CASE STUDY: Mahler AGS, Germany
Mahler AGS significantly saves labor
hours by upgrading to Intergraph®
CADWorx®
Plant Professional & CAESAR II®
Improved user-friendliness and easier implementation increase
efficiency across design and manufacturing processes
IDENTIFYING GOALS
Mahler AGS is an international leader in designing and manufacturing hydrogen
generation plants, specializing in steam reforming and pressure swing
absorption technology. With more than 60 years of experience in the business,
the company provides tailored, turn-key solutions for clients across different
chemical sectors.
Mahler AGS was employed to design and manufacture a modular hydrogen
plant for a leading global company in the palm oil business. The resulting plant
is now used to refine crude palm oil and crude palm kernel oil. The plant design
is based on Mahler AGS’ HYDROFORM-C hydrogen generation plant series.
This is Mahler’s turnkey plant design solution for hydrogen generating plants,
focusing on flexibility and full automation. As part of the modular design prin-
ciple, Mahler preassembled and delivered the plant as prefabricated units.
Mahler AGS was looking for both a new pipe stress analysis software as well as
one to replace its existing design software (X-Plant) that included a modern 3D
planning solution. The new system needed to be compatible with the previous
AutoCAD-based software, easy-to-use, and fast to implement so it could
minimize project downtime and delay. Intergraph®
CADWorx Plant Professional
and CAESAR II were chosen due to their AutoCAD®
-based
structure, scalability, and suitability for the project scope.
OVERCOMING CHALLENGES
A tight time schedule and mixed existing ASME/DIN EN piping codes affected
the design and manufacturing process of the new plant. Meeting the strict
project deadlines was ensured by the efficiency and accuracy of CADWorx
Plant Professional. As an AutoCAD-based solution, most of the users already
had experience with a similar product and were able to get up-to-speed quickly.
Even though this was the first of Mahler’s projects in which Intergraph
solutions were executed, only a short adoption time was needed because
FACTS AT A GLANCE
Company: Mahler AGS, Germany
Website: www.mahler-ags.com
Description: Mahler AGS is the
leading manufacturer and supplier of
cost-effective, safe, and reliable gas
generation and purification plants for
hydrogen, oxygen, nitrogen, biogas,
and protective gas. Mahler AGS
offers a variety of cost-effective, on-
site plants for users in a wide field
of industries. More than 60 years
of experience in plant design and
engineering guarantee high operational
availability of all Mahler AGS gas
generation and purification plants.
Employees: 40
Industry: Oil and Gas, Chemical &
Petrochemical
Country: Germany
PRODUCTS USED:
•	CADWorx ®
Plant Professional
•	CAESAR II®
KEY BENEFITS:
•	Improved efficiency: Up to 15 	 	
	 percent savings on project man-hours
•	Streamlined work processes: Up 		
to 30 percent less hours spent on
	 stress calculations
•	Accurate and structured pipe stress 	
	analysis
•	Fast implementation: Reduced 	 	
	 project delay and downtime
training and design were performed in parallel. Due to the
ease of use and quick implementation of both CADWorx Plant
Professional and CAESAR II, the design for the new plant was
completed within approximately five months from the project
start date.
CAESAR II was used throughout the project for all of the pipe
stress analysis needs, and provided Mahler with a way to
ensure the accuracy and safety of the piping specifications and
pipe stress analysis.
realiZinG reSultS
CADWorx Plant Professional was used to create an intelligent
3D plant model of the new plant, including:
• Intelligent 3D models of equipment, steel structures, and
piping
• 2D layout drawings, and civil guide drawings
• Isometric drawings
• Bills of material for piping and steel.
CAESAR II was used for all piping stress calculations, data
sheets, and piping specifications. As a default, CAESAR II
creates bi-directional links between plant design and
engineering analysis. This enabled Mahler to pass data
between different departments without data loss. Training and
setup were completed by an employee with previous
experience in both CADWorx and CAESAR II. Currently, the
CAD department of Mahler has full access to the system.
Ultimately, by choosing CADWorx Plant Professional and
CAESAR II, Mahler AGS reduced project man-hours by
10-15 percent, with an additional 25-30 percent reduction in
time spent on stress calculations. The latter is attributed to the
overarching compatibility between Intergraph solutions,
requiring fewer model revisions throughout the design
process, regardless of the amount of overall changes.
MovinG forWard
Following the successful Hydroform-C series plant design,
Mahler AGS has designed four new plants using Intergraph
CADWorx Plant Professional and CAESAR II. The company
continues to use the software in all future projects, such as
ordered design and manufacture projects for two hydrogen
plants, a nitrogen plant, and an oxygen plant.
Intergraph helps the world work smarter. The company’s
software and solutions improve the lives of millions of people
through better facilities, safer communities, and more reliable
operations.
Intergraph Process, Power & Marine (PP&M) is the world’s
leading provider of enterprise engineering software enabling
smarter design and operation of plants, ships, and offshore
facilities. Intergraph Security, Government & Infrastructure
(SG&I) is the leader in smart solutions for emergency response,
utilities, transportation, and other global challenges. For more
information, visit www.intergraph.com.
Intergraph is part of Hexagon (Nordic exchange: HEXA B;
www.hexagon.com), a leading global provider of design,
measurement, and visualization technologies that enable
customers to design, measure, and position objects, and
process and present data.
ABOUT INTERGRAPH
© Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph, the Intergraph logo, CADWorx, and CAESAR II are registered
trademarks of Intergraph Corporation or its subsidiaries in the United States and in other countries. Other brands and product names are trademarks of
their respective owners. 6/2014 – PPM - NL - 0295A - ENG.
Mahler AGS Hydrogen Generation Plant - 5000 NM3/H.

