Summer Monitoring
Projects Demonstrate
Flexibility & Expertise
of Ambient Group
Global’s Ambient Seismic team successfully
completed another busy summer of monitoring
projects. Perseverance and unique solutions to
challenges on each project showcased the group’s
expertise and client-centered philosophy.
Rapid Mobilization
Jump-Starts Summer
Summer operations went from zero to 60 in record
time as the group’s first project materialized rapidly
due to a last minute decision by the client to do the
project.
“Their plan was always to complete the wells, but at
the last minute they decided they wanted them moni-
tored,” said Operations Manager Holli Sims.
Crew 461 and the rest of the Ambient Seismic team
jumped at the opportunity, accepted the challenge
and fully mobilized in a matter of days.
“Normally we have four to six weeks to prepare, in
this case we had four days,” said Sims.
Mobilization began in earnest May 26 and the crew
left for Williston, North Dakota May 30. Adding to the
challenge of a quick mobilization was the fact that
this was the first time the group acquired Ambient
Seismic data on a buried array that it did not install.
In this case, special adapters were needed to make
the installed grid work with Global’s equipment. Ross
Kennedy, worldwide quality & recording resource man-
ager, played a major role in making the project happen.
He was able to lean upon a long-standing vendor rela-
tionship to have the necessary adapters manufactured
and sent from China within the required time frame.
Trevor Lowe, vibrator supervisor and Wes Everett, se-
nior AutoSeis®
support technician were also key play-
ers in the fast mobilization. Lowe filled in as general
mechanic preparing trucks and trailers for the project,
while Everett prepped the recording equipment.
Once on site, insufficient documentation of the
array forced the crew to start from scratch in many
respects. One such case was that the original survey
data on the installment was inaccurate. As a solution
the crew employed auto locate capabilities, combin-
ing the GPS sampling of the AutoSeis®
system with the
free LIDAR elevation data available in many areas to
locate each receiver position at a greatly reduced cost
to that of topographic surveying.
Despite the challenges, the crew successfully mon-
itored the completion of three wells for 24 hours a day
for 26 days, completing the project with zero HSEQ in-
cidents. The crew demobilized and left North Dakota
on July 8, having delivered the final data to the pro-
cessing team led by Ambient Seismic Analyst Amanda
Klaus.
“There are two parts of this project - five stages
of reprocessing and then the three new wells,” said
Klaus. “The reprocessing was quite complicated but
ultimately resulted in a quality finished product and
an improvement to our own workflow.”
The final reprocessing was delivered to the client
August 28, at which time the processing for the three
new wells began.
SDC10334.JPG
SDC10346.JPG
In addition to the normal frac monitoring, this
project also involved monitoring flow-back; the pro-
cess of pumping out of the ground all the liquid that
is pumped into the ground during a frac, a first for
Global. An unusual factor that had to be taken into
consideration on each project this summer was the
occurrence of a leap second, which is a one-second
adjustment that is occasionally applied to civil time to
keep the time of day as close as possible to the mean
solar time. This interruption of time impacts GPS sys-
tems, and therefore causes a recording disruption in
the AutoSeis®
system. The Ambient Seismic team de-
vised a different plan for dealing with the leap second
on each of its projects this summer.
On this program the client decided to let AutoSeis®
run as normal and automatically reset after the leap
second interruption, accepting a slight loss in data
during the time it would take the system to reset.
Ambient Seismic Informs
Completion Plans
Completed for a long-standing client who from
the beginning has pushed the Company’s technolo-
gy to new realms, the second project of the summer
demonstrated how Ambient Seismic can inform and
impact completion plans.
Phase one of the project began in May when Glob-
al’s crew deployed an Ambient Seismic array to moni-
tor a single well. The crew collected three days of Am-
bient Seismic data before the well was completed. At
the end of three days Crew 461 retrieved the equip-
ment and sent the data to processing for a fast track
reservoir scale TFI
sm
.
In June, Global’s crew returned to redeploy the
same array and monitor the well’s completion.
“At first, the frac didn’t go the way they wanted.
They were not breaking rock,” said Sims. “The pro-
cessing group had an idea to apply a new stress in-
version algorithm. The client used the results of the
stress inversion algorithm to adjust their completion
plans and the rest of the frac went the way they want-
ed. We could do that because they had the Ambient
Seismic data prior to the frac.”
Of course, no seismic project is without its trials
and so despite the immense success of the Ambi-
ent Seismic monitoring, the crew at times struggled
against Mother Nature to maintain access to the re-
cording units.
“The first problem was that the corn planted in the
area grew to around eight feet tall when we were mon-
itoring the well. There was no way to find the HDRs
without a Garmin to lead you to it,” said Party Man-
ager Ricky Leger. “Problem two was that with all the
rain in the area the nearby river flooded. The river kept
coming up every day. Some stations were in 10 feet of
water by the time the river finally crested. When we
finished with the frac we had to get a boat to retrieve
some stations.”
Furthermore, the crew and client had to once more
decide on a course of action for dealing with the leap
second. With the leap second scheduled to occur
during the completion of the well, the crew and client
agreed that operations would take a short break be-
tween frac’ing stages to let the leap second pass and
make sure all HDR’s were back up and running before
the next well-stage was completed.
The crew wrapped things up during the first week
of July and passed the data along to processing. The
final data was delivered to the client at the end of Au-
gust, ahead of schedule.
Ongoing Monitoring of CO2
Sequestration
The final project of the summer for the group was
the continuation of an ongoing CO2 sequestration
monitoring project in Virginia. Funded by the Depart-
ment of Energy, the project is experimental in nature
with Global’s technology contributing to the under-
standing of injection wells. The Company installed
the buried array in November 2014 and has returned
for monitoring on numerous occasions. Party Manager
Mark Mercer provided leadership to the project, which
involved 16 days of monitoring.
“The job went very well, the crew did a great job
maintaining the equipment in the field and had great
support from the Houston office,” said Mercer. “The
best part was there were no recordable incidents in
very rough terrain.”
The third project of the summer also offered the
third solution to the leap second. In this case, the
crew programmed the HDR units to sleep through
the leap second. Then the day after, all HDR’s were
switched out to start a fresh cycle of 24 hour re-
cording.
The end of the project marked the end of another
busy summer for the Ambient Seismic group, which
continues to demonstrate its expertise and innova-
tion through clever, custom solutions to client prob-
lems and general project challenges, all without a
single recordable HSEQ incident.
DSC04194.JPG
DSC04195-edit.jpg

