Construction Technology and
Materials
Course Contents
• Building Construction Technology
• Bridge Construction Technology
• Road Construction Technology
Building Construction Technology
• Lecture 1-Prehistoric construction techniques
• Lecture 2-Contemporary construction
methodologies
• Lecture 3-Construction technology of the future
(Green technology, Energy Saving Technology,
Sustainable technology etc.)
• Lecture 4-Timber Trenches
• Lecture 5-Type of Foundations
Building Construction Technology
• Lecture 6-Brick works and Masonry
Construction
• Lecture 7-Cavity wall construction
• Lecture 8-Arches and Lintels
• Lecture 9-Ground and upper floors
• Lecture 10-Single roofs
• Lecture 11-States and tiled roofs
• Lecture 12-Built up roof and cladding
Building Construction Technology
• Lecture 13-Windows and doors
• Lecture 14-partition walls
• Lecture 15-Plastering
• Lecture 16-Plumbing installation
• Lecture 17-Electric installation
• Lecture 18-Fire fight equipments and
installation
• Lecture-19: Bridge Construction Technology
• Lecture-20: Road Construction Technology
• Lectture-21: Overall discussion on Question
and Exam.
Building Construction Technology
• History of Human civilization
• Civilization in Indian Subcontinent
• Prehistoric Construction Technology
Lecture 1: Prehistoric construction techniques
History of Human civilization
What is Civilization?
It is the collective and organized human
endeavor to bring changes in life, society and
state.
• Necessities: Food, water, shelter, reproduction/child
raising, waste, reflection, creativity, spiritual expression
• Subsistence: Scavenging, hunting-fishing/gathering,
horticulture, pastoralism, agriculture
• Social Organization: Family, clan, tribe, nation (semi-
nomadic, or nomadic), village, town, city, state.
Adaptations to change Agents of change
Culture Environment
Beliefs Geographical
Observations (receptivity) Theo-philosophical
Social Ideological
Political Technological
Economic Economic
Technologic
Change may be gradual or drastic
Society: A society is an artificial construction of a collection
of linked formal and informal institutions that govern group
behavior.
Culture: Culture is the set of conscious and unconscious
beliefs and assumptions about the way in which world works that
governs individual behavior.
Diffusion: The movement or spread of one or more
elements of a society or culture from one place to another.
TECHNOLOGY
• Building technologies
• Water technologies
• Agricultural technologies
• Architecture
• Military technologies
WORLD CIVILIZATION
IN THE TIME OF PRE-LITERACY
15,000 YEARS BC
Sophisticated hunter-gatherer cultures with diverse toolkits appropriate
to their environments and resources. Dogs have been domesticated.
Art flourishes.
10,000 YEARS BC
AFRICA AMERICAS ASIA EUROPE OCEANA
SAN hunter-gathers Tehuacanos Jarmo ----------- Mammoth cave
Qadan horticulture (Mexico) Natufian Jericho Knossos
(Egypt) (olives)
Saharan cattle herders Karanovo
(Tassili)
• 5000BC
AFRICA AMERICAS ASIA EUROPE OCEANA
Badarian agriculture Cochise (SWNA) Yangshao Danubian Kuk
(wheat/barley) (maize) (rice) (wheat) (yams/taro)
Hacilar
Catal Huyuk
• 4000 BC
Pre-unification Egypt Archaic period Ubaid Minoan Melanesian
Unified archaic Egypt Harrapan Varna expansion
Narmer/Menes Non Nok Tha
Loang Spean
• 3000 BC
AFRICA AMERICAS ASIA EUROPE OCEANA
Old Kingdom Egypt Preclassic Indus (Kurgan) Battle Axe Lapita
Pyramids Ban Chieng Beaker Folk
Lungshan Troy
Sumer
Sargon of Akkad
• 2000 BC
Old Kingdom Egypt Early Olmecs Shang China Myceneans
Intermediate Period Hitittes Thera
Middle Kingdom (Iron)
Babylonians
Aryan Invasions Barbarian Invasions
• 1000 BC (1000BC)
AFRICA AMERICAS ASIA EUROPE OCEANA
Middle Kingdom Olmecs Assyrians Hellenic Greece
New Kingdom Adena Phoenicians (Pericles through Alexander)
Late Period Hopewell Canaanites Carthage
Bantu Kingdoms Anasazi Gupta India Etruscans/Rome
Han China La Tene/Hallstatt
Celts & Germania
• 1 AD
Ghana Maya China Rome Polynesians
Cro-Magnon Man:
The Late Pleistocene Hunter and the first real artists.
about 30,000 years ago.
• Built by hunter-gatherers (no sign of agriculture here).
All bones found are wild animal. There is no
evidence of inhabitation; the structures are
interpreted as temples. After 8,000 BCE, the site
was abandoned and purposefully covered up with
tons of soil below the hill.
Segment D is one of the near circular shaped pillared areas in the
best condition of Göbekli Tepe. The largest weigh about 50
tons
Middle-Eastern Civilization
(Mesopotamian)
The Tigris & Euphrates River Valleys
Great Indian Civilization
The Indus River is located
in Pakistan. It was along
this river that a civilization
developed around 2,500
BCE. It is called the
Indus Valley Civilization.
Two major cities of this
civilization were Harappa
and Mohenjo-Daro.
Geography and Early India
Indian civilization first developed on the Indus
River.
Main Ideas
• The geography of India includes high
mountains, great rivers, and heavy seasonal
rain.
• Harappan civilization developed along the
Indus River.
Mountains
• North: The
Himalayas are
the highest
mountains in
the world.
• West: The
Hindu Kush
provide
protection
from enemies.
Plains and
Plateaus
• Rivers and
melting snow kept
the plains fertile.
• Both sides of the
river thrived.
Indian Geography
Water
• Monsoons
• Heavy rainfall
• Civilizations
arose around
seasonal rainfall.
People
• Population grew
in the Indus
River Valley.
• Growth came as
irrigation and
farming
techniques
improved.
• Cities were built
as surplus food
was produced.
Cities
• Harrapa
• Mohenjo Daro
• Fortresses for
defense against
enemies
• Well-planned
public areas
Harappan Civilization
Achievements
• Wells and indoor
plumbing
• Pottery, cotton
clothing, jewelry
• India’s first writing
system
The Indus Valley Culture
• The people of the Indus
Valley were mostly
peaceful farmers. They
built large cities with
ordered streets and bricks
made all the same size.
This indicates they had a
strong central government.
This statue is probably a
priest or king.
The Indus Valley people had an advanced civilization
with large cities, running water and sewer systems.
They built walls around their cities which indicated that
they might have had to defend themselves against
other people. We do not know a lot about them
because we cannot yet read their writing.
The picture at the right shows
an example of Indus Valley
writing. Linguists are still
trying to decode the
language. We know they
traded with the people of
Mesopotamia and Egypt so
perhaps those people knew
how to read and speak this
language!
Indus Valley Script
• Here are several
examples of Indus
Valley writing. It is
believed that the
Indus Valley people
may have also
written on palm
leaves or cloth but
no evidence of this
has survived.
