
– 3-D modeling tool
 Complexity
– Installation, configuration, administrative nightmare
– End-user training required but integrated to ProE
 Challenges
– What to do about viewing? (ProductView from PTC)
 Lessons learned
– CAD modeling standards absolutely necessary
15
Windchill
 Business driver
– OTB solution for drawing management
– Release control through workflow & lifecycle management
– Open integration through use of Java API
 Complexity
– Web-based allowed for simplification of UI
 Challenges
– Upgrade from V2.0 to V4.0 was several month transition
– No integration with ProE, initially
 Lessons learned
– Customizing for simplicity results in a lifetime commitment
– „KNOW YOUR PROCESSES‟ beforehand
16
USEM Implements CMS
 Business driver
– Needed ProE model / file control
– Recommendation by consultant as best solution for ProE
 Complexity
– OTB installation, very little customization
– CAD independent
 Challenges
– What to do about viewables created from .drw files?
– Train the trainer methodology
 Lessons learned
– It just worked
17
USEM Implements Windchill
 Business driver
– Online viewing and distribution
– Workflow / Release functionality - need for control of viewables
 Complexity
– Hidden by consultation
 Challenges
– Convergence to a single Life Cycle
– Conversion from aperture cards to viewable files
 Lessons learned
– How to implement offshore outsourcing with India resources
18
Transition to Teamcenter Eng
 Business driver
– Emerson corporate decision
 Complexity
– Combining 4 separate PLM systems into one
– Maintaining global „collaboration‟
 Challenges
– Getting divisional time for data correction/cleansing
– Revision migration wasn‟t in the cards
– Seamless integration of pre-existing processes and functionality
 Lessons learned
– Emerson Teamcenter CoE
– Relearned that hiring knowledgeable resource is invaluable
19
Switch „flipped‟ to Innovator
 Business driver
– Loss of volume leverage compounded by costs associated with additional TC modules
– Replication functionality existed to resolve ProE global usage
 Complexity
– Entire revision migration (ProE especially)
– Maintaining continuity for end users through migration
 Challenges
– Aggressive time-frame (5 months max )
– Seamless integration of pre-existing processes and functionality
– Migration resources with TC knowledge
 Lessons learned
– Reaffirmed that access to software is indispensable for learning
20
Observational Summary
 We were CAD centric in vision
 Version control was a must
 We built an understanding of process management along the way
– „in-house‟ developed systems for ECN/ECO, parts definition, classification
– Collaboration with BPI teams
21
Observational Summary
 Get people „up to speed‟
 Enable users to be more productive
– CAD integration
– Enhance functionality
 Establish standards and make them known
 Engage with your other corporate divisions
22
Aras Innovator at NMC
 Current Implementation
– Subscribers at version 9.3 SP4
– Pro/Engineer integration
– Replication to China
– Customized „Cad Document‟ and custom „NMC Eng Document‟
– Custom created Life Cycle maps
– Custom external web services
 Project Statistics
– 2 Teams
• NMC – Project Manager, CAD & User admin, Infrastructure & Migration & Development
• Softech – Project Manager, TC migration expert, Innovator load expert
– Pre-project strategy and discovery – May 2012
– Admin and developer training – June/July 2012
– Aug. 1, 2012 – Dec. 12, 2012 (19 weeks – with data migration)
– Additional 3 weeks for replication
– 215,000 TC item masters
– representing 290,000 total item revisions
– encapsulating 320,000 files
23
Aras Innovator future at NMC
 Prototype projects
– Project management – IT project to upgrade globally used system
– Custom application for design layout and printing of labels
– Competitive analysis tool
 Serious investigation
– ECAD integration with component library consolidation
 Future
– Part/BOM implementation
– Parts classification
– ECN/ECO integration
– NPD tool
– External applications for Product Data re-implemented
24
Aras Innovator vision for NMC
 We plan:
– Mapping our current processes for BOM control
– Re-examining our current NPD process and tool
– Reevaluating our current product definition / classification tools
– Extending studies into areas where we have begun prototyping solutions to
attain a better understanding the capabilities of Aras Innovator
 Based on the results, we will hone our vision for how to best
utilize and integrate Aras Innovator into our business, and finally
create a roadmap for implementation.

