Customer benefits
– Complete implementation by experienced specialists
– Saving in resources, costs and time
– Dependable local support
MAPAL re.tooling service: complete process
planning for new workpieces up to commissioning
A B S O L U T P R Ä Z I S I O N
A perfect team: GROB high performance machines and MAPAL re.tooling
were undertaken by MAPAL staff on
the machines at GROB in Mindel-
heim. Due to changes in the alumini-
um casting at short notice, a further
machining step had to be added and
various MAPAL solid carbide tools re-
vised. „MAPAL has proven itself with
its flexibility and speed of reaction“,
says the project manager at GROB,
Hong Lou.
After preliminary acceptance and
demonstration of the process capabili-
ty, a further 200 pre-series production
parts were manufactured. The specia-
lists from MAPAL were also on site
during this period to be able to react
immediately if necessary. Shortly af-
terwards the machines were shipped to
the end customer in China. With the
final acceptance MAPAL and GROB
again jointly confirmed the capabili-
ty of the machine, fixture, tools and
process. Hand-over to the customer
then followed.
With MAPAL re.tooling our customers
receive a complete, reliable process
from a single source. New projects are
realised using the latest technologies
in the shortest time with transparent
costs.
Your contact person for further information:
Frank Stäbler | frank.staebler@de.mapal.com
For many years GROB and MAPAL
have collaborated closely and success-
fully in the project business. Custo-
mers with the highest requirements
and demands in manufacturing rely
on high performance machinery from
GROB and MAPAL tool technology.
For three years GROB has marketed a
series of standard machines. Alongside
the G350, the G550 series for larger
workpieces now completes the product
range of the Mindelheim-based ma-
chine tool manufacturer. The horizon-
tal 5-axis centres impress with their
stability, flexibility and performance.
For a new project GROB has sold four
G350 series machining centres to an
automotive supplier. The machines are
used for the production of aluminium
steering rack tubes in China. The order
placed by the automotive supplier on
GROB was not just for the sale of the
machines. The project also inclu-
ded the complete process planning
including the design of all tools, the
clamping fixture and the NC program,
including commissioning in China.
For this project GROB decided for
the MAPAL re.tooling service, that is
GROB decided to give the entire res-
ponsibility for the machining process
to MAPAL. GROB was convinced by
the many years of experience with the
planning of complete tool packages,
the innovative MAPAL tool techno-
logy and the know-how related to
efficient processes. A further decision
criterion for „outsourcing“ the respon-
sibility for the process to MAPAL was
the very critical schedule due to the
high level of utilisation of in-house
resources.
MAPAL tools have already been used
successfully worldwide for machi-
ning aluminium steering rack tubes
for a number of years. MAPAL has
extensive experience here and offers
a cost-effective solution for every re-
quirement. Special MAPAL PCD tools
have become established in the series
production manufacture of these parts.
MAPAL re.tooling in practice
The new project started with the de-
finition of the process and machining
strategy, a cycle time study, as well as
a draft clamping concept to enable the
entire part to be manufactured on a
5-axis machining centre in one clam-
ping system. The most cost-effective
machining sequence and the optimal
tools for this strategy as well as a
detailed collision analysis are crucial
factors here.
This work was immediately followed
by the manufacture of the tools and
the clamping fixture. In parallel MA-
PAL prepared the NC program for the
machine controller.
The project manager Timo Killinger
from MAPAL reports: „Due to the
close collaboration with fixture and
tool design as well as the NC pro-
grammer, it was possible to prepare a
high performance overall process in a
very short time“.
Both the installation
of the process
as well
as the fine
tuning
of the
NC program
f.r.t.l.: Hong Lou (project manager at GROB),
Roman Kutzner (MAPAL regional sales mana-
ger) and Timo Killinger (project manager at
MAPAL re.tooling).
Innovative and cost-effective MAPAL tool technology. Everything from a single source – MAPAL takes over complete project responsibility.
GROB G350 – machining centre for the highest
requirements.

