Company Overview
  Commenced operation in 1986 and present in the
            EPC
            Real Estate
            Strategic Investments – Hospitality Sector


  Unique Business Positioning

                                   Real Estate                     Strategic Investments
 EPC                               Key to scalability and value    Driven by opportunities
  Reputation of a Company          unlocking, building on the      arising from the growth
 which provides the highest        strong EPC edifice to give it   prospects of the company’s
 quality for the right value and   the cutting edge                EPC and Real Estate
 in a timely manner.                                               businesses




                                                                                                3
Key Differentiators

  Broad based skill sets of Qualified & Experienced management team

  High standards of corporate Governance and Transparency

  Strong and diversified Revenue model

  Timely execution of projects / Efficiency in delivery schedules

  Competitive edge on account of EPC expertise

  Technological innovations

  Owned equipment base – leads to better utilization rates and reduced time for deploying
  resources

  Transparency in accounting methods adopted and business dealings

  Aspiration to make a significant impact across business segments – driving growth

                                                                                            4
Key highlights for the quarter

 1. Signed agreement to develop township at Oragadam, Chennai
   Company plans to develop a 105-acre township, predominantly residential, at
   Oragadam on the outskirts of Chennai in four phases with total saleable area of
   over 10 million sq. ft.

   The project will be developed in a joint venture with Balakh realtors and the
   association will be on a revenue-sharing basis.


 2. Bagged new order worth Rs. 1,332 million

   Company has bagged new orders worth Rs. 1,332 million during the last
   quarter. Total EPC order book of the company stands Rs.38.5 bn. and backlog of
   Rs. 26.6 bn.

 3. Launched project Tulip - Phase II in Coimbatore
   Company has Launched Tulip – Phase II, a residential project in Coimbatore with
   total saleable area of ~ 0.2 million sq. ft.


                                                                                     5
Key financials




                 6
Key financials – Q2 & H1 FY11
P & L (consolidated)                                                  Rs. in million
                                                                            Growth
                                                                         H1 FY11 Vs. H1
Particulars                   Q2 FY11   Q2 FY10   H1 FY11   H1 FY10          FY10

Total Income                  2253.6     2199.2   4316.9     3625.0         19.09%
 Total Income - EPC            1798.8    1755.2    3765.2    2896.7          29.9%
 Total Income – Real Estate    135.5     348.8     206.7     583.9

EBIDTA                         301.5     287.9     568.3     509.5           11.5%

Profit Before Tax              218.4     207.2     424.9     349.6           21.5%

Profit After Tax               177.7     132.2     316.2     237.3           33.2%

EPS (Rs.) - diluted            1.93       1.72      3.57      3.10


EBITDA Margin                  13.4 %    13.1 %    13.2 %    14.1 %

PAT Margin                     7.9 %     6.0 %     7.3 %     6.6 %
                                                                                          7
Key Ratios

   (consolidated)
                                                   Rs. in million


    Particulars                As on 30.09.10   As on 30.09.09

    ROCE – annualised (%)          10.82             13.88

    ROE – annualised (%)           12.22             15.04

    Total Debt (Rs. million)      2,567. 8          2,129.5

    Net worth (Rs. million)       6,953.3           4,648.2

    Debt: Equity ratio              0.37             0.46




                                                                    8
EPC




      9
Business Model – EPC Business

ENGINEERING, PROCUREMENT & CONSTRUCTION                Stability Driver

 Constructing factories hospitals, hospitality properties, office and
 residential complexes, shopping malls, multiplexes, IT parks and
 other buildings

 Strong Track Record & Reputation
     High integrity
     Highest Quality for the Right Value
     Timely Completion of Projects


 Competitive Bidding to win Contracts
     Recent fund raising exercise to boost prospects


 Repeat Orders from Joint Venture Partners across regions


 Forayed into Government contracts.
                                                                          10
Pan-India Presence
                                     As on 30.09.10
             Himachal Pradesh
                 EPC (Rs mn)
  Order Book: 175                         Haryana
  Order Backlog: 85                      EPC (Rs mn)

                                   Order Book: 1,264                           Delhi
                     Punjab
                                   Order Backlog: 640                        EPC (Rs mn)
                 EPC (Rs mn)
                                                                     Order Book: 2,481
  Order Book: 300
                                                                     Order Backlog: 734
  Order Backlog: 230


                     Gujarat
                 EPC (Rs mn)
  Order Book: 3180
  Order Backlog: 3180


                Maharashtra
                     EPC (Rs mn)
  Order Book: 24,975
  Order Backlog: 16,667
                                                 Andhra Pradesh
                        Goa                            EPC (Rs mn)
                     EPC (Rs mn)
                                        Order Book: 1,383
  Order Book: 455                       Order Backlog: 1,265
  Order Backlog: 215