More Related Content

What's hot

C2 Guðmundur Ómar Friðleifsson
C2 Guðmundur Ómar FriðleifssonC2 Guðmundur Ómar Friðleifsson
C2 Guðmundur Ómar Friðleifsson
GEORG Geothermal Workshop 2016
 
WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...
WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...
WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...
grssieee
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
Deepak Paithankar
 
Andrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINALAndrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINAL
Andrew Sitek
 
Ianson
IansonIanson
Ianson
NASAPMC
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
Steve Williams
 
KOREC - Atlantic Geomatics - Dini
KOREC - Atlantic Geomatics - DiniKOREC - Atlantic Geomatics - Dini
KOREC - Atlantic Geomatics - Dini
MARIAN MIRAUTE
 
The Gaia Revolution
The Gaia RevolutionThe Gaia Revolution
The Gaia Revolution
Ronald Drimmel
 
Q2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill WrobelQ2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill Wrobel
WallopsIslandRegionalAlliance
 
AAS National Conference 2008: Kris Zacny
AAS National Conference 2008: Kris ZacnyAAS National Conference 2008: Kris Zacny
AAS National Conference 2008: Kris Zacny
American Astronautical Society
 
Stephan harrison
Stephan harrisonStephan harrison
Stephan harrison
ClimDev15
 
Hydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick GuideHydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick Guide
Emmanuel Mathot
 
01 groundwork clean-powerresearch_sandia_2017-05-09
01 groundwork clean-powerresearch_sandia_2017-05-0901 groundwork clean-powerresearch_sandia_2017-05-09
01 groundwork clean-powerresearch_sandia_2017-05-09
Sandia National Laboratories: Energy & Climate: Renewables
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13
Dmitry Tseitlin
 
Andrew.petro
Andrew.petroAndrew.petro
Andrew.petro
NASAPMC
 
Standards-based workflows for flood analysis with authoritative and non-autho...
Standards-based workflows for flood analysis with authoritative and non-autho...Standards-based workflows for flood analysis with authoritative and non-autho...
Standards-based workflows for flood analysis with authoritative and non-autho...
Julian Rosser
 
Hapsite large plume slide
Hapsite large plume slide Hapsite large plume slide
Hapsite large plume slide
Chris Lutes
 
IWP 6.19.2013 meeting
IWP 6.19.2013 meetingIWP 6.19.2013 meeting
IWP 6.19.2013 meeting
Sara Steussy
 
