INTRODUCTION
The 7 QC Tools are simple statistical tools used for problem solving. These tools were either developed in Japan orintroduced to Japan
by the Quality Gurus such as Deming and Juran. In terms of importance, these are the most useful. Kaoru Ishikawa has stated that these
7 tools can be used to solve 95 percent ofall problems. These tools have been the foundation ofJapan's astomishing industrial resurgence
after the second world war.
For solving quality problems seven QC tools used are Pareto Diagram, Cause & Effect Diagram ,Histogram, Control Charts , Scat ter
Diagrams, Graphs and Check Sheets . all this tools are important tools used widely at manufacturing field to monitor the over all
operation and continuous process improvement. This tools are used to find out root causes and eliminates them , thus the ma nufacturing
process can be improved. The modes of defects on production line are investigated through direct observation on the productio n line
and statistical tools.
Methodology
For solving quality problems following seven QC tools are required
1. Pareto Diagram
2. Cause & Effect Diagram
3. Histogram
4. Control Charts
5. Scatter Diagrams
6. Graphs
7. Check Sheets
1) Pareto Diagram
Pareto Diagram is a toolthat arranges items in the order of the magnitude of their contribution, thereby identifying a few items exerting
maximum influence. This toolis used in SPC and quality improvement forprioritizing projects for improvement, prioritising setting up
of corrective action teams to solve problems, identifying products on which most complaints are received, identifying the nature of
complaints occurring most often, identifying most frequent causes forrejections orfor other similar purposes.The origin of the toollies
in the observation by an Italian economist Vilfredo Pareto that a large portion of wealth was in the hands of a few people. He observed
that such distribution pattern was common in most fields. Pareto principle also known as the 80/20 rule is used in the field of materials
management for ABC analysis.20% ofthe items purchased by a company account for80% ofthe value. These constitute the A items on
which maximum attention is paid. Dr.Juran suggested the use ofthis principle to quality control for separating the "vital few" problems
from the "trivial many" now called the "useful many".
Procedure :
The steps in the preparation of a Pareto Diagram are :
1. From the available data calculate the contribution of each individual item.
2. Arrange the items in descending order of their individual contributions. If there are too many items contributing a small percentage
of the contribution, group them togetheras "others". It is obvious that "others" will contribute more than a few single individual items.
Still it is kept last in the new order ofitems.
3. Tabulate the items, their contributions in absolute number as well as in percent of total and cumulative contribution of the items.
4. Draw X and Y axes. Various items are represented on the X-axis. Unlike other graphs Pareto Diagrams have two Y-axes - one on the
left representing numbers and the one on right representing the percent contributions.The scale for X-axis is selected in such a manner
that all the items including others are accommodated between the two Y-axes. The scales for the Y-axes are so selected that the total
number of items on the left side and 100% on the right side occupy the same height.
5. Draw bars representing the contributions of each item.
6. Plot points for cumulative contributions at the end of each item. A simple way to do this is to draw the bars for the second and each
subsequentitemat theirnormal place on the X-axis as well as at a level where the previous bar ends.This bar at the higher level is drawn
in dotted lines. Drawing the second bar is not normally recommended in the texts.
7. Connect the points. If additional bars as suggested in step 6are drawn this becomes simple. All one needs to do is - connect the
diagonals of the bars to the origin.
8. The chart is now ready for interpretation. The slope ofthe chart suddenly changes at some point. This point separates the 'vital few'
from the 'useful many' like the A,B and C class items in materials management.
2) Cause & Effect Diagram
A Cause-and Effect Diagram is a tool that shows systematic relationship between a result or a symptomor an effect and its possible
causes.It is an effective tool to systematically generate ideas about causes for problems and to present these in a structu red form. This
tool was devised by Dr. Kouro Ishikawa and as mentioned earlier is also known as Ishikawa Diagram.
Procedure
The steps in the procedure to prepare a cause-and-effect diagram are :
1. Agree on the definition of the 'Effect' for which causes are to be found.Place the effect in the dark box at the right. Draw the
spine or the backbone as a dark line leading to the box for the effect.
1. Determine the main groups or categories of causes.Place them in boxes and connect them through large bones to the
backbone.
1. Brainstorm to find possible causes and subsidiary causes under each ofthe main groups.Make sure that the route from the
cause to the effect is correctly depicted.The path must start from a root cause and end in the effect.
1. After completing all the main groups,brainstorm for more causes that may have escaped earlier.
