SlideShare a Scribd company logo
T HE
                                             G
                                           IN
                               T YIA    UR
                         C   I         D
                        S G’AS
                    O LI UN
              O P   YM
               N ENR UM
            CHY H FOR
         TE N B YA
      ZAATIO KEN
  ONENT TED
K S C
P RE NNE
   CO
LOCATION OF KONZA CITY IN KENYA
E-READINESS: CONNECTIVITY AVAILABLE FOR
KONZA CITY
WHY KONZA CITY
              Konza is envisioned to be an exemplar mixed
Project        development technology city developed on a
   Profile     Greenfield site 60 kms from Nairobi on the major
               Mombasa Nairobi Highway.
              Phased development over 20 years with the BPO
               Park taking up 23% of the planned 6M square feet
               of floor space.
               Create 200,000 jobs over in BPO, IT ITES and related
                 sectors in 20 years.
Economic
Benefits       World class infrastructure and technology to facilitate
                 research, education and business.
               Kenya becomes a knowledge based economy.

               Mixed urban development and best in class residential and
 Social          working environment.
 Benefits      Enhance local research and development and
                 entrepreneurship and IT enterprise formation culture.
PROPOSED KONZA CITY
PROPOSED KONZA CITY CONT.
Atibut
 tr e                        Opt 1 -Gid
                               ion r      Opt 2 -Coridor Opt 3-R dia Coridor
                                            ion     r      ion a l r           KONZA CITY
                                                                               5000 ACRES
                                                                               (2011 HA)
                                                                               PLAN
BPO/ITES Technopark          162.00       163.00 0       163.00
area, ha




CBD area, ha                 99.20        99.20          99.20

Hospital/ University area,   21.90        21.90          21.90
ha


Residential community,       969.10       947.20         955.80
ha


Water/ Sewage                74.60        74.60          74.60
infrastructure, ha


Strategic reserve            42.00        48.80          25.30

Central park, ha             18.90        36.10          20.40
ALLOCATION OF
    LAND IN KONZA
    CITY
K
INVESTMENT OPPORTUNITIES IN KONZA CITY
 Ready-built structures to house BPO and IT Enabled Services
 Commercial office space and Hotels
 Real Estate residential
 Large scale commercial shopping malls
 Recreation and entertainment venues
 Film and Media City
 Financial District Center
 Community support services, including health, clinics, green
  space, educational institutions, houses of worship, etc
 University, research centre and convention centre
 Transportation infrastructure
 World class ICT infrastructure
 Utilities, roads and other infrastructure
CURRENT STATUS OF PROJECT
 Procured 5,000 Ha of Land
 Operationalized the BPO Directorate to spearhead the project
  implementation
 Temporary Fencing of the entire City Completed
 Legal Notice on Establishment of Konza Technology City Development
  Authority finalized
 Ground Water Potential Mapping done and Identified 75 sites with 9 viable
  sites
 NYS engaged to drill ,equip one borehole and construct Modern Sanitation
  Block

 Notice to Plan Issued for zoning around the city covering 10KM
 Park Power Requirement Phases incorporated in the LCPDP for 2012-2032
 Training Needs in BPO/KPO Identified
 Eight forums held in Asia , Europe and America
 Local Marketing Campaign through the Media ongoing
CURRENT STATUS OF PROJECT CONT.
 Konza Mark of Identity adopted
 Intention to Plan issued for the 5,000 Ha

 RFP for hiring Master Delivery Partner Consultancy
  services finalized
 Expression of Interest (EOI) to procure Master
  Delivery Partner Advertised.
 Feasibility Study for construction of 60KM High Speed
  Railway line ongoing

 Project Launch tentatively set for the month of August

 Investor’s Conference in May 2012
 Ground breaking in August 2012
KONZA CITY INCENTIVES PACKAGE
Group   Scheme/Activity   Income Tax    Withholding   Investment     Import Duty/   % Stamp     % Work    %
                          Rate          Tax           Deductions     VAT            Duty        Permits   Domestic
                                                                                    Reduction   Allowed   Market
                                                                                                          Access