TGS GPS- Hi GBE Regional Velocity Model UK
TGS GPS- Hi GBE Regional Velocity Model UK TGS GPS- Hi GBE Regional Velocity Model UK
TGS GPS- Hi GBE Regional Velocity Model UK
TGS
 

What's hot (19)

C2 Guðmundur Ómar Friðleifsson
C2 Guðmundur Ómar FriðleifssonC2 Guðmundur Ómar Friðleifsson
C2 Guðmundur Ómar Friðleifsson
 
WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...
WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...
WE1.L10 - IMPLEMENTATION OF THE LAND, ATMOSPHERE NEAR-REAL-TIME CAPABILITY FO...
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
 
Andrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINALAndrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINAL
 
Ianson
IansonIanson
Ianson
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
KOREC - Atlantic Geomatics - Dini
KOREC - Atlantic Geomatics - DiniKOREC - Atlantic Geomatics - Dini
KOREC - Atlantic Geomatics - Dini
 
The Gaia Revolution
The Gaia RevolutionThe Gaia Revolution
The Gaia Revolution
 
Q2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill WrobelQ2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill Wrobel
 
AAS National Conference 2008: Kris Zacny
AAS National Conference 2008: Kris ZacnyAAS National Conference 2008: Kris Zacny
AAS National Conference 2008: Kris Zacny
 
Stephan harrison
Stephan harrisonStephan harrison
Stephan harrison
 
Hydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick GuideHydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick Guide
 
01 groundwork clean-powerresearch_sandia_2017-05-09
01 groundwork clean-powerresearch_sandia_2017-05-0901 groundwork clean-powerresearch_sandia_2017-05-09
01 groundwork clean-powerresearch_sandia_2017-05-09
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13
 
Andrew.petro
Andrew.petroAndrew.petro
Andrew.petro
 
Standards-based workflows for flood analysis with authoritative and non-autho...
Standards-based workflows for flood analysis with authoritative and non-autho...Standards-based workflows for flood analysis with authoritative and non-autho...
Standards-based workflows for flood analysis with authoritative and non-autho...
 
Hapsite large plume slide
Hapsite large plume slide Hapsite large plume slide
Hapsite large plume slide
 
IWP 6.19.2013 meeting
IWP 6.19.2013 meetingIWP 6.19.2013 meeting
IWP 6.19.2013 meeting
 
TGS GPS- Hi GBE Regional Velocity Model UK
TGS GPS- Hi GBE Regional Velocity Model UK TGS GPS- Hi GBE Regional Velocity Model UK
TGS GPS- Hi GBE Regional Velocity Model UK
 

Viewers also liked

AHMED A. MOHAMED CV
AHMED A. MOHAMED CVAHMED A. MOHAMED CV
AHMED A. MOHAMED CV
Ahmed Al Hatimy
 
Advanced Pharmacovigilance
Advanced PharmacovigilanceAdvanced Pharmacovigilance
Advanced PharmacovigilancePavel Garkaviy
 
Query de consulta bd vacia
Query de consulta bd vaciaQuery de consulta bd vacia
Query de consulta bd vacia
Kimberley Rodriguez Lopez
 
P1 e1 internet
P1 e1 internetP1 e1 internet
P1 e1 internet
martaraul97
 
Educapaly 2
Educapaly 2Educapaly 2
Educapaly 2
veronica pallarozo
 
Innovating from the outside in– altc2016 SLIDES
Innovating from the outside in– altc2016 SLIDESInnovating from the outside in– altc2016 SLIDES
Innovating from the outside in– altc2016 SLIDES
Sonja Grussendorf
 
MYRESUME
MYRESUMEMYRESUME
Amada y atrapante buenos aires
Amada y  atrapante  buenos airesAmada y  atrapante  buenos aires
Amada y atrapante buenos aires
jorge oscar carbonelli
 
Criterios de equidad para una administracion de justicia con perspectiva de g...
Criterios de equidad para una administracion de justicia con perspectiva de g...Criterios de equidad para una administracion de justicia con perspectiva de g...
Criterios de equidad para una administracion de justicia con perspectiva de g...
spaovh
 
cv.namrata
cv.namratacv.namrata
cv.namrata
Namrata Sharma
 
Karolinska Certificate
Karolinska CertificateKarolinska Certificate
Karolinska Certificate
Pavel Garkaviy
 