1. Once the diagram is complete, discuss relative importance of the causes.Short list the important rootcauses.
3) Histogram
Histograms or Frequency Distribution Diagrams are bar charts showing the distribution pattern of observations grouped in conv enient
class intervals and arranged in order of magnitude. Histograms are usefulin studying patterns of distribution and in drawing conclusions
about the process based on the pattern.
The Procedure to prepare a Histogram consists ofthe following steps :
1. Collect data (preferably 50 or more observations ofan item).
1. Arrange all values in an ascending order.
1. Divide the entire range of values into a convenient number of groups each representing an equal class interval. It is cust omary to have
number of groups equal to or less than the square root of the number of observations.However one should not b e too rigid about
this. The reason for this cautionary note will be obvious when we see some examples.
1. Note the number of observations orfrequency in each group.
1. Draw X-axis and Y-axis and decide appropriate scales for the groups on X-axis and the number of observations orthe frequency
on Y-axis.
1. Draw bars representing the frequency for each of the groups.
1. Provide a suitable title to the Histogram.
1. Study the pattern of distribution and draw conclusion.
normal histogram
Bi modal
high platue
alternate peaks and vales
cliff patern
4) Control Charts
Variability is inherent in all manufacturing processes.These variations may be due to two causes ;
i. Random / Chance causes (un-preventable).
ii. Assignable causes (preventable).
Control charts was developed by Dr. Walter A. Shewhart during 1920's while he was with Bell Telephone Laboratories.
These charts separate out assignable causes.
Control chart makes possible the diagnosis and correction of many production troubles and brings substantialimprovements in the
quality of the products and reduction of spoilage and rework.
It tells us when to leave a process alone as well as when to take action to correc trouble
.
BASIC CONCEPTS :
a. Data is of two types :
Variable - measured and expressed quantitatively
Attribute - quanlitative
b.mean and Range :
⎯X - Mean is the average of a sub-group
R - Range is the difference between the minimum and maximum in a sub-group c.control Charts for Variables
Charts depleting the variations in ⎯X and R with time are known as ⎯X and R charts. ⎯X and R charts are used for variable data when the
sample size of the subgroup is 2-5. When the subgroup size is larger, s Charts are used instead of R charts where s is the standard
deviation of the subgroup.
d.control Charts for Attributes
International Journal of Engineering Research and General Science Volume 2, Issue 4, June-July, 2014
ISSN 2091-2730
The control charts for attributes are p-chart, np-chart, c-chart and u-chart. Control charts for defectives are p and np charts. P charts are
used when the sample size is constant and np charts are used when the sample size is variable. In the case where the number o f defects
is the data available for plotting,c and u charts are used.If the sample size is constant,c charts are used and u charts are used for variable
sample sizes.
5) Scatter Diagram
When solving a problem or analysing a situation one needs to know the relationship between two variables. A relationship may or may
not exist between two variables. If a relationship exists, it may be positive or negative, it may be strong or weak and may be simple or
complex. A tool to study the relationship between two variables is known as Scatter Diagram. It consists of plotting a series of points
representing several observations on a graph in which one variable is on X-axis and the othervariable in on Y-axis. If more than one set
of values are identical, requiring more points at the same spot, a small circle is drawn around the original dot to indicate second point
with the same values.The way the points lie scattered in the quadrant gives a goodindication ofthe relationship between the two variables.
6) Graphs
Graphs of various types are used for pictoral representation of data. Pictoral representation enables the user or viewer to quickly grasp
the meaning of the data. Different graphical representation of data are chosen depending on the purpose of the analysis and p reference
of the audience. The different types of graphs used are as given below :
Sr.No Type of graph purpose
1 Bar Graph To compare sizes of data
2 Line Graph To represent changes of data
3 Gantt chart To plan and schedule
4 Radar chart To represent changes in data (before and after)
5 Band Graph Same as above
7) Check Sheets
8.1 As measurement and collection of data forms the basis for any analysis, this activity needs to be planned in such a way that the
information collected is both relevant and comprehensive.
8.2 Check sheets are tools forcollecting data.They are designed specific to the type ofdata to be collected.Check sheets aid in systematic
collection of data. Some examples of check sheets are daily maintenance check sheets, attendance records, production log books, etc.
Data collected using check sheets needs to be meaningfully classified. Such classification helps gaining a preliminary understanding of
relevance and dispersion of the data so that further analysis can be planned to obtain a meaningful output.Meaningful classification of