                                                Tamil Nadu
                 Karnataka
                                                 EPC (Rs mn)
                     EPC (Rs mn)
  Order Book: 61                   Order Book: 3,939
  Order Backlog: 0                 Order Backlog: 3,293


                                                                                           11
EPC – Key Projects
                                                                   Rs. in million
                                                                                Contract
Contracting Entity                                 Location
                                                                                  Value
Delhi International Airport –car park              Delhi                            2,481
TN Assembly Complex (Block-B)                      Tamilnadu                        2,109
Ruby Mills, Dadar                                  Maharashtra                      2,074
HDIL                                               Maharashtra                      1,791
Neelkanth Palacia,Mall & Business centre           Maharashtra                      1,333
KONDHWA Realty                                     Maharashtra                       999
Savitribai Phule Shikshan Prasarak Mandal          Maharashtra                       820
Neelkanth IT Park                                  Maharashtra                       759
North Town, Chennai                                Tamilnadu                         748
BPTP - IT park                                     Haryana                           739
"Kshitij" Parmanandwadi                            Maharashtra                       564
Villa Viviana                                      Tamilnadu                         562
Sinhgad Technical Education Society- Addition      Maharashtra                       536

            Total Contract value of Rs. 38.2 bn. and Backlog of Rs. 26.3 bn.
                                                                                            12
EPC – New orders bagged during the quarter


   Projects                                            Value (Rs. Million)
   Park Mansion-BPTP                                           328
   Forest County                                               300
   Park Serence –BPTP                                          197
   Sinhgad School - Pune                                       138
   Caspia Hotel                                                121
   Tulips –Coimbatore                                          100
   Others                                                       148
   Total                                                       1,332


                   New order bagged during H1 FY11 ~ 4.32 bn



                                                                             13
Real Estate




              14
Business Model – Real Estate
                                                            Scalability Driver

  Based on strong foundation of EPC experience ranks among the top ten builders
  in India (source: Construction World publication in June 2007 )


  Expected to provide high scalability


  Cost efficient development model – Joint Development Agreements (JDAs) and
  Joint Ventures lowers working capital requirements

  De-Risked Business Model – by investing in properties only after gaining
  significant hands on experience from JVs and JDAs.


  Historic Land Bank purchased at low prices giving it significant scope for capital
  appreciation.


  Conservative Accounting Policy
                                                                                   15
Land bank – National Presence
                                                         Chandigarh
                                                   Dev. potential   0.3

                                                                             million sq. ft.


          Ahmedabad
    Dev. potential 2.7


             Nashik
     Dev. potential   1.7


             Thane
     Dev. potential 19.0                                               Aurangabad
                                                                 Dev. potential  1.4
              Pune
     Dev. potential   25.6

               Goa                                       Hyderabad
     Dev. potential    0.6                        Dev. potential   0.6

                                                  Coimbatore
             Belgaum
                                            Dev. potential  3.3
     Dev. potential  0.2

               Chennai                            Madhurai
                                           Dev. potential  1.6
      Dev. potential   11.6


               Total development potential ~ 68.6 million sq. ft.                              16
Projects progress status

 On going project updates                                                                                              As on 30.09.10




                                         Vista        Willows      Forest County Willows        Vista         Tulip          Tulip
Project                                 Phase I       phase I         phase I    Phase II      phase II      phase I        phase II     Windermere


Type                                   Residential   Residential    Residential   Residential Residential   Residential    Residential        Mix



Location                                 Nashik         Pune           Pune         Pune        Nashik      Coimbatore     Coimbatore         Pune



Total saleable area (sq. ft.)           176,260       197,262        688,370       159,910     128,000        74,000        197,500         396,800



Total area sold (sq. ft) till sep 10    160873        143015         547,486        60,918      66,285        74,000         38,795          55482


 % Area Sold                              91%           73%            80%           38%         52%          100%            20%             14%

                                                                                                                                         Apartments - 62
Total no. of apartments                   126            60            386           126         112            48            112          Duplex - 21




                                                                                                                                                     17
Acquisition of GMP Technical Solutions Pvt. Ltd.

   Company has acquired 90% of GMP Technical Solutions Pvt. Ltd with the cash
   outflow of Rs. 626 million

 GMP has 3 divisions:
      Manufacturing: Clean rooms, office partitions, door sets, storage racks
      BMS: Integrated business management services; US FDA compliant for
       pharma industry
      QA Technical Services: Validation and certification of weights and
      measures

   Acquisition to yield economies of scale. Synergy to strengthen capability to
   offer turnkey solutions




                                                                18
The Strategic Roadmap


                           Expanding
                        Industry Portfolio

                                                 Pan Indian
          Expanding                           opportunities in
         Geographical                        terms of strategic
           presence                            investments in
                                                 hospitality


