SlideShare a Scribd company logo
1 of 3
Kirk E. Doerr
Civil Construction Engineer
Qualification
Highlights
and
Key Achievements
and
Experienc
es
• University of Kansas-Dean’s Honor Roll (Fall 2012)
• Awarded the Scholarship Certificate and President’s Award for
Academic Excellence (2010)
• Kansas Board of Regents Recognition (2010)
• Eagle Scout Award (2008)
Education
and Training
• BS Civil Engineering, University of Kansas (2014)
• Overall College GPA: 3.35
• Passed Fundamental Engineering Exam (2015)
• Computer Skills- Documentum, AutoCAD, ArcGIS, MathCAD,
Excel, RISA, VBA, PowerPoint, SitePro, Idocs.
• Engineer in Training (EIT) Kansas (2016)
Languages • English
Relevant
Experience
June 2017- Present
February 2017 –
May 2017
CB&I (2015 - Present)
CB&I, Shintech Ethylene Project, Plaquemine, Louisiana
Construction Coordination/Technical Services
• Corrected and organized civil work packages in Sitepro
CB&I, Cameron LNG Construction Site- Hackberry, Louisiana
CTP Trainee/Civil Field Engineer/Concrete Coordinator
• Update Quality/Client Inspection notification log to satisfy
contractual obligation.
• Produce a Pour Plan for Night Shift concrete activities.
• Report concrete activities in “Pour Score” for previous 24 hrs. of
placement.
• Conduct Concrete Pour Plan Meeting for next 24 hrs. of concrete
placement each afternoon.
• Manage and coordinate concrete activities throughout day.
• Coordinate with the concrete and pump truck subcontractors.
• Perform engineering inspections on completed construction
items in order to pour concrete.
• Expedite work and manage civil activities in multiple work areas.
• Communicate with QC and other disciplines to timely release
civil items to different disciplines for work.
• Harmonize work between Quality, Construction and Engineering
to ensure all items are completed as efficiently as possible while
maintaining the highest level of quality.
• Planned, progressed, tracked, managed, coordinated, and
handled any problems for all grouting activities onsite.
9/10/2016
Kirk E. Doerr
Civil Construction Engineer
June 2016- January
2017
December 2015-
May 2016
June 2015-
November 2015
CB&I, Cameron LNG Construction Site- Hackberry, Louisiana
CTP Trainee and Night Shift Civil Field Engineer
• Completed daily Night Shift Activity Construction Report
• Confirmed construction had the latest revisions and all of the
engineering/construction drawings ensuring the highest level of
production.
• Prepared pour card reports which were used to document and
guarantee concrete pour quality.
• Resolved and problem solved field engineering and construction
issues.
• Performed engineering inspections on completed construction
items in order to pour concrete.
• Planned and coordinated concrete pours for Night Shift concrete
activities.
• Worked and communicated with the Client, Quality, Engineering,
and Construction to pour as much concrete as possible while
achieving the highest level of quality.
• Highly involved in pouring over 110,000 cu. Yardage of concrete
while on night shift.
CB&I, Fabrication Facility- Lake Charles, Louisiana
CTP Trainee and Project Controls Specialist
• Performed a time study, data analysis, and composed a report of
the cutting bay process to be able to identify inefficiencies in the
cutting process and provide Project Controls with information to
be able to more accurately bid for new projects.
• Helped update and manage industrial projects Quantity and
Work-Hour spreadsheets and Progress Update spreadsheets.
• Tracked projects isometric counts, ship dates, ship weights, and
prepared completion percentage comparisons for progress.
• Capture and organize progress photos of industrial and nuclear
projects.
CB&I, VC Summer- Jenkinsville, South Carolina
CTP Trainee and Civil/Structural Engineer
• Prepared dispositions and performed licensing reviews for Non-
Conformance and Design Change Reports for a variety of field
construction issues.
• Provided assistance in submitting Engineering Procurement
transmittals.
• Spent Time in field visually inspecting Non-Conformance
material for defects.
9/10/2016
Kirk E. Doerr
Civil Construction Engineer
Summer 2014-
Winter 2015
Horizon Systems- Lenexa, Kansas
Engineering Intern
• Worked on drafting/editing AutoCAD drawings for manufacturing
equipment systems.
• Prepared flow drawings in AutoCAD for different projects.
Summer 2014-
Winter 2014
Westar Energy- Topeka , Kansas
Engineering Intern
• Worked on drafting/editing AutoCAD drawings for the company’s
utility standard and specification manual.
• Participated in a pole study committee to determine if an
alternate material for distribution poles should be used.
Summer 2011 and
Summer 2012
Boresow’s Lawn LLC - Grandview, Missouri
Landscaper/Crew Chief
• Led a mowing crew that was responsible for about 60 properties
weekly.
• Communicated with clients daily to ensure satisfaction.
9/10/2016