This is a photograph of “The Great Bath” at Mohenjo
Daro. This is one of the earliest examples of a public
bath or water storage system found in the world. The
Indus Valley people were great architects and city
planners.
Here is a reconstruction of what the entrance to
Mohenjo Daro might have looked like.
• Around 1500 BCE, a group of nomadic
warrior-herders crossed the narrow Khyber
Pass in the Hindu Kush Mountains and
invaded the Indus Valley culture. These
people, the Aryans, came from Eastern
Europe between the Black Sea and Caspian
Sea, probably looking for pastures for their
animals. Flooding and earthquakes had
weakened the Indus Valley culture and they
were unable to withstand the newcomers.
Aryan Invasion
Religion
Government
Language
Invaders from
the West
When the Harappan civilization dissipated in
1700 BC, Central Asians called Aryans began
taking over territory.
The Aryans left behind vast collections of
poems, hymns, myths, and rituals. They
also had religious writings known as Vedas.
No central government: small communities
ruled by rajas
Sanskrit is the root of many modern South
Asian languages.
Aryan Invasion
Origins of Hinduism
Hinduism, the largest religion in India today,
developed out of ancient Indian beliefs and practices.
Main Ideas
• Indian society divided into distinct groups under the
Aryans.
• The Aryans practiced a religion known as Brahmanism.
• Hinduism developed out of Brahmanism and influences
from other cultures.
• The Jains reacted to Hinduism by breaking away to form
their own religion.
Kshatriyas
Vaisyas
Sudras
Brahmins Priests
Rulers and warriors
Laborers and non-Aryans
Indian Society Divides
Varnas
Farmers, craftspeople, and traders
Social divisions in Aryan society
Individuals
• Place in society based
on birth, wealth, or
occupation
• 3,000 castes once
existed in India.
• Individuals could rarely
change castes.
Caste Rules
• Sutras (guides) listed all
the rules for the caste
system.
• Breaking rules resulted
in a transfer to a lower
class.
Caste System
Brahmanism
• Aryan priests
were called
Brahmins.
• Wrote Vedic
texts, which
were their
thoughts about
the Vedas
Evolving Beliefs
The Vedas,
Upanishads, and
other Vedic texts
began blending
with beliefs from
different cultures,
creating Hinduism.
Brahmanism develops into Hinduism
Hinduism
• Many gods
• Reincarnation:
could be reborn
into new forms
and castes
• Men and women
could both gain
salvation, but
women were
inferior.
Origins of Jainism
Four Principles of Jainism
• 599 BC, established as an alternative to Hindu
ritualism
• Based on the teachings of Mahavira, who abandoned
his life of luxury to become a monk
• Injure no life.
• Tell the truth.
• Do not steal.
• Own no property.
Jains React to Hinduism
Origins of Buddhism
Buddhism began in India and became a major
religion.
Main Ideas
• Siddhartha Gautama searched for wisdom in
many ways.
• The teachings of Buddhism deal with finding
peace.
• Buddhism spread far from where it began in
India.
1.
Suffering and unhappiness are a part of human life. No one
can escape sorrow.
Teachings of Buddhism
Four Noble Truths
2.
Suffering comes from our desires for pleasure and material
goods.
3.
People can overcome desire and ignorance and reach
nirvana, a state of perfect peace.
4.
People can overcome ignorance and desire by following an
eightfold path that leads to wisdom, enlightenment, and
salvation.
Ancient Ways
• The Buddha
taught that
following the
Vedic texts was
unnecessary.
• Challenged the
authority of
Hindu priests
Changing Society
• A more
individualistic
approach to
enlightenment
• Rebirth as a
means to evolve
Challenging Hindu Ideas
Caste System
• Opposed caste
system
• The Eightfold
Path could lead
any individual to
nirvana.
• The Buddha’s
teachings
reached all
classes.
Buddhism branches out
Buddhism splits
• Asoka, one of the most powerful kings in India, became a
Buddhist and spread Buddhism in India and foreign lands.
• Buddhist missionaries traveled the world to teach
enlightenment.
• Buddhism split into two main sects: Theravada and Mahayana.
• Members of the Theravada followed the Buddha’s teachings
exactly.
• Members of the Mahayana believed that individual
interpretation was important.
Buddhism began in India and then became a major
religion.
Indian Empires
The Big Idea
The Mauryas and the Guptas built great empires in India.
Main Ideas
• The Mauryan Empire unified most of India.
• Gupta rulers promoted Hinduism in their empire.
Candragupta Maurya
• Candragupta seized control
of northern India and
created a society
dominated by war.
• Candragupta became a
Jainist monk and gave up
his throne.
Asoka
• The grandson of
Candragupt extended
Mauryan rule over most of
India.
• Asoka converted to
Buddhism and stopped
waging war, choosing
instead to rebuild cities
and spread Buddhist
teachings.
Mauryan Rule
Gupta Empire
• After the decline of the Mauryan Empire, India remained primarily
Buddhist for 500 years.
• Under the rule of Candra Gupta I, India became unified and
prosperous again.
• Gupta rulers spread Hinduism in their empire through the
building of temples and the promotion of Hindu writings and
rituals.
• Widespread religious tolerance was encouraged for Buddhists
and Jainists.
Economy and
Culture
The Caste
System
Social
Ramifications
Growth
Under Candra Gupta II, the Gupta Empire
reached the height of its power. It spread
across northern India and prospered.
The economy boomed, allowing citizens the
time and money to create great works of art
and literature.
It was believed that keeping citizens under
strict caste rule would stabilize the empire.
Women in the caste system were not seen
as equals and had few basic rights.
Candra Gupta II
Time Line
• 320 BC Candragupta Maurya becomes the first Mauryan emperor.
• 301 BC Candragupta Maurya relinquishes the throne to become a
Jainist monk.
• 270 BC Asoka becomes the second Mauryan emperor.
• 261 BC Asoka’s empire gains great power, and he leaves to
become a Buddhist.
• AD 375 Candra Gupta I invades and conquers northern India and
brings Hinduism, prosperity, and a strict caste system back into
popular culture.
Indian Achievements
The people of ancient India made great contributions to the
arts and sciences.
Main Ideas
• Indian artists created great works of religious art.
• Sanskrit literature flourished during the Gupta period.
• The Indians made scientific advances in metalworking,
medicine, and other sciences.
• Both Hindu and Buddhist temples began flourishing under
Gupta rule.
• Once simply constructed meeting places, Hindu temples
became complex towers covered with intricate carvings.
• Buddhist temples were large and impressive, some carved
out of mountainsides.
• Buddhist stupas were built to house sacred objects from
the life of the Buddha. They were covered with detailed
carvings.
Religious Art: Temples
• Great artists were commissioned by rich and powerful
members of society.
• Paintings offered a perspective on the daily life and
religious belief of the ancient Indians; many of these
paintings could be found on the walls of temples.
• Indian sculptors carved columns, statues, and entire
temples in the likenesses of the Buddha and Hindu gods.
