Ahmed Sabry Page 1 of 5
Ahmed sabry Elaraby
38, Masr Kadima, Cairo, Egypt
Tel: +2-23622046
Mobile: +2-0120202248
+2-0100199284
E-mail: Ahmed4info@yahoo.com & ahmedelaraby@live.com
Objective To obtain a challenging position that would utilize and expand my knowledge and experience in:
- Civil Works and installation contracts follow up, including subcontractors & suppliers, as
well as quality and delivery time supervision
- Networking and Data Communication
- Supervise the subcontractor's personnel on-site
- GSM Network fundamental
- Project management professional PMP
- Point-to-point microwave radio and wireless transmission.
Work Experience
Afro-Egypt Engineering Company
Project Coordinator
30 Aug up to Now
- Health and Safety Plans and requirements
- Management and lead the on-site Construction resources, as Installation Managers, Project
Supervisors and temporarily assigned employees Site maintenance and servicing
- Civil Works and installation contracts follow up & suppliers, as well as quality and
- delivery time supervision
- coordinated the project for the Civil work and repair of U900 4G
- Coordinated the project for expansion of and the Micro-Wave network Communication network.
Ahmed Sabry Page 2 of 5
Work Experience
Orascom Telecom, maintenance, Cairo Region.
Senior Radio Engineer
Jan16 up to 30 Aug
- Installation, troubleshooting and maintenance of telecommunication equipment from different
vendors, Motorola ,Huawei , Alcatel,Semines,Nokia,ZTE
- Faults management with log analysis, defects debug and work around responsibility
- Single Site Verification tests & Acceptance
- Sites Re-Engineering (Azimuth/Tilts/Heights/Additional Sectors Planning) Recommendations.
- the ability to make Radio optimization(Hard/Soft) actions on 2G/3G Huawei sites to enhance the
radio performance to meet the cluster KPIs
- Handle the design, deployment, and optimization of 2G, 3G, and 4G wireless telecommunications
networks for delivering mobile voice and data services.
- Downlink and uplink power control
Work Experience
Vodafone Egypt, network services NTRA & Hub management control
Nov 14– up to Aug15
 planning, execution, monitoring & control up to the closure Technical Cases troubleshooting and following with
technical departments
 Auditing Mobile Base Stations (safety factors and standardization of Macro and Micro Mobile Base Stations).
Visiting Macro and Micro sites belonged to the three operators (Vodafone) all over Egypt.
 Working with SATIMO EME spy Electro Magnetic Field measurement device to analyze the
signal strength for all wireless techniques such as (GSM,DCS,UMTS,etc…) all over Egypt
 Excellent experience about construction and safety protocol by ICNRP. NTRA ,Egypt
Vodafone Egypt, Regional Operations, Delta region.
NFM Engineer Feb 13– Nov 14
 First level troubleshooting for the opened TTs (TX, 2G, and 3G) and identify the root cause
 Plans for down TRUs & cells to achieve the required availability
 Supporting the teams if there were any problem “Access, technical”.
 End to end Following to close/handle/transfer the opened TTs
Ahmed Sabry Page 3 of 5
 Quality control & quality assurance.
 Reporting planned/unplanned activities
 Following up with -Remedy- VF system.
 Daily routine maintenance and troubleshooting.
 Network KPIs and status monitoring.
 Supervise contractors and NFM technicians.
Work Experience
Alkan Telecom, PMP, coordinator
Feb 10 – Mar 13
 Working as a project administrator for Telecom & IT projects.
 Hold meetings with customers & with contractors.
 Manage budget, running costs, tasks timelines, and working hours.
 Manages Satellite, wireless, IT & Integrated solutions projects.
 Develop full-scale project plans and associated communications documents.
 Coach, mentor, motivate and supervise project team members and contractors, and
influence them to take positive action and accountability for their assigned work.
 Develop best practices and tools for project execution and management
 Estimate the resources and participants needed to achieve project goals.
 Organizational teams / stakeholders. Directs and coordinates the work activities of
project team within the region.
 Managing the transport network (IP, microwave transmission and FM) projects for
Vodafone
Work Experience
Alkan Telecom, technical support , engineer
Dec 07 – Feb 10
Wireless Division, Providing professional Installation & Commissioning services
 LOS, OLOS & NLOS survey for both PTP and PMP network, link availability verification
and Link Budget using Radio Mobile software
 Installation, Commissioning, and Maintenance for Redline equipments; AN30-e, AN50-e,
AN80i, and RDL 2000
 Installation, commissioning and maintenance for Aviat “Harris Stratex formerly” Eclipse
Microwave links.