More Related Content

What's hot

Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
CCT International
 
Kannan Ravi_CV
Kannan Ravi_CVKannan Ravi_CV
Kannan Ravi_CVKanna Ravi
 
Phoenix Control Systems
Phoenix Control SystemsPhoenix Control Systems
Phoenix Control SystemsRichard Taylor
 
Resume_Sameer_Gautam (2)
Resume_Sameer_Gautam (2)Resume_Sameer_Gautam (2)
Resume_Sameer_Gautam (2)Sameer Gautam
 
Drilling Application Center in China_ACoE
Drilling Application Center in China_ACoEDrilling Application Center in China_ACoE
Drilling Application Center in China_ACoEIvano Nastasi
 
Resume Saleemuddin Shaikh-04-09-2015
Resume Saleemuddin Shaikh-04-09-2015Resume Saleemuddin Shaikh-04-09-2015
Resume Saleemuddin Shaikh-04-09-2015Saleemuddin Shaikh
 
Cx a activities flow diagram en
Cx a activities flow diagram enCx a activities flow diagram en
Cx a activities flow diagram enNicholas Chazapis
 
Gorrell_Gene_Res_Final
Gorrell_Gene_Res_FinalGorrell_Gene_Res_Final
Gorrell_Gene_Res_FinalGene Gorrell
 
Production challenges in the Central Nile Delta: Fast solutions via rental pr...
Production challenges in the Central Nile Delta: Fast solutions via rental pr...Production challenges in the Central Nile Delta: Fast solutions via rental pr...
Production challenges in the Central Nile Delta: Fast solutions via rental pr...
Richard Vaughan
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Dylan Gonsalves
 
Lida html
Lida htmlLida html
Lida htmllidanx
 
Automate SAP PI/PO Migration
Automate SAP PI/PO Migration Automate SAP PI/PO Migration
Automate SAP PI/PO Migration
Daniel Graversen
 

What's hot (20)

Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
 
Haitham Sayed C.V
Haitham Sayed C.VHaitham Sayed C.V
Haitham Sayed C.V
 
Kannan Ravi_CV
Kannan Ravi_CVKannan Ravi_CV
Kannan Ravi_CV
 
CV ENG
CV ENGCV ENG
CV ENG
 
Mitigtion Plan Presentation
Mitigtion Plan PresentationMitigtion Plan Presentation
Mitigtion Plan Presentation
 
M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
 
Phoenix Control Systems
Phoenix Control SystemsPhoenix Control Systems
Phoenix Control Systems
 
CV_181214
CV_181214CV_181214
CV_181214
 
Resume AG- 22.11.2016
Resume AG- 22.11.2016Resume AG- 22.11.2016
Resume AG- 22.11.2016
 
SamarKantiBarua
SamarKantiBaruaSamarKantiBarua
SamarKantiBarua
 
Resume_Sameer_Gautam (2)
Resume_Sameer_Gautam (2)Resume_Sameer_Gautam (2)
Resume_Sameer_Gautam (2)
 
Drilling Application Center in China_ACoE
Drilling Application Center in China_ACoEDrilling Application Center in China_ACoE
Drilling Application Center in China_ACoE
 
Resume Saleemuddin Shaikh-04-09-2015
Resume Saleemuddin Shaikh-04-09-2015Resume Saleemuddin Shaikh-04-09-2015
Resume Saleemuddin Shaikh-04-09-2015
 
Cx a activities flow diagram en
Cx a activities flow diagram enCx a activities flow diagram en
Cx a activities flow diagram en
 
Gorrell_Gene_Res_Final
Gorrell_Gene_Res_FinalGorrell_Gene_Res_Final
Gorrell_Gene_Res_Final
 
Production challenges in the Central Nile Delta: Fast solutions via rental pr...
Production challenges in the Central Nile Delta: Fast solutions via rental pr...Production challenges in the Central Nile Delta: Fast solutions via rental pr...
Production challenges in the Central Nile Delta: Fast solutions via rental pr...
 