A
        ICT Park & ICT    10 year       10 Years      100% after     Perpetually    100%        20%       100%
        Tower             exempt        exempt        tax holiday    exempt         reduction
        ICT Services      20% there
                          after


B
        Science and       10 year       10 Years      100% on        Perpetually    100%        20%       100%
        technology park   exempt        exempt        new            exempt on      reduction
                          20% there                   investment     all inputs
                          after                       after tax
                                                      holiday


C
        Manufacturing     10 year       10 Years      100% on        Perpetually    100%        20%       70% for
        and other         exempt        exempt        machinery      exempt on      reduction             logistic
        services for      20% there                   and            all input                            good 50%
        export            after                       buildings                                           for non
                                                      after end of                                        strategic
                                                      holiday                                             goods


D
        Incubator         10 year       10 Years      100% on        Perpetually    100%        10%       70% for
        manufacturing     exempt        exempt        machinery      exempt on      reduction             logistic
        and other         20% there                   and            all inputs                           good 50%
        services
                          after                       buildings                                           for non
                                                      after end of                                        strategic
                                                      holiday                                             goods


E
        Regional          20%           100% on       100%           Perpetually    50%         10%       Restricted
        headquarters      through out   dividends     deductions     exempt on      reduction             to regional
                                                      on building    all office                           affiliates
                                                                     equipment
                                                                     furniture
                                                                     and
                                                                     telecommu
                                                                     nication
CONT…
Group   Scheme/Activity   Income Tax   Withholding   Investment    Import        % Stamp     % Work Permits Allowed
                          Rate         Tax           Deductions    Duty/VAT      Duty
                                                                                 Reduction


F
        Zone              10 year      10 Years      100% on       Perpetually   100%        Class A: for managerial
        developer and     exempt       exempt        new           exempt on     reduction   technical & supervisory
        operator          20% there                  investment    all inputs                cadre 5% of employees
                          after                      & buildings                             in drainage,
                                                     after end                               telecommunication,
                                                     of holiday                              roads, schools, health
                                                                                             clinics, accommodation
                                                                                             industrial go down,
                                                                                             workshops offices, docks,
                                                                                             yards, and related
                                                                                             amenities granted
INVESTMENT SUMMARY
Infrastructure development                 $ 2.1 B
 On-site $ 1.9 B
 Off-site $ 200 M

Site real estate development               $ 4.9 B

Total project cost                         $ 7.0 B




Average expected return - based on real estate market in Kenya:
 12 -15% per annum for lease income
 20% capital gains per annum (straight line)
INVESTOR PARTICIPATION APPROACH
   Single Private Master Developer undertakes the master
    planning of the entire property under Master Development
    Agreement and finances its development directly or through
    sub-developers. Government finances backbone infrastructure
    fully or partially.


   Government Authority finances backbone infrastructure and
    undertakes the master planning of the property, including
    attracting developers for specific land uses.


   Government contributes land to an SPV to be established
    jointly with private Master Developer. Terms and
    responsibilities of each party to be determined.
 Konza technopolis city Status Update as at April 2012

More Related Content

Similar to Konza technopolis city Status Update as at April 2012

Investing in Lebanon - Restructured Presentation
Investing in Lebanon - Restructured PresentationInvesting in Lebanon - Restructured Presentation
Investing in Lebanon - Restructured Presentation
Mohamad Badr
 
Chungju-ecopolis
Chungju-ecopolisChungju-ecopolis
Chungju-ecopolis
Pil-seon Lyu
 
DigiAnt_BusinessCase_DigitalMigration_with Factory
DigiAnt_BusinessCase_DigitalMigration_with FactoryDigiAnt_BusinessCase_DigitalMigration_with Factory
DigiAnt_BusinessCase_DigitalMigration_with Factory
Eduard Walker
 
Draft lite davis langdon national construction conference oct 2012
Draft lite davis langdon national construction conference oct 2012Draft lite davis langdon national construction conference oct 2012
Draft lite davis langdon national construction conference oct 2012
pmitchell6763
 
EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...
EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...
EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...
Government of Ekiti State, Nigeria
 
Psi 2013
Psi 2013Psi 2013
Psi 2013
Vishal Rathi
 
RFID & WSN Applications for u-City
RFID & WSN Applications for u-CityRFID & WSN Applications for u-City
RFID & WSN Applications for u-City
Alex G. Lee, Ph.D. Esq. CLP
 
DESC: ICT and Low Carbon Growth in China
DESC: ICT and Low Carbon Growth in ChinaDESC: ICT and Low Carbon Growth in China
DESC: ICT and Low Carbon Growth in China
zadeknet
 
Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)
Thailand Science Park
 
NBSM Nepal Budget 2072/73 (2015/16) Highlights
NBSM Nepal Budget 2072/73 (2015/16) HighlightsNBSM Nepal Budget 2072/73 (2015/16) Highlights
NBSM Nepal Budget 2072/73 (2015/16) Highlights
Nil Saru
 
inovaDay - TIC e Concorrência Sustentável das Cidades
inovaDay - TIC e Concorrência Sustentável das CidadesinovaDay - TIC e Concorrência Sustentável das Cidades
inovaDay - TIC e Concorrência Sustentável das Cidades
inovaDay .
 
Jordan Ict Sector June 2009
Jordan Ict Sector June 2009Jordan Ict Sector June 2009
Jordan Ict Sector June 2009
Entrepreneurship and ICT Advisor
 
Cict cavite[1]
Cict cavite[1]Cict cavite[1]
Cict cavite[1]
Paul Erwin Sarabia
 
2012 total telecom
2012 total telecom2012 total telecom
2012 total telecom
JPStafford
 
Regional Service Hub
Regional Service HubRegional Service Hub
Regional Service Hub
InvestInGeorgia
 
Konza market sounding presentation 2011
Konza market sounding presentation 2011Konza market sounding presentation 2011
Konza market sounding presentation 2011
MILLA MENGA
 
Nasscom vision about IT and BPO India-Latam
Nasscom vision about IT and BPO India-LatamNasscom vision about IT and BPO India-Latam
Nasscom vision about IT and BPO India-Latam
Fabio Aguiar
 
Jordan ICT Sector Apr 2011
Jordan ICT Sector Apr 2011Jordan ICT Sector Apr 2011
Jordan ICT Sector Apr 2011
Entrepreneurship and ICT Advisor
 
Tax guide-2012[1]
Tax guide-2012[1]Tax guide-2012[1]
Tax guide-2012[1]
abhi4593
 
Telco 2020 ... A Mature Market Outlook
Telco 2020 ... A Mature Market OutlookTelco 2020 ... A Mature Market Outlook
Telco 2020 ... A Mature Market Outlook
Dr. Kim (Kyllesbech Larsen)
 

Similar to Konza technopolis city Status Update as at April 2012 (20)

Investing in Lebanon - Restructured Presentation
Investing in Lebanon - Restructured PresentationInvesting in Lebanon - Restructured Presentation
Investing in Lebanon - Restructured Presentation
 
Chungju-ecopolis
Chungju-ecopolisChungju-ecopolis
Chungju-ecopolis
 
DigiAnt_BusinessCase_DigitalMigration_with Factory
DigiAnt_BusinessCase_DigitalMigration_with FactoryDigiAnt_BusinessCase_DigitalMigration_with Factory
DigiAnt_BusinessCase_DigitalMigration_with Factory
 
Draft lite davis langdon national construction conference oct 2012
Draft lite davis langdon national construction conference oct 2012Draft lite davis langdon national construction conference oct 2012
Draft lite davis langdon national construction conference oct 2012
 
EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...
EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...
EKITI STATE GOVERNMENT MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT, ADO ...
 