data is called stratification. Stratification may be by group, location, type, origin, symptom, etc.
7QC TOOLS THROUGH PDCA-CYCLE
In successful application of quality tools an implemented quality management system is an advantage. The quality management
principles are a starting point forthe company’s management striving for continuous efficiency improvement overa long period of time
and customer satisfaction. A quality management system is based on the integrity of all production and support resources of a certain
company.It enables a faultless process flow in meeting related contracts,standards and market quality requirements. Implementation of
a quality management system is always a part of a company’s development processentification and/or process analysis. Continuous
improvement as a fifth principle ofQMS (ISO 9001:2000) could not be realized without quality tools which are presented through four
groups of activities of Deming’s quality cycle or PDCA-cycle, The PDCA-cycle is an integral part of process management and is
designed to be used as a dynamic model because one cycle represents one complete step of improvement. The PDCA-cycle is used to
coordinate continuous improvement efforts. It emphasizes and demonstrates that improvement programs must start with careful
planning, must result in effective action, and must move on again to careful planning in a continuous cycle – the Deming’s quality cycle
is never-ending. It is a strategy used to achieve breakthrough improvements in safety, quality, morale, delivery cost, and other critical
business objectives.
The completion of one cycle continues with the beginning of the next. A PDCA-cycle consists offour consecutive steps orphases,as
follows:
• Plan - analysis of what needs to be improved by taking into consideration areas that hold opportunities for change.Decision on what
should be changed.
• Do - implementation of the changes that are decided on in the Plan step.
• Check - Control and measurement of processes and products in accordance to changes made in previous steps and in accordance
with policy, goals and requirements on products.Report on results.
• Act - Adoption or reaction to the changes or running the PDCA-cycle through again. Keeping improvement on-going.
Seven basic quality tools (7QC tools) in correlation with PDCA-cycle steps
Seven basic
quality tools
(7QC tools)
Plan Do Plan , Check Plan ,Act Check
Problem
Identification
Implement
solutions
Process analysis Solution
Development
Result Evaluation
Flow chart √ √
Cause and Effect
diagram
√ √
Check Sheet √ √ √
Pareto diagram √ √ √
Histogram √ √
Scatter plot √ √ √ √
Control chart √ √ √
International Journal of Engineering Research and General Science Volume 2, Issue 4, June-July, 2014
ISSN 2091-2730
CONCLUSION
 Statististical QC is chiefly concerned in making sure that several procedures and working arrangements are in place to provid e
for effective and efficient statistical processes , to minimize the risk of errors or weaknesses in procedures or systems or in
source material
 Seven QC tools are most helpful in troubleshooting issues related to quality
 All processes are affected by multiple factors and therefore statistical QC tools can be applied to any process.
 The continuous use of these tools upgrades the personnelcharacteristics of the people involved. It enhances their ability to
think generate ideas, solve problem and do proper planning.
REFERENCES:
[1]Pyzdek, T., Quality Engineering Handbook, Second Edition, Marcel Dekker, Inc., New
York, 2003.
[2]Pimblott, J.G., Managing Improvement – Where to start, Quality Forum, Vol. 16, No. 4,
1990, pp.165-173.
[3] Pratik J. Patel*, Sanjay C. Shah**, Sanjay Makwana [Int. Journal of Engineering Research and Applications www.ijera.com ISSN
: 2248-9622,Vol.4, Issue 2( Version 1), February 2014, pp.129-134 ]
[4] Paliska, G.; Pavletić, D. & Soković, M.[ advanced engineering 2(2008)1, ISSN 1846-5900]
[5] Duško Pavletić, Mirko Soković,Glorija Paliska [International Journal for Quality research UDK- 658.562]
[6]Bisgaard, S. 1993. Statistical Tools for Manufacturing. Manufacturing Review. 6(3): 192–200
[7]Juran J.M.,1974, Quality Control Handbook, McGrawHill, NewYork.
[8]Kim, J.S. and Larsen, M.D. (1997): Integration of Statistical Techniques into Quality Improvement Systems. In Proceedings of the 41st
Congress ofthe European Organization for Quality, 2,277-284
[9]S Raghuraman, KThiruppathi, JPraveen Kumar, BIndhirajith, ―Enhancement ofquality ofthe processes using statistical tools- A review‖,
International Journal ofEngineering Science & Advanced technology, ISSN: 2250-3676, volume-2, Issue-4,1008-1017,2012.
[10]Kamalesh Panthi, Syed M. Ahmed, ―Application ofQuality Tools to Improve Quality: A case study ofa building Remediation Contractor‖,
Florida International University Miami, Florida.
[11]Aichouni, M. „Quality Control – The Basic Tools and their Applications in Manufacturing and Services‟, ISBN 6690-75-688-2,Dar Al-Asshab
Book Publishing, Riyadh., 2007
[12]Walker, H. Fand Levesque, J. 'The Innovation Process and Quality Tools', Quality Progress, Vol. 40,No. 7, July 2007,pp.18/22.
[13]Gunther, J.,and Hawkins, F., 'Making TQM work: Quality tools forhuman service organizations'. Springer Publishing Company, NewYork,
1999