More Related Content

What's hot

Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin Drude
 
Reducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia ConsultantsReducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
AVEVA Group plc
 
How Rohde & Schwarz use 6SigmaET for thermal simulation of electronics
How Rohde & Schwarz use 6SigmaET for thermal simulation of electronicsHow Rohde & Schwarz use 6SigmaET for thermal simulation of electronics
How Rohde & Schwarz use 6SigmaET for thermal simulation of electronics
6sigmaet
 
Sandeep S G - resume cfd
Sandeep S G - resume   cfdSandeep S G - resume   cfd
Sandeep S G - resume cfd
Sandeep S.G
 
Presentation
PresentationPresentation
Presentation
Cabrinil
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experience
hugo_mx
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experience
hugo_mx
 
Utomi kelly ufeli resume- may 2016
Utomi kelly ufeli resume- may 2016Utomi kelly ufeli resume- may 2016
Utomi kelly ufeli resume- may 2016
Utomi Kelly-Ufeli
 

What's hot (15)

Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin N Drude Resume 10-16
Justin N Drude Resume 10-16
 
Whitepaper0310
Whitepaper0310Whitepaper0310
Whitepaper0310
 
Reducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia ConsultantsReducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
 
How Rohde & Schwarz use 6SigmaET for thermal simulation of electronics
How Rohde & Schwarz use 6SigmaET for thermal simulation of electronicsHow Rohde & Schwarz use 6SigmaET for thermal simulation of electronics
How Rohde & Schwarz use 6SigmaET for thermal simulation of electronics
 
Sandeep S G - resume cfd
Sandeep S G - resume   cfdSandeep S G - resume   cfd
Sandeep S G - resume cfd
 
M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
 
Presentation
PresentationPresentation
Presentation
 
Resume-Aerothermo-updatedzil
Resume-Aerothermo-updatedzilResume-Aerothermo-updatedzil
Resume-Aerothermo-updatedzil
 
jim. resume2015
jim. resume2015jim. resume2015
jim. resume2015
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experience
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experience
 
Thai Truong Resume
Thai Truong ResumeThai Truong Resume
Thai Truong Resume
 
cv (4)
cv (4)cv (4)
cv (4)
 
Optimisation in Aerospace
Optimisation in AerospaceOptimisation in Aerospace
Optimisation in Aerospace
 
Utomi kelly ufeli resume- may 2016
Utomi kelly ufeli resume- may 2016Utomi kelly ufeli resume- may 2016
Utomi kelly ufeli resume- may 2016
 

Similar to CaseStudy_Mahler_CADWorx_CAESARII

Intergraph ICAS tools through Ingenious
Intergraph ICAS tools through IngeniousIntergraph ICAS tools through Ingenious
Intergraph ICAS tools through Ingenious
Gautam Vadnere
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerNicole Brlek
 
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In KabulField Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Rishabh Engineering Services
 
CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI EngineeringMaurizio Sirica
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
Sistema FIEB
 