Psi 2013
Psi 2013Psi 2013
Psi 2013
 
RFID & WSN Applications for u-City
RFID & WSN Applications for u-CityRFID & WSN Applications for u-City
RFID & WSN Applications for u-City
 
DESC: ICT and Low Carbon Growth in China
DESC: ICT and Low Carbon Growth in ChinaDESC: ICT and Low Carbon Growth in China
DESC: ICT and Low Carbon Growth in China
 
Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)
 
NBSM Nepal Budget 2072/73 (2015/16) Highlights
NBSM Nepal Budget 2072/73 (2015/16) HighlightsNBSM Nepal Budget 2072/73 (2015/16) Highlights
NBSM Nepal Budget 2072/73 (2015/16) Highlights
 
inovaDay - TIC e Concorrência Sustentável das Cidades
inovaDay - TIC e Concorrência Sustentável das CidadesinovaDay - TIC e Concorrência Sustentável das Cidades
inovaDay - TIC e Concorrência Sustentável das Cidades
 
Jordan Ict Sector June 2009
Jordan Ict Sector June 2009Jordan Ict Sector June 2009
Jordan Ict Sector June 2009
 
Cict cavite[1]
Cict cavite[1]Cict cavite[1]
Cict cavite[1]
 
2012 total telecom
2012 total telecom2012 total telecom
2012 total telecom
 
Regional Service Hub
Regional Service HubRegional Service Hub
Regional Service Hub
 
Konza market sounding presentation 2011
Konza market sounding presentation 2011Konza market sounding presentation 2011
Konza market sounding presentation 2011
 
Nasscom vision about IT and BPO India-Latam
Nasscom vision about IT and BPO India-LatamNasscom vision about IT and BPO India-Latam
Nasscom vision about IT and BPO India-Latam
 
Jordan ICT Sector Apr 2011
Jordan ICT Sector Apr 2011Jordan ICT Sector Apr 2011
Jordan ICT Sector Apr 2011
 
Tax guide-2012[1]
Tax guide-2012[1]Tax guide-2012[1]
Tax guide-2012[1]
 
Telco 2020 ... A Mature Market Outlook
Telco 2020 ... A Mature Market OutlookTelco 2020 ... A Mature Market Outlook
Telco 2020 ... A Mature Market Outlook
 

Recently uploaded

20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
Zilliz
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
IndexBug
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 

Recently uploaded (20)