Right Message, Right Buyer - at the Right TIme
Right Message, Right Buyer - at the Right TImeRight Message, Right Buyer - at the Right TIme
Right Message, Right Buyer - at the Right TIme
Marketo
 
8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them
8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them
8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them
Marketo
 
Youtube editor
Youtube editorYoutube editor
Youtube editor
Liceo Fray Marcos
 

Viewers also liked (14)

AHMED A. MOHAMED CV
AHMED A. MOHAMED CVAHMED A. MOHAMED CV
AHMED A. MOHAMED CV
 
Advanced Pharmacovigilance
Advanced PharmacovigilanceAdvanced Pharmacovigilance
Advanced Pharmacovigilance
 
Query de consulta bd vacia
Query de consulta bd vaciaQuery de consulta bd vacia
Query de consulta bd vacia
 
P1 e1 internet
P1 e1 internetP1 e1 internet
P1 e1 internet
 
Educapaly 2
Educapaly 2Educapaly 2
Educapaly 2
 
Innovating from the outside in– altc2016 SLIDES
Innovating from the outside in– altc2016 SLIDESInnovating from the outside in– altc2016 SLIDES
Innovating from the outside in– altc2016 SLIDES
 
MYRESUME
MYRESUMEMYRESUME
MYRESUME
 
Amada y atrapante buenos aires
Amada y  atrapante  buenos airesAmada y  atrapante  buenos aires
Amada y atrapante buenos aires
 
Criterios de equidad para una administracion de justicia con perspectiva de g...
Criterios de equidad para una administracion de justicia con perspectiva de g...Criterios de equidad para una administracion de justicia con perspectiva de g...
Criterios de equidad para una administracion de justicia con perspectiva de g...
 
cv.namrata
cv.namratacv.namrata
cv.namrata
 
Karolinska Certificate
Karolinska CertificateKarolinska Certificate
Karolinska Certificate
 
Right Message, Right Buyer - at the Right TIme
Right Message, Right Buyer - at the Right TImeRight Message, Right Buyer - at the Right TIme
Right Message, Right Buyer - at the Right TIme
 
8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them
8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them
8 Biggest Mistakes Account-Based Marketers Make and How to Avoid Them
 
Youtube editor
Youtube editorYoutube editor
Youtube editor
 

Similar to Ambient Summer

SOTC_2016_RMJ_SurveyingChallenges
SOTC_2016_RMJ_SurveyingChallengesSOTC_2016_RMJ_SurveyingChallenges
SOTC_2016_RMJ_SurveyingChallenges
Ricardo Mark Johnson
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
Sandia National Laboratories: Energy & Climate: Renewables
 
2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps
2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps
2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps
GIS in the Rockies
 
AAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary DavisAAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary Davis
American Astronautical Society
 
Sareic calandro
Sareic calandroSareic calandro
Sareic calandro
Brett Johnson
 
IkeGPS Seismic Survey Case Study
IkeGPS Seismic Survey Case StudyIkeGPS Seismic Survey Case Study
IkeGPS Seismic Survey Case Study
GlobalgeoGNSS
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014
Bavik Sing
 
REU_Poster
REU_PosterREU_Poster
REU_Poster
Tyler Hackett
 
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Peter Löwe
 
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Peter Löwe
 
Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...
Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...
Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...
Werner Keil
 
Photogrammetry predicts infrastructure problems before they happen
Photogrammetry predicts infrastructure problems before they happenPhotogrammetry predicts infrastructure problems before they happen
Photogrammetry predicts infrastructure problems before they happen
NI BT
 
Kelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin - Geophysical - Formal
Kelvin - Geophysical - Formal
Kelvin Soice
 
NDGISUC2017 - New Lidar Technologies for 3DEP
NDGISUC2017 - New Lidar Technologies for 3DEPNDGISUC2017 - New Lidar Technologies for 3DEP
NDGISUC2017 - New Lidar Technologies for 3DEP
North Dakota GIS Hub
 
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEWTH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
grssieee
 
IkeGPS Katrina Case Study
IkeGPS Katrina Case StudyIkeGPS Katrina Case Study
IkeGPS Katrina Case Study
GlobalgeoGNSS
 
Polar Use Case in ExtremeEarth-phiweek19
Polar Use Case in ExtremeEarth-phiweek19Polar Use Case in ExtremeEarth-phiweek19
Polar Use Case in ExtremeEarth-phiweek19
ExtremeEarth
 
