As a PROJECT MANAGER, did you
◦ Prepare “Regular Project Status Reports” ?
◦ Understood the “Performance Variance” ?
◦ Attempt to highlight the “Current Project Performance” ?
◦ Derive and communicate “Project Forecast” ?
If your answers to any of above is “NO”,
Please continue to read on……..
ProPM Academy - Project Management Training And Consulting
EVM is one of the widely used scientific
approach to measure, analyze, integrate
project data to accurately report on
current project performance and
forecast the required performance for
completion.
ProPM Academy - Project Management Training And Consulting
Relies on assumptions, interpretations
based on high level work status
Lack of any measured data and facts
Project Health (Red/Amber/Green) is
debatable and subjective
Relies on measured values derived from
triple constraints – Scope, Time and Cost
Project Status reported based on defined
matrix
Unambiguous, No Assumptions
Easily understandable by Stakeholders
Green
OR Red
?
What
IF…??
?
Can defend the
current Project Status
Assertive
ProPM Academy - Project Management Training And Consulting
Scope
Cost
----
----
---- ----
Timeline
Project’s performance based on information On Scope, Cost and Time at a given
point in time.
This is compared against Scope Baseline, Cost Baseline and Schedule Baseline.
ProPM Academy - Project Management Training And Consulting
So, What is
Earned Value (EV)?
 Objective method to measure project
progress.
 Helps to determine if a project is on track.
 Indicator of current project performance.
 Provides early warnings and trends on any
cost and/or schedule over runs.
 Helps to derive the Project Forecasts on Cost
and Timelines.
ProPM Academy - Project Management Training And Consulting
Earned Value is an
 Indicates how much of “Value” you have
“Earned” on the project at any given point
of time.
 Helps determine variance against Planned
Value (PV).
ProPM Academy - Project Management Training And Consulting
EVM - Key measurement components
 Planned Value (PV) – Is the “Authorized Budget” to be
expended for an activity, work package, Milestone or to
the project at a given point.
 Budget At Completion (BAC) – “Total Planned Value
(PV)” at the end of the project
 Earned Value (EV) – The “Value of Work Performed”
expressed in terms of the Authorized Budget
 Actual Cost (AC) – “Cost Incurred or Expended for
the Work” performed at a given point to complete an
Work Package or accomplish a Milestone.
ProPM Academy - Project Management Training And Consulting
 Earned Value – Key Components
PV = Planned % complete X BAC
EV = Actual % complete X BAC
AC = Cumulative money spent till date
 Performance Reviews
Variances Analysis
Schedule Variance (SV) = EV – PV (SV > 0, Good)
Cost Variance (CV) = EV – AC (CV > 0, Good)
Variance At Complete (VAC) = BAC – EAC (VAC > 0, Good)
 Performance Indicators
Schedule Performance Index (SPI) = EV / PV (SPI > 1, Good)
Cost Performance Index (CPI) = EV / AC (CPI > 1 Good)
ProPM Academy - Project Management Training And Consulting
A Forecast
 Helps to determine Revised likely Budgets using
performance measurements.
 Helps to determine
 “Estimate At Complete (EAC)” . This indicates the revised
BAC and may requirea approval from sponsor if variance
between BAC and EAC is quite marginal
 “Estimate To Complete (ETC) ”. This indicates the amount
required to to complete the rest of the project.
 “To-Complete-Performance-Index”. This is an indicator of how
much speed(performance) is required to be applied in order
to catch up with the plan in the remaining period of the project
ProPM Academy - Project Management Training And Consulting
EAC – Three methods
◦ EAC = AC + BAC – EV (when initial assumptions were flawed)
◦ EAC = BAC / cumulative CPI (assuming similar CPI would continue)
◦ EAC = AC + ((BAC – EV) / cumulative CPI X cumulative SPI )
(trying to factor both schedule and cost performances)
ETC = EAC-AC
To-Complete-Performance-Index
◦ TCPI = work remaining / funds remaining
◦ TCPI = (BAC - EV) / (BAC - AC) Based on BAC
◦ TCPI = (BAC - EV) / (EAC - AC) Based on EAC
ProPM Academy - Project Management Training And Consulting
Time (in Weeks) 
Deliverables
1 2 3 4 5 6 7
A
B
C
D
E
100%
75%
50%,
$500
$2000
$800
$5000
$600
20%
0%
PV= $4900
$600
$2500
$600
$2000
EV= $3400
AC= $5700
$0
ProPM Academy - Project Management Training And Consulting
BAC= $8900
Let us consider the following example to understand the concepts better
An ERP implementation project for ABC company is estimated to
cost $500,000 with an estimated duration of 40 weeks. At the
end of 10 weeks the project is 20% complete with $150,000
being already spent on the project.
Exercise:
1. Identify what is BAC and AC
2. Calculate PV, EV, CV, SV, CPI, SPI, EAC, ETC, TCPI, VAC
Please Watch our next video for explanation of this Exercise.
ProPM Academy - Project Management Training And Consulting
ProPM Academy, # 99, 1st Floor, Eshwar Towers, 22nd Main, BSK 2nd Stage, Bangalore - 560070 Tel +91 80 26716924, +91 9845280484
WWW.PROPMACADEMY.COM
THANK YOU
FOR
WATCHING
Contact Us
+91 98452 80484
+91 98860 25967
info@propmacademy.com Follow us on LinkedIn : Follow us on LinkedIn.
Like us on Facebook: Like us on FACEBOOK
WWW.PROPMACADEMY.COM

