A Perfect Efforts for GreenRoad Transportation(EV Initiates)
Weather Monitoring Station (Warning & Monitoring)
Hello I am Green India and My EV Infra policy Ahead
• Model Building Byelaws,2016 amended to provide for electric vehiclecharging
infrastructure
• The Ministry of Housing and Urban Affairs has amended the Model Building Byelaws,
2016 and the Urban Regional Development Plans Formulation and Implementation
Guidelines, 2014to facilitatethe availability of electric vehicle (EV) charging
infrastructure. The amended guidelines will act as a guiding document for states and
union territories to incorporate the norms and standards of EV charging infrastructure
in their respective building byelaws. The central government aims to have 25% of all
vehicles on roads to be electric by 2020. Note that in December 2018, the Ministry of
Power had released guidelines and standards for charging infrastructure for electric
vehicles.
• Model Building Byelaws: Based on the occupancy pattern and the total parking
provisions in the premises of various building types, charging infrastructure will be
provided only for EVs. Currently, the required occupancy is assumed to be 20% of all
vehicle holding capacity/ parking capacityat the premises.
• Urban Regional DevelopmentPlans Formulationand ImplementationGuidelines:The
norms for distribution of public charging stations across a city have been specified. For
example, standalone public charging stations must be placed every 25 km on both sides
of the highways.
Picture Abhi Baaki Hey
Decide Yourself& Set goal Your Self StopBlamingPolicyor Others
Thisis your Planet Your Journey
A Little WorryHowManyPeoplewillbe Job LessDue to EV and EV Infra
• A petrol bunk machine dispenses about 4000 liters of fuel worth
2.8 lacs per day. A 30 KW charger (for cars) even with 100%
utilization would dispense about 720 KWh of electricity worth 7200
Rs per day......not sure why would any petrol pump would put up a
electrical charging outlet which will block the same amount of real
estate for 2% revenue. While oil is dispensed from underground
bunks, electricity flows overhead...you need a fundamentally
different approach to setting up charging station driven by
technology, data, siting, load flows. Oil companies dominated by
dealers are NOT going to lead the charging infra rollout in
Indiaelectric chargers would stop the free flow of traffic at pumps
since charging takes much longer than filling liquid fuel
electric chargers would stop the free flow of traffic at pumps since
charging takes much longer than filling liquid fuel
Just for Information Tarrif and Infra Cost
Electricity Use Charges along with Electric Vehicle in Delhi
Battery OperatedVehicleand ChargingInfra
Questions
I am BatteryKindlyunderstand me FeedMe and Cool DriveYour Vehicle
• Vehicle is unlikely to accept power at the maximum rate. Because a standard limits the current, when battery voltage is low either because of battery design or a low state of charge, the
power delivered at maximum amperage is lower. For example, 50 kW chargers in practice often dispense no more than 40 kW depending on the vehicle and state of charge and maximum
battery pack voltage. For this reason, 400 kW chargers are often referred to as 350 kW chargers and this terminology will be used. Even when a charger is capable of providing high power,
smaller battery packs are unlikely to be able to accept this much power. For example, if 350 kW power is available to a smaller 25 kWh pack, battery protection circuits will limit the current
and the pack will not accept the higher power. No vehicle on the market in 2018 can accept 350 kW and technological progress must be made in battery cooling or chemistry to fully utilize a
350 kW charger. Vehicle hardware improvements to enable these higher fast-charging speeds could cost approximately $1,000, assuming no change in battery size (Burnham et al., 2017).
However, the higher voltage 350 kW chargers can reduce voltage output and still charge present vehicle models at a reduced power. Fast-charging speed is linked with developments in
electric vehicle battery technology and vehicle range. The technology of battery chemistry and cooling limit how fast a battery can proceed from empty to approximately 80% recharged (the
state of charge when charging rate generally reduces), currently ranging from about 38 minutes in a
• 125 kW charger to 14 minutes in a Kia Soul electric vehicle (EV) using a 100 kW charger. Charging a battery with too much power could cause lithium plating and dendrite formation around
the anode, permanently reducing capacity; at a pack level, it can cause cells to age at different rates and pack overheating (Ahmed et al., 2017). If the Kia Soul EV battery capacity were
doubled it hypothetically could accept 200 kW, but would still be limited to a 14-minute charging time
• This relationship between acceptance power and capacity is shown on a cell level in Battery packs in vehicles consist of many cells connected together, but each cell has a maximum
