AIC NETBOOKS
Shifted all of production volume to China.
innovating n designing of each components.
Diversifying its product portfolio to include
consumer electronics.
The company work on quality proof in its product
by double checking the product.
Waiting for launching of Intel ATOM Processor.
Supervisors were often engaged in firefighting
addressing an immediate problem without fixing the
root cause.
Unpredictable demand.
Third Shift should be introduced.
In two shift- 700/ shift (9 hr shift)
* 2= 1400/ Day
* 6= 8400/week
In three shift- approx 620/ shift (8 hr shift)
*3= 1860/ Day
*6= 11160/week

For long term sustainability they should find the
solution of root cause.
1 supervisor should be appointed for 2 assembly
lines so that we will need only 2 supervisors.
Presented By:
•Pankhuri Rastogi
•Sibi Siddique
•Ashutosh Tiwari
•Richa Goel
•Rachita Bawa

•Aman Jaiswal
•Yogesh Gulati
•Ayush Mittal
•Vidit Dargarh
•Vaibhav Chopra

aic

  • 1.
  • 2.
    Shifted all ofproduction volume to China. innovating n designing of each components. Diversifying its product portfolio to include consumer electronics. The company work on quality proof in its product by double checking the product.
  • 3.
    Waiting for launchingof Intel ATOM Processor. Supervisors were often engaged in firefighting addressing an immediate problem without fixing the root cause. Unpredictable demand.
  • 4.
    Third Shift shouldbe introduced. In two shift- 700/ shift (9 hr shift) * 2= 1400/ Day * 6= 8400/week In three shift- approx 620/ shift (8 hr shift) *3= 1860/ Day *6= 11160/week For long term sustainability they should find the solution of root cause. 1 supervisor should be appointed for 2 assembly lines so that we will need only 2 supervisors.
  • 5.
    Presented By: •Pankhuri Rastogi •SibiSiddique •Ashutosh Tiwari •Richa Goel •Rachita Bawa •Aman Jaiswal •Yogesh Gulati •Ayush Mittal •Vidit Dargarh •Vaibhav Chopra