                            Fortify an
                           Integrated
                              & De-
                             Risked
                              Model
                                              Gaining significant
                                                  experience
          Focus on                            through JDAs and
         Technology                          JVs before entering
                                                into land bank
                                                 investments
Thank You
For further information, please contact :

M. Krishnamurthi/ Vivek Sakharkar
Vascon Engineers Ltd.
Contact : +91 20 3056 2300
Email: mk_murthi@vascon.com
       viveksakharkar@vascon.com

                                            20
Annexure




           21
Financial Statement B/S
   Consolidated numbers
                                              Rs. in million

Particulars                       30-Sep-10      30-Sep-09
Liabilities
Capital                             900.2           792.2
Reserves & Surplus                 6,053.2         3,856.1
Total Loans                        2,567.8         2,129.5
Minority Interest                   69.2            74.9
Total Liabilities                  9,594.9         6,854.1


Assets
Fixed Assets                       2,381.9         1,028.6
Investment                          832.8           836.9
Deferred Tax Asset                  19.6             9.5
Net Current Assets                 6,360.6         4,979.1
Total Assets                       9594.9          6854.1
Disclaimer

•This presentation and the accompanying slides (the “Presentation”), which have been prepared by Vascon Engineers Limited (the
“Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or
subscribe for any securities, and shall not form the basis or be relied on in connection with any contract or binding commitment whatsoever.
No offering of securities of the Company will be made except by means of a statutory offering document containing detailed information about
the Company.

•This Presentation has been prepared by the Company based on information and data which the Company considers reliable, but the Company
makes no representation or warranty, express or implied, whatsoever, and no reliance shall be placed on, the truth, accuracy, completeness,
fairness and reasonableness of the contents of this Presentation. This Presentation may not be all inclusive and may not contain all of the
information that you may consider material. Any liability in respect of the contents of, or any omission from, this Presentation is expressly
excluded.

•Certain matters discussed in this Presentation may contain statements regarding the Company’s market opportunity and business prospects
that are individually and collectively forward-looking statements. Such forward-looking statements are not guarantees of future performance
and are subject to known and unknown risks, uncertainties and assumptions that are difficult to predict. These risks and uncertainties include,
but are not limited to, the performance of the Indian economy and of the economies of various international markets, the performance of the
industry in India and world-wide, competition, the company’s ability to successfully implement its strategy, the Company’s future levels of
growth and expansion, technological implementation, changes and advancements, changes in revenue, income or cash flows, the Company’s
market preferences and its exposure to market risks, as well as other risks. The Company’s actual results, levels of activity, performance or
achievements could differ materially and adversely from results expressed in or implied by this Presentation. The Company assumes no
obligation to update any forward-looking information contained in this Presentation. Any forward looking statements and projections made by
third parties included in this Presentation are not adopted by the Company and the Company is not responsible for such third party statements
and projections.

•No offering of the Company’s securities will be registered under the U.S. Securities Act of 1933, as amended (the “Securities Act”).
Accordingly, unless an exemption from registration under the Securities Act is available, the Company’s securities may not be offered, sold,
resold, delivered or distributed, directly or indirectly, into the United States or to, or for the account or benefit of, any U.S. Person (as defined in
regulation S under the Securities Act).

•The distribution of this document in certain jurisdictions may be restricted by law and persons into whose possession this presentation
comes should inform themselves about and observe any such restrictions.
                                                                                                                                                     23

More Related Content

What's hot

Cr2 presentation - 1 q12
Cr2   presentation - 1 q12Cr2   presentation - 1 q12
Cr2 presentation - 1 q12SiteriCR2
 
2Q10 Conference Call
2Q10 Conference Call2Q10 Conference Call
2Q10 Conference CallPDG Realty
 
Goldfarb Increase in Stake Presentation
Goldfarb Increase in Stake PresentationGoldfarb Increase in Stake Presentation
Goldfarb Increase in Stake PresentationPDG Realty
 
charter communications Final_Charter_Annual_Report_2007
charter communications Final_Charter_Annual_Report_2007charter communications Final_Charter_Annual_Report_2007
charter communications Final_Charter_Annual_Report_2007finance34
 
Br properties 2010 earnings release presentation
Br properties   2010 earnings release presentationBr properties   2010 earnings release presentation
Br properties 2010 earnings release presentationbrproperties
 
Br properties 2010 earnings release presentation
Br properties   2010 earnings release presentationBr properties   2010 earnings release presentation
Br properties 2010 earnings release presentationbrproperties
 
newmont mining sept_Denver_Gold_Forum_Presentation
newmont mining sept_Denver_Gold_Forum_Presentationnewmont mining sept_Denver_Gold_Forum_Presentation
newmont mining sept_Denver_Gold_Forum_Presentationfinance37
 
Presentation @germany
Presentation @germanyPresentation @germany
Presentation @germanyIskandar Muda
 
CONAGRA 2007_AR
CONAGRA 2007_ARCONAGRA 2007_AR
CONAGRA 2007_ARfinance21
 
Cteep presentation 1 q12_may_14_2012
Cteep presentation 1 q12_may_14_2012Cteep presentation 1 q12_may_14_2012
Cteep presentation 1 q12_may_14_2012Cteep
 
CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012
CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012
CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012Linda Roos
 
GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11Pac-Van, Inc.
 