More Related Content

What's hot

Prism-IND Windchill ESI
Prism-IND Windchill ESIPrism-IND Windchill ESI
Prism-IND Windchill ESIPrism-IND
 
Hunter Fan + EAC Presentation
Hunter Fan + EAC PresentationHunter Fan + EAC Presentation
Hunter Fan + EAC PresentationAddison9
 
Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08kcurley
 
ALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFSALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFSDigicomp Academy AG
 
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...PTC
 
Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...
Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...
Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...Mark Peterson
 
EAC Hunter Fan Presentation
EAC Hunter Fan PresentationEAC Hunter Fan Presentation
EAC Hunter Fan PresentationAddison9
 
PTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorxPTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorxPTC
 
PDSA Results Flexsteel
PDSA Results FlexsteelPDSA Results Flexsteel
PDSA Results FlexsteelSophia Hudson
 
Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140kailashgavare
 
Vipavetz.kevin
Vipavetz.kevinVipavetz.kevin
Vipavetz.kevinNASAPMC
 
Platform & Application Modernization
Platform & Application ModernizationPlatform & Application Modernization
Platform & Application ModernizationJK Tech
 
SAP INTEGRATIONS WITH SERVICENOW
SAP INTEGRATIONS WITH SERVICENOWSAP INTEGRATIONS WITH SERVICENOW
SAP INTEGRATIONS WITH SERVICENOWAspediens
 
Expand the Business Value of Riverbed Solutions with New Optimize Services
Expand the Business Value of Riverbed Solutions with New Optimize ServicesExpand the Business Value of Riverbed Solutions with New Optimize Services
Expand the Business Value of Riverbed Solutions with New Optimize ServicesRiverbed Technology
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras
 
Autdoesk PLM 360 to PDM Integration with Jitterbit
Autdoesk PLM 360 to PDM Integration with JitterbitAutdoesk PLM 360 to PDM Integration with Jitterbit
Autdoesk PLM 360 to PDM Integration with JitterbitRazorleaf Corporation
 

What's hot (20)

Prism-IND Windchill ESI
Prism-IND Windchill ESIPrism-IND Windchill ESI
Prism-IND Windchill ESI
 
Hunter Fan + EAC Presentation
Hunter Fan + EAC PresentationHunter Fan + EAC Presentation
Hunter Fan + EAC Presentation
 
Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08Talent Management Preswith Ptc5 15 08
Talent Management Preswith Ptc5 15 08
 
ALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFSALM Application und Service Lifecycle Management mit TFS
ALM Application und Service Lifecycle Management mit TFS
 
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
Fujitsu Adopts PTC Service Lifecycle Management Solution to Support PC Servic...
 
Erp
ErpErp
Erp
 
My path to you
My path to youMy path to you
My path to you
 
Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...
Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...
Lavacon 2014: But will it fit in my bathroom? Creating a single interface for...
 
EAC Hunter Fan Presentation
EAC Hunter Fan PresentationEAC Hunter Fan Presentation
EAC Hunter Fan Presentation
 
PTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorxPTC Acquires Leading Internet of Things Platform Provider ThingWorx
PTC Acquires Leading Internet of Things Platform Provider ThingWorx
 
PDSA Results Flexsteel
PDSA Results FlexsteelPDSA Results Flexsteel
PDSA Results Flexsteel
 
Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140Introductiontoadaptiveand3dexperience 180807145140
Introductiontoadaptiveand3dexperience 180807145140
 
EAC + Cadence Slide Deck
EAC + Cadence Slide DeckEAC + Cadence Slide Deck
EAC + Cadence Slide Deck
 
Vipavetz.kevin
Vipavetz.kevinVipavetz.kevin
Vipavetz.kevin
 
Platform & Application Modernization
Platform & Application ModernizationPlatform & Application Modernization
Platform & Application Modernization
 