charging rate.
• When battery pack capacity is increased, the ability to accept more power increases proportionally, but the charging time from empty to 80% remains constant. This simplistic doubling of
capacity also assumes that the space for the battery is doubled, but in reality doubling capacity often involves arranging the battery cells more tightly, affecting the ability to cool the battery
which slows charging time.
• Doubling battery capacity by adding more cells increases the overall power a battery pack can accept, but charging time remains constant.
I am Important(Connector) 2 Charge your EV(Battery)
• FAST-CHARGING STATIONAVAILABILITY Currently, there are major deployments of fast chargers
worldwide. The growth in the number and location of fast charging units have two ports, one
for CCS and one for CHAdeMO, but only one port can be used at a time
• The availability of the three fast-charging types is relatively evenly split in each market. CCS is
more prevalent than CHAdeMO in Austria, Finland, and Germany, while CHAdeMO is more
common in all other markets, with the highest share in France and the United States. Tesla fast
charging representedhalf of all fast-charging points in the United States outside of California
and also made up a large fraction of charging in Belgium and France. China has the greatest
number of DC fast chargers and uses the GB/T standard.
Smart Home with Smart Road Transportation
I am Ready I am AvailableWaiting for You(400KW)
EV Charging Infra andRequire CommunicationSystems
Respect New LawElectrical Vehicle
for
Building and Public Infra Structure
Amendments in amendments are made in the relevant sections (Chapter 10)
of the Model Building Bye-laws, 2016.
(MBBL - 2016)
for
Electric Vehicle Charging Infrastructure By
Town and Country Planning Organization Ministry of Housing and Urban
Affairs
Government of India February, 2019
GovtOf India/PowerPolicyfor Public EV Charging
India is Ready with Inftrastructure Public EV
Charging
1200 × 335Im ages m aybe s ubjectto copyright. Find outm ore
Power Supply Substation 11KV for EV Charging INFRA
Power Generation,Transmission,Distributionand
Facilitation for Electrical Charging Infra in India
• IMPACTS OF FAST CHARGINGON THE ELECTRIC GRID Key questions about the impact of fast charging on the
electric grid are related to the deployment of electric vehicles over time, how much and when they rely on fast
charging, and whether the various fast-charging locations require electric grid upgrades.
• The three main parts to the utility system:generation, transmission, and distribution. Although electric vehicles
will consume a significant amount of electricity
• The other hand, distribution systemsare the mostlikely to need upgrades resulting from electric vehicle charging,
especially if demand for fast charging occurs at the period of other distribution loads. In addition, if energy is
demanded at the same time as general system peak loads, transmissionand generation mayneed to be
upgraded. .
24X7IncrazeGreenPowerGeneration(Sun-Water-Wind)
SolarPV + HighEnergyStorage+ PowerGridfor Parking(EVCharging)
Generate Your Own Power Using SolarPV,Wind ,Waste and
HEBSS
BUS Charging Infra (Using Power from Pentagraph)
My India Smart Initiate
Electric Vehicles for Smarter Cities
The Futureof Energy and Mobility(Solar+Wind+Storage)
Fleet and Public Road Transport and RequireEV Infra
India Electrical Vehicle andInfra Charging Plan Public/Rental
Car Charging Station Facility
BUS Charging Infra (Using Power from Pentagraph)
Fly in Plane Fuel is Battery and Charging Infra(Concept)
RespectNewLawElectricalVehicle
for
Building and Public Infra Structure
Amendments in amendments are made in the relevant sections (Chapter
10) of the Model Building Bye-laws, 2016.
(MBBL - 2016)
for
Electric Vehicle Charging Infrastructure By
Town and Country Planning Organization Ministry of Housing and Urban
Affairs
Government of India February, 2019
GovtOf India/PowerPolicyforPublicEV Charging
India is Ready with Inftrastructure Public EV
Charging
DistributionBoards • Complete Range –
SPN , TPN, PPI, MCCB VTPN .
4Way, 8Way, 16Way, Single Door , Double Door
IP42/43
• Choice of Multiple Incomer-MCB/ RCCB/
Isolator
• Insulated and Captive Bus bar for better safety
and protection.
• Heavy Duty gasket – for weather proofing
• Independent of power supply and line voltage.
• Adequate wiring space
• Steel inserts with deep screws-to give firm hold
and better grip to the door
• Smooth finish with 60micron powder coating
• Lock and key mechanismon the door
• Masking sheet – provides protection during
masson work
Reduce up to 21%
Out-Door LT Feeder Pillar (Without Front Door)
Electrical Safetyfor HumanNo Compromise FollowNBC2016
Useof Powerand HumanSafety(ElectricalHazards)
Mahesh Chandra Manav
GM BD Key Accounts and Projects
M-9811247237
Mahesh.manav@cselectric.co.in 011-
33849000
CS Electric Ltd 222 Okhla Ph-3 New Delhi-20