Satellite Applications Catapult Centre
Satellite Applications Catapult CentreSatellite Applications Catapult Centre
Satellite Applications Catapult CentreA. Rocketeer
 
Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...
Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...
Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...Global Business Events
 
Total 2012 results presentation
Total 2012 results presentationTotal 2012 results presentation
Total 2012 results presentationTradeWindsnews
 
Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...
Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...
Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...NC Military Business Center
 
Presentation @germany
Presentation @germanyPresentation @germany
Presentation @germanyIskandar Muda
 

What's hot (17)

Cr2 presentation - 1 q12
Cr2   presentation - 1 q12Cr2   presentation - 1 q12
Cr2 presentation - 1 q12
 
2Q10 Conference Call
2Q10 Conference Call2Q10 Conference Call
2Q10 Conference Call
 
Goldfarb Increase in Stake Presentation
Goldfarb Increase in Stake PresentationGoldfarb Increase in Stake Presentation
Goldfarb Increase in Stake Presentation
 
charter communications Final_Charter_Annual_Report_2007
charter communications Final_Charter_Annual_Report_2007charter communications Final_Charter_Annual_Report_2007
charter communications Final_Charter_Annual_Report_2007
 
Br properties 2010 earnings release presentation
Br properties   2010 earnings release presentationBr properties   2010 earnings release presentation
Br properties 2010 earnings release presentation
 
Br properties 2010 earnings release presentation
Br properties   2010 earnings release presentationBr properties   2010 earnings release presentation
Br properties 2010 earnings release presentation
 
newmont mining sept_Denver_Gold_Forum_Presentation
newmont mining sept_Denver_Gold_Forum_Presentationnewmont mining sept_Denver_Gold_Forum_Presentation
newmont mining sept_Denver_Gold_Forum_Presentation
 
Presentation @germany
Presentation @germanyPresentation @germany
Presentation @germany
 
CONAGRA 2007_AR
CONAGRA 2007_ARCONAGRA 2007_AR
CONAGRA 2007_AR
 
Cteep presentation 1 q12_may_14_2012
Cteep presentation 1 q12_may_14_2012Cteep presentation 1 q12_may_14_2012
Cteep presentation 1 q12_may_14_2012
 
CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012
CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012
CATHSSETA presentation to WCHI HR Forum Skills Committee - June 2012
 
GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11
 
Satellite Applications Catapult Centre
Satellite Applications Catapult CentreSatellite Applications Catapult Centre
Satellite Applications Catapult Centre
 
Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...
Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...
Davide Palumbo, Head of Operations, Supply Chain & Systems at Mitsubushi Heav...
 
Total 2012 results presentation
Total 2012 results presentationTotal 2012 results presentation
Total 2012 results presentation
 
Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...
Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...
Lieutenant General Mark D. "Shack" Shackelford, Military Deputy, Office of th...
 
Presentation @germany
Presentation @germanyPresentation @germany
Presentation @germany
 

Viewers also liked

Enam what to_buy_what_to_sell
Enam what to_buy_what_to_sellEnam what to_buy_what_to_sell
Enam what to_buy_what_to_sellVasconEngineers
 
Vascon bd meeting_10.05.10
Vascon bd meeting_10.05.10Vascon bd meeting_10.05.10
Vascon bd meeting_10.05.10VasconEngineers
 
Annualreport2008 101208034321-phpapp01
Annualreport2008 101208034321-phpapp01Annualreport2008 101208034321-phpapp01
Annualreport2008 101208034321-phpapp01VasconEngineers
 
Vascon engg q2_fy11_ result
Vascon engg q2_fy11_ resultVascon engg q2_fy11_ result
Vascon engg q2_fy11_ resultVasconEngineers
 

Viewers also liked (7)

Enam what to_buy_what_to_sell
Enam what to_buy_what_to_sellEnam what to_buy_what_to_sell
Enam what to_buy_what_to_sell
 
Vascon bd meeting_10.05.10
Vascon bd meeting_10.05.10Vascon bd meeting_10.05.10
Vascon bd meeting_10.05.10
 
Xotech E Brochure
Xotech E BrochureXotech E Brochure
Xotech E Brochure
 
Annualreport2008 101208034321-phpapp01
Annualreport2008 101208034321-phpapp01Annualreport2008 101208034321-phpapp01
Annualreport2008 101208034321-phpapp01
 
