This project involves infrastructure works for the Mall of Qatar including over 6km each of water, stormwater and sewage networks as well as fire fighting, irrigation and cable networks. There will also be 7 underground tunnels and ramps with a total length of 900m, large storage tanks for stormwater, sewage and irrigation, and water features, parking areas and landscaping. The project duration is 1 year with a value of 320 million QAR.