More Related Content

What's hot

Mad about wheels edition 03
Mad about wheels edition 03Mad about wheels edition 03
Mad about wheels edition 03Shaaz Malik
 
IRJET- Modeling of PV based Bidirectional Battery Charger for Electric Ve...
IRJET-  	  Modeling of PV based Bidirectional Battery Charger for Electric Ve...IRJET-  	  Modeling of PV based Bidirectional Battery Charger for Electric Ve...
IRJET- Modeling of PV based Bidirectional Battery Charger for Electric Ve...IRJET Journal
 
India case study - Future of Electric Vehicles in Road Passenger Mobility of ...
India case study - Future of Electric Vehicles in Road Passenger Mobility of ...India case study - Future of Electric Vehicles in Road Passenger Mobility of ...
India case study - Future of Electric Vehicles in Road Passenger Mobility of ...IEA-ETSAP
 
Welcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on roadWelcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on roadMahesh Chandra Manav
 
P2P EV Charging Infrastructure
P2P EV Charging InfrastructureP2P EV Charging Infrastructure
P2P EV Charging InfrastructureSanjaya Panigrahi
 
Electric vehicles in india in 2021
Electric vehicles in india in 2021Electric vehicles in india in 2021
Electric vehicles in india in 2021Pratima Pandey
 
EV Basics & Barriers Webinar - ABB Presentation
EV Basics & Barriers Webinar - ABB PresentationEV Basics & Barriers Webinar - ABB Presentation
EV Basics & Barriers Webinar - ABB PresentationWisconsin Clean Cities
 
India EV policy: Suggestions for increasing adoption
India EV policy: Suggestions for increasing adoptionIndia EV policy: Suggestions for increasing adoption
India EV policy: Suggestions for increasing adoptionjnandi
 
Grinntech introduction
Grinntech introductionGrinntech introduction
Grinntech introductiongrinntech
 
IRJET- Design of O-T-G Charging System for Next-Gen Electric Vehicles
IRJET- Design of O-T-G Charging System for Next-Gen Electric VehiclesIRJET- Design of O-T-G Charging System for Next-Gen Electric Vehicles
IRJET- Design of O-T-G Charging System for Next-Gen Electric VehiclesIRJET Journal
 
EV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPCEV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPCShiva Prashanth Kasina
 
EV| Electrical Vehicles| All you need to know
EV| Electrical Vehicles| All you need to knowEV| Electrical Vehicles| All you need to know
EV| Electrical Vehicles| All you need to knowpaul young cpa, cga
 
Charging Stations For Electric Vehicle
Charging Stations For Electric VehicleCharging Stations For Electric Vehicle
Charging Stations For Electric VehicleSarang Bongirwar
 
2009 05 Electric Vehicles In Apac – Fad Or Reality Frost & Sullivan
2009 05 Electric Vehicles In Apac – Fad Or Reality   Frost & Sullivan2009 05 Electric Vehicles In Apac – Fad Or Reality   Frost & Sullivan
2009 05 Electric Vehicles In Apac – Fad Or Reality Frost & SullivanAlvin Chua
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Gensol Engineering Limited
 