Vascon engg q2_fy11_ result
Vascon engg q2_fy11_ resultVascon engg q2_fy11_ result
Vascon engg q2_fy11_ result
 
Annual report 2009
Annual report 2009Annual report 2009
Annual report 2009
 
Almonte Presentation
Almonte PresentationAlmonte Presentation
Almonte Presentation
 

Similar to Analyst meet presentation_q2_fy11

Similar to Analyst meet presentation_q2_fy11 (20)

Elecon
EleconElecon
Elecon
 
Elecon
EleconElecon
Elecon
 
MPL Result Update 4qfy2010-030510-final
MPL Result Update 4qfy2010-030510-finalMPL Result Update 4qfy2010-030510-final
MPL Result Update 4qfy2010-030510-final
 
Measurement of performance of bharti airtel by using different ratios
Measurement of performance of bharti airtel by using different ratiosMeasurement of performance of bharti airtel by using different ratios
Measurement of performance of bharti airtel by using different ratios
 
Hcl tech 1 qfy2011-211010
Hcl tech  1 qfy2011-211010Hcl tech  1 qfy2011-211010
Hcl tech 1 qfy2011-211010
 
Anant raj ru4 qfy2010-280510
Anant raj ru4 qfy2010-280510Anant raj ru4 qfy2010-280510
Anant raj ru4 qfy2010-280510
 
Ntpc ru4 qfy2010-190510
Ntpc ru4 qfy2010-190510Ntpc ru4 qfy2010-190510
Ntpc ru4 qfy2010-190510
 
BGR Energy IC, 26 March
BGR Energy  IC, 26 MarchBGR Energy  IC, 26 March
BGR Energy IC, 26 March
 
IRB
IRBIRB
IRB
 
Areva t&d ru1 qcy2010-260410
Areva t&d ru1 qcy2010-260410Areva t&d ru1 qcy2010-260410
Areva t&d ru1 qcy2010-260410
 
MPL
MPLMPL
MPL
 
Wockhardt ltd result update
Wockhardt ltd result updateWockhardt ltd result update
Wockhardt ltd result update
 
Concor Result Update
Concor Result UpdateConcor Result Update
Concor Result Update
 
RIL - result Update
RIL - result UpdateRIL - result Update
RIL - result Update
 
Investment Idea - Sterlite Technologies Ltd - "BUY"
Investment Idea - Sterlite Technologies Ltd - "BUY"Investment Idea - Sterlite Technologies Ltd - "BUY"
Investment Idea - Sterlite Technologies Ltd - "BUY"
 
Concor -Result Update
Concor -Result UpdateConcor -Result Update
Concor -Result Update
 
BHEL -Result Update
BHEL -Result UpdateBHEL -Result Update
BHEL -Result Update
 
Blue star ru4 qfy2010-190510
Blue star ru4 qfy2010-190510Blue star ru4 qfy2010-190510
Blue star ru4 qfy2010-190510
 
Hindalco Result Update 4 qfy2010-110510
Hindalco Result Update 4 qfy2010-110510Hindalco Result Update 4 qfy2010-110510
Hindalco Result Update 4 qfy2010-110510
 
Tech Mahindra
Tech Mahindra Tech Mahindra
Tech Mahindra
 

More from VasconEngineers

Companyprofile1 101208044707-phpapp01
Companyprofile1 101208044707-phpapp01Companyprofile1 101208044707-phpapp01
Companyprofile1 101208044707-phpapp01VasconEngineers
 
Annualreportfy10 101208042512-phpapp01
Annualreportfy10 101208042512-phpapp01Annualreportfy10 101208042512-phpapp01
Annualreportfy10 101208042512-phpapp01VasconEngineers
 
Analystmeetpresentationq2fy11 101210004323-phpapp02
Analystmeetpresentationq2fy11 101210004323-phpapp02Analystmeetpresentationq2fy11 101210004323-phpapp02
Analystmeetpresentationq2fy11 101210004323-phpapp02VasconEngineers
 
Analystmeetpresentation 101210003921-phpapp02
Analystmeetpresentation 101210003921-phpapp02Analystmeetpresentation 101210003921-phpapp02
Analystmeetpresentation 101210003921-phpapp02VasconEngineers
 
V Tech C Building Presentation
V  Tech  C Building PresentationV  Tech  C Building Presentation
V Tech C Building PresentationVasconEngineers
 
V Tech A Building Presentation Rev
V  Tech  A Building Presentation RevV  Tech  A Building Presentation Rev
V Tech A Building Presentation RevVasconEngineers
 
Financial results quarter ended june 2010
Financial results quarter ended june 2010Financial results quarter ended june 2010
Financial results quarter ended june 2010VasconEngineers
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11VasconEngineers
 
Financial results june_2010
Financial results june_2010Financial results june_2010
Financial results june_2010VasconEngineers
 