 Assist in the selection process of materials, testing products and components to ensure the
quality of materials
 Design suitable solutions for site implementation
Ahmed Sabry Page 4 of 5
 good in safety Knowledge and methods to deal with it petroleum companies
Projects performed under my responsible with:
 The majority of TEData customer such as Juhyna Company (4 links),
 Work in Vodafone swap site survey project that done in upper Egypt for 10 months, as
Vodafone swap all Ericsson devices in upper Egypt to huawei
 Maintenance infrastructure network and data communication in Water Wastewater Holding
Company
 Petrobel Oil & Gas Company for their huge off-shore network
 Vegas Oil & Gas Company for their network @ Allam Shawesh
 Petro Dara , Ras Gharib Red See (3 links )
 Etisalat Misr, NLOS project
 Vodafone Egypt, NLOS project
 Vodafone Swap Site Survey Project
 US Embassy for their NLOS link @ New Maadi
 TRD “Security Agency in Egypt” for the Cairo Surveillance Project
 Central Bank of Egypt wireless links
InoTek Systems, IT specialist
February 04 - November 07
InoTek Systems for Integrated solution “triple play solution” over wireless media
 Installation, configuration, and maintenance of the following products:
 Colubris Wi-Fi device
 Managing and administer networks (Workgroup).
 Maintenance Computer Hardware & Software
 - Managing and administer networks.
 CCTV & VOIP devices
 Perform acceptance for the site to meet customers aspects
Projects performed under my responsible with:
 The majority of TEData customer such as Misr University, GUC, CIC, Nile On Line, and AL
Ahly club (Al Gazerah and Nasr City branches)
 Al Alamia for cables
 Ministry of Interior for their CCTV network in Kafr Sheikh, Matrouh, Suez and Behira
Education
2006-2010 thebes academy : Bachelor of Computer Science and Information
Technology
Graduation Grade : Good
Ahmed Sabry Page 5 of 5
Graduation Project subject: Visual search engine Made by Technology
Geographic Information System (GIS) using (SQL database & VB.NET)
Graduation Project grade : Excellent
Oct-2011 up to date
Study in the pre master Faculty of Computer and Information Sciences
An Shams University
Trainings & Courses
 (Center For Research And Business Studies Cairo University)
 Linux Ubuntu
 Project Management Professional (PMP)
 Networking and Data Communication & wireless & network +
 GSM, WCDMA & LTE Radio Access Network & Core Network.
 Radio Network design & planning using (TMES planning tool).
 Transmission Network design & planning (Microwave).
 Introduction to RBS Family.
 Information & Communication Technology(ICT) – Advanced Course
 MCSE&CCNA (self studies )
 Center Exxon-( Windows 2003 Server Infrastructure)
 Jelecom A.D.Panasonic – (Networking and Data Communication) Advanced Course
 I have TOFEL certificate
Languages
 Arabic : Native
 English : Good
Personal Information
 Nationality : Egyptian
 Born in : Cairo, Egypt
 Date of birth : 26th
of February, 1987
 Driver license : I have Driver license
 Military Status : Exempted
Activities and societies
 Vic president of the assembly Gowan Khair
 Volunteer at hospital 57357
References Furnished Upon Request

sabry C.V UD-3

  • 1.
    Ahmed Sabry Page1 of 5 Ahmed sabry Elaraby 38, Masr Kadima, Cairo, Egypt Tel: +2-23622046 Mobile: +2-0120202248 +2-0100199284 E-mail: Ahmed4info@yahoo.com & ahmedelaraby@live.com Objective To obtain a challenging position that would utilize and expand my knowledge and experience in: - Civil Works and installation contracts follow up, including subcontractors & suppliers, as well as quality and delivery time supervision - Networking and Data Communication - Supervise the subcontractor's personnel on-site - GSM Network fundamental - Project management professional PMP - Point-to-point microwave radio and wireless transmission. Work Experience Afro-Egypt Engineering Company Project Coordinator 30 Aug up to Now - Health and Safety Plans and requirements - Management and lead the on-site Construction resources, as Installation Managers, Project Supervisors and temporarily assigned employees Site maintenance and servicing - Civil Works and installation contracts follow up & suppliers, as well as quality and - delivery time supervision - coordinated the project for the Civil work and repair of U900 4G - Coordinated the project for expansion of and the Micro-Wave network Communication network.
  • 2.
    Ahmed Sabry Page2 of 5 Work Experience Orascom Telecom, maintenance, Cairo Region. Senior Radio Engineer Jan16 up to 30 Aug - Installation, troubleshooting and maintenance of telecommunication equipment from different vendors, Motorola ,Huawei , Alcatel,Semines,Nokia,ZTE - Faults management with log analysis, defects debug and work around responsibility - Single Site Verification tests & Acceptance - Sites Re-Engineering (Azimuth/Tilts/Heights/Additional Sectors Planning) Recommendations. - the ability to make Radio optimization(Hard/Soft) actions on 2G/3G Huawei sites to enhance the radio performance to meet the cluster KPIs - Handle the design, deployment, and optimization of 2G, 3G, and 4G wireless telecommunications networks for delivering mobile voice and data services. - Downlink and uplink power control Work Experience Vodafone Egypt, network services NTRA & Hub management control Nov 14– up to Aug15  planning, execution, monitoring & control up to the closure Technical Cases troubleshooting and following with technical departments  Auditing Mobile Base Stations (safety factors and standardization of Macro and Micro Mobile Base Stations). Visiting Macro and Micro sites belonged to the three operators (Vodafone) all over Egypt.  Working with SATIMO EME spy Electro Magnetic Field measurement device to analyze the signal strength for all wireless techniques such as (GSM,DCS,UMTS,etc…) all over Egypt  Excellent experience about construction and safety protocol by ICNRP. NTRA ,Egypt Vodafone Egypt, Regional Operations, Delta region. NFM Engineer Feb 13– Nov 14  First level troubleshooting for the opened TTs (TX, 2G, and 3G) and identify the root cause  Plans for down TRUs & cells to achieve the required availability  Supporting the teams if there were any problem “Access, technical”.  End to end Following to close/handle/transfer the opened TTs
  • 3.