Solar Charging Stations
Solar Charging StationsSolar Charging Stations
Solar Charging StationsKabeeranban
 
EV charging in india
EV charging in indiaEV charging in india
EV charging in indiaJishnu Rajeev
 

What's hot (20)

Mad about wheels edition 03
Mad about wheels edition 03Mad about wheels edition 03
Mad about wheels edition 03
 
IRJET- Modeling of PV based Bidirectional Battery Charger for Electric Ve...
IRJET-  	  Modeling of PV based Bidirectional Battery Charger for Electric Ve...IRJET-  	  Modeling of PV based Bidirectional Battery Charger for Electric Ve...
IRJET- Modeling of PV based Bidirectional Battery Charger for Electric Ve...
 
India case study - Future of Electric Vehicles in Road Passenger Mobility of ...
India case study - Future of Electric Vehicles in Road Passenger Mobility of ...India case study - Future of Electric Vehicles in Road Passenger Mobility of ...
India case study - Future of Electric Vehicles in Road Passenger Mobility of ...
 
Welcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on roadWelcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on road
 
P2P EV Charging Infrastructure
P2P EV Charging InfrastructureP2P EV Charging Infrastructure
P2P EV Charging Infrastructure
 
Electric vehicles in india in 2021
Electric vehicles in india in 2021Electric vehicles in india in 2021
Electric vehicles in india in 2021
 
EV Basics & Barriers Webinar - ABB Presentation
EV Basics & Barriers Webinar - ABB PresentationEV Basics & Barriers Webinar - ABB Presentation
EV Basics & Barriers Webinar - ABB Presentation
 
India EV policy: Suggestions for increasing adoption
India EV policy: Suggestions for increasing adoptionIndia EV policy: Suggestions for increasing adoption
India EV policy: Suggestions for increasing adoption
 
Grinntech introduction
Grinntech introductionGrinntech introduction
Grinntech introduction
 
Advancing Electric Vehicle Charging Stations
Advancing Electric Vehicle Charging StationsAdvancing Electric Vehicle Charging Stations
Advancing Electric Vehicle Charging Stations
 
IRJET- Design of O-T-G Charging System for Next-Gen Electric Vehicles
IRJET- Design of O-T-G Charging System for Next-Gen Electric VehiclesIRJET- Design of O-T-G Charging System for Next-Gen Electric Vehicles
IRJET- Design of O-T-G Charging System for Next-Gen Electric Vehicles
 
EV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPCEV Charging - Business Opportunity for NTPC
EV Charging - Business Opportunity for NTPC
 
EV| Electrical Vehicles| All you need to know
EV| Electrical Vehicles| All you need to knowEV| Electrical Vehicles| All you need to know
EV| Electrical Vehicles| All you need to know
 
Charging Stations For Electric Vehicle
Charging Stations For Electric VehicleCharging Stations For Electric Vehicle
Charging Stations For Electric Vehicle
 
2009 05 Electric Vehicles In Apac – Fad Or Reality Frost & Sullivan
2009 05 Electric Vehicles In Apac – Fad Or Reality   Frost & Sullivan2009 05 Electric Vehicles In Apac – Fad Or Reality   Frost & Sullivan
2009 05 Electric Vehicles In Apac – Fad Or Reality Frost & Sullivan
 
Electrical Vehicle Battery Swapping
Electrical Vehicle Battery SwappingElectrical Vehicle Battery Swapping
Electrical Vehicle Battery Swapping
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy
 
Ev charging-station
Ev charging-stationEv charging-station
Ev charging-station
 
Solar Charging Stations
Solar Charging StationsSolar Charging Stations
Solar Charging Stations
 
EV charging in india
EV charging in indiaEV charging in india
EV charging in india
 

Similar to A perfect efforts for green road transportation(ev initiates

E-mobility | Part 4 - EV charging and the next frontier (English)
E-mobility | Part 4 - EV charging and the next frontier (English)E-mobility | Part 4 - EV charging and the next frontier (English)
E-mobility | Part 4 - EV charging and the next frontier (English)Vertex Holdings
 
Enabling EV Charging in Condominiums
Enabling EV Charging in CondominiumsEnabling EV Charging in Condominiums
Enabling EV Charging in CondominiumsJosh Tzventarny
 