Analyst meet presentation
Analyst meet presentationAnalyst meet presentation
Analyst meet presentationVasconEngineers
 
Vascon engineers 6_9_10_pl
Vascon engineers 6_9_10_plVascon engineers 6_9_10_pl
Vascon engineers 6_9_10_plVasconEngineers
 

More from VasconEngineers (20)

Companyprofile1 101208044707-phpapp01
Companyprofile1 101208044707-phpapp01Companyprofile1 101208044707-phpapp01
Companyprofile1 101208044707-phpapp01
 
Annualreportfy10 101208042512-phpapp01
Annualreportfy10 101208042512-phpapp01Annualreportfy10 101208042512-phpapp01
Annualreportfy10 101208042512-phpapp01
 
Analystmeetpresentationq2fy11 101210004323-phpapp02
Analystmeetpresentationq2fy11 101210004323-phpapp02Analystmeetpresentationq2fy11 101210004323-phpapp02
Analystmeetpresentationq2fy11 101210004323-phpapp02
 
Analystmeetpresentation 101210003921-phpapp02
Analystmeetpresentation 101210003921-phpapp02Analystmeetpresentation 101210003921-phpapp02
Analystmeetpresentation 101210003921-phpapp02
 
Almonte presentation
Almonte presentationAlmonte presentation
Almonte presentation
 
Windermere brochure
Windermere brochureWindermere brochure
Windermere brochure
 
V Tech C Building Presentation
V  Tech  C Building PresentationV  Tech  C Building Presentation
V Tech C Building Presentation
 
V Tech A Building Presentation Rev
V  Tech  A Building Presentation RevV  Tech  A Building Presentation Rev
V Tech A Building Presentation Rev
 
Financial results quarter ended june 2010
Financial results quarter ended june 2010Financial results quarter ended june 2010
Financial results quarter ended june 2010
 
Windermere brochure
Windermere brochureWindermere brochure
Windermere brochure
 
Vista ph2 18_05
Vista ph2 18_05Vista ph2 18_05
Vista ph2 18_05
 
Vista ph1 presentation
Vista ph1 presentationVista ph1 presentation
Vista ph1 presentation
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11
 
Share holding pattern
Share holding patternShare holding pattern
Share holding pattern
 
Financial results june_2010
Financial results june_2010Financial results june_2010
Financial results june_2010
 
Consolidated sept 09
Consolidated sept 09Consolidated sept 09
Consolidated sept 09
 
Press release q2_fy11
Press release q2_fy11Press release q2_fy11
Press release q2_fy11
 
Analyst meet presentation
Analyst meet presentationAnalyst meet presentation
Analyst meet presentation
 
Vascon engineers 6_9_10_pl
Vascon engineers 6_9_10_plVascon engineers 6_9_10_pl
Vascon engineers 6_9_10_pl
 
Reality revenue 2_q11
Reality revenue 2_q11Reality revenue 2_q11
Reality revenue 2_q11
 