Religious Art:
Paintings and Sculpture
Mahabharata
• One of the world’s longest
literary works
• The story of two Indian
families struggling for
control of a kingdom
• Many long passages of
Hindu beliefs and practices
Ramayana
• The story of a god, Vishnu,
who has taken human form
• Written long after the
Mahabharata; contains
models for the ideal ruler
(Rama) and the ideal mate
(Sita)
Sanskrit Literature
Sanskrit Literature
• Chadra Gupta II hired a famous writer named
Kalidasa to write plays for the royal court.
• The Panchatantra, a book of stories intended
to teach moral lessons and quick thinking,
was translated into many languages.
Other Works
Mathematics
Medicine
Astronomy
Metalworking
Pioneers of metallurgy, the Indians created
tools and weapons by mixing iron and other
metals together.
The Indians invented the concept of zero and
developed a sophisticated number system,
the Hindu-Arabic numerals.
Using plants and minerals, Indian doctors
made advances in medicinal science. They
were among the first to practice inoculation
and perform surgery.
Indian astronomers knew of seven about the
nine planets in the solar system and could
predict eclipses of the sun and moon.
Scientific Advances
Timeline of History
• Indus Civilization Began around : 5000 B.C.
• Horoppa and Mohenjo Daro Civilizations : 2500 - 1000 B.C.
• Aryan Civilization (Birth Hinduism, Jainism , Buddhism) 563 -
400 B.C.
• Mauryan Dynasty : 325 - 175 B.C.
• Gupta Dynasty : 300 - 650 A.D.
• Regional Kingdoms and Muslim Invasions : 700 – 1200 A.D.
• The Mughal Empire : 1300 - 1700 A.D.
• The British East-India Company : 1600 A.D.
• The British Empire : 1700 - 1900 A.D.
• India's Freedom Struggle : 1857 - 1947
• Independence : 1947
Hierarchy of Rulers
Samudra Gupta
(335 – 375 A.D.)
ChandraGupta II
Vikramaditya
(375 – 415 A.D.)
Chandragupta I
(320 – 335 A.D.)
Kumar Gupta
(415 – 445 A.D.)
Harsha Vardhana
(606– 647A.D.)
Golden Age of Culture and Arts
• Royal support gave funding to build Hindu temples
dedicated to worship of Gods like Siva, Visnu, and
Divine Mother Durga.
• This period is noted for the development of cave art and
sculpture. Ajanta’s cave paintings and sculptures of
human figures are historic mementoes of the people’s
life during the Gupta period.
• Science, Mathematics, Painting, Sculpture and Music
reached the climax of development.
Kalidasa
• Great poet and Dramatist.
• Considered the chief of the nine gems of
Vikramaditya’s court.
• Famous drama ‘Shakuntala’ and ‘Meghdoot’.
• The name ‘Bharat’ came from the classic
‘Shakuntala’.
Cave#11: Buddha Cave#16: Buddha
Ajanta Caves
Ajanta Caves contd..
Cave #13: Monks bed chambers
Ajanta Caves contd..
Cave #17 Entrance
Ajanta Caves contd..
Cave#19: Entrance
Ajanta Caves contd..
Cave#19: The famous horseshoe shaped
window
Ajanta Caves contd..
Cave#19: Exterior Sculpture Cave#19: Stupa
Ajanta Caves contd..
Cave#19: Pillar carvings and Sculpture
Ajanta Caves contd..
Cave #20: Inside View
Ajanta Caves contd..
Cave #26: Sculpture
THE MUGHAL EMPIRE (1526-1707)
• The Mughal emperors (first six rulers).
• BABUR (1526-30)
• HUMAYUN (1530-56)
• AKBAR (1556-1605)
• JAHANGIR (1605-28)
• SHAHJAHAN (1628-58)
• AURANGZEB (1658-1707)
• Founded in 1526.
• Dominated India between
17th and 18th centuries.
• Empire ended in mid-1900s.
• Descended from Mongolian
ancestors around Pakistan.
• Population at height:
between 110 and 130 million
people.
• Sophisticated, mixed Indo-
Persian culture.
HUMAYUN’S TOMB, DELHI
Copyright © 2003 by Pearson Education, Inc., publishing as Prentice Hall, Upper Saddle River, NJ. All rights reserved.
Jamma Masjid
The biggest mosque in India
Gateway of India
Mysore Palace
Illuminated by 97,000 light bulbs
THE TAJ MAHAL
5th ruler Shah Jahan built the Taj Mahal in 1653.
ANOTHER VIEW OF TAJ
DIWAN-I-KHAS, DELHI
LAL QILA, DELHI
FATEHPUR SIKRI
The Golden Temple
SHALIMAR BAGH, KASHMIR
MUGHAL PAINTINGS
MUGHAL PAINTINGS
MUGHAL PAINTINGS
MUGHAL ART
MUGHAL JEWELLRY
Robert Clive Conquers India
• The EIC’s force of
armed guards was
growing into an
army; Clive joined
them as an officer
• In 1751 Clive led
500 men against
10,000 French and
Indian soldiers and
won!
• Clive led the EIC’s
army to victory
many more times,
forcing the French
out and making
the East India
Company very
powerful – it
wasn’t the British
government taking
over India – it was
History of World Structures
Egyptian Pyramids (2500 BC)
480 feet (146m) tall
Limited to stone
Not slender
Slope stability limit Tower of Pisa (1350 AD)
183 feet (56m) tall
Foundation settlement =
Geotechnical problem
High aspect ratio (H/W)=
sensitive to small base
movement
Verticality during and
after construction
Correction attempted
as they built
Angle of Tilt =?