More Related Content

What's hot

Earned value management
Earned value managementEarned value management
Earned value management
Ashif AR
 

What's hot (20)

Earned value analysis - presentation
Earned value analysis  -  presentationEarned value analysis  -  presentation
Earned value analysis - presentation
 
Introduction to Earned Value Management
Introduction to Earned Value ManagementIntroduction to Earned Value Management
Introduction to Earned Value Management
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Earned value analysis
Earned value analysisEarned value analysis
Earned value analysis
 
Earned value
Earned value Earned value
Earned value
 
Earned value
Earned valueEarned value
Earned value
 
Earned value management
Earned value managementEarned value management
Earned value management
 
7.4 Earned Value Analysis
7.4 Earned Value Analysis7.4 Earned Value Analysis
7.4 Earned Value Analysis
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
 
Pmp cost chapter 7
Pmp cost chapter 7Pmp cost chapter 7
Pmp cost chapter 7
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project cost & control
Project cost & controlProject cost & control
Project cost & control
 
Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting
 
Cost management
Cost managementCost management
Cost management
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 

Similar to A simple approach to understanding Earned Value Management

Earned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxEarned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docx
sagarlesley
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Serdar Temiz
 
Understanding_EVA_V2.pptx
Understanding_EVA_V2.pptxUnderstanding_EVA_V2.pptx
Understanding_EVA_V2.pptx
FasiHaider3
 

Similar to A simple approach to understanding Earned Value Management (20)

PM - EVM - Dr Najam Abbas - OHT 1.pdf
PM - EVM - Dr Najam Abbas - OHT 1.pdfPM - EVM - Dr Najam Abbas - OHT 1.pdf
PM - EVM - Dr Najam Abbas - OHT 1.pdf
 
PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - Formulas
 
Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value Analysis
 
#Measuring Project Performance - Earned Value Management System# By SN Panigrahi
#Measuring Project Performance - Earned Value Management System# By SN Panigrahi#Measuring Project Performance - Earned Value Management System# By SN Panigrahi
#Measuring Project Performance - Earned Value Management System# By SN Panigrahi
 
cost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.pptcost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.ppt
 
Track Project Performance - Earned Value Management
Track Project Performance - Earned Value ManagementTrack Project Performance - Earned Value Management
Track Project Performance - Earned Value Management
 
Earned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxEarned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docx
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Lecture 06 project_cost_management
Lecture 06 project_cost_managementLecture 06 project_cost_management
Lecture 06 project_cost_management
 
Understanding_EVA_V2.pptx
Understanding_EVA_V2.pptxUnderstanding_EVA_V2.pptx
Understanding_EVA_V2.pptx
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
An introduction to project accounting
An introduction to project accountingAn introduction to project accounting
An introduction to project accounting
 
Project Management 3.2 cost
Project Management 3.2 costProject Management 3.2 cost
Project Management 3.2 cost
 
PMP COST FORMULAE
PMP COST FORMULAEPMP COST FORMULAE
PMP COST FORMULAE
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Project managment 6 (a)
Project managment 6 (a)Project managment 6 (a)
Project managment 6 (a)
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
Project Management EVM & SCBA
Project Management EVM & SCBAProject Management EVM & SCBA
Project Management EVM & SCBA
 
Project performance tracking analysis and reporting
Project performance tracking analysis and reportingProject performance tracking analysis and reporting
Project performance tracking analysis and reporting
 

Recently uploaded

Recently uploaded (20)

Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health Education
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 

