RAJWINDER SINGH KHOKHAR
26 Snowdrift Trail harrykhokhar@gmail.com
Brampton ON L6R 3K2 Phone: 905-598-6660
Canada
Profile:
Project Manager with over 12 years of working experience in the Telecommunications
industry as a Construction Project Manager-Telecom Infrastructure Management
specializing in the build of turnkey sites and/or overlay of new technologies.
Current role is on assignment with Bell Mobility accountable for network builds of the
HSPA (High speed packet Access) and LTE (Long Term Evolution) network over
existing sites and new builds of both towers and rooftop sites. The role includes
preparing, tendering, awarding, construction and financial reporting to the satisfaction of
the Client.
Education:
July 2000 – G.Z.S. College of Engineering and Technology
May 2004 Bathinda, India
 Completed Bachelors of Technology in Civil Engineering
Apr 1998 – G.T.B Khalsa Sen.Sec.School
March 1999 Malout, India
 Completed grade 10+2
Training and Projects Undertaken:
 Completed major project in college which involved design of Multistoried
Building,
 Completed six months Industrial Training in CPWD (Central Public Works
Department). Designed and supervised many small scale buildings of CPWD
ProfessionalExperience:
Construction/Erectionofmore than 300 Ground and RoofTop Towers
WSP Canada (Construction Project Manager) 2008 to current
 Assignment with Bell Mobility, Toronto
 Project Management of projects/assignments include management of turnkey sites
for new HSPA and LTE technology & respective augments, cost management,
scheduling, construction and financial accountability
 Working directly with telecommunications Client, contractors
(engineering/riggers/etc.) & technical resources (internal/external Clients)
 Project/program planning & budget estimating/reporting and active with site
selection, tower audits & assessments
 Preparing (create/issue/review/award) tender documents, writing of documents
informing contractors of obligations
 Establishing construction schedules & coordination of resources to meet
time/cost/quality objectives
 Team meeting project planning, project status reporting & respective database
inputs
 Continual communication needs, setting expectations, delegation & status
reporting
G.T.L Ltd. (Project Engineer) March 2006- September 2008
 On site supervision for foundations of ground base and roof top cellular towers
 Plans, organizes, and supervises the work of subordinate personnel to provide
direction and feedback
 Installs, maintains, repairs, removes, and retrofits antenna systems equipment and
power systems (e.g. antennas, dishes, microwaves, electric generators, etc.)
 Analyzes problems with remote communications sites to determine cause of
problem and/or failure, and determine appropriate remedy using technical
expertise.
 Prioritizes incoming assignments to assure accurate and timely completion of
work using section and/or unit practices.
 Monitors purchase orders and evaluates needs for communication expenditures to
coordinate unit budget using standard office equipment.
 Researches and evaluates new antenna system and radio rigging products to
upgrade existing systems and make recommendations for future projects using
technical expertise and vendor product information
 Acquires personal safety and tower safety equipment using federal and state
statutes and section practices.
 Analyzes remote communications sites to determine best location and proper
placement for installation of new antenna systems equipment using section
documentation, manufacturers' documents, and specialized equipment.
 Responds to 24-hour calls for assistance to provide emergency support to return
antenna systems equipment to operational mode during off-duty hours.
 Develops and conducts training of subordinate personnel to assure quality, safe
and proper use of tools, equipment, and materials, and to demonstrate safety or
technical job requirements using appropriate visual aids and materials.
 Maintains work order logs to record and document work performed and
associated costs using modern office equipment.
 Makes preliminary line-of-sight surveys from communication towers using
climbing and safety gear (e.g., climbing belt, harness, hard hat, steel toed boots,
etc.).
 Operates various construction equipment (e.g. truck cranes, fork-lifts, concrete
mixers, hand tools, etc.) to install building or tower foundations, load/unload
communications equipment and supplies, and install/remove antenna systems
equipment.
Tata Tele Services Ltd. (Civil Engineer) July 2004 – Aug 2005
 On site supervision for foundations of ground base and roof top cellular towers ,
 Casting of Raft and Isolated Footing, Pile Foundation for Ground Base
Towers
 Casting of shelter foundation .installation of shelter as per drawing installing
cable Tray
 Supervision of tower erection ,
 Inspects the work of subcontractors to ensure the quality of work meets
established standards using safety procedures, blueprints, diagrams, and technical
expertise.
 Conduct site inspections ( including climbing of all types of towers, maximum
height 100 meters )
 Prepare technical reports and verify reports of technicians and inspectors in
conjunction with the engineer
 Prepare/Review tender documents and inspection documents, write memos and
letters of notice informing contractors of contractual obligations
 Travels to work locations including remote mountain tops to perform functions of
the job, sometimes under adverse conditions, using appropriate vehicles.
 Remains current on job-specific and Departmental topics through training
courses, workshops, seminars, professional organizations, professional
publications, etc. to apply appropriate policies and technologies to assigned job
functions.
 The design and fabrication of metal support structures (e.g. antenna brackets, ice
shields, solar array supports, feedline support systems, mono pole towers, etc.).
COMPUTER KNOWLEDGE:
 Operate effectively with Microsoft office tools namely word, excel, power point,
access.
 Have worked with various versions of Windows Operating system namely
WinNT and Win 98 ,WIN XP,VISTA ,Windows 7.