Resume
ResumeResume
Resume
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
Lida html
Lida htmlLida html
Lida html
 
Automate SAP PI/PO Migration
Automate SAP PI/PO Migration Automate SAP PI/PO Migration
Automate SAP PI/PO Migration
 

Similar to A perfect team: GROB high performance machines and MAPAL re.tooling.

MDT-ZA Metalworking News March 2015-2
MDT-ZA Metalworking News March 2015-2MDT-ZA Metalworking News March 2015-2
MDT-ZA Metalworking News March 2015-2Gary Muller
 
innform 2016: the newsletter of Innoval Technology
innform 2016: the newsletter of Innoval Technologyinnform 2016: the newsletter of Innoval Technology
innform 2016: the newsletter of Innoval Technology
Innoval Technology
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
Akshay Deshpande
 
New solutions for disassembly, remanufacturing and testing automotive metal p...
New solutions for disassembly, remanufacturing and testing automotive metal p...New solutions for disassembly, remanufacturing and testing automotive metal p...
New solutions for disassembly, remanufacturing and testing automotive metal p...
OlgaRodrguezLargo
 
Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh Handigol
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
J. García - Verdugo
 
Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr
PLMX -Soluções para Negocios
 
ZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype IntroductionZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype IntroductionStitch Overseas
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTPraveen Pravin
 
Advancing Additive Manufacturing In Aerospace
Advancing Additive Manufacturing In AerospaceAdvancing Additive Manufacturing In Aerospace
Advancing Additive Manufacturing In Aerospace
EWI
 
R stelmach aprs 2018 rev 2
R stelmach aprs 2018  rev 2R stelmach aprs 2018  rev 2
R stelmach aprs 2018 rev 2
Richard Stelmach
 
Oliver Kerr - Engineering Resume 10.28.16
Oliver Kerr - Engineering Resume 10.28.16Oliver Kerr - Engineering Resume 10.28.16
Oliver Kerr - Engineering Resume 10.28.16Oliver Kerr
 
Lanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefitLanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefit
Lanner
 

Similar to A perfect team: GROB high performance machines and MAPAL re.tooling. (20)

MDT-ZA Metalworking News March 2015-2
MDT-ZA Metalworking News March 2015-2MDT-ZA Metalworking News March 2015-2
MDT-ZA Metalworking News March 2015-2
 
innform 2016: the newsletter of Innoval Technology
innform 2016: the newsletter of Innoval Technologyinnform 2016: the newsletter of Innoval Technology
innform 2016: the newsletter of Innoval Technology
 
Resume_caterpillar
Resume_caterpillarResume_caterpillar
Resume_caterpillar
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
New solutions for disassembly, remanufacturing and testing automotive metal p...
New solutions for disassembly, remanufacturing and testing automotive metal p...New solutions for disassembly, remanufacturing and testing automotive metal p...
New solutions for disassembly, remanufacturing and testing automotive metal p...
 
Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
 
Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr
 
ZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype IntroductionZYBODY Semi Mass Production & Prototype Introduction
ZYBODY Semi Mass Production & Prototype Introduction
 
CaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARIICaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARII
 
KARTIK_CV
KARTIK_CVKARTIK_CV
KARTIK_CV
 
CaseStudy-SAFE
CaseStudy-SAFECaseStudy-SAFE
CaseStudy-SAFE
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENT
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
Advancing Additive Manufacturing In Aerospace
Advancing Additive Manufacturing In AerospaceAdvancing Additive Manufacturing In Aerospace
Advancing Additive Manufacturing In Aerospace
 
R stelmach aprs 2018 rev 2
R stelmach aprs 2018  rev 2R stelmach aprs 2018  rev 2
R stelmach aprs 2018 rev 2
 
Oliver Kerr - Engineering Resume 10.28.16
Oliver Kerr - Engineering Resume 10.28.16Oliver Kerr - Engineering Resume 10.28.16
Oliver Kerr - Engineering Resume 10.28.16
 
Chattigar-Resume
Chattigar-ResumeChattigar-Resume
Chattigar-Resume
 
Lanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefitLanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefit
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 

A perfect team: GROB high performance machines and MAPAL re.tooling.