A PeopleSoft Roadmap
A PeopleSoft RoadmapA PeopleSoft Roadmap
A PeopleSoft Roadmap
 
SAP INTEGRATIONS WITH SERVICENOW
SAP INTEGRATIONS WITH SERVICENOWSAP INTEGRATIONS WITH SERVICENOW
SAP INTEGRATIONS WITH SERVICENOW
 
Expand the Business Value of Riverbed Solutions with New Optimize Services
Expand the Business Value of Riverbed Solutions with New Optimize ServicesExpand the Business Value of Riverbed Solutions with New Optimize Services
Expand the Business Value of Riverbed Solutions with New Optimize Services
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016
 
Autdoesk PLM 360 to PDM Integration with Jitterbit
Autdoesk PLM 360 to PDM Integration with JitterbitAutdoesk PLM 360 to PDM Integration with Jitterbit
Autdoesk PLM 360 to PDM Integration with Jitterbit
 

Similar to Nidec Global PLM Past, Present & Future

PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignEMA Design Automation
 
Project controls for csx engineering ppt
Project controls for csx engineering pptProject controls for csx engineering ppt
Project controls for csx engineering pptp6academy
 
What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...Dawn Collins
 
Software Factories in the Real World: How an IBM WebSphere Integration Factor...
Software Factories in the Real World: How an IBM WebSphere Integration Factor...Software Factories in the Real World: How an IBM WebSphere Integration Factor...
Software Factories in the Real World: How an IBM WebSphere Integration Factor...ghodgkinson
 
Hall brouwers2004tenixmatrixinovsummitcmis(present)
Hall brouwers2004tenixmatrixinovsummitcmis(present)Hall brouwers2004tenixmatrixinovsummitcmis(present)
Hall brouwers2004tenixmatrixinovsummitcmis(present)William Hall
 
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...camunda services GmbH
 
Visualizing the engineering project lifecycle - Unite Copenhagen
Visualizing the engineering project lifecycle - Unite CopenhagenVisualizing the engineering project lifecycle - Unite Copenhagen
Visualizing the engineering project lifecycle - Unite CopenhagenUnity Technologies
 
Software development Life Cycle
Software development Life CycleSoftware development Life Cycle
Software development Life CycleKumar
 
A Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere ToolsA Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere Toolsghodgkinson
 
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCBECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCBEMA Design Automation
 
Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio Neboneed Farhadi
 
Alejandro Chico Resume
Alejandro Chico ResumeAlejandro Chico Resume
Alejandro Chico ResumeAlex Chico
 
HCI U-II HCI software Process (1).pdf
HCI U-II HCI software Process (1).pdfHCI U-II HCI software Process (1).pdf
HCI U-II HCI software Process (1).pdfudhayaveenaa
 
2015-05-20 openmdm-architecture
2015-05-20 openmdm-architecture2015-05-20 openmdm-architecture
2015-05-20 openmdm-architectureAndreas Benzing
 
Markus keuneke partial data-models
Markus keuneke   partial data-modelsMarkus keuneke   partial data-models
Markus keuneke partial data-modelscaise2013vlc
 
SharePoint Best Practices Conference 2013
SharePoint Best Practices Conference 2013SharePoint Best Practices Conference 2013
SharePoint Best Practices Conference 2013Mike Brannon
 

Similar to Nidec Global PLM Past, Present & Future (20)

PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB Design
 
Project controls for csx engineering ppt
Project controls for csx engineering pptProject controls for csx engineering ppt
Project controls for csx engineering ppt
 
What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...
 
Software Factories in the Real World: How an IBM WebSphere Integration Factor...
Software Factories in the Real World: How an IBM WebSphere Integration Factor...Software Factories in the Real World: How an IBM WebSphere Integration Factor...
Software Factories in the Real World: How an IBM WebSphere Integration Factor...
 