A simple approach to understanding Earned Value Management

  • 1.
  • 2. As a PROJECT MANAGER, did you ◦ Prepare “Regular Project Status Reports” ? ◦ Understood the “Performance Variance” ? ◦ Attempt to highlight the “Current Project Performance” ? ◦ Derive and communicate “Project Forecast” ? If your answers to any of above is “NO”, Please continue to read on…….. ProPM Academy - Project Management Training And Consulting
  • 3. EVM is one of the widely used scientific approach to measure, analyze, integrate project data to accurately report on current project performance and forecast the required performance for completion. ProPM Academy - Project Management Training And Consulting
  • 4. Relies on assumptions, interpretations based on high level work status Lack of any measured data and facts Project Health (Red/Amber/Green) is debatable and subjective Relies on measured values derived from triple constraints – Scope, Time and Cost Project Status reported based on defined matrix Unambiguous, No Assumptions Easily understandable by Stakeholders Green OR Red ? What IF…?? ? Can defend the current Project Status Assertive ProPM Academy - Project Management Training And Consulting
  • 5. Scope Cost ---- ---- ---- ---- Timeline Project’s performance based on information On Scope, Cost and Time at a given point in time. This is compared against Scope Baseline, Cost Baseline and Schedule Baseline. ProPM Academy - Project Management Training And Consulting
  • 6. So, What is Earned Value (EV)?
  • 7.  Objective method to measure project progress.  Helps to determine if a project is on track.  Indicator of current project performance.  Provides early warnings and trends on any cost and/or schedule over runs.  Helps to derive the Project Forecasts on Cost and Timelines. ProPM Academy - Project Management Training And Consulting Earned Value is an
  • 8.  Indicates how much of “Value” you have “Earned” on the project at any given point of time.  Helps determine variance against Planned Value (PV). ProPM Academy - Project Management Training And Consulting
  • 9. EVM - Key measurement components  Planned Value (PV) – Is the “Authorized Budget” to be expended for an activity, work package, Milestone or to the project at a given point.  Budget At Completion (BAC) – “Total Planned Value (PV)” at the end of the project  Earned Value (EV) – The “Value of Work Performed” expressed in terms of the Authorized Budget  Actual Cost (AC) – “Cost Incurred or Expended for the Work” performed at a given point to complete an Work Package or accomplish a Milestone. ProPM Academy - Project Management Training And Consulting
  • 10.  Earned Value – Key Components PV = Planned % complete X BAC EV = Actual % complete X BAC AC = Cumulative money spent till date  Performance Reviews Variances Analysis Schedule Variance (SV) = EV – PV (SV > 0, Good) Cost Variance (CV) = EV – AC (CV > 0, Good) Variance At Complete (VAC) = BAC – EAC (VAC > 0, Good)  Performance Indicators Schedule Performance Index (SPI) = EV / PV (SPI > 1, Good) Cost Performance Index (CPI) = EV / AC (CPI > 1 Good) ProPM Academy - Project Management Training And Consulting
  • 11. A Forecast  Helps to determine Revised likely Budgets using performance measurements.  Helps to determine  “Estimate At Complete (EAC)” . This indicates the revised BAC and may requirea approval from sponsor if variance between BAC and EAC is quite marginal  “Estimate To Complete (ETC) ”. This indicates the amount required to to complete the rest of the project.  “To-Complete-Performance-Index”. This is an indicator of how much speed(performance) is required to be applied in order to catch up with the plan in the remaining period of the project ProPM Academy - Project Management Training And Consulting
  • 12. EAC – Three methods ◦ EAC = AC + BAC – EV (when initial assumptions were flawed) ◦ EAC = BAC / cumulative CPI (assuming similar CPI would continue) ◦ EAC = AC + ((BAC – EV) / cumulative CPI X cumulative SPI ) (trying to factor both schedule and cost performances) ETC = EAC-AC To-Complete-Performance-Index ◦ TCPI = work remaining / funds remaining ◦ TCPI = (BAC - EV) / (BAC - AC) Based on BAC ◦ TCPI = (BAC - EV) / (EAC - AC) Based on EAC ProPM Academy - Project Management Training And Consulting
  • 13. Time (in Weeks)  Deliverables 1 2 3 4 5 6 7 A B C D E 100% 75% 50%, $500 $2000 $800 $5000 $600 20% 0% PV= $4900 $600 $2500 $600 $2000 EV= $3400 AC= $5700 $0 ProPM Academy - Project Management Training And Consulting BAC= $8900
  • 14. Let us consider the following example to understand the concepts better An ERP implementation project for ABC company is estimated to cost $500,000 with an estimated duration of 40 weeks. At the end of 10 weeks the project is 20% complete with $150,000 being already spent on the project. Exercise: 1. Identify what is BAC and AC 2. Calculate PV, EV, CV, SV, CPI, SPI, EAC, ETC, TCPI, VAC Please Watch our next video for explanation of this Exercise. ProPM Academy - Project Management Training And Consulting
  • 15. ProPM Academy, # 99, 1st Floor, Eshwar Towers, 22nd Main, BSK 2nd Stage, Bangalore - 560070 Tel +91 80 26716924, +91 9845280484 WWW.PROPMACADEMY.COM THANK YOU FOR WATCHING Contact Us +91 98452 80484 +91 98860 25967 info@propmacademy.com Follow us on LinkedIn : Follow us on LinkedIn. Like us on Facebook: Like us on FACEBOOK WWW.PROPMACADEMY.COM

Editor's Notes

  1. Coloured once need to be splashed
  2. Reading sequence
  3. Underline variance
  4. Heading needs to Changed