IRJET-Smart Self Charging Batteries in Electric Vehicle
IRJET-Smart Self Charging Batteries in Electric VehicleIRJET-Smart Self Charging Batteries in Electric Vehicle
IRJET-Smart Self Charging Batteries in Electric VehicleIRJET Journal
 
Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...
Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...
Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...Scribe
 
Charging in electric vehicles(ev)
Charging  in electric vehicles(ev)Charging  in electric vehicles(ev)
Charging in electric vehicles(ev)UrmilasSrinivasan
 
EVOLUTION OF ELECTRIC CARS
EVOLUTION OF ELECTRIC CARSEVOLUTION OF ELECTRIC CARS
EVOLUTION OF ELECTRIC CARSIRJET Journal
 
Electrical Vehicle Presentation A to Z
Electrical Vehicle Presentation A to ZElectrical Vehicle Presentation A to Z
Electrical Vehicle Presentation A to ZAbhishek Kumar
 
BEV ( Battery Operated Electric Vehicles) PPT
BEV ( Battery Operated Electric Vehicles) PPTBEV ( Battery Operated Electric Vehicles) PPT
BEV ( Battery Operated Electric Vehicles) PPTPranav Mistry
 
Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?
Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?
Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?Nicolas Meilhan
 
seminar-171013111123 (1).pdf
seminar-171013111123 (1).pdfseminar-171013111123 (1).pdf
seminar-171013111123 (1).pdfriteshudakhe
 
Paper of Different Types of Charging Point for Electric Cars & Description on...
Paper of Different Types of Charging Point for Electric Cars & Description on...Paper of Different Types of Charging Point for Electric Cars & Description on...
Paper of Different Types of Charging Point for Electric Cars & Description on...Chintan Patel
 
pro ev charging station for ev hhuihfjdh
pro ev charging station for ev hhuihfjdhpro ev charging station for ev hhuihfjdh
pro ev charging station for ev hhuihfjdhprinceraj112004
 
IJSRED-V2I1P32
IJSRED-V2I1P32IJSRED-V2I1P32
IJSRED-V2I1P32IJSRED
 
EV CHARGING WITH IOT
EV CHARGING WITH IOTEV CHARGING WITH IOT
EV CHARGING WITH IOTSumant Kumar
 
Wave of electric vehicle charging investment
Wave of electric vehicle charging investmentWave of electric vehicle charging investment
Wave of electric vehicle charging investmentIndoAsia Partners
 
IRJET- Conversion of IC Engine Vehicle to Electric Vehicle
IRJET- Conversion of IC Engine Vehicle to Electric VehicleIRJET- Conversion of IC Engine Vehicle to Electric Vehicle
IRJET- Conversion of IC Engine Vehicle to Electric VehicleIRJET Journal
 

Similar to A perfect efforts for green road transportation(ev initiates (20)

E-mobility | Part 4 - EV charging and the next frontier (English)
E-mobility | Part 4 - EV charging and the next frontier (English)E-mobility | Part 4 - EV charging and the next frontier (English)
E-mobility | Part 4 - EV charging and the next frontier (English)
 
Enabling EV Charging in Condominiums
Enabling EV Charging in CondominiumsEnabling EV Charging in Condominiums
Enabling EV Charging in Condominiums
 
IRJET-Smart Self Charging Batteries in Electric Vehicle
IRJET-Smart Self Charging Batteries in Electric VehicleIRJET-Smart Self Charging Batteries in Electric Vehicle
IRJET-Smart Self Charging Batteries in Electric Vehicle
 
Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...
Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...
Electric Vehicle Charging for Parish and Town Councils - Options and Benifits...
 