More Related Content

What's hot

Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic Tools
Madeleine Lee
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
gurjeetdhillon
 
Basic quality tools and others
Basic quality tools and othersBasic quality tools and others
Basic quality tools and othersLynja C. Refugio
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
johnreilly
 
7 qc tools.
7 qc tools.7 qc tools.
Statistical Process Control & Control Chart
Statistical Process Control  & Control ChartStatistical Process Control  & Control Chart
Statistical Process Control & Control ChartShekhar Verma
 
Seven tools of quality control
Seven tools of quality controlSeven tools of quality control
Seven tools of quality controlrashmi123vaish
 
Pareto Diagram
Pareto DiagramPareto Diagram
Pareto Diagram
Divyansh jain
 
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
SRIKUMAR BIRADAR
 
SPC and Control Charts
SPC and Control ChartsSPC and Control Charts
SPC and Control Charts
Miguel Montenegro Araujo
 
Cause and effect diagram
Cause and effect diagramCause and effect diagram
Cause and effect diagramLizzette Danan
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
Production and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsProduction and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality Tools
Dr. John V. Padua
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
Babasab Patil
 
Seven quality tools
Seven quality toolsSeven quality tools
Seven quality tools
Prateek Nigam
 
7 tools of quality
7 tools of quality7 tools of quality
7 tools of quality
Farah Amreen
 
Tqm tools
Tqm toolsTqm tools
The Seven Basic Tools of Quality
The Seven Basic Tools of QualityThe Seven Basic Tools of Quality
The Seven Basic Tools of Quality
Tim McMahon
 
7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf
7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf
7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf
EngFaisalAlrai
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
Jitesh Gaurav
 

What's hot (20)

Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic Tools
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Basic quality tools and others
Basic quality tools and othersBasic quality tools and others
Basic quality tools and others
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
7 qc tools.
7 qc tools.7 qc tools.
7 qc tools.
 
Statistical Process Control & Control Chart
Statistical Process Control  & Control ChartStatistical Process Control  & Control Chart
Statistical Process Control & Control Chart
 
Seven tools of quality control
Seven tools of quality controlSeven tools of quality control
Seven tools of quality control
 
Pareto Diagram
Pareto DiagramPareto Diagram
Pareto Diagram
 
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
7 QC Tools 7 Quality Tools Process Improvement Tools.pdf
 
SPC and Control Charts
SPC and Control ChartsSPC and Control Charts
SPC and Control Charts
 
Cause and effect diagram
Cause and effect diagramCause and effect diagram
Cause and effect diagram
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
 
Production and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsProduction and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality Tools
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
 
Seven quality tools
Seven quality toolsSeven quality tools
Seven quality tools
 
7 tools of quality
7 tools of quality7 tools of quality
7 tools of quality
 
Tqm tools
Tqm toolsTqm tools
Tqm tools
 
The Seven Basic Tools of Quality
The Seven Basic Tools of QualityThe Seven Basic Tools of Quality
The Seven Basic Tools of Quality
 
7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf
7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf
7_QC_Tools_and_Problem_Solving_Presentation_1656881575.pdf
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
 

Similar to 7 QC quality control (7 QC) tools for continuous improvement of manufacturing processes