  • 1. Page 14 | MAPAL Impulse Page 15 | MAPAL Impulse Customer benefits – Complete implementation by experienced specialists – Saving in resources, costs and time – Dependable local support MAPAL re.tooling service: complete process planning for new workpieces up to commissioning A B S O L U T P R Ä Z I S I O N A perfect team: GROB high performance machines and MAPAL re.tooling were undertaken by MAPAL staff on the machines at GROB in Mindel- heim. Due to changes in the alumini- um casting at short notice, a further machining step had to be added and various MAPAL solid carbide tools re- vised. „MAPAL has proven itself with its flexibility and speed of reaction“, says the project manager at GROB, Hong Lou. After preliminary acceptance and demonstration of the process capabili- ty, a further 200 pre-series production parts were manufactured. The specia- lists from MAPAL were also on site during this period to be able to react immediately if necessary. Shortly af- terwards the machines were shipped to the end customer in China. With the final acceptance MAPAL and GROB again jointly confirmed the capabili- ty of the machine, fixture, tools and process. Hand-over to the customer then followed. With MAPAL re.tooling our customers receive a complete, reliable process from a single source. New projects are realised using the latest technologies in the shortest time with transparent costs. Your contact person for further information: Frank Stäbler | frank.staebler@de.mapal.com For many years GROB and MAPAL have collaborated closely and success- fully in the project business. Custo- mers with the highest requirements and demands in manufacturing rely on high performance machinery from GROB and MAPAL tool technology. For three years GROB has marketed a series of standard machines. Alongside the G350, the G550 series for larger workpieces now completes the product range of the Mindelheim-based ma- chine tool manufacturer. The horizon- tal 5-axis centres impress with their stability, flexibility and performance. For a new project GROB has sold four G350 series machining centres to an automotive supplier. The machines are used for the production of aluminium steering rack tubes in China. The order placed by the automotive supplier on GROB was not just for the sale of the machines. The project also inclu- ded the complete process planning including the design of all tools, the clamping fixture and the NC program, including commissioning in China. For this project GROB decided for the MAPAL re.tooling service, that is GROB decided to give the entire res- ponsibility for the machining process to MAPAL. GROB was convinced by the many years of experience with the planning of complete tool packages, the innovative MAPAL tool techno- logy and the know-how related to efficient processes. A further decision criterion for „outsourcing“ the respon- sibility for the process to MAPAL was the very critical schedule due to the high level of utilisation of in-house resources. MAPAL tools have already been used successfully worldwide for machi- ning aluminium steering rack tubes for a number of years. MAPAL has extensive experience here and offers a cost-effective solution for every re- quirement. Special MAPAL PCD tools have become established in the series production manufacture of these parts. MAPAL re.tooling in practice The new project started with the de- finition of the process and machining strategy, a cycle time study, as well as a draft clamping concept to enable the entire part to be manufactured on a 5-axis machining centre in one clam- ping system. The most cost-effective machining sequence and the optimal tools for this strategy as well as a detailed collision analysis are crucial factors here. This work was immediately followed by the manufacture of the tools and the clamping fixture. In parallel MA- PAL prepared the NC program for the machine controller. The project manager Timo Killinger from MAPAL reports: „Due to the close collaboration with fixture and tool design as well as the NC pro- grammer, it was possible to prepare a high performance overall process in a very short time“. Both the installation of the process as well as the fine tuning of the NC program f.r.t.l.: Hong Lou (project manager at GROB), Roman Kutzner (MAPAL regional sales mana- ger) and Timo Killinger (project manager at MAPAL re.tooling). Innovative and cost-effective MAPAL tool technology. Everything from a single source – MAPAL takes over complete project responsibility. GROB G350 – machining centre for the highest requirements.