Hall brouwers2004tenixmatrixinovsummitcmis(present)
Hall brouwers2004tenixmatrixinovsummitcmis(present)Hall brouwers2004tenixmatrixinovsummitcmis(present)
Hall brouwers2004tenixmatrixinovsummitcmis(present)
 
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
 
Visualizing the engineering project lifecycle - Unite Copenhagen
Visualizing the engineering project lifecycle - Unite CopenhagenVisualizing the engineering project lifecycle - Unite Copenhagen
Visualizing the engineering project lifecycle - Unite Copenhagen
 
Software development Life Cycle
Software development Life CycleSoftware development Life Cycle
Software development Life Cycle
 
A Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere ToolsA Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere Tools
 
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCBECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
 
Sysdev
SysdevSysdev
Sysdev
 
PCB Design and Data Management
PCB Design and Data ManagementPCB Design and Data Management
PCB Design and Data Management
 
Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio
 
Alejandro Chico Resume
Alejandro Chico ResumeAlejandro Chico Resume
Alejandro Chico Resume
 
Discover Your IT Career Path
Discover Your IT Career PathDiscover Your IT Career Path
Discover Your IT Career Path
 
HCI U-II HCI software Process (1).pdf
HCI U-II HCI software Process (1).pdfHCI U-II HCI software Process (1).pdf
HCI U-II HCI software Process (1).pdf
 
2015-05-20 openmdm-architecture
2015-05-20 openmdm-architecture2015-05-20 openmdm-architecture
2015-05-20 openmdm-architecture
 
Cloud
CloudCloud
Cloud
 
Markus keuneke partial data-models
Markus keuneke   partial data-modelsMarkus keuneke   partial data-models
Markus keuneke partial data-models
 
SharePoint Best Practices Conference 2013
SharePoint Best Practices Conference 2013SharePoint Best Practices Conference 2013
SharePoint Best Practices Conference 2013
 

More from Aras

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryAras
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM ManagementAras
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology DirectionsAras
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016Aras
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of EngineeringAras
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD ConnectorsAras
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionAras
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product DesignAras
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile DeploymentAras
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelAras
 
Quality Systems
Quality SystemsQuality Systems
Quality SystemsAras
 
Variant Management
Variant ManagementVariant Management
Variant ManagementAras
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service ReportingAras
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchAras
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkAras
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical PublicationsAras
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange PortalAras
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk ManagementAras
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech DocsAras
 
Techniques for Gathering Agile Requirements
Techniques for Gathering Agile RequirementsTechniques for Gathering Agile Requirements
Techniques for Gathering Agile RequirementsAras
 

More from Aras (20)

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM Management
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology Directions
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of Engineering
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD Connectors
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic Vision
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product Design
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile Deployment
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next Level
 
Quality Systems
Quality SystemsQuality Systems
Quality Systems
 
Variant Management
Variant ManagementVariant Management
Variant Management
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service Reporting
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise Search
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling Framework
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical Publications
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange Portal
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk Management
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech Docs
 
Techniques for Gathering Agile Requirements
Techniques for Gathering Agile RequirementsTechniques for Gathering Agile Requirements
Techniques for Gathering Agile Requirements
 