Analyst meet presentation_q2_fy11

  • 1. Vascon Engineers Limited Analyst Meet Presentation Q2 FY11
  • 2. Agenda 1. Group Overview 2. Key highlights for the quarter 3. Financials highlights 4. Project highlights 5. Acquisition 6. Annexure 2
  • 3. Company Overview Commenced operation in 1986 and present in the EPC Real Estate Strategic Investments – Hospitality Sector Unique Business Positioning Real Estate Strategic Investments EPC Key to scalability and value Driven by opportunities Reputation of a Company unlocking, building on the arising from the growth which provides the highest strong EPC edifice to give it prospects of the company’s quality for the right value and the cutting edge EPC and Real Estate in a timely manner. businesses 3
  • 4. Key Differentiators Broad based skill sets of Qualified & Experienced management team High standards of corporate Governance and Transparency Strong and diversified Revenue model Timely execution of projects / Efficiency in delivery schedules Competitive edge on account of EPC expertise Technological innovations Owned equipment base – leads to better utilization rates and reduced time for deploying resources Transparency in accounting methods adopted and business dealings Aspiration to make a significant impact across business segments – driving growth 4
  • 5. Key highlights for the quarter 1. Signed agreement to develop township at Oragadam, Chennai Company plans to develop a 105-acre township, predominantly residential, at Oragadam on the outskirts of Chennai in four phases with total saleable area of over 10 million sq. ft. The project will be developed in a joint venture with Balakh realtors and the association will be on a revenue-sharing basis. 2. Bagged new order worth Rs. 1,332 million Company has bagged new orders worth Rs. 1,332 million during the last quarter. Total EPC order book of the company stands Rs.38.5 bn. and backlog of Rs. 26.6 bn. 3. Launched project Tulip - Phase II in Coimbatore Company has Launched Tulip – Phase II, a residential project in Coimbatore with total saleable area of ~ 0.2 million sq. ft. 5
  • 7. Key financials – Q2 & H1 FY11 P & L (consolidated) Rs. in million Growth H1 FY11 Vs. H1 Particulars Q2 FY11 Q2 FY10 H1 FY11 H1 FY10 FY10 Total Income 2253.6 2199.2 4316.9 3625.0 19.09% Total Income - EPC 1798.8 1755.2 3765.2 2896.7 29.9% Total Income – Real Estate 135.5 348.8 206.7 583.9 EBIDTA 301.5 287.9 568.3 509.5 11.5% Profit Before Tax 218.4 207.2 424.9 349.6 21.5% Profit After Tax 177.7 132.2 316.2 237.3 33.2% EPS (Rs.) - diluted 1.93 1.72 3.57 3.10 EBITDA Margin 13.4 % 13.1 % 13.2 % 14.1 % PAT Margin 7.9 % 6.0 % 7.3 % 6.6 % 7
  • 8. Key Ratios (consolidated) Rs. in million Particulars As on 30.09.10 As on 30.09.09 ROCE – annualised (%) 10.82 13.88 ROE – annualised (%) 12.22 15.04 Total Debt (Rs. million) 2,567. 8 2,129.5 Net worth (Rs. million) 6,953.3 4,648.2 Debt: Equity ratio 0.37 0.46 8
  • 9. EPC 9
  • 10. Business Model – EPC Business ENGINEERING, PROCUREMENT & CONSTRUCTION Stability Driver Constructing factories hospitals, hospitality properties, office and residential complexes, shopping malls, multiplexes, IT parks and other buildings Strong Track Record & Reputation High integrity Highest Quality for the Right Value Timely Completion of Projects Competitive Bidding to win Contracts Recent fund raising exercise to boost prospects Repeat Orders from Joint Venture Partners across regions Forayed into Government contracts. 10
  • 11. Pan-India Presence As on 30.09.10 Himachal Pradesh EPC (Rs mn) Order Book: 175 Haryana Order Backlog: 85 EPC (Rs mn) Order Book: 1,264 Delhi Punjab Order Backlog: 640 EPC (Rs mn) EPC (Rs mn) Order Book: 2,481 Order Book: 300 Order Backlog: 734 Order Backlog: 230 Gujarat EPC (Rs mn) Order Book: 3180 Order Backlog: 3180 Maharashtra EPC (Rs mn) Order Book: 24,975 Order Backlog: 16,667 Andhra Pradesh Goa EPC (Rs mn) EPC (Rs mn) Order Book: 1,383 Order Book: 455 Order Backlog: 1,265 Order Backlog: 215 Tamil Nadu Karnataka EPC (Rs mn) EPC (Rs mn) Order Book: 61 Order Book: 3,939 Order Backlog: 0 Order Backlog: 3,293 11
  • 12. EPC – Key Projects Rs. in million Contract Contracting Entity Location Value Delhi International Airport –car park Delhi 2,481 TN Assembly Complex (Block-B) Tamilnadu 2,109 Ruby Mills, Dadar Maharashtra 2,074 HDIL Maharashtra 1,791 Neelkanth Palacia,Mall & Business centre Maharashtra 1,333 KONDHWA Realty Maharashtra 999 Savitribai Phule Shikshan Prasarak Mandal Maharashtra 820 Neelkanth IT Park Maharashtra 759 North Town, Chennai Tamilnadu 748 BPTP - IT park Haryana 739 "Kshitij" Parmanandwadi Maharashtra 564 Villa Viviana Tamilnadu 562 Sinhgad Technical Education Society- Addition Maharashtra 536 Total Contract value of Rs. 38.2 bn. and Backlog of Rs. 26.3 bn. 12
  • 13. EPC – New orders bagged during the quarter Projects Value (Rs. Million) Park Mansion-BPTP 328 Forest County 300 Park Serence –BPTP 197 Sinhgad School - Pune 138 Caspia Hotel 121 Tulips –Coimbatore 100 Others 148 Total 1,332 New order bagged during H1 FY11 ~ 4.32 bn 13
  • 15. Business Model – Real Estate Scalability Driver Based on strong foundation of EPC experience ranks among the top ten builders in India (source: Construction World publication in June 2007 ) Expected to provide high scalability Cost efficient development model – Joint Development Agreements (JDAs) and Joint Ventures lowers working capital requirements De-Risked Business Model – by investing in properties only after gaining significant hands on experience from JVs and JDAs. Historic Land Bank purchased at low prices giving it significant scope for capital appreciation. Conservative Accounting Policy 15