Section-2
Modern Construction
Technology and Trend
Modern Building Construction
Technology
• Kind of symbol of domination and prestige
• City centers become expensive, so vertical
extension is needed
• Rapid urbanization in compacted area
Empire State Building
1931
102stories1453 feet
(443m) tall
Steel frame
Fullwidth moment frames
Window strips, masonry
strips, trim
Fast construction
Superorganized
Design by
Dr. F. R Khan
(1929-1982)
The Sears tower,
1974, 1454 ft, 110 floors
Recent tall buildings
Petronas Tower, Kuala Lumpur,
1998
Burj Dubai
2008,162stories
Building Design Issue
• Quality
• Cost
• Sustainability
• Comfort
• Aesthetic
Structural Material Selection 1
• Availability of local material
• Reliability of material quality control
• Reliability of local labor and training
• Constructability (ability to erect large,
heavy steel members)
• Relative cost
• Construction speed
• Architectural layout Impact
• Cultural attitudes
Structural Material Selection 2
 Building weight
– Foundation load
– Net uplift
– Seismic mass
 Dynamic behavior
• Stiffness
• Concrete E increases with strength
• Steel E constant for all strength
• Period (~ mass / stiffness)
• Damping
Design of Super Structure-
Selection of Building Structural
System
• Gravity Load resisting System
Beam, Slab, Girder, Column etc
• Lateral Load resisting system
Column, Shear wall, Bracing etc
• Floor System
Provide in-plane floor stiffness
Structural System Behavior
Excitation
Loads,
Vibrations
Settlements
Thermal
Changes
Responses
Displacements
Stress
Strains
Crack
Evolution of Building Design
Approach
• Short Building : Strength Design
• Gravity Control: Strength Design
2PP
M 4M
Evolution of Building Design
Approach
• Intermediate Size Building: Deflection
• Lateral Load Control: StrengthDesign
Evolution of Building Design
Approach
• Tall Building:
• Wind Induced Bldg Motion (acceleration)
• Control – Dynamic Stiffness Design
• Force Based Design
• Displacement Based Design
• Performance Based Design
Evolution of Building Design
Approach
Common Structural system
• Moment Resisting Frames
• Shear Wall-Frame Systems
• Shear Truss-Outrigger Braced Systems
• Framed-Tubes
• Tube-in-Tube Systems with interior columns
• Bundled Tubes
• Truss Tubes without interior columns
• Modular Tubes
Lateral Load Resisting Systems
Foundation Design
• Intensive soil investigation and analysis
• Concentrated building weight affecting
strength and settlement studies
• Construction sequences
• Model deep basement “anchor” against
overturning vs. baseline at top of mat
• Pile depths – verticality
• Dewatering for deep basements
Shun Hing Square – 1260 ft (382 m) 69 Floors IFC, HongKong, 1362 ft, 88 flrs
WFC, Shangshi– 1614 ft (492 m) 101 Floors, 2008
Taipei 101– 1671 ft (509 m) 101 Floors,
2004
Structural System #1
Flared
Structural System #2 Bundled
Structural System
#3MegaFrame
(Outriggers)
Structural System #4 Linked
Nakheel Tower
Structural System #5 Tripod
Solution
CN Tower Tornto , Canada (1750 ft , Twice the height of Eif
Wind Design:
Building Shapes and Aerodynamics
Rectangular, Circular, Triangular
Vortex Effects
Modification to Building
Shapes to
reduce Wind Effect
• Stair Step Corner
• Through Building Openings
• Rotate ad Twist
Stair Step’ Corners (Taipei
101)
Rough corner can
reduce Vortex
Shedding effects
Through Building Openings
Openings
reduce wind
forces
Shanghai
Financial Center
(1614 ft)
Through Building Openings
151 Incheon Tower, Korea (1972
ft, 151 floor)
Floors Use
Area (square
metres)
148-151 Restaurant 13,194
120-145 Condominium 86,702
118-119 Observatory 8,707
59-115 Apartment 169,951
36-56 Hotel 71,124
7-36 Office 151,736
B1-4 Retail 106,738
Rotate/Twist
Rotate to minimize load
from prevailing
direction
Twist avoids
simultaneous vortex
Shedding along height
Wind tunnel studies offer the best estimate of the wind
loading on a building for cladding as well as structural
frame design
Seismic Design Issues
• Less critical than wind for tall building
with long natural period
• Minimum base shear may govern
seismic Inter-story drift
-Max at upper floors
• Ductile detailing still important!
• Geometric compatibility
• Performance Based Design
Shake Table Test
From the past experiences, it has demonstrated that building
materials, designs and construction methods can be responsible
for death or survival when an earthquake strikes
Other Consideration Think
Green
EDDIT Tower Singapore O14, Dubai
Structural Sustainable
Design
• Recycled materials
• Local manufacturers
• Less travel distance = less pollution
• No waste of materials
• Fly ash or slag in concrete mixes
Computer Applications in
Structural Engineering
• GRASP for structural analysis in 2D
• GEAR for the design of structural
members
• ETABS for analysis and design of
buildings
• SAP2000 for advanced structural
modeling and analysis
• STAAD Pro for analysis of 2D, 3D
structures
• ANSIS for FEM analysis of structure
ETABS user interface
Evaluation of Seismic
Performance
Wind Analysis of Building
Modern Construction in Bangladesh
Want to connect to the World History link for this section? Click Here.
2
Want to connect to the World History link for this section? Click Here.
Skyline in Dhaka (Japan Garden City)
Small collage
Duplex
Ware house
Villa
Cottage
Irregular Structure and Forms
Shell Structures
– textured shell structures
– folded textured sheets (Origami)
Geometry of Surfaces
Freeform Architecture
– doubly-curved concrete formwork
Example Shell Structures -
Architecture
Milo Ketchum (1910-1999)
Sir Norman Foster (1997)
Eero Saarinen (1962)
Example Shell Structures -
Engineering
VernerPanton(1969)
Shell Structures
• shell structures
– thickness is small relative to other dimensions
– carry loads (in-plane and bending)
– geometry is extremely important
• widespread use
– architecture
– piping, pressure vessels, etc.
– aircraft fuselages, car bodies, etc.
Textured Shell Structures
Adding a local texture to thin-walled
sheets in order to change their global
mechanical properties.
The local texture is of an intermediate
scale, between the global structural
dimensions and material level.
Textured Shell Structures -
Examples
corrugated sheets
– improved stiffness to weight ratio
– countless examples in daily life
Textured Shell Structures -
Examples
bistable corrugated sheets
– combination of pre-stress and geometry
Textured Shell Structures -
Examples
dimpled sheets
– pre-stressed bistable dimples
– global shape depends on local up/down
pattern
Folded Textured Sheets
Miura sheet
Eggbox sheet
Deformation of Folded
Textured Sheets
Miura sheet Eggbox sheet
Deformation of Folded
Textured Sheets
• mid-surface plane of the sheet can be twisted into a
global saddle shape
Miura sheet Eggbox sheet
Differential Geometry of
Surfaces
Differential Geometry
– study of the properties of surfaces
– how can one shape transform into another
– a very important property : Gaussian
curvature
Gaussian Curvature and Map
Making
Sphere: positive Gaussian curvature
Map: zero Gaussian c
Developable Surfaces
Developable surface: zero Gaussian
curvature
– Gaussian curvature is invariant under bending
Developable Surfaces
Curvature of Folded Textured
Sheets
Folded Textured Sheets
– flat sheets can assume doubly-curved shapes
• change their ‘global’ Gaussian curvature
• possible due to opening and closing of folds
– ‘global’ Gaussian curvature
• no mathematical definition (yet)
• poorly defined: ‘squint your eyes’
‘Global’ Gaussian Curvature
‘Squinting’
Freeform Architecture
Freeform Architecture, aka ‘BLOB’
KunsthausGra
Thin Concrete Shells
Thin concrete shells
– large span thin concrete shells
Oceanogràfic
Valencia, Spain
(2002)
Félix Candela, †1997
Thin Concrete Shells
decrease in popularity since its 1960s
heyday
– labour intensive and expensive
false- and formwork
Modern Thin Concrete Shell -
I
Imperial War Museum, Duxford (1997)
924 precast panels
Doubly-Curved Concrete
Formwork
• styrofoam blocks
• inflatable formwork
• ruled surfaces of wood formwork
– composed of straight wooden beams
Veltkamp (2
Doubly-Curved Concrete
Formwork
Problem:
no real solution for adaptable and
reusable formwork for (pre-cast) doubly-
curved
concrete shells
Adaptable Doubly-Curved
Formwork
• limited number
of linearly
actuated nodes
• doubly-curved shape
follows from these
control points
Adaptable Doubly-Curved
Formwork
Adaptable Doubly-Curved
Formwork
Adaptable Doubly-Curved
Formwork
• Textured sheets as flexible formwork
– reusable for range of doubly-curved shapes
– few control points and actuators
• a lot of unknowns!