Nidec Global PLM Past, Present & Future

  • 1. Nidec Motor Corporation Global PLM Past, Present & Future
  • 2. 2 Agenda  Nidec overview – Emerson Motor Company (Pre-Nidec) – Nidec Corporate – Nidec Motor Corporation (NMC)  NMC PLM timeline of events – Initial driver for each major event – Complexity – Challenges tackled – Lessons learned  Observational summary  Aras Innovator at NMC – So far, so good – Future implementation possibilities – Integration vision “Complexity is not always a difficulty metric, sometimes it is merely descriptive of a solution‟s problem space.”
  • 3. 3 Overview  Established in 1890 in St. Louis, MO as foundation of Emerson Electric Manufacturing Company – 1892 built and distributed first electric fans in US – Followed quickly by electric sewing machines, electric dental drills, power tools, and appliance motors Circa 1898
  • 4. 4 Overview  Developed advanced technology in 3 areas of motor technology – Brushless DC – Induction (blowers, pumps, compressor, gear/belt, direct) – Switched Reluctance, SR (hybrid and electric vehicle)
  • 5. 5 Overview  Nidec Motor Corporation formed Sept. 2010 when acquired by Nidec Corporation of Japan – Establish North America operations with expanded US sales and customer base, maintaining St. Louis, MO as North American headquarters – Leverage supply chain, operations, products, technology, customers, marketing channels NMC Appliance Washer Motors Dryer Motors Dishwasher Motors Appliance Controls Automotive Controls Commercial (Fractional HP) Res/Com HVACR Pool, Spa, Tub Pumps Mechanical Duty Variable Speed Control Industrial (Integral HP) Liquid Pumping Air Compressors Mechanical Duty General Purpose Vehicle Traction
  • 6. 6 Nidec Corporate Profile  Global Leader in Small and Mid-Sized Electric Motors, Controls, and Related Products  Headquarters in Kyoto, Japan  2011 Sales $8.5B, Market Cap ~$12B  Over 100,000 Global Employees  Stock Listing: NJ on NYSE Tokyo & Osaka Exchanges  Company Founded – July 1973 Kyoto Headquarters & Central R&D Facility HDD Spindle Motors Brushless DC Motors Cooling Fan Motors
  • 7. 7 Shigenobu Nagamori - Founder & CEO of Nidec Corporation  Established Nidec Corporation in 1973 as an Electrical Engineer at age 28  Select by Barron‟s as one of “The World‟s Thirty Most Respected CEOs”  Ranked 3rd in Japan‟s top 100 corporate leaders by Nikkei Business  Selected as “Business Statesman of the Year in Japan” by Harvard Business School  Author / Co-author – Definitive Technical Reference Books on Brushless Motor Technology – General Management Books on Human Resource Management and Motivation
  • 8. 8 Nidec PDM/PLM timeline • Prehistoric • UniGraphics file manager • Primitive revision control by folder/filename conventions (for Claris CAD) • Homegrown ‘Catch & Release’ (for MicroStation files) • ProIntralink for ProEngineer model/drawing files • Windchill replaces ‘Catch & Release’ • US Electrical Motors merges with Emerson Motor Company (Oct 2000) • brings CMS and separate Windchill installation • 4 systems combined into Teamcenter Engineering • Aras Innovator replaces TcEng Prehistoric UG Primitive Aras Teamcenter Eng CMS Windchill (USEM) Windchill ProIntralink „Catch‟ 1982 1991 1994 1999 2000 2006 2008 20121996
  • 9. 9 Prehistoric  Drawings created with Tsquares, 4H lead, vellum, sepia prints, etc.  Processes controlled by policy, managed by people  Documentation archived in drawing file cabinets, binders and ledgers  Control of product iteration
  • 11. 11 UniGraphics managed  Business driver – Electronic drawings – CADD – Good sales people  Complexity – Sophisticated workstations for traditional draftspeople  Challenges – Training – Understanding  Lessons learned – Provide exposure of tools to end users – Have actual knowledge of what the tool (hardware & software) is doing
  • 12. 12 Primitive Document Management  Business driver – Sanity for all users of Claris CAD  Complexity – Basic revision functionality through folder creation with file renaming  Challenges – Cementing user practices  Lessons learned – “Got to be a better way” – Hire someone with some practical knowledge – Knowledge transfer and mentoring
  • 13. 13 „Catch & Release‟  Business driver – In-house knowledge/programming skills  Complexity – Completely „homegrown‟ system – Simple interface – Version management through „Drydock‟  Challenges – Original developer left company  Lessons learned – CAD tool integration a must – Watch out for specific platform ties