20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 

Konza technopolis city Status Update as at April 2012

  • 1. T HE G IN T YIA UR C I D S G’AS O LI UN O P YM N ENR UM CHY H FOR TE N B YA ZAATIO KEN ONENT TED K S C P RE NNE CO
  • 2. LOCATION OF KONZA CITY IN KENYA
  • 4. WHY KONZA CITY  Konza is envisioned to be an exemplar mixed Project development technology city developed on a Profile Greenfield site 60 kms from Nairobi on the major Mombasa Nairobi Highway.  Phased development over 20 years with the BPO Park taking up 23% of the planned 6M square feet of floor space.  Create 200,000 jobs over in BPO, IT ITES and related sectors in 20 years. Economic Benefits  World class infrastructure and technology to facilitate research, education and business.  Kenya becomes a knowledge based economy.  Mixed urban development and best in class residential and Social working environment. Benefits  Enhance local research and development and entrepreneurship and IT enterprise formation culture.
  • 7. Atibut tr e Opt 1 -Gid ion r Opt 2 -Coridor Opt 3-R dia Coridor ion r ion a l r KONZA CITY 5000 ACRES (2011 HA) PLAN BPO/ITES Technopark 162.00 163.00 0 163.00 area, ha CBD area, ha 99.20 99.20 99.20 Hospital/ University area, 21.90 21.90 21.90 ha Residential community, 969.10 947.20 955.80 ha Water/ Sewage 74.60 74.60 74.60 infrastructure, ha Strategic reserve 42.00 48.80 25.30 Central park, ha 18.90 36.10 20.40
  • 8. ALLOCATION OF LAND IN KONZA CITY K
  • 9. INVESTMENT OPPORTUNITIES IN KONZA CITY  Ready-built structures to house BPO and IT Enabled Services  Commercial office space and Hotels  Real Estate residential  Large scale commercial shopping malls  Recreation and entertainment venues  Film and Media City  Financial District Center  Community support services, including health, clinics, green space, educational institutions, houses of worship, etc  University, research centre and convention centre  Transportation infrastructure  World class ICT infrastructure  Utilities, roads and other infrastructure
  • 10. CURRENT STATUS OF PROJECT  Procured 5,000 Ha of Land  Operationalized the BPO Directorate to spearhead the project implementation  Temporary Fencing of the entire City Completed  Legal Notice on Establishment of Konza Technology City Development Authority finalized  Ground Water Potential Mapping done and Identified 75 sites with 9 viable sites  NYS engaged to drill ,equip one borehole and construct Modern Sanitation Block  Notice to Plan Issued for zoning around the city covering 10KM  Park Power Requirement Phases incorporated in the LCPDP for 2012-2032  Training Needs in BPO/KPO Identified  Eight forums held in Asia , Europe and America  Local Marketing Campaign through the Media ongoing
  • 11. CURRENT STATUS OF PROJECT CONT.  Konza Mark of Identity adopted  Intention to Plan issued for the 5,000 Ha  RFP for hiring Master Delivery Partner Consultancy services finalized  Expression of Interest (EOI) to procure Master Delivery Partner Advertised.  Feasibility Study for construction of 60KM High Speed Railway line ongoing  Project Launch tentatively set for the month of August  Investor’s Conference in May 2012  Ground breaking in August 2012
  • 12. KONZA CITY INCENTIVES PACKAGE Group Scheme/Activity Income Tax Withholding Investment Import Duty/ % Stamp % Work % Rate Tax Deductions VAT Duty Permits Domestic Reduction Allowed Market Access A ICT Park & ICT 10 year 10 Years 100% after Perpetually 100% 20% 100% Tower exempt exempt tax holiday exempt reduction ICT Services 20% there after B Science and 10 year 10 Years 100% on Perpetually 100% 20% 100% technology park exempt exempt new exempt on reduction 20% there investment all inputs after after tax holiday C Manufacturing 10 year 10 Years 100% on Perpetually 100% 20% 70% for and other exempt exempt machinery exempt on reduction logistic services for 20% there and all input good 50% export after buildings for non after end of strategic holiday goods D Incubator 10 year 10 Years 100% on Perpetually 100% 10% 70% for manufacturing exempt exempt machinery exempt on reduction logistic and other 20% there and all inputs good 50% services after buildings for non after end of strategic holiday goods E Regional 20% 100% on 100% Perpetually 50% 10% Restricted headquarters through out dividends deductions exempt on reduction to regional on building all office affiliates equipment furniture and telecommu nication
  • 13. CONT… Group Scheme/Activity Income Tax Withholding Investment Import % Stamp % Work Permits Allowed Rate Tax Deductions Duty/VAT Duty Reduction F Zone 10 year 10 Years 100% on Perpetually 100% Class A: for managerial developer and exempt exempt new exempt on reduction technical & supervisory operator 20% there investment all inputs cadre 5% of employees after & buildings in drainage, after end telecommunication, of holiday roads, schools, health clinics, accommodation industrial go down, workshops offices, docks, yards, and related amenities granted
  • 14. INVESTMENT SUMMARY Infrastructure development $ 2.1 B  On-site $ 1.9 B  Off-site $ 200 M Site real estate development $ 4.9 B Total project cost $ 7.0 B Average expected return - based on real estate market in Kenya:  12 -15% per annum for lease income  20% capital gains per annum (straight line)
  • 15. INVESTOR PARTICIPATION APPROACH  Single Private Master Developer undertakes the master planning of the entire property under Master Development Agreement and finances its development directly or through sub-developers. Government finances backbone infrastructure fully or partially.  Government Authority finances backbone infrastructure and undertakes the master planning of the property, including attracting developers for specific land uses.  Government contributes land to an SPV to be established jointly with private Master Developer. Terms and responsibilities of each party to be determined.