– possibly limited set of configurations
– manufacturing of large textured sheets
– deflection under dead load of concrete
Conclusions
Folded textured sheets
– fold patterns enable sheets to assume
globally doubly-curved configurations
Doubly-curved formwork
– existing methods
limited configurations and/or not reusable
– proposed alternative
folded textured sheets as formwork
Thank You

acient history

  • 1.
  • 2.
    Course Contents • BuildingConstruction Technology • Bridge Construction Technology • Road Construction Technology
  • 3.
    Building Construction Technology •Lecture 1-Prehistoric construction techniques • Lecture 2-Contemporary construction methodologies • Lecture 3-Construction technology of the future (Green technology, Energy Saving Technology, Sustainable technology etc.) • Lecture 4-Timber Trenches • Lecture 5-Type of Foundations
  • 4.
    Building Construction Technology •Lecture 6-Brick works and Masonry Construction • Lecture 7-Cavity wall construction • Lecture 8-Arches and Lintels • Lecture 9-Ground and upper floors • Lecture 10-Single roofs • Lecture 11-States and tiled roofs • Lecture 12-Built up roof and cladding
  • 5.
    Building Construction Technology •Lecture 13-Windows and doors • Lecture 14-partition walls • Lecture 15-Plastering • Lecture 16-Plumbing installation • Lecture 17-Electric installation • Lecture 18-Fire fight equipments and installation
  • 6.
    • Lecture-19: BridgeConstruction Technology • Lecture-20: Road Construction Technology • Lectture-21: Overall discussion on Question and Exam.
  • 7.
    Building Construction Technology •History of Human civilization • Civilization in Indian Subcontinent • Prehistoric Construction Technology Lecture 1: Prehistoric construction techniques
  • 8.
    History of Humancivilization
  • 9.
    What is Civilization? Itis the collective and organized human endeavor to bring changes in life, society and state. • Necessities: Food, water, shelter, reproduction/child raising, waste, reflection, creativity, spiritual expression • Subsistence: Scavenging, hunting-fishing/gathering, horticulture, pastoralism, agriculture • Social Organization: Family, clan, tribe, nation (semi- nomadic, or nomadic), village, town, city, state.
  • 10.
    Adaptations to changeAgents of change Culture Environment Beliefs Geographical Observations (receptivity) Theo-philosophical Social Ideological Political Technological Economic Economic Technologic Change may be gradual or drastic
  • 11.
    Society: A societyis an artificial construction of a collection of linked formal and informal institutions that govern group behavior. Culture: Culture is the set of conscious and unconscious beliefs and assumptions about the way in which world works that governs individual behavior. Diffusion: The movement or spread of one or more elements of a society or culture from one place to another.
  • 12.
    TECHNOLOGY • Building technologies •Water technologies • Agricultural technologies • Architecture • Military technologies
  • 13.
    WORLD CIVILIZATION IN THETIME OF PRE-LITERACY 15,000 YEARS BC Sophisticated hunter-gatherer cultures with diverse toolkits appropriate to their environments and resources. Dogs have been domesticated. Art flourishes. 10,000 YEARS BC AFRICA AMERICAS ASIA EUROPE OCEANA SAN hunter-gathers Tehuacanos Jarmo ----------- Mammoth cave Qadan horticulture (Mexico) Natufian Jericho Knossos (Egypt) (olives) Saharan cattle herders Karanovo (Tassili)
  • 14.
    • 5000BC AFRICA AMERICASASIA EUROPE OCEANA Badarian agriculture Cochise (SWNA) Yangshao Danubian Kuk (wheat/barley) (maize) (rice) (wheat) (yams/taro) Hacilar Catal Huyuk • 4000 BC Pre-unification Egypt Archaic period Ubaid Minoan Melanesian Unified archaic Egypt Harrapan Varna expansion Narmer/Menes Non Nok Tha Loang Spean
  • 15.
    • 3000 BC AFRICAAMERICAS ASIA EUROPE OCEANA Old Kingdom Egypt Preclassic Indus (Kurgan) Battle Axe Lapita Pyramids Ban Chieng Beaker Folk Lungshan Troy Sumer Sargon of Akkad • 2000 BC Old Kingdom Egypt Early Olmecs Shang China Myceneans Intermediate Period Hitittes Thera Middle Kingdom (Iron) Babylonians Aryan Invasions Barbarian Invasions
  • 16.
    • 1000 BC(1000BC) AFRICA AMERICAS ASIA EUROPE OCEANA Middle Kingdom Olmecs Assyrians Hellenic Greece New Kingdom Adena Phoenicians (Pericles through Alexander) Late Period Hopewell Canaanites Carthage Bantu Kingdoms Anasazi Gupta India Etruscans/Rome Han China La Tene/Hallstatt Celts & Germania • 1 AD Ghana Maya China Rome Polynesians
  • 17.
    Cro-Magnon Man: The LatePleistocene Hunter and the first real artists. about 30,000 years ago.
  • 18.
    • Built byhunter-gatherers (no sign of agriculture here). All bones found are wild animal. There is no evidence of inhabitation; the structures are interpreted as temples. After 8,000 BCE, the site was abandoned and purposefully covered up with tons of soil below the hill.
  • 19.
    Segment D isone of the near circular shaped pillared areas in the best condition of Göbekli Tepe. The largest weigh about 50 tons
  • 23.
  • 24.
    Great Indian Civilization TheIndus River is located in Pakistan. It was along this river that a civilization developed around 2,500 BCE. It is called the Indus Valley Civilization. Two major cities of this civilization were Harappa and Mohenjo-Daro.
  • 26.
    Geography and EarlyIndia Indian civilization first developed on the Indus River. Main Ideas • The geography of India includes high mountains, great rivers, and heavy seasonal rain. • Harappan civilization developed along the Indus River.
  • 28.
    Mountains • North: The Himalayasare the highest mountains in the world. • West: The Hindu Kush provide protection from enemies. Plains and Plateaus • Rivers and melting snow kept the plains fertile. • Both sides of the river thrived. Indian Geography Water • Monsoons • Heavy rainfall • Civilizations arose around seasonal rainfall.
  • 29.
    People • Population grew inthe Indus River Valley. • Growth came as irrigation and farming techniques improved. • Cities were built as surplus food was produced. Cities • Harrapa • Mohenjo Daro • Fortresses for defense against enemies • Well-planned public areas Harappan Civilization Achievements • Wells and indoor plumbing • Pottery, cotton clothing, jewelry • India’s first writing system
  • 30.
    The Indus ValleyCulture • The people of the Indus Valley were mostly peaceful farmers. They built large cities with ordered streets and bricks made all the same size. This indicates they had a strong central government. This statue is probably a priest or king.
  • 31.
    The Indus Valleypeople had an advanced civilization with large cities, running water and sewer systems. They built walls around their cities which indicated that they might have had to defend themselves against other people. We do not know a lot about them because we cannot yet read their writing. The picture at the right shows an example of Indus Valley writing. Linguists are still trying to decode the language. We know they traded with the people of Mesopotamia and Egypt so perhaps those people knew how to read and speak this language!