CAMS General Assembly Fires by Kaiser
CAMS General Assembly Fires  by Kaiser CAMS General Assembly Fires  by Kaiser
CAMS General Assembly Fires by Kaiser
Copernicus ECMWF
 
CONNEXUS_WoF_2
CONNEXUS_WoF_2CONNEXUS_WoF_2
CONNEXUS_WoF_2
Mario Pacione
 
DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...
DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...
DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...
Deltares
 

Similar to Ambient Summer (20)

SOTC_2016_RMJ_SurveyingChallenges
SOTC_2016_RMJ_SurveyingChallengesSOTC_2016_RMJ_SurveyingChallenges
SOTC_2016_RMJ_SurveyingChallenges
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
 
2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps
2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps
2018 GIS in Business: Trials and Tribulations of Switching to esri's Mobile Apps
 
AAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary DavisAAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary Davis
 
Sareic calandro
Sareic calandroSareic calandro
Sareic calandro
 
IkeGPS Seismic Survey Case Study
IkeGPS Seismic Survey Case StudyIkeGPS Seismic Survey Case Study
IkeGPS Seismic Survey Case Study
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014
 
REU_Poster
REU_PosterREU_Poster
REU_Poster
 
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
 
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
Mapping the Tohoku 2011 Tsunami event with a remote sensing satellite constel...
 
Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...
Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...
Data Quality on Mars - ISO 80000 and other Standards - Apache Big Data Europe...
 
Photogrammetry predicts infrastructure problems before they happen
Photogrammetry predicts infrastructure problems before they happenPhotogrammetry predicts infrastructure problems before they happen
Photogrammetry predicts infrastructure problems before they happen
 
Kelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin - Geophysical - Formal
Kelvin - Geophysical - Formal
 
NDGISUC2017 - New Lidar Technologies for 3DEP
NDGISUC2017 - New Lidar Technologies for 3DEPNDGISUC2017 - New Lidar Technologies for 3DEP
NDGISUC2017 - New Lidar Technologies for 3DEP
 
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEWTH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
 
IkeGPS Katrina Case Study
IkeGPS Katrina Case StudyIkeGPS Katrina Case Study
IkeGPS Katrina Case Study
 
Polar Use Case in ExtremeEarth-phiweek19
Polar Use Case in ExtremeEarth-phiweek19Polar Use Case in ExtremeEarth-phiweek19
Polar Use Case in ExtremeEarth-phiweek19
 
CAMS General Assembly Fires by Kaiser
CAMS General Assembly Fires  by Kaiser CAMS General Assembly Fires  by Kaiser
CAMS General Assembly Fires by Kaiser
 
CONNEXUS_WoF_2
CONNEXUS_WoF_2CONNEXUS_WoF_2
CONNEXUS_WoF_2
 
DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...
DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...
DSD-INT 2018 An Engineering Approach to construction of a Storm Surge Model f...
 