  • 14. 14 ProIntralink  Business driver – Single source management of ProE files – 3-D modeling tool  Complexity – Installation, configuration, administrative nightmare – End-user training required but integrated to ProE  Challenges – What to do about viewing? (ProductView from PTC)  Lessons learned – CAD modeling standards absolutely necessary
  • 15. 15 Windchill  Business driver – OTB solution for drawing management – Release control through workflow & lifecycle management – Open integration through use of Java API  Complexity – Web-based allowed for simplification of UI  Challenges – Upgrade from V2.0 to V4.0 was several month transition – No integration with ProE, initially  Lessons learned – Customizing for simplicity results in a lifetime commitment – „KNOW YOUR PROCESSES‟ beforehand
  • 16. 16 USEM Implements CMS  Business driver – Needed ProE model / file control – Recommendation by consultant as best solution for ProE  Complexity – OTB installation, very little customization – CAD independent  Challenges – What to do about viewables created from .drw files? – Train the trainer methodology  Lessons learned – It just worked
  • 17. 17 USEM Implements Windchill  Business driver – Online viewing and distribution – Workflow / Release functionality - need for control of viewables  Complexity – Hidden by consultation  Challenges – Convergence to a single Life Cycle – Conversion from aperture cards to viewable files  Lessons learned – How to implement offshore outsourcing with India resources
  • 18. 18 Transition to Teamcenter Eng  Business driver – Emerson corporate decision  Complexity – Combining 4 separate PLM systems into one – Maintaining global „collaboration‟  Challenges – Getting divisional time for data correction/cleansing – Revision migration wasn‟t in the cards – Seamless integration of pre-existing processes and functionality  Lessons learned – Emerson Teamcenter CoE – Relearned that hiring knowledgeable resource is invaluable
  • 19. 19 Switch „flipped‟ to Innovator  Business driver – Loss of volume leverage compounded by costs associated with additional TC modules – Replication functionality existed to resolve ProE global usage  Complexity – Entire revision migration (ProE especially) – Maintaining continuity for end users through migration  Challenges – Aggressive time-frame (5 months max ) – Seamless integration of pre-existing processes and functionality – Migration resources with TC knowledge  Lessons learned – Reaffirmed that access to software is indispensable for learning
  • 20. 20 Observational Summary  We were CAD centric in vision  Version control was a must  We built an understanding of process management along the way – „in-house‟ developed systems for ECN/ECO, parts definition, classification – Collaboration with BPI teams
  • 21. 21 Observational Summary  Get people „up to speed‟  Enable users to be more productive – CAD integration – Enhance functionality  Establish standards and make them known  Engage with your other corporate divisions
  • 22. 22 Aras Innovator at NMC  Current Implementation – Subscribers at version 9.3 SP4 – Pro/Engineer integration – Replication to China – Customized „Cad Document‟ and custom „NMC Eng Document‟ – Custom created Life Cycle maps – Custom external web services  Project Statistics – 2 Teams • NMC – Project Manager, CAD & User admin, Infrastructure & Migration & Development • Softech – Project Manager, TC migration expert, Innovator load expert – Pre-project strategy and discovery – May 2012 – Admin and developer training – June/July 2012 – Aug. 1, 2012 – Dec. 12, 2012 (19 weeks – with data migration) – Additional 3 weeks for replication – 215,000 TC item masters – representing 290,000 total item revisions – encapsulating 320,000 files
  • 23. 23 Aras Innovator future at NMC  Prototype projects – Project management – IT project to upgrade globally used system – Custom application for design layout and printing of labels – Competitive analysis tool  Serious investigation – ECAD integration with component library consolidation  Future – Part/BOM implementation – Parts classification – ECN/ECO integration – NPD tool – External applications for Product Data re-implemented
  • 24. 24 Aras Innovator vision for NMC  We plan: – Mapping our current processes for BOM control – Re-examining our current NPD process and tool – Reevaluating our current product definition / classification tools – Extending studies into areas where we have begun prototyping solutions to attain a better understanding the capabilities of Aras Innovator  Based on the results, we will hone our vision for how to best utilize and integrate Aras Innovator into our business, and finally create a roadmap for implementation.