Charging in electric vehicles(ev)
Charging  in electric vehicles(ev)Charging  in electric vehicles(ev)
Charging in electric vehicles(ev)
 
EVOLUTION OF ELECTRIC CARS
EVOLUTION OF ELECTRIC CARSEVOLUTION OF ELECTRIC CARS
EVOLUTION OF ELECTRIC CARS
 
Electrical Vehicle Presentation A to Z
Electrical Vehicle Presentation A to ZElectrical Vehicle Presentation A to Z
Electrical Vehicle Presentation A to Z
 
EV PPT B-36-1.pptx
EV PPT B-36-1.pptxEV PPT B-36-1.pptx
EV PPT B-36-1.pptx
 
CALSTATE
CALSTATECALSTATE
CALSTATE
 
BEV ( Battery Operated Electric Vehicles) PPT
BEV ( Battery Operated Electric Vehicles) PPTBEV ( Battery Operated Electric Vehicles) PPT
BEV ( Battery Operated Electric Vehicles) PPT
 
Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?
Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?
Electric Car Wars - Who will win the race between BEVs, PHEVs, and FCEVs?
 
seminar-171013111123 (1).pdf
seminar-171013111123 (1).pdfseminar-171013111123 (1).pdf
seminar-171013111123 (1).pdf
 
EV PPT B-36.pptx
EV PPT B-36.pptxEV PPT B-36.pptx
EV PPT B-36.pptx
 
Paper of Different Types of Charging Point for Electric Cars & Description on...
Paper of Different Types of Charging Point for Electric Cars & Description on...Paper of Different Types of Charging Point for Electric Cars & Description on...
Paper of Different Types of Charging Point for Electric Cars & Description on...
 
pro ev charging station for ev hhuihfjdh
pro ev charging station for ev hhuihfjdhpro ev charging station for ev hhuihfjdh
pro ev charging station for ev hhuihfjdh
 
IJSRED-V2I1P32
IJSRED-V2I1P32IJSRED-V2I1P32
IJSRED-V2I1P32
 
EV CHARGING WITH IOT
EV CHARGING WITH IOTEV CHARGING WITH IOT
EV CHARGING WITH IOT
 
electronic vehicles.pptx
electronic vehicles.pptxelectronic vehicles.pptx
electronic vehicles.pptx
 
Wave of electric vehicle charging investment
Wave of electric vehicle charging investmentWave of electric vehicle charging investment
Wave of electric vehicle charging investment
 
IRJET- Conversion of IC Engine Vehicle to Electric Vehicle
IRJET- Conversion of IC Engine Vehicle to Electric VehicleIRJET- Conversion of IC Engine Vehicle to Electric Vehicle
IRJET- Conversion of IC Engine Vehicle to Electric Vehicle
 

More from Mahesh Chandra Manav

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...Mahesh Chandra Manav
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfMahesh Chandra Manav
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyMahesh Chandra Manav
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue systemMahesh Chandra Manav
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstMahesh Chandra Manav
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue systemMahesh Chandra Manav
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)Mahesh Chandra Manav
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionMahesh Chandra Manav
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationMahesh Chandra Manav
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueMahesh Chandra Manav
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemMahesh Chandra Manav
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue systemMahesh Chandra Manav
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue systemMahesh Chandra Manav
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Mahesh Chandra Manav
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021Mahesh Chandra Manav
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleMahesh Chandra Manav
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VueMahesh Chandra Manav
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...Mahesh Chandra Manav
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingMahesh Chandra Manav
 

More from Mahesh Chandra Manav (20)