More Related Content

What's hot

ALEX_COX_CB&I Resume 4.26.16
ALEX_COX_CB&I Resume 4.26.16ALEX_COX_CB&I Resume 4.26.16
ALEX_COX_CB&I Resume 4.26.16Alex Cox
 
Draftsman & Engineer Tech
Draftsman & Engineer TechDraftsman & Engineer Tech
Draftsman & Engineer TechMatthew Winter
 
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_MuellerTim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_MuellerTim Robb
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick ResumeRudy Wick
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone ResumeLagrone Andy
 
Jacob Powell Resume
Jacob Powell ResumeJacob Powell Resume
Jacob Powell ResumeJacob Powell
 
Casey Stripling Engineer Resume
Casey Stripling Engineer ResumeCasey Stripling Engineer Resume
Casey Stripling Engineer ResumeCasey Stripling
 
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCELJOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCELTanmoy Sarkar
 
mcpherrin resume 42415
mcpherrin resume 42415mcpherrin resume 42415
mcpherrin resume 42415Bill McPherrin
 

What's hot (20)

Resume PCL
Resume PCLResume PCL
Resume PCL
 
Resume
ResumeResume
Resume
 
JWP-2015
JWP-2015JWP-2015
JWP-2015
 
ALEX_COX_CB&I Resume 4.26.16
ALEX_COX_CB&I Resume 4.26.16ALEX_COX_CB&I Resume 4.26.16
ALEX_COX_CB&I Resume 4.26.16
 
Draftsman & Engineer Tech
Draftsman & Engineer TechDraftsman & Engineer Tech
Draftsman & Engineer Tech
 
Resume Updated
Resume UpdatedResume Updated
Resume Updated
 
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_MuellerTim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
 
LNKN_Resume 2016
LNKN_Resume 2016LNKN_Resume 2016
LNKN_Resume 2016
 
Resume
ResumeResume
Resume
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
mubashir C-V
mubashir C-Vmubashir C-V
mubashir C-V
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone Resume
 
Jacob Powell Resume
Jacob Powell ResumeJacob Powell Resume
Jacob Powell Resume
 
CWood-Resume
CWood-ResumeCWood-Resume
CWood-Resume
 
Allred Resume 2014
Allred Resume 2014Allred Resume 2014
Allred Resume 2014
 
Casey Stripling Engineer Resume
Casey Stripling Engineer ResumeCasey Stripling Engineer Resume
Casey Stripling Engineer Resume
 
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCELJOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
 
mcpherrin resume 42415
mcpherrin resume 42415mcpherrin resume 42415
mcpherrin resume 42415
 

Similar to Kirk Doerr CB&I Resume (Updated 7/25/2017)

Ryan_Faber_Resume 2015
Ryan_Faber_Resume 2015Ryan_Faber_Resume 2015
Ryan_Faber_Resume 2015Ryan Faber
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CVAfzal Khan
 
David Morrison Resume 2015
David Morrison Resume 2015David Morrison Resume 2015
David Morrison Resume 2015David Morrison
 
Resume - Alden Onoya
Resume - Alden OnoyaResume - Alden Onoya
Resume - Alden OnoyaAlden Onoya
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...Azhar Niazi
 
Alaa Jafar Resume
Alaa Jafar ResumeAlaa Jafar Resume
Alaa Jafar ResumeALAA JAFAR
 
Mansoor Anwer Resume
Mansoor Anwer ResumeMansoor Anwer Resume
Mansoor Anwer Resumemansoor anwar
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawarengrijaz727
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016Abi Joseph
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam ResumeSamsul Alam
 

Similar to Kirk Doerr CB&I Resume (Updated 7/25/2017) (20)

Ryan_Faber_Resume 2015
Ryan_Faber_Resume 2015Ryan_Faber_Resume 2015
Ryan_Faber_Resume 2015
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CV
 
David Morrison Resume 2015
David Morrison Resume 2015David Morrison Resume 2015
David Morrison Resume 2015
 
Resume - Alden Onoya
Resume - Alden OnoyaResume - Alden Onoya
Resume - Alden Onoya
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...
 