Vaestus GmbH-Business Profile_2022.pdf
Vaestus GmbH-Business Profile_2022.pdfVaestus GmbH-Business Profile_2022.pdf
Vaestus GmbH-Business Profile_2022.pdf
Arberor MITA
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROMaurizio Sirica
 
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-Maurizio Sirica
 
Cadison world-issue-01-2013
Cadison world-issue-01-2013Cadison world-issue-01-2013
Cadison world-issue-01-2013CADISON
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
CADISON
 
CAESAR II
CAESAR IICAESAR II
CAESAR II
N.A. Tecnologia
 
Ansys marine-industry-brochure-pdf
Ansys marine-industry-brochure-pdfAnsys marine-industry-brochure-pdf
Ansys marine-industry-brochure-pdf
Mohsen Tayefeh
 
Smartplant application and effectiveness
Smartplant application and effectivenessSmartplant application and effectiveness
Smartplant application and effectivenessraghunathan janarthanan
 
MCR Engineering Company Overview
MCR Engineering Company OverviewMCR Engineering Company Overview
MCR Engineering Company Overview
Marcus Fróis
 
Applications 3D Articles
Applications 3D ArticlesApplications 3D Articles
Applications 3D Articles
Applications 3D
 

Similar to CaseStudy_Mahler_CADWorx_CAESARII (20)

Intergraph ICAS tools through Ingenious
Intergraph ICAS tools through IngeniousIntergraph ICAS tools through Ingenious
Intergraph ICAS tools through Ingenious
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis Flyer
 
CaseStudy-SAFE
CaseStudy-SAFECaseStudy-SAFE
CaseStudy-SAFE
 
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In KabulField Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
 
CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI Engineering
 
Mpds4 brochure en
Mpds4 brochure enMpds4 brochure en
Mpds4 brochure en
 
CaseStudy_OnLine_Design
CaseStudy_OnLine_DesignCaseStudy_OnLine_Design
CaseStudy_OnLine_Design
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
 
Vaestus GmbH-Business Profile_2022.pdf
Vaestus GmbH-Business Profile_2022.pdfVaestus GmbH-Business Profile_2022.pdf
Vaestus GmbH-Business Profile_2022.pdf
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGRO
 
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-
 
Cadison world-issue-01-2013
Cadison world-issue-01-2013Cadison world-issue-01-2013
Cadison world-issue-01-2013
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
 
CAESAR II
CAESAR IICAESAR II
CAESAR II
 
Ansys marine-industry-brochure-pdf
Ansys marine-industry-brochure-pdfAnsys marine-industry-brochure-pdf
Ansys marine-industry-brochure-pdf
 
4 YEARS EXP RESUME
4 YEARS EXP RESUME4 YEARS EXP RESUME
4 YEARS EXP RESUME
 
Smartplant application and effectiveness
Smartplant application and effectivenessSmartplant application and effectiveness
Smartplant application and effectiveness
 
CaseStudy-ECOFOXl
CaseStudy-ECOFOXlCaseStudy-ECOFOXl
CaseStudy-ECOFOXl
 
MCR Engineering Company Overview
MCR Engineering Company OverviewMCR Engineering Company Overview
MCR Engineering Company Overview
 
Applications 3D Articles
Applications 3D ArticlesApplications 3D Articles
Applications 3D Articles
 