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

A perfect efforts for green road transportation(ev initiates

  • 1. A Perfect Efforts for GreenRoad Transportation(EV Initiates)
  • 2. Weather Monitoring Station (Warning & Monitoring)
  • 3. Hello I am Green India and My EV Infra policy Ahead • Model Building Byelaws,2016 amended to provide for electric vehiclecharging infrastructure • The Ministry of Housing and Urban Affairs has amended the Model Building Byelaws, 2016 and the Urban Regional Development Plans Formulation and Implementation Guidelines, 2014to facilitatethe availability of electric vehicle (EV) charging infrastructure. The amended guidelines will act as a guiding document for states and union territories to incorporate the norms and standards of EV charging infrastructure in their respective building byelaws. The central government aims to have 25% of all vehicles on roads to be electric by 2020. Note that in December 2018, the Ministry of Power had released guidelines and standards for charging infrastructure for electric vehicles. • Model Building Byelaws: Based on the occupancy pattern and the total parking provisions in the premises of various building types, charging infrastructure will be provided only for EVs. Currently, the required occupancy is assumed to be 20% of all vehicle holding capacity/ parking capacityat the premises. • Urban Regional DevelopmentPlans Formulationand ImplementationGuidelines:The norms for distribution of public charging stations across a city have been specified. For example, standalone public charging stations must be placed every 25 km on both sides of the highways.
  • 5.
  • 6. Decide Yourself& Set goal Your Self StopBlamingPolicyor Others Thisis your Planet Your Journey
  • 7. A Little WorryHowManyPeoplewillbe Job LessDue to EV and EV Infra • A petrol bunk machine dispenses about 4000 liters of fuel worth 2.8 lacs per day. A 30 KW charger (for cars) even with 100% utilization would dispense about 720 KWh of electricity worth 7200 Rs per day......not sure why would any petrol pump would put up a electrical charging outlet which will block the same amount of real estate for 2% revenue. While oil is dispensed from underground bunks, electricity flows overhead...you need a fundamentally different approach to setting up charging station driven by technology, data, siting, load flows. Oil companies dominated by dealers are NOT going to lead the charging infra rollout in Indiaelectric chargers would stop the free flow of traffic at pumps since charging takes much longer than filling liquid fuel electric chargers would stop the free flow of traffic at pumps since charging takes much longer than filling liquid fuel
  • 8. Just for Information Tarrif and Infra Cost
  • 9. Electricity Use Charges along with Electric Vehicle in Delhi
  • 11. I am BatteryKindlyunderstand me FeedMe and Cool DriveYour Vehicle • Vehicle is unlikely to accept power at the maximum rate. Because a standard limits the current, when battery voltage is low either because of battery design or a low state of charge, the power delivered at maximum amperage is lower. For example, 50 kW chargers in practice often dispense no more than 40 kW depending on the vehicle and state of charge and maximum battery pack voltage. For this reason, 400 kW chargers are often referred to as 350 kW chargers and this terminology will be used. Even when a charger is capable of providing high power, smaller battery packs are unlikely to be able to accept this much power. For example, if 350 kW power is available to a smaller 25 kWh pack, battery protection circuits will limit the current and the pack will not accept the higher power. No vehicle on the market in 2018 can accept 350 kW and technological progress must be made in battery cooling or chemistry to fully utilize a 350 kW charger. Vehicle hardware improvements to enable these higher fast-charging speeds could cost approximately $1,000, assuming no change in battery size (Burnham et al., 2017). However, the higher voltage 350 kW chargers can reduce voltage output and still charge present vehicle models at a reduced power. Fast-charging speed is linked with developments in electric vehicle battery technology and vehicle range. The technology of battery chemistry and cooling limit how fast a battery can proceed from empty to approximately 80% recharged (the state of charge when charging rate generally reduces), currently ranging from about 38 minutes in a • 125 kW charger to 14 minutes in a Kia Soul electric vehicle (EV) using a 100 kW charger. Charging a battery with too much power could cause lithium plating and dendrite formation around the anode, permanently reducing capacity; at a pack level, it can cause cells to age at different rates and pack overheating (Ahmed et al., 2017). If the Kia Soul EV battery capacity were doubled it hypothetically could accept 200 kW, but would still be limited to a 14-minute charging time • This relationship between acceptance power and capacity is shown on a cell level in Battery packs in vehicles consist of many cells connected together, but each cell has a maximum charging rate. • When battery pack capacity is increased, the ability to accept more power increases proportionally, but the charging time from empty to 80% remains constant. This simplistic doubling of capacity also assumes that the space for the battery is doubled, but in reality doubling capacity often involves arranging the battery cells more tightly, affecting the ability to cool the battery which slows charging time. • Doubling battery capacity by adding more cells increases the overall power a battery pack can accept, but charging time remains constant.