 Have sound knowledge on Oracle 9i Database,AutoCAD
References available upon

cv.Harry Khokhar .Rajwinder 2017

  • 1.
    RAJWINDER SINGH KHOKHAR 26Snowdrift Trail harrykhokhar@gmail.com Brampton ON L6R 3K2 Phone: 905-598-6660 Canada Profile: Project Manager with over 12 years of working experience in the Telecommunications industry as a Construction Project Manager-Telecom Infrastructure Management specializing in the build of turnkey sites and/or overlay of new technologies. Current role is on assignment with Bell Mobility accountable for network builds of the HSPA (High speed packet Access) and LTE (Long Term Evolution) network over existing sites and new builds of both towers and rooftop sites. The role includes preparing, tendering, awarding, construction and financial reporting to the satisfaction of the Client. Education: July 2000 – G.Z.S. College of Engineering and Technology May 2004 Bathinda, India  Completed Bachelors of Technology in Civil Engineering Apr 1998 – G.T.B Khalsa Sen.Sec.School March 1999 Malout, India  Completed grade 10+2 Training and Projects Undertaken:  Completed major project in college which involved design of Multistoried Building,  Completed six months Industrial Training in CPWD (Central Public Works Department). Designed and supervised many small scale buildings of CPWD ProfessionalExperience: Construction/Erectionofmore than 300 Ground and RoofTop Towers WSP Canada (Construction Project Manager) 2008 to current  Assignment with Bell Mobility, Toronto  Project Management of projects/assignments include management of turnkey sites for new HSPA and LTE technology & respective augments, cost management, scheduling, construction and financial accountability  Working directly with telecommunications Client, contractors (engineering/riggers/etc.) & technical resources (internal/external Clients)
  • 2.
     Project/program planning& budget estimating/reporting and active with site selection, tower audits & assessments  Preparing (create/issue/review/award) tender documents, writing of documents informing contractors of obligations  Establishing construction schedules & coordination of resources to meet time/cost/quality objectives  Team meeting project planning, project status reporting & respective database inputs  Continual communication needs, setting expectations, delegation & status reporting G.T.L Ltd. (Project Engineer) March 2006- September 2008  On site supervision for foundations of ground base and roof top cellular towers  Plans, organizes, and supervises the work of subordinate personnel to provide direction and feedback  Installs, maintains, repairs, removes, and retrofits antenna systems equipment and power systems (e.g. antennas, dishes, microwaves, electric generators, etc.)  Analyzes problems with remote communications sites to determine cause of problem and/or failure, and determine appropriate remedy using technical expertise.  Prioritizes incoming assignments to assure accurate and timely completion of work using section and/or unit practices.  Monitors purchase orders and evaluates needs for communication expenditures to coordinate unit budget using standard office equipment.  Researches and evaluates new antenna system and radio rigging products to upgrade existing systems and make recommendations for future projects using technical expertise and vendor product information  Acquires personal safety and tower safety equipment using federal and state statutes and section practices.  Analyzes remote communications sites to determine best location and proper placement for installation of new antenna systems equipment using section documentation, manufacturers' documents, and specialized equipment.  Responds to 24-hour calls for assistance to provide emergency support to return antenna systems equipment to operational mode during off-duty hours.  Develops and conducts training of subordinate personnel to assure quality, safe and proper use of tools, equipment, and materials, and to demonstrate safety or technical job requirements using appropriate visual aids and materials.  Maintains work order logs to record and document work performed and associated costs using modern office equipment.  Makes preliminary line-of-sight surveys from communication towers using climbing and safety gear (e.g., climbing belt, harness, hard hat, steel toed boots, etc.).  Operates various construction equipment (e.g. truck cranes, fork-lifts, concrete mixers, hand tools, etc.) to install building or tower foundations, load/unload communications equipment and supplies, and install/remove antenna systems equipment.
  • 3.
    Tata Tele ServicesLtd. (Civil Engineer) July 2004 – Aug 2005  On site supervision for foundations of ground base and roof top cellular towers ,  Casting of Raft and Isolated Footing, Pile Foundation for Ground Base Towers  Casting of shelter foundation .installation of shelter as per drawing installing cable Tray  Supervision of tower erection ,  Inspects the work of subcontractors to ensure the quality of work meets established standards using safety procedures, blueprints, diagrams, and technical expertise.  Conduct site inspections ( including climbing of all types of towers, maximum height 100 meters )  Prepare technical reports and verify reports of technicians and inspectors in conjunction with the engineer  Prepare/Review tender documents and inspection documents, write memos and letters of notice informing contractors of contractual obligations  Travels to work locations including remote mountain tops to perform functions of the job, sometimes under adverse conditions, using appropriate vehicles.  Remains current on job-specific and Departmental topics through training courses, workshops, seminars, professional organizations, professional publications, etc. to apply appropriate policies and technologies to assigned job functions.  The design and fabrication of metal support structures (e.g. antenna brackets, ice shields, solar array supports, feedline support systems, mono pole towers, etc.). COMPUTER KNOWLEDGE:  Operate effectively with Microsoft office tools namely word, excel, power point, access.  Have worked with various versions of Windows Operating system namely WinNT and Win 98 ,WIN XP,VISTA ,Windows 7.  Have sound knowledge on Oracle 9i Database,AutoCAD References available upon