Ambient Summer

  • 1. Summer Monitoring Projects Demonstrate Flexibility & Expertise of Ambient Group Global’s Ambient Seismic team successfully completed another busy summer of monitoring projects. Perseverance and unique solutions to challenges on each project showcased the group’s expertise and client-centered philosophy. Rapid Mobilization Jump-Starts Summer Summer operations went from zero to 60 in record time as the group’s first project materialized rapidly due to a last minute decision by the client to do the project. “Their plan was always to complete the wells, but at the last minute they decided they wanted them moni- tored,” said Operations Manager Holli Sims. Crew 461 and the rest of the Ambient Seismic team jumped at the opportunity, accepted the challenge and fully mobilized in a matter of days. “Normally we have four to six weeks to prepare, in this case we had four days,” said Sims. Mobilization began in earnest May 26 and the crew left for Williston, North Dakota May 30. Adding to the challenge of a quick mobilization was the fact that this was the first time the group acquired Ambient Seismic data on a buried array that it did not install. In this case, special adapters were needed to make the installed grid work with Global’s equipment. Ross Kennedy, worldwide quality & recording resource man- ager, played a major role in making the project happen. He was able to lean upon a long-standing vendor rela- tionship to have the necessary adapters manufactured and sent from China within the required time frame. Trevor Lowe, vibrator supervisor and Wes Everett, se- nior AutoSeis® support technician were also key play- ers in the fast mobilization. Lowe filled in as general mechanic preparing trucks and trailers for the project, while Everett prepped the recording equipment. Once on site, insufficient documentation of the array forced the crew to start from scratch in many respects. One such case was that the original survey data on the installment was inaccurate. As a solution the crew employed auto locate capabilities, combin- ing the GPS sampling of the AutoSeis® system with the free LIDAR elevation data available in many areas to locate each receiver position at a greatly reduced cost to that of topographic surveying. Despite the challenges, the crew successfully mon- itored the completion of three wells for 24 hours a day for 26 days, completing the project with zero HSEQ in- cidents. The crew demobilized and left North Dakota on July 8, having delivered the final data to the pro- cessing team led by Ambient Seismic Analyst Amanda Klaus. “There are two parts of this project - five stages of reprocessing and then the three new wells,” said Klaus. “The reprocessing was quite complicated but ultimately resulted in a quality finished product and an improvement to our own workflow.” The final reprocessing was delivered to the client August 28, at which time the processing for the three new wells began. SDC10334.JPG SDC10346.JPG
  • 2. In addition to the normal frac monitoring, this project also involved monitoring flow-back; the pro- cess of pumping out of the ground all the liquid that is pumped into the ground during a frac, a first for Global. An unusual factor that had to be taken into consideration on each project this summer was the occurrence of a leap second, which is a one-second adjustment that is occasionally applied to civil time to keep the time of day as close as possible to the mean solar time. This interruption of time impacts GPS sys- tems, and therefore causes a recording disruption in the AutoSeis® system. The Ambient Seismic team de- vised a different plan for dealing with the leap second on each of its projects this summer. On this program the client decided to let AutoSeis® run as normal and automatically reset after the leap second interruption, accepting a slight loss in data during the time it would take the system to reset. Ambient Seismic Informs Completion Plans Completed for a long-standing client who from the beginning has pushed the Company’s technolo- gy to new realms, the second project of the summer demonstrated how Ambient Seismic can inform and impact completion plans. Phase one of the project began in May when Glob- al’s crew deployed an Ambient Seismic array to moni- tor a single well. The crew collected three days of Am- bient Seismic data before the well was completed. At the end of three days Crew 461 retrieved the equip- ment and sent the data to processing for a fast track reservoir scale TFI sm . In June, Global’s crew returned to redeploy the same array and monitor the well’s completion. “At first, the frac didn’t go the way they wanted. They were not breaking rock,” said Sims. “The pro- cessing group had an idea to apply a new stress in- version algorithm. The client used the results of the stress inversion algorithm to adjust their completion plans and the rest of the frac went the way they want- ed. We could do that because they had the Ambient Seismic data prior to the frac.” Of course, no seismic project is without its trials and so despite the immense success of the Ambi- ent Seismic monitoring, the crew at times struggled against Mother Nature to maintain access to the re- cording units. “The first problem was that the corn planted in the area grew to around eight feet tall when we were mon- itoring the well. There was no way to find the HDRs without a Garmin to lead you to it,” said Party Man- ager Ricky Leger. “Problem two was that with all the rain in the area the nearby river flooded. The river kept coming up every day. Some stations were in 10 feet of water by the time the river finally crested. When we finished with the frac we had to get a boat to retrieve some stations.” Furthermore, the crew and client had to once more decide on a course of action for dealing with the leap second. With the leap second scheduled to occur during the completion of the well, the crew and client agreed that operations would take a short break be- tween frac’ing stages to let the leap second pass and make sure all HDR’s were back up and running before the next well-stage was completed. The crew wrapped things up during the first week of July and passed the data along to processing. The final data was delivered to the client at the end of Au- gust, ahead of schedule. Ongoing Monitoring of CO2 Sequestration The final project of the summer for the group was the continuation of an ongoing CO2 sequestration monitoring project in Virginia. Funded by the Depart- ment of Energy, the project is experimental in nature with Global’s technology contributing to the under- standing of injection wells. The Company installed the buried array in November 2014 and has returned for monitoring on numerous occasions. Party Manager Mark Mercer provided leadership to the project, which involved 16 days of monitoring. “The job went very well, the crew did a great job maintaining the equipment in the field and had great support from the Houston office,” said Mercer. “The best part was there were no recordable incidents in very rough terrain.” The third project of the summer also offered the third solution to the leap second. In this case, the crew programmed the HDR units to sleep through the leap second. Then the day after, all HDR’s were switched out to start a fresh cycle of 24 hour re- cording. The end of the project marked the end of another busy summer for the Ambient Seismic group, which continues to demonstrate its expertise and innova- tion through clever, custom solutions to client prob- lems and general project challenges, all without a single recordable HSEQ incident. DSC04194.JPG DSC04195-edit.jpg