  • 12. I am Important(Connector) 2 Charge your EV(Battery) • FAST-CHARGING STATIONAVAILABILITY Currently, there are major deployments of fast chargers worldwide. The growth in the number and location of fast charging units have two ports, one for CCS and one for CHAdeMO, but only one port can be used at a time • The availability of the three fast-charging types is relatively evenly split in each market. CCS is more prevalent than CHAdeMO in Austria, Finland, and Germany, while CHAdeMO is more common in all other markets, with the highest share in France and the United States. Tesla fast charging representedhalf of all fast-charging points in the United States outside of California and also made up a large fraction of charging in Belgium and France. China has the greatest number of DC fast chargers and uses the GB/T standard.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. Smart Home with Smart Road Transportation
  • 18. I am Ready I am AvailableWaiting for You(400KW)
  • 19. EV Charging Infra andRequire CommunicationSystems
  • 20.
  • 21. Respect New LawElectrical Vehicle for Building and Public Infra Structure Amendments in amendments are made in the relevant sections (Chapter 10) of the Model Building Bye-laws, 2016. (MBBL - 2016) for Electric Vehicle Charging Infrastructure By Town and Country Planning Organization Ministry of Housing and Urban Affairs Government of India February, 2019
  • 22.
  • 23.
  • 25. India is Ready with Inftrastructure Public EV Charging
  • 26. 1200 × 335Im ages m aybe s ubjectto copyright. Find outm ore
  • 27.
  • 28. Power Supply Substation 11KV for EV Charging INFRA
  • 29.
  • 30. Power Generation,Transmission,Distributionand Facilitation for Electrical Charging Infra in India • IMPACTS OF FAST CHARGINGON THE ELECTRIC GRID Key questions about the impact of fast charging on the electric grid are related to the deployment of electric vehicles over time, how much and when they rely on fast charging, and whether the various fast-charging locations require electric grid upgrades. • The three main parts to the utility system:generation, transmission, and distribution. Although electric vehicles will consume a significant amount of electricity • The other hand, distribution systemsare the mostlikely to need upgrades resulting from electric vehicle charging, especially if demand for fast charging occurs at the period of other distribution loads. In addition, if energy is demanded at the same time as general system peak loads, transmissionand generation mayneed to be upgraded. .
  • 32. SolarPV + HighEnergyStorage+ PowerGridfor Parking(EVCharging)
  • 33.
  • 34. Generate Your Own Power Using SolarPV,Wind ,Waste and HEBSS
  • 35.
  • 36.
  • 37.
  • 38. BUS Charging Infra (Using Power from Pentagraph)
  • 39.
  • 40. My India Smart Initiate Electric Vehicles for Smarter Cities The Futureof Energy and Mobility(Solar+Wind+Storage)
  • 41. Fleet and Public Road Transport and RequireEV Infra
  • 42. India Electrical Vehicle andInfra Charging Plan Public/Rental
  • 43.
  • 45. BUS Charging Infra (Using Power from Pentagraph)
  • 46. Fly in Plane Fuel is Battery and Charging Infra(Concept)
  • 47. RespectNewLawElectricalVehicle for Building and Public Infra Structure Amendments in amendments are made in the relevant sections (Chapter 10) of the Model Building Bye-laws, 2016. (MBBL - 2016) for Electric Vehicle Charging Infrastructure By Town and Country Planning Organization Ministry of Housing and Urban Affairs Government of India February, 2019
  • 48.
  • 49.
  • 51. India is Ready with Inftrastructure Public EV Charging
  • 52.
  • 53.
  • 54.
  • 55. DistributionBoards • Complete Range – SPN , TPN, PPI, MCCB VTPN . 4Way, 8Way, 16Way, Single Door , Double Door IP42/43 • Choice of Multiple Incomer-MCB/ RCCB/ Isolator • Insulated and Captive Bus bar for better safety and protection. • Heavy Duty gasket – for weather proofing • Independent of power supply and line voltage. • Adequate wiring space • Steel inserts with deep screws-to give firm hold and better grip to the door • Smooth finish with 60micron powder coating • Lock and key mechanismon the door • Masking sheet – provides protection during masson work
  • 56.
  • 57.
  • 58.
  • 59.
  • 61.
  • 62.
  • 63. Out-Door LT Feeder Pillar (Without Front Door)
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72. Electrical Safetyfor HumanNo Compromise FollowNBC2016
  • 74. Mahesh Chandra Manav GM BD Key Accounts and Projects M-9811247237 Mahesh.manav@cselectric.co.in 011- 33849000 CS Electric Ltd 222 Okhla Ph-3 New Delhi-20