CHAPTER 7.pptx
CHAPTER 7.pptxCHAPTER 7.pptx
CHAPTER 7.pptx
CristyDocdocos1
 
Study On 7 Quality Control Tools | Seven QC Tools
Study On 7 Quality Control Tools | Seven QC ToolsStudy On 7 Quality Control Tools | Seven QC Tools
Study On 7 Quality Control Tools | Seven QC Tools
Md Rakibul Hassan
 
TQM UNIT 3.ppt
TQM UNIT 3.pptTQM UNIT 3.ppt
TQM UNIT 3.ppt
ssusereef268
 
Iso 9001 company
Iso 9001 companyIso 9001 company
Iso 9001 companyjintrajom
 
Iso 9001 internal audit training
Iso 9001 internal audit trainingIso 9001 internal audit training
Iso 9001 internal audit trainingtagujomri
 
Iso 9001 documentation requirements
Iso 9001 documentation requirementsIso 9001 documentation requirements
Iso 9001 documentation requirementsjintrajom
 
Iso 9001 internal audit checklist
Iso 9001 internal audit checklistIso 9001 internal audit checklist
Iso 9001 internal audit checklistjomharipe
 
Iso 9001 qualification
Iso 9001 qualificationIso 9001 qualification
Iso 9001 qualificationjondarita
 
Requirement of iso 9001
Requirement of iso 9001Requirement of iso 9001
Requirement of iso 9001jintrajom
 
Iso 9001 consultancy
Iso 9001 consultancyIso 9001 consultancy
Iso 9001 consultancyjomjintra
 
Iso 9001 quality assurance
Iso 9001 quality assuranceIso 9001 quality assurance
Iso 9001 quality assurancejintrajom
 
Iso 9001 certification consultants
Iso 9001 certification consultantsIso 9001 certification consultants
Iso 9001 certification consultantsjintrajom
 
Iso 9001 checklist free
Iso 9001 checklist freeIso 9001 checklist free
Iso 9001 checklist freetagujomri
 
Iso 9001 as9100
Iso 9001 as9100Iso 9001 as9100
Iso 9001 as9100tagujomri
 

Similar to 7 QC quality control (7 QC) tools for continuous improvement of manufacturing processes (20)

7 qc tools
7 qc tools7 qc tools
7 qc tools
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
CHAPTER 7.pptx
CHAPTER 7.pptxCHAPTER 7.pptx
CHAPTER 7.pptx
 
Study On 7 Quality Control Tools | Seven QC Tools
Study On 7 Quality Control Tools | Seven QC ToolsStudy On 7 Quality Control Tools | Seven QC Tools
Study On 7 Quality Control Tools | Seven QC Tools
 
TQM UNIT 3.ppt
TQM UNIT 3.pptTQM UNIT 3.ppt
TQM UNIT 3.ppt
 
Iso 9001 company
Iso 9001 companyIso 9001 company
Iso 9001 company
 
Ukas iso 9001
Ukas iso 9001Ukas iso 9001
Ukas iso 9001
 
Iso 9001 internal audit training
Iso 9001 internal audit trainingIso 9001 internal audit training
Iso 9001 internal audit training
 
Iso 9001 documentation requirements
Iso 9001 documentation requirementsIso 9001 documentation requirements
Iso 9001 documentation requirements
 
Iso 9001 internal audit checklist
Iso 9001 internal audit checklistIso 9001 internal audit checklist
Iso 9001 internal audit checklist
 
Project management quality
Project management qualityProject management quality
Project management quality
 
Iso 9001 qualification
Iso 9001 qualificationIso 9001 qualification
Iso 9001 qualification
 
Requirement of iso 9001
Requirement of iso 9001Requirement of iso 9001
Requirement of iso 9001
 
Iso 9001 consultancy
Iso 9001 consultancyIso 9001 consultancy
Iso 9001 consultancy
 
Quality management tool
Quality management toolQuality management tool
Quality management tool
 
Iso 9001 quality assurance
Iso 9001 quality assuranceIso 9001 quality assurance
Iso 9001 quality assurance
 
Iso 9001 certification consultants
Iso 9001 certification consultantsIso 9001 certification consultants
Iso 9001 certification consultants
 
Iso 9001 checklist free
Iso 9001 checklist freeIso 9001 checklist free
Iso 9001 checklist free
 
Quality management books
Quality management booksQuality management books
Quality management books
 