CaseStudy_Mahler_CADWorx_CAESARII

  • 1. CASE STUDY: Mahler AGS, Germany Mahler AGS significantly saves labor hours by upgrading to Intergraph® CADWorx® Plant Professional & CAESAR II® Improved user-friendliness and easier implementation increase efficiency across design and manufacturing processes IDENTIFYING GOALS Mahler AGS is an international leader in designing and manufacturing hydrogen generation plants, specializing in steam reforming and pressure swing absorption technology. With more than 60 years of experience in the business, the company provides tailored, turn-key solutions for clients across different chemical sectors. Mahler AGS was employed to design and manufacture a modular hydrogen plant for a leading global company in the palm oil business. The resulting plant is now used to refine crude palm oil and crude palm kernel oil. The plant design is based on Mahler AGS’ HYDROFORM-C hydrogen generation plant series. This is Mahler’s turnkey plant design solution for hydrogen generating plants, focusing on flexibility and full automation. As part of the modular design prin- ciple, Mahler preassembled and delivered the plant as prefabricated units. Mahler AGS was looking for both a new pipe stress analysis software as well as one to replace its existing design software (X-Plant) that included a modern 3D planning solution. The new system needed to be compatible with the previous AutoCAD-based software, easy-to-use, and fast to implement so it could minimize project downtime and delay. Intergraph® CADWorx Plant Professional and CAESAR II were chosen due to their AutoCAD® -based structure, scalability, and suitability for the project scope. OVERCOMING CHALLENGES A tight time schedule and mixed existing ASME/DIN EN piping codes affected the design and manufacturing process of the new plant. Meeting the strict project deadlines was ensured by the efficiency and accuracy of CADWorx Plant Professional. As an AutoCAD-based solution, most of the users already had experience with a similar product and were able to get up-to-speed quickly. Even though this was the first of Mahler’s projects in which Intergraph solutions were executed, only a short adoption time was needed because FACTS AT A GLANCE Company: Mahler AGS, Germany Website: www.mahler-ags.com Description: Mahler AGS is the leading manufacturer and supplier of cost-effective, safe, and reliable gas generation and purification plants for hydrogen, oxygen, nitrogen, biogas, and protective gas. Mahler AGS offers a variety of cost-effective, on- site plants for users in a wide field of industries. More than 60 years of experience in plant design and engineering guarantee high operational availability of all Mahler AGS gas generation and purification plants. Employees: 40 Industry: Oil and Gas, Chemical & Petrochemical Country: Germany PRODUCTS USED: • CADWorx ® Plant Professional • CAESAR II® KEY BENEFITS: • Improved efficiency: Up to 15 percent savings on project man-hours • Streamlined work processes: Up to 30 percent less hours spent on stress calculations • Accurate and structured pipe stress analysis • Fast implementation: Reduced project delay and downtime
  • 2. training and design were performed in parallel. Due to the ease of use and quick implementation of both CADWorx Plant Professional and CAESAR II, the design for the new plant was completed within approximately five months from the project start date. CAESAR II was used throughout the project for all of the pipe stress analysis needs, and provided Mahler with a way to ensure the accuracy and safety of the piping specifications and pipe stress analysis. realiZinG reSultS CADWorx Plant Professional was used to create an intelligent 3D plant model of the new plant, including: • Intelligent 3D models of equipment, steel structures, and piping • 2D layout drawings, and civil guide drawings • Isometric drawings • Bills of material for piping and steel. CAESAR II was used for all piping stress calculations, data sheets, and piping specifications. As a default, CAESAR II creates bi-directional links between plant design and engineering analysis. This enabled Mahler to pass data between different departments without data loss. Training and setup were completed by an employee with previous experience in both CADWorx and CAESAR II. Currently, the CAD department of Mahler has full access to the system. Ultimately, by choosing CADWorx Plant Professional and CAESAR II, Mahler AGS reduced project man-hours by 10-15 percent, with an additional 25-30 percent reduction in time spent on stress calculations. The latter is attributed to the overarching compatibility between Intergraph solutions, requiring fewer model revisions throughout the design process, regardless of the amount of overall changes. MovinG forWard Following the successful Hydroform-C series plant design, Mahler AGS has designed four new plants using Intergraph CADWorx Plant Professional and CAESAR II. The company continues to use the software in all future projects, such as ordered design and manufacture projects for two hydrogen plants, a nitrogen plant, and an oxygen plant. Intergraph helps the world work smarter. The company’s software and solutions improve the lives of millions of people through better facilities, safer communities, and more reliable operations. Intergraph Process, Power & Marine (PP&M) is the world’s leading provider of enterprise engineering software enabling smarter design and operation of plants, ships, and offshore facilities. Intergraph Security, Government & Infrastructure (SG&I) is the leader in smart solutions for emergency response, utilities, transportation, and other global challenges. For more information, visit www.intergraph.com. Intergraph is part of Hexagon (Nordic exchange: HEXA B; www.hexagon.com), a leading global provider of design, measurement, and visualization technologies that enable customers to design, measure, and position objects, and process and present data. ABOUT INTERGRAPH © Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph, the Intergraph logo, CADWorx, and CAESAR II are registered trademarks of Intergraph Corporation or its subsidiaries in the United States and in other countries. Other brands and product names are trademarks of their respective owners. 6/2014 – PPM - NL - 0295A - ENG. Mahler AGS Hydrogen Generation Plant - 5000 NM3/H.