1. Compendium of ROB drawings
● Compendium for Road Over Bridges on Indian Railways prepared as Report number BS-132.
● It will not only save precious time but also avoid the duplicity of efforts in developing designs for
each ROB. The fact that 188 drawings included in the Compendium have been approved by Zonal
Railways obviates the need for approval if they are to be used. Apart from this, 30 RDSO
standard drawings have also been included in this Compendium.
● RDSO has prepared this Compendium for Road Over Bridges on Indian Railways with an aim to
disseminate good practices in planning of ROBs, launching operations and to create a repository
of drawings in use over Indian Railways.
● The Compendium has been made available on RRCAS portal (Rail-Road Crossing GAD Approval
System) which can be accessed by Railways and Road Authorities involved in planning and
execution of ROBs.
● The Compendium was jointly inaugurated by Hon'ble Minister of Railways and Hon'ble Minister of
Road Transport and Highways on 02.06.2022.
2.
3. Specifications Issued (April 2022-November
2022)
1. Revised Specification and Schedule of Technical Requirement (STR) for
manufacture and supply of Elastomeric Bearing to Indian Railway for use on
Railway bridges /ROB issued in July 2022.
2. Revised Specification and Schedule of Technical Requirement (STR) for
manufacture and supply of POT-PTFE bearing to Indian Railway for use on
Railway bridges /ROB issued in July 2022.
3. Revised Specification and Schedule of Technical Requirement (STR) for
manufacture and supply of Expansion joints to Indian Railway for use on
Railway bridges /ROB issued in July 2022.
4. Specifications Issued (April 2022-November
2022) (Continued…..)
4. Guidelines (RDSO/2022/GE:G-0022) for Use of Coir Geo-Textile for slope
protection in Indian Railways issued in April 2022.
5. Draft guideline on Soil Nailing has been finalized and sent to Zonal Railways
on 03.11.2022 for sending comments/suggestions.
6. Draft Guidelines on Soft Soil has been finalized and sent to Zonal Railways on
28.11.2022 for sending comments/suggestions.
5. FOB with Tubular Section
● First time an ergonomic FOB is designed in IR , 6m wide for span 25m-30m.
● Hollow Tubular Sections were used in Columns, Staircase and Roof Truss for
the first time in an FOB.
● Standard drawing of Ramp was provided for the first time. Dogged Legged
ramp is provided.
● Composite Girder is used for the first time in an FOB which resulted in
reduction of Girder height up to 400 mm.
● No. of columns in FOB trestle were reduced from 10 to 6.
● Most of the splices designed are bolted. Very minimum field welding is
required
● Circular roof was provided in FOB for the first time
7. Reports and Committees where RDSO
officials nominated
1. For simplification of business processes for sanction and operation of
New/Modified Rolling stock on IR, ED level committee comprising of
EDCE(G),EDME(Freight),ED/Signal(Dev.) from Railway Board and ED Track
Design-1,ED/B&S and EDMP from RDSO was formed. Committee has
submitted report to Railway Board on 26.09.2022.
8. Reports and Committees where RDSO
officials nominated (continued….)
2. For defining Wagon parameters limits relevant to fixed assets
(track,formation,bridges etc.) a committee comprising of ED/B&S, ED/Track ,
ED/Wagon from RDSO and ED/B&S, EDME(freight) from Railway Board was
constituted.
3. For Review of “Technical Eligibility Criteria and Special conditions of
Contract for design and construction of Ballast less track (BLT) on
viaducts/tunnels on Indian Railways” a committee comprising of ED/B&S,
ED/Track-II, Shri Sandeep Gupta-CE/S/USBRL/NR, Shri Vikram Gupta-CE/C/NFR,
Shri Bhanu Prakash-ED/RVNL and Shri Atul Deshpande, AP/IRICEN, from Railway
Board was constituted on 06.12.2022
9. Reports and Committees where RDSO
officials nominated (continued….)
4. For preparing a comprehensive recommedation regarding provision of
ventilation in tunnels a committee comprising of PED/GE/RDSO, ED/EM/RDSO,
Sr. Professor (Projects)/IRICEN, CE/Con/VII/NFR and CE/S/USBRL/NR/Jammu
was constituted by Railway Board on 19.11.2020.
Further on advise of the Committee Railway Board vide letter No.
2016/55/CE-III/BR/Tunnel dated 26.07.2021 approved to Co-opt Shri Mohinder
Singh, Executive Director/Civil/IRCON (Project Director at Shivok-Rangpo
Project) for engaging consultant to put up comprehensive recommendations on
the provision of Ventilation in tunnels in IR. Matter is under consideration of
IRCON.