  • 32.
    Indus Valley Script •Here are several examples of Indus Valley writing. It is believed that the Indus Valley people may have also written on palm leaves or cloth but no evidence of this has survived.
  • 33.
    This is aphotograph of “The Great Bath” at Mohenjo Daro. This is one of the earliest examples of a public bath or water storage system found in the world. The Indus Valley people were great architects and city planners.
  • 34.
    Here is areconstruction of what the entrance to Mohenjo Daro might have looked like.
  • 35.
    • Around 1500BCE, a group of nomadic warrior-herders crossed the narrow Khyber Pass in the Hindu Kush Mountains and invaded the Indus Valley culture. These people, the Aryans, came from Eastern Europe between the Black Sea and Caspian Sea, probably looking for pastures for their animals. Flooding and earthquakes had weakened the Indus Valley culture and they were unable to withstand the newcomers. Aryan Invasion
  • 37.
    Religion Government Language Invaders from the West Whenthe Harappan civilization dissipated in 1700 BC, Central Asians called Aryans began taking over territory. The Aryans left behind vast collections of poems, hymns, myths, and rituals. They also had religious writings known as Vedas. No central government: small communities ruled by rajas Sanskrit is the root of many modern South Asian languages. Aryan Invasion
  • 38.
    Origins of Hinduism Hinduism,the largest religion in India today, developed out of ancient Indian beliefs and practices. Main Ideas • Indian society divided into distinct groups under the Aryans. • The Aryans practiced a religion known as Brahmanism. • Hinduism developed out of Brahmanism and influences from other cultures. • The Jains reacted to Hinduism by breaking away to form their own religion.
  • 39.
    Kshatriyas Vaisyas Sudras Brahmins Priests Rulers andwarriors Laborers and non-Aryans Indian Society Divides Varnas Farmers, craftspeople, and traders Social divisions in Aryan society
  • 40.
    Individuals • Place insociety based on birth, wealth, or occupation • 3,000 castes once existed in India. • Individuals could rarely change castes. Caste Rules • Sutras (guides) listed all the rules for the caste system. • Breaking rules resulted in a transfer to a lower class. Caste System
  • 41.
    Brahmanism • Aryan priests werecalled Brahmins. • Wrote Vedic texts, which were their thoughts about the Vedas Evolving Beliefs The Vedas, Upanishads, and other Vedic texts began blending with beliefs from different cultures, creating Hinduism. Brahmanism develops into Hinduism Hinduism • Many gods • Reincarnation: could be reborn into new forms and castes • Men and women could both gain salvation, but women were inferior.
  • 42.
    Origins of Jainism FourPrinciples of Jainism • 599 BC, established as an alternative to Hindu ritualism • Based on the teachings of Mahavira, who abandoned his life of luxury to become a monk • Injure no life. • Tell the truth. • Do not steal. • Own no property. Jains React to Hinduism
  • 43.
    Origins of Buddhism Buddhismbegan in India and became a major religion. Main Ideas • Siddhartha Gautama searched for wisdom in many ways. • The teachings of Buddhism deal with finding peace. • Buddhism spread far from where it began in India.
  • 44.
    1. Suffering and unhappinessare a part of human life. No one can escape sorrow. Teachings of Buddhism Four Noble Truths 2. Suffering comes from our desires for pleasure and material goods. 3. People can overcome desire and ignorance and reach nirvana, a state of perfect peace. 4. People can overcome ignorance and desire by following an eightfold path that leads to wisdom, enlightenment, and salvation.
  • 45.
    Ancient Ways • TheBuddha taught that following the Vedic texts was unnecessary. • Challenged the authority of Hindu priests Changing Society • A more individualistic approach to enlightenment • Rebirth as a means to evolve Challenging Hindu Ideas Caste System • Opposed caste system • The Eightfold Path could lead any individual to nirvana. • The Buddha’s teachings reached all classes.
  • 46.
    Buddhism branches out Buddhismsplits • Asoka, one of the most powerful kings in India, became a Buddhist and spread Buddhism in India and foreign lands. • Buddhist missionaries traveled the world to teach enlightenment. • Buddhism split into two main sects: Theravada and Mahayana. • Members of the Theravada followed the Buddha’s teachings exactly. • Members of the Mahayana believed that individual interpretation was important. Buddhism began in India and then became a major religion.
  • 47.
    Indian Empires The BigIdea The Mauryas and the Guptas built great empires in India. Main Ideas • The Mauryan Empire unified most of India. • Gupta rulers promoted Hinduism in their empire.
  • 48.
    Candragupta Maurya • Candraguptaseized control of northern India and created a society dominated by war. • Candragupta became a Jainist monk and gave up his throne. Asoka • The grandson of Candragupt extended Mauryan rule over most of India. • Asoka converted to Buddhism and stopped waging war, choosing instead to rebuild cities and spread Buddhist teachings. Mauryan Rule
  • 49.
    Gupta Empire • Afterthe decline of the Mauryan Empire, India remained primarily Buddhist for 500 years. • Under the rule of Candra Gupta I, India became unified and prosperous again. • Gupta rulers spread Hinduism in their empire through the building of temples and the promotion of Hindu writings and rituals. • Widespread religious tolerance was encouraged for Buddhists and Jainists.
  • 50.
    Economy and Culture The Caste System Social Ramifications Growth UnderCandra Gupta II, the Gupta Empire reached the height of its power. It spread across northern India and prospered. The economy boomed, allowing citizens the time and money to create great works of art and literature. It was believed that keeping citizens under strict caste rule would stabilize the empire. Women in the caste system were not seen as equals and had few basic rights. Candra Gupta II
  • 51.
    Time Line • 320BC Candragupta Maurya becomes the first Mauryan emperor. • 301 BC Candragupta Maurya relinquishes the throne to become a Jainist monk. • 270 BC Asoka becomes the second Mauryan emperor. • 261 BC Asoka’s empire gains great power, and he leaves to become a Buddhist. • AD 375 Candra Gupta I invades and conquers northern India and brings Hinduism, prosperity, and a strict caste system back into popular culture.
  • 52.
    Indian Achievements The peopleof ancient India made great contributions to the arts and sciences. Main Ideas • Indian artists created great works of religious art. • Sanskrit literature flourished during the Gupta period. • The Indians made scientific advances in metalworking, medicine, and other sciences.
  • 53.
    • Both Hinduand Buddhist temples began flourishing under Gupta rule. • Once simply constructed meeting places, Hindu temples became complex towers covered with intricate carvings. • Buddhist temples were large and impressive, some carved out of mountainsides. • Buddhist stupas were built to house sacred objects from the life of the Buddha. They were covered with detailed carvings. Religious Art: Temples
  • 54.
    • Great artistswere commissioned by rich and powerful members of society. • Paintings offered a perspective on the daily life and religious belief of the ancient Indians; many of these paintings could be found on the walls of temples. • Indian sculptors carved columns, statues, and entire temples in the likenesses of the Buddha and Hindu gods. Religious Art: Paintings and Sculpture
  • 55.