Iso 9001 as9100
Iso 9001 as9100Iso 9001 as9100
Iso 9001 as9100
 

More from Chandan Sah

Operations case 5s
Operations case 5sOperations case 5s
Operations case 5s
Chandan Sah
 
Business plan for startup UMEED AMBULENCE
Business plan for startup  UMEED AMBULENCEBusiness plan for startup  UMEED AMBULENCE
Business plan for startup UMEED AMBULENCE
Chandan Sah
 
START UP- Umeed Ambulnce CABreport
START UP- Umeed Ambulnce  CABreportSTART UP- Umeed Ambulnce  CABreport
START UP- Umeed Ambulnce CABreport
Chandan Sah
 
100+ useful phrases for running a Business Meeting
100+ useful phrases for running a Business Meeting100+ useful phrases for running a Business Meeting
100+ useful phrases for running a Business Meeting
Chandan Sah
 
Submission of day 1 Activity presentation
Submission of day 1 Activity presentationSubmission of day 1 Activity presentation
Submission of day 1 Activity presentation
Chandan Sah
 
User manual learning_ Business Simulation
User manual learning_ Business SimulationUser manual learning_ Business Simulation
User manual learning_ Business Simulation
Chandan Sah
 
I bizsim student 2018 session 1 to 3
I bizsim student 2018   session 1 to 3I bizsim student 2018   session 1 to 3
I bizsim student 2018 session 1 to 3
Chandan Sah
 
BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT
BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT
BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT
Chandan Sah
 
Digital forensic
Digital forensicDigital forensic
Digital forensic
Chandan Sah
 
Report writing
Report writingReport writing
Report writing
Chandan Sah
 
Storyboarding
StoryboardingStoryboarding
Storyboarding
Chandan Sah
 
Building arguments
Building argumentsBuilding arguments
Building arguments
Chandan Sah
 
Idea validity template
Idea validity templateIdea validity template
Idea validity template
Chandan Sah
 
Lecture 1 introduction to mno
Lecture 1 introduction to mnoLecture 1 introduction to mno
Lecture 1 introduction to mno
Chandan Sah
 
Lecture 2 understanding organizations copy
Lecture 2 understanding organizations   copyLecture 2 understanding organizations   copy
Lecture 2 understanding organizations copy
Chandan Sah
 
Lecture 3 understanding organizations copy
Lecture 3 understanding organizations   copyLecture 3 understanding organizations   copy
Lecture 3 understanding organizations copy
Chandan Sah
 
Lecture 4 organizational culture
Lecture 4 organizational cultureLecture 4 organizational culture
Lecture 4 organizational culture
Chandan Sah
 
Lecture 8 models of effectiveness
Lecture  8 models of effectiveness Lecture  8 models of effectiveness
Lecture 8 models of effectiveness
Chandan Sah
 
Lecture 5 6 7_organizational structure
Lecture 5 6 7_organizational structureLecture 5 6 7_organizational structure
Lecture 5 6 7_organizational structure
Chandan Sah
 

More from Chandan Sah (20)

Operations case 5s
Operations case 5sOperations case 5s
Operations case 5s
 
Business plan for startup UMEED AMBULENCE
Business plan for startup  UMEED AMBULENCEBusiness plan for startup  UMEED AMBULENCE
Business plan for startup UMEED AMBULENCE
 
START UP- Umeed Ambulnce CABreport
START UP- Umeed Ambulnce  CABreportSTART UP- Umeed Ambulnce  CABreport
START UP- Umeed Ambulnce CABreport
 
100+ useful phrases for running a Business Meeting
100+ useful phrases for running a Business Meeting100+ useful phrases for running a Business Meeting
100+ useful phrases for running a Business Meeting
 
Submission of day 1 Activity presentation
Submission of day 1 Activity presentationSubmission of day 1 Activity presentation
Submission of day 1 Activity presentation
 
User manual learning_ Business Simulation
User manual learning_ Business SimulationUser manual learning_ Business Simulation
User manual learning_ Business Simulation
 
I bizsim student 2018 session 1 to 3
I bizsim student 2018   session 1 to 3I bizsim student 2018   session 1 to 3
I bizsim student 2018 session 1 to 3
 
BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT
BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT
BIRLA SUNLIFE INSURANCE BSLI. SUMMER INTERNSHIP PROJECT
 