    Ahmed Sabry Page3 of 5  Quality control & quality assurance.  Reporting planned/unplanned activities  Following up with -Remedy- VF system.  Daily routine maintenance and troubleshooting.  Network KPIs and status monitoring.  Supervise contractors and NFM technicians. Work Experience Alkan Telecom, PMP, coordinator Feb 10 – Mar 13  Working as a project administrator for Telecom & IT projects.  Hold meetings with customers & with contractors.  Manage budget, running costs, tasks timelines, and working hours.  Manages Satellite, wireless, IT & Integrated solutions projects.  Develop full-scale project plans and associated communications documents.  Coach, mentor, motivate and supervise project team members and contractors, and influence them to take positive action and accountability for their assigned work.  Develop best practices and tools for project execution and management  Estimate the resources and participants needed to achieve project goals.  Organizational teams / stakeholders. Directs and coordinates the work activities of project team within the region.  Managing the transport network (IP, microwave transmission and FM) projects for Vodafone Work Experience Alkan Telecom, technical support , engineer Dec 07 – Feb 10 Wireless Division, Providing professional Installation & Commissioning services  LOS, OLOS & NLOS survey for both PTP and PMP network, link availability verification and Link Budget using Radio Mobile software  Installation, Commissioning, and Maintenance for Redline equipments; AN30-e, AN50-e, AN80i, and RDL 2000  Installation, commissioning and maintenance for Aviat “Harris Stratex formerly” Eclipse Microwave links.  Assist in the selection process of materials, testing products and components to ensure the quality of materials  Design suitable solutions for site implementation
  • 4.
    Ahmed Sabry Page4 of 5  good in safety Knowledge and methods to deal with it petroleum companies Projects performed under my responsible with:  The majority of TEData customer such as Juhyna Company (4 links),  Work in Vodafone swap site survey project that done in upper Egypt for 10 months, as Vodafone swap all Ericsson devices in upper Egypt to huawei  Maintenance infrastructure network and data communication in Water Wastewater Holding Company  Petrobel Oil & Gas Company for their huge off-shore network  Vegas Oil & Gas Company for their network @ Allam Shawesh  Petro Dara , Ras Gharib Red See (3 links )  Etisalat Misr, NLOS project  Vodafone Egypt, NLOS project  Vodafone Swap Site Survey Project  US Embassy for their NLOS link @ New Maadi  TRD “Security Agency in Egypt” for the Cairo Surveillance Project  Central Bank of Egypt wireless links InoTek Systems, IT specialist February 04 - November 07 InoTek Systems for Integrated solution “triple play solution” over wireless media  Installation, configuration, and maintenance of the following products:  Colubris Wi-Fi device  Managing and administer networks (Workgroup).  Maintenance Computer Hardware & Software  - Managing and administer networks.  CCTV & VOIP devices  Perform acceptance for the site to meet customers aspects Projects performed under my responsible with:  The majority of TEData customer such as Misr University, GUC, CIC, Nile On Line, and AL Ahly club (Al Gazerah and Nasr City branches)  Al Alamia for cables  Ministry of Interior for their CCTV network in Kafr Sheikh, Matrouh, Suez and Behira Education 2006-2010 thebes academy : Bachelor of Computer Science and Information Technology Graduation Grade : Good
  • 5.
    Ahmed Sabry Page5 of 5 Graduation Project subject: Visual search engine Made by Technology Geographic Information System (GIS) using (SQL database & VB.NET) Graduation Project grade : Excellent Oct-2011 up to date Study in the pre master Faculty of Computer and Information Sciences An Shams University Trainings & Courses  (Center For Research And Business Studies Cairo University)  Linux Ubuntu  Project Management Professional (PMP)  Networking and Data Communication & wireless & network +  GSM, WCDMA & LTE Radio Access Network & Core Network.  Radio Network design & planning using (TMES planning tool).  Transmission Network design & planning (Microwave).  Introduction to RBS Family.  Information & Communication Technology(ICT) – Advanced Course  MCSE&CCNA (self studies )  Center Exxon-( Windows 2003 Server Infrastructure)  Jelecom A.D.Panasonic – (Networking and Data Communication) Advanced Course  I have TOFEL certificate Languages  Arabic : Native  English : Good Personal Information  Nationality : Egyptian  Born in : Cairo, Egypt  Date of birth : 26th of February, 1987  Driver license : I have Driver license  Military Status : Exempted Activities and societies  Vic president of the assembly Gowan Khair  Volunteer at hospital 57357 References Furnished Upon Request