    Mahabharata • One ofthe world’s longest literary works • The story of two Indian families struggling for control of a kingdom • Many long passages of Hindu beliefs and practices Ramayana • The story of a god, Vishnu, who has taken human form • Written long after the Mahabharata; contains models for the ideal ruler (Rama) and the ideal mate (Sita) Sanskrit Literature
  • 56.
    Sanskrit Literature • ChadraGupta II hired a famous writer named Kalidasa to write plays for the royal court. • The Panchatantra, a book of stories intended to teach moral lessons and quick thinking, was translated into many languages. Other Works
  • 57.
    Mathematics Medicine Astronomy Metalworking Pioneers of metallurgy,the Indians created tools and weapons by mixing iron and other metals together. The Indians invented the concept of zero and developed a sophisticated number system, the Hindu-Arabic numerals. Using plants and minerals, Indian doctors made advances in medicinal science. They were among the first to practice inoculation and perform surgery. Indian astronomers knew of seven about the nine planets in the solar system and could predict eclipses of the sun and moon. Scientific Advances
  • 69.
    Timeline of History •Indus Civilization Began around : 5000 B.C. • Horoppa and Mohenjo Daro Civilizations : 2500 - 1000 B.C. • Aryan Civilization (Birth Hinduism, Jainism , Buddhism) 563 - 400 B.C. • Mauryan Dynasty : 325 - 175 B.C. • Gupta Dynasty : 300 - 650 A.D. • Regional Kingdoms and Muslim Invasions : 700 – 1200 A.D. • The Mughal Empire : 1300 - 1700 A.D. • The British East-India Company : 1600 A.D. • The British Empire : 1700 - 1900 A.D. • India's Freedom Struggle : 1857 - 1947 • Independence : 1947
  • 70.
    Hierarchy of Rulers SamudraGupta (335 – 375 A.D.) ChandraGupta II Vikramaditya (375 – 415 A.D.) Chandragupta I (320 – 335 A.D.) Kumar Gupta (415 – 445 A.D.) Harsha Vardhana (606– 647A.D.)
  • 71.
    Golden Age ofCulture and Arts • Royal support gave funding to build Hindu temples dedicated to worship of Gods like Siva, Visnu, and Divine Mother Durga. • This period is noted for the development of cave art and sculpture. Ajanta’s cave paintings and sculptures of human figures are historic mementoes of the people’s life during the Gupta period. • Science, Mathematics, Painting, Sculpture and Music reached the climax of development.
  • 72.
    Kalidasa • Great poetand Dramatist. • Considered the chief of the nine gems of Vikramaditya’s court. • Famous drama ‘Shakuntala’ and ‘Meghdoot’. • The name ‘Bharat’ came from the classic ‘Shakuntala’.
  • 73.
    Cave#11: Buddha Cave#16:Buddha Ajanta Caves
  • 74.
    Ajanta Caves contd.. Cave#13: Monks bed chambers
  • 75.
  • 76.
  • 77.
    Ajanta Caves contd.. Cave#19:The famous horseshoe shaped window
  • 78.
    Ajanta Caves contd.. Cave#19:Exterior Sculpture Cave#19: Stupa
  • 79.
    Ajanta Caves contd.. Cave#19:Pillar carvings and Sculpture
  • 80.
    Ajanta Caves contd.. Cave#20: Inside View
  • 81.
  • 83.
    THE MUGHAL EMPIRE(1526-1707) • The Mughal emperors (first six rulers). • BABUR (1526-30) • HUMAYUN (1530-56) • AKBAR (1556-1605) • JAHANGIR (1605-28) • SHAHJAHAN (1628-58) • AURANGZEB (1658-1707)
  • 84.
    • Founded in1526. • Dominated India between 17th and 18th centuries. • Empire ended in mid-1900s. • Descended from Mongolian ancestors around Pakistan. • Population at height: between 110 and 130 million people. • Sophisticated, mixed Indo- Persian culture.
  • 85.
  • 86.
    Copyright © 2003by Pearson Education, Inc., publishing as Prentice Hall, Upper Saddle River, NJ. All rights reserved.
  • 87.
    Jamma Masjid The biggestmosque in India
  • 88.
  • 89.
    Mysore Palace Illuminated by97,000 light bulbs
  • 91.
    THE TAJ MAHAL 5thruler Shah Jahan built the Taj Mahal in 1653.
  • 92.
  • 93.
  • 94.
  • 95.
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101.
  • 102.
  • 104.
    Robert Clive ConquersIndia • The EIC’s force of armed guards was growing into an army; Clive joined them as an officer • In 1751 Clive led 500 men against 10,000 French and Indian soldiers and won!
  • 105.
    • Clive ledthe EIC’s army to victory many more times, forcing the French out and making the East India Company very powerful – it wasn’t the British government taking over India – it was
  • 106.
    History of WorldStructures Egyptian Pyramids (2500 BC) 480 feet (146m) tall Limited to stone Not slender Slope stability limit Tower of Pisa (1350 AD) 183 feet (56m) tall
  • 107.
    Foundation settlement = Geotechnicalproblem High aspect ratio (H/W)= sensitive to small base movement Verticality during and after construction Correction attempted as they built Angle of Tilt =?
  • 108.
  • 109.
    Modern Building Construction Technology •Kind of symbol of domination and prestige • City centers become expensive, so vertical extension is needed • Rapid urbanization in compacted area
  • 110.
    Empire State Building 1931 102stories1453feet (443m) tall Steel frame Fullwidth moment frames Window strips, masonry strips, trim Fast construction Superorganized
  • 111.
    Design by Dr. F.R Khan (1929-1982) The Sears tower, 1974, 1454 ft, 110 floors
  • 112.
    Recent tall buildings PetronasTower, Kuala Lumpur, 1998 Burj Dubai 2008,162stories
  • 113.
    Building Design Issue •Quality • Cost • Sustainability • Comfort • Aesthetic
  • 114.
    Structural Material Selection1 • Availability of local material • Reliability of material quality control • Reliability of local labor and training • Constructability (ability to erect large, heavy steel members) • Relative cost • Construction speed • Architectural layout Impact • Cultural attitudes
  • 115.
    Structural Material Selection2  Building weight – Foundation load – Net uplift – Seismic mass  Dynamic behavior • Stiffness • Concrete E increases with strength • Steel E constant for all strength • Period (~ mass / stiffness) • Damping
  • 116.
    Design of SuperStructure- Selection of Building Structural System • Gravity Load resisting System Beam, Slab, Girder, Column etc • Lateral Load resisting system Column, Shear wall, Bracing etc • Floor System Provide in-plane floor stiffness
  • 117.
  • 118.
    Evolution of BuildingDesign Approach • Short Building : Strength Design • Gravity Control: Strength Design 2PP M 4M
  • 119.
    Evolution of BuildingDesign Approach • Intermediate Size Building: Deflection • Lateral Load Control: StrengthDesign
  • 120.
    Evolution of BuildingDesign Approach • Tall Building: • Wind Induced Bldg Motion (acceleration) • Control – Dynamic Stiffness Design
  • 121.
    • Force BasedDesign • Displacement Based Design • Performance Based Design Evolution of Building Design Approach
  • 122.