Alaa Jafar Resume
Alaa Jafar ResumeAlaa Jafar Resume
Alaa Jafar Resume
 
SUNIL
SUNILSUNIL
SUNIL
 
Resume
ResumeResume
Resume
 
Mansoor Anwer Resume
Mansoor Anwer ResumeMansoor Anwer Resume
Mansoor Anwer Resume
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
 
@resume
@resume@resume
@resume
 
Timothy Jaeger Resume
Timothy Jaeger ResumeTimothy Jaeger Resume
Timothy Jaeger Resume
 
Humayun Akhtar Resume
Humayun Akhtar ResumeHumayun Akhtar Resume
Humayun Akhtar Resume
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
 
Julian_Carroll resume 2015 link
Julian_Carroll resume 2015 linkJulian_Carroll resume 2015 link
Julian_Carroll resume 2015 link
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 

Recently uploaded (20)

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Kirk Doerr CB&I Resume (Updated 7/25/2017)

  • 1. Kirk E. Doerr Civil Construction Engineer Qualification Highlights and Key Achievements and Experienc es • University of Kansas-Dean’s Honor Roll (Fall 2012) • Awarded the Scholarship Certificate and President’s Award for Academic Excellence (2010) • Kansas Board of Regents Recognition (2010) • Eagle Scout Award (2008) Education and Training • BS Civil Engineering, University of Kansas (2014) • Overall College GPA: 3.35 • Passed Fundamental Engineering Exam (2015) • Computer Skills- Documentum, AutoCAD, ArcGIS, MathCAD, Excel, RISA, VBA, PowerPoint, SitePro, Idocs. • Engineer in Training (EIT) Kansas (2016) Languages • English Relevant Experience June 2017- Present February 2017 – May 2017 CB&I (2015 - Present) CB&I, Shintech Ethylene Project, Plaquemine, Louisiana Construction Coordination/Technical Services • Corrected and organized civil work packages in Sitepro CB&I, Cameron LNG Construction Site- Hackberry, Louisiana CTP Trainee/Civil Field Engineer/Concrete Coordinator • Update Quality/Client Inspection notification log to satisfy contractual obligation. • Produce a Pour Plan for Night Shift concrete activities. • Report concrete activities in “Pour Score” for previous 24 hrs. of placement. • Conduct Concrete Pour Plan Meeting for next 24 hrs. of concrete placement each afternoon. • Manage and coordinate concrete activities throughout day. • Coordinate with the concrete and pump truck subcontractors. • Perform engineering inspections on completed construction items in order to pour concrete. • Expedite work and manage civil activities in multiple work areas. • Communicate with QC and other disciplines to timely release civil items to different disciplines for work. • Harmonize work between Quality, Construction and Engineering to ensure all items are completed as efficiently as possible while maintaining the highest level of quality. • Planned, progressed, tracked, managed, coordinated, and handled any problems for all grouting activities onsite. 9/10/2016
  • 2. Kirk E. Doerr Civil Construction Engineer June 2016- January 2017 December 2015- May 2016 June 2015- November 2015 CB&I, Cameron LNG Construction Site- Hackberry, Louisiana CTP Trainee and Night Shift Civil Field Engineer • Completed daily Night Shift Activity Construction Report • Confirmed construction had the latest revisions and all of the engineering/construction drawings ensuring the highest level of production. • Prepared pour card reports which were used to document and guarantee concrete pour quality. • Resolved and problem solved field engineering and construction issues. • Performed engineering inspections on completed construction items in order to pour concrete. • Planned and coordinated concrete pours for Night Shift concrete activities. • Worked and communicated with the Client, Quality, Engineering, and Construction to pour as much concrete as possible while achieving the highest level of quality. • Highly involved in pouring over 110,000 cu. Yardage of concrete while on night shift. CB&I, Fabrication Facility- Lake Charles, Louisiana CTP Trainee and Project Controls Specialist • Performed a time study, data analysis, and composed a report of the cutting bay process to be able to identify inefficiencies in the cutting process and provide Project Controls with information to be able to more accurately bid for new projects. • Helped update and manage industrial projects Quantity and Work-Hour spreadsheets and Progress Update spreadsheets. • Tracked projects isometric counts, ship dates, ship weights, and prepared completion percentage comparisons for progress. • Capture and organize progress photos of industrial and nuclear projects. CB&I, VC Summer- Jenkinsville, South Carolina CTP Trainee and Civil/Structural Engineer • Prepared dispositions and performed licensing reviews for Non- Conformance and Design Change Reports for a variety of field construction issues. • Provided assistance in submitting Engineering Procurement transmittals. • Spent Time in field visually inspecting Non-Conformance material for defects. 9/10/2016
  • 3. Kirk E. Doerr Civil Construction Engineer Summer 2014- Winter 2015 Horizon Systems- Lenexa, Kansas Engineering Intern • Worked on drafting/editing AutoCAD drawings for manufacturing equipment systems. • Prepared flow drawings in AutoCAD for different projects. Summer 2014- Winter 2014 Westar Energy- Topeka , Kansas Engineering Intern • Worked on drafting/editing AutoCAD drawings for the company’s utility standard and specification manual. • Participated in a pole study committee to determine if an alternate material for distribution poles should be used. Summer 2011 and Summer 2012 Boresow’s Lawn LLC - Grandview, Missouri Landscaper/Crew Chief • Led a mowing crew that was responsible for about 60 properties weekly. • Communicated with clients daily to ensure satisfaction. 9/10/2016