#onetimeatAgileCamp
September 2018
#onetimeatAgileCamp
Chris Dunn
Agile Coach @ Nelnet
cdunn@5280solutions.com
@csdunn
#onetimeatAgileCamp
11 minutes before interrupted
25 minutes to regain the point before interruption
9% margin of error rate (uninterrupted)
15% margin of error rate (interrupted)
#onetimeatAgileCamp
Arrive at 9 am Monday morning… Read emails, get coffee, warm up
9:30 am… Begin a complex task
9:41 am… Interruption, “How was your weekend?”
9:51 am… Get back at your complex task
10:16 am… finally back in your “groove”
That’s 35 minutes of lost time by a single interruption!
In the first 76 minutes, only 11 minutes of
productive task work
#onetimeatAgileCamp
Tend to underestimate distractions…
And say YES to requests we should
decline
#onetimeatAgileCamp
1. I don’t want to let the team down
#onetimeatAgileCamp
2. I’d rather start something new than toil in
something unglamorous
#onetimeatAgileCamp
3. I didn’t realize how big the request was
#onetimeatAgileCamp
4. The boss asked me
#onetimeatAgileCamp
#onetimeatAgileCamp
#onetimeatAgileCamp
#onetimeatAgileCamp
demand
capacity
#onetimeatAgileCamp
Congested FLOW
#onetimeatAgileCamp
• Context switching is common
• We start new tasks before finishing older tasks
• Work gets neglected and ages
#onetimeatAgileCamp
#onetimeatAgileCamp
An interruption – usually to fix a problem
Ex: Break fix, support tickets, risk mitigation
#onetimeatAgileCamp
#onetimeatAgileCamp
#onetimeatAgileCamp
#onetimeatAgileCamp
#onetimeatAgileCamp
• If you don’t use WIP limits, start!
• Let WIP limits be a creative friendly constraint
• Limit WIP to the team’s capacity
• Remember: High WIP = high wait times because
other items sit waiting for attention
Take charge of WIP
#onetimeatAgileCamp
• Make work visible
• Yes, even the “drive-by” requests
• Understand the source of all work done by the
team and what slows FLOW
Measure All Work
#onetimeatAgileCamp
Trend the Data
#onetimeatAgileCamp
Trend the Data
#onetimeatAgileCamp
#onetimeatAgileCamp

Agile Camp 2018 - Unplanned Work

Editor's Notes

  • #3  Poll Title: What are some of the more common "thieves of time" for you and your teams? https://www.polleverywhere.com/free_text_polls/fcHqWoJrb1tgMK6
  • #8 “Can you help me?” – we are eager to help teammates and don’t want to let them down
  • #9 Optimize for fun
  • #10 Everything always takes longer than we think it should
  • #11 Yes is easier than No We overload ourselves and our teams
  • #13 Multi-tasking is NOT a thing It is simply switching tasks We cannot switch tasks efficiently Leads to more mistakes
  • #14 What is it that steals time away from our teams?
  • #15 When demand exceed capacity Take on more than what is possible Possibly due to the reasons before Won’t take so long Couldn’t possibly impact my sprint Boss asked me
  • #16 Biggest impact to FLOW is too much WIP FLOW = fast and smooth movement of work across the VALUE Stream Value Stream = activities done from beginning to end for a product/service in order to provide business value. Improve FLOW: Reduce batch size Build in quality
  • #17 Unfinished work is waste
  • #18 To improve your flow, start by making the work visible Honor WIP limits Look for Traffic Jams – understand the cause, change behaviors
  • #19 Defined as NOT PLANNED – typically takes us away from our goal Most common in IT that I hear about is Support Work
  • #20 We take time and effort to lay out the best plans Set goals and intend to deliver value to our customer Constant interruptions create context switching Delays planned work
  • #21 Make it visible
  • #23 Start visualizing dependencies Work closely with teams where there are dependencies
  • #24 What about SCRUM teams? Should we setup WIP limits?
  • #28 William Edwards Deming was an American engineer, statistician, professor, author, lecturer, and management consultant.
  • #29  Poll Title: Impact of Hidden and Unplanned Work https://www.polleverywhere.com/surveys/k0mp6uN2Q