    Common Structural system •Moment Resisting Frames • Shear Wall-Frame Systems • Shear Truss-Outrigger Braced Systems • Framed-Tubes • Tube-in-Tube Systems with interior columns • Bundled Tubes • Truss Tubes without interior columns • Modular Tubes
  • 123.
  • 124.
    Foundation Design • Intensivesoil investigation and analysis • Concentrated building weight affecting strength and settlement studies • Construction sequences • Model deep basement “anchor” against overturning vs. baseline at top of mat • Pile depths – verticality • Dewatering for deep basements
  • 128.
    Shun Hing Square– 1260 ft (382 m) 69 Floors IFC, HongKong, 1362 ft, 88 flrs
  • 129.
    WFC, Shangshi– 1614ft (492 m) 101 Floors, 2008 Taipei 101– 1671 ft (509 m) 101 Floors, 2004
  • 130.
  • 131.
  • 132.
  • 133.
    Structural System #4Linked Nakheel Tower
  • 134.
    Structural System #5Tripod Solution CN Tower Tornto , Canada (1750 ft , Twice the height of Eif
  • 135.
    Wind Design: Building Shapesand Aerodynamics Rectangular, Circular, Triangular
  • 136.
  • 137.
    Modification to Building Shapesto reduce Wind Effect • Stair Step Corner • Through Building Openings • Rotate ad Twist
  • 138.
    Stair Step’ Corners(Taipei 101) Rough corner can reduce Vortex Shedding effects
  • 139.
    Through Building Openings Openings reducewind forces Shanghai Financial Center (1614 ft)
  • 140.
    Through Building Openings 151Incheon Tower, Korea (1972 ft, 151 floor) Floors Use Area (square metres) 148-151 Restaurant 13,194 120-145 Condominium 86,702 118-119 Observatory 8,707 59-115 Apartment 169,951 36-56 Hotel 71,124 7-36 Office 151,736 B1-4 Retail 106,738
  • 141.
    Rotate/Twist Rotate to minimizeload from prevailing direction Twist avoids simultaneous vortex Shedding along height
  • 142.
    Wind tunnel studiesoffer the best estimate of the wind loading on a building for cladding as well as structural frame design
  • 143.
    Seismic Design Issues •Less critical than wind for tall building with long natural period • Minimum base shear may govern seismic Inter-story drift -Max at upper floors • Ductile detailing still important! • Geometric compatibility • Performance Based Design
  • 144.
    Shake Table Test Fromthe past experiences, it has demonstrated that building materials, designs and construction methods can be responsible for death or survival when an earthquake strikes
  • 145.
    Other Consideration Think Green EDDITTower Singapore O14, Dubai
  • 146.
    Structural Sustainable Design • Recycledmaterials • Local manufacturers • Less travel distance = less pollution • No waste of materials • Fly ash or slag in concrete mixes
  • 147.
    Computer Applications in StructuralEngineering • GRASP for structural analysis in 2D • GEAR for the design of structural members • ETABS for analysis and design of buildings • SAP2000 for advanced structural modeling and analysis • STAAD Pro for analysis of 2D, 3D structures • ANSIS for FEM analysis of structure
  • 148.
  • 149.
  • 150.
  • 151.
    Modern Construction inBangladesh Want to connect to the World History link for this section? Click Here.
  • 152.
    2 Want to connectto the World History link for this section? Click Here.
  • 153.
    Skyline in Dhaka(Japan Garden City)
  • 154.
  • 155.
  • 156.
  • 157.
  • 160.
  • 161.
    Irregular Structure andForms Shell Structures – textured shell structures – folded textured sheets (Origami) Geometry of Surfaces Freeform Architecture – doubly-curved concrete formwork
  • 162.
    Example Shell Structures- Architecture Milo Ketchum (1910-1999) Sir Norman Foster (1997) Eero Saarinen (1962)
  • 163.
    Example Shell Structures- Engineering VernerPanton(1969)
  • 164.
    Shell Structures • shellstructures – thickness is small relative to other dimensions – carry loads (in-plane and bending) – geometry is extremely important • widespread use – architecture – piping, pressure vessels, etc. – aircraft fuselages, car bodies, etc.
  • 165.
    Textured Shell Structures Addinga local texture to thin-walled sheets in order to change their global mechanical properties. The local texture is of an intermediate scale, between the global structural dimensions and material level.
  • 166.
    Textured Shell Structures- Examples corrugated sheets – improved stiffness to weight ratio – countless examples in daily life
  • 167.
    Textured Shell Structures- Examples bistable corrugated sheets – combination of pre-stress and geometry
  • 168.
    Textured Shell Structures- Examples dimpled sheets – pre-stressed bistable dimples – global shape depends on local up/down pattern
  • 169.
    Folded Textured Sheets Miurasheet Eggbox sheet
  • 170.
    Deformation of Folded TexturedSheets Miura sheet Eggbox sheet
  • 171.
    Deformation of Folded TexturedSheets • mid-surface plane of the sheet can be twisted into a global saddle shape Miura sheet Eggbox sheet
  • 172.
    Differential Geometry of Surfaces DifferentialGeometry – study of the properties of surfaces – how can one shape transform into another – a very important property : Gaussian curvature
  • 173.
    Gaussian Curvature andMap Making Sphere: positive Gaussian curvature Map: zero Gaussian c
  • 174.
    Developable Surfaces Developable surface:zero Gaussian curvature – Gaussian curvature is invariant under bending
  • 175.
  • 176.
    Curvature of FoldedTextured Sheets Folded Textured Sheets – flat sheets can assume doubly-curved shapes • change their ‘global’ Gaussian curvature • possible due to opening and closing of folds – ‘global’ Gaussian curvature • no mathematical definition (yet) • poorly defined: ‘squint your eyes’
  • 177.
  • 178.
  • 179.
    Thin Concrete Shells Thinconcrete shells – large span thin concrete shells Oceanogràfic Valencia, Spain (2002) Félix Candela, †1997
  • 180.
    Thin Concrete Shells decreasein popularity since its 1960s heyday – labour intensive and expensive false- and formwork
  • 181.
    Modern Thin ConcreteShell - I Imperial War Museum, Duxford (1997) 924 precast panels
  • 182.
    Doubly-Curved Concrete Formwork • styrofoamblocks • inflatable formwork • ruled surfaces of wood formwork – composed of straight wooden beams Veltkamp (2
  • 183.
    Doubly-Curved Concrete Formwork Problem: no realsolution for adaptable and reusable formwork for (pre-cast) doubly- curved concrete shells
  • 184.
    Adaptable Doubly-Curved Formwork • limitednumber of linearly actuated nodes • doubly-curved shape follows from these control points
  • 185.
  • 186.
  • 187.
    Adaptable Doubly-Curved Formwork • Texturedsheets as flexible formwork – reusable for range of doubly-curved shapes – few control points and actuators • a lot of unknowns! – possibly limited set of configurations – manufacturing of large textured sheets – deflection under dead load of concrete
  • 188.
    Conclusions Folded textured sheets –fold patterns enable sheets to assume globally doubly-curved configurations Doubly-curved formwork – existing methods limited configurations and/or not reusable – proposed alternative folded textured sheets as formwork
  • 189.