  • 16. Land bank – National Presence Chandigarh Dev. potential 0.3 million sq. ft. Ahmedabad Dev. potential 2.7 Nashik Dev. potential 1.7 Thane Dev. potential 19.0 Aurangabad Dev. potential 1.4 Pune Dev. potential 25.6 Goa Hyderabad Dev. potential 0.6 Dev. potential 0.6 Coimbatore Belgaum Dev. potential 3.3 Dev. potential 0.2 Chennai Madhurai Dev. potential 1.6 Dev. potential 11.6 Total development potential ~ 68.6 million sq. ft. 16
  • 17. Projects progress status On going project updates As on 30.09.10 Vista Willows Forest County Willows Vista Tulip Tulip Project Phase I phase I phase I Phase II phase II phase I phase II Windermere Type Residential Residential Residential Residential Residential Residential Residential Mix Location Nashik Pune Pune Pune Nashik Coimbatore Coimbatore Pune Total saleable area (sq. ft.) 176,260 197,262 688,370 159,910 128,000 74,000 197,500 396,800 Total area sold (sq. ft) till sep 10 160873 143015 547,486 60,918 66,285 74,000 38,795 55482 % Area Sold 91% 73% 80% 38% 52% 100% 20% 14% Apartments - 62 Total no. of apartments 126 60 386 126 112 48 112 Duplex - 21 17
  • 18. Acquisition of GMP Technical Solutions Pvt. Ltd. Company has acquired 90% of GMP Technical Solutions Pvt. Ltd with the cash outflow of Rs. 626 million GMP has 3 divisions: Manufacturing: Clean rooms, office partitions, door sets, storage racks BMS: Integrated business management services; US FDA compliant for pharma industry QA Technical Services: Validation and certification of weights and measures Acquisition to yield economies of scale. Synergy to strengthen capability to offer turnkey solutions 18
  • 19. The Strategic Roadmap Expanding Industry Portfolio Pan Indian Expanding opportunities in Geographical terms of strategic presence investments in hospitality Fortify an Integrated & De- Risked Model Gaining significant experience Focus on through JDAs and Technology JVs before entering into land bank investments
  • 20. Thank You For further information, please contact : M. Krishnamurthi/ Vivek Sakharkar Vascon Engineers Ltd. Contact : +91 20 3056 2300 Email: mk_murthi@vascon.com viveksakharkar@vascon.com 20
  • 21. Annexure 21
  • 22. Financial Statement B/S Consolidated numbers Rs. in million Particulars 30-Sep-10 30-Sep-09 Liabilities Capital 900.2 792.2 Reserves & Surplus 6,053.2 3,856.1 Total Loans 2,567.8 2,129.5 Minority Interest 69.2 74.9 Total Liabilities 9,594.9 6,854.1 Assets Fixed Assets 2,381.9 1,028.6 Investment 832.8 836.9 Deferred Tax Asset 19.6 9.5 Net Current Assets 6,360.6 4,979.1 Total Assets 9594.9 6854.1
  • 23. Disclaimer •This presentation and the accompanying slides (the “Presentation”), which have been prepared by Vascon Engineers Limited (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for any securities, and shall not form the basis or be relied on in connection with any contract or binding commitment whatsoever. No offering of securities of the Company will be made except by means of a statutory offering document containing detailed information about the Company. •This Presentation has been prepared by the Company based on information and data which the Company considers reliable, but the Company makes no representation or warranty, express or implied, whatsoever, and no reliance shall be placed on, the truth, accuracy, completeness, fairness and reasonableness of the contents of this Presentation. This Presentation may not be all inclusive and may not contain all of the information that you may consider material. Any liability in respect of the contents of, or any omission from, this Presentation is expressly excluded. •Certain matters discussed in this Presentation may contain statements regarding the Company’s market opportunity and business prospects that are individually and collectively forward-looking statements. Such forward-looking statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties and assumptions that are difficult to predict. These risks and uncertainties include, but are not limited to, the performance of the Indian economy and of the economies of various international markets, the performance of the industry in India and world-wide, competition, the company’s ability to successfully implement its strategy, the Company’s future levels of growth and expansion, technological implementation, changes and advancements, changes in revenue, income or cash flows, the Company’s market preferences and its exposure to market risks, as well as other risks. The Company’s actual results, levels of activity, performance or achievements could differ materially and adversely from results expressed in or implied by this Presentation. The Company assumes no obligation to update any forward-looking information contained in this Presentation. Any forward looking statements and projections made by third parties included in this Presentation are not adopted by the Company and the Company is not responsible for such third party statements and projections. •No offering of the Company’s securities will be registered under the U.S. Securities Act of 1933, as amended (the “Securities Act”). Accordingly, unless an exemption from registration under the Securities Act is available, the Company’s securities may not be offered, sold, resold, delivered or distributed, directly or indirectly, into the United States or to, or for the account or benefit of, any U.S. Person (as defined in regulation S under the Securities Act). •The distribution of this document in certain jurisdictions may be restricted by law and persons into whose possession this presentation comes should inform themselves about and observe any such restrictions. 23