Digital forensic
Digital forensicDigital forensic
Digital forensic
 
Announcement
AnnouncementAnnouncement
Announcement
 
Report writing
Report writingReport writing
Report writing
 
Storyboarding
StoryboardingStoryboarding
Storyboarding
 
Building arguments
Building argumentsBuilding arguments
Building arguments
 
Idea validity template
Idea validity templateIdea validity template
Idea validity template
 
Lecture 1 introduction to mno
Lecture 1 introduction to mnoLecture 1 introduction to mno
Lecture 1 introduction to mno
 
Lecture 2 understanding organizations copy
Lecture 2 understanding organizations   copyLecture 2 understanding organizations   copy
Lecture 2 understanding organizations copy
 
Lecture 3 understanding organizations copy
Lecture 3 understanding organizations   copyLecture 3 understanding organizations   copy
Lecture 3 understanding organizations copy
 
Lecture 4 organizational culture
Lecture 4 organizational cultureLecture 4 organizational culture
Lecture 4 organizational culture
 
Lecture 8 models of effectiveness
Lecture  8 models of effectiveness Lecture  8 models of effectiveness
Lecture 8 models of effectiveness
 
Lecture 5 6 7_organizational structure
Lecture 5 6 7_organizational structureLecture 5 6 7_organizational structure
Lecture 5 6 7_organizational structure
 

Recently uploaded

How to use Short Form Video To Grow Your Brand and Business - Keenya Kelly
How to use Short Form Video To Grow Your Brand and Business - Keenya KellyHow to use Short Form Video To Grow Your Brand and Business - Keenya Kelly
How to use Short Form Video To Grow Your Brand and Business - Keenya Kelly
DigiMarCon - Digital Marketing, Media and Advertising Conferences & Exhibitions
 
Etsy Marketing Guide - Tips For Selling Digital Products
Etsy Marketing Guide - Tips For Selling Digital ProductsEtsy Marketing Guide - Tips For Selling Digital Products
Etsy Marketing Guide - Tips For Selling Digital Products
kcblog21
 
What is digital marketing And why is it used?
What is digital marketing And why is it used?What is digital marketing And why is it used?
What is digital marketing And why is it used?
125albina
 
janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...
janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...
janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...
janudm24
 
SEO Master Class - Steve Wiideman, Wiideman Consulting Group
SEO Master Class - Steve Wiideman,  Wiideman Consulting GroupSEO Master Class - Steve Wiideman,  Wiideman Consulting Group
SEO Master Class - Steve Wiideman, Wiideman Consulting Group
DigiMarCon - Digital Marketing, Media and Advertising Conferences & Exhibitions
 
Exploring the Top Digital Marketing Company in Canada
Exploring the Top Digital Marketing Company in CanadaExploring the Top Digital Marketing Company in Canada
Exploring the Top Digital Marketing Company in Canada
Solomo Media
 
The Good the Bad and The Ugly of Marketing Measurement
The Good the Bad and The Ugly of Marketing MeasurementThe Good the Bad and The Ugly of Marketing Measurement
The Good the Bad and The Ugly of Marketing Measurement
NapierPR
 
Gokila digital marketing| consultant| Coimbatore
Gokila digital marketing| consultant| CoimbatoreGokila digital marketing| consultant| Coimbatore
Gokila digital marketing| consultant| Coimbatore
dmgokila
 
Unlocking Everyday Narratives: The Power of Storytelling in Marketing - Chad...
Unlocking Everyday Narratives: The Power of Storytelling in Marketing  - Chad...Unlocking Everyday Narratives: The Power of Storytelling in Marketing  - Chad...
Unlocking Everyday Narratives: The Power of Storytelling in Marketing - Chad...
DigiMarCon - Digital Marketing, Media and Advertising Conferences & Exhibitions
 
Top digital marketing institutein noida
Top digital marketing institutein noidaTop digital marketing institutein noida
Top digital marketing institutein noida
aditisingh6607
 
Enhancing a Luxury Furniture E-commerce Store with Expert Shopify Management
Enhancing a Luxury Furniture E-commerce Store with Expert Shopify ManagementEnhancing a Luxury Furniture E-commerce Store with Expert Shopify Management
Enhancing a Luxury Furniture E-commerce Store with Expert Shopify Management
SunTec India
 
Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...
Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...
Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...
Martal Group
 
Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...
Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...
Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...
DigiMarCon - Digital Marketing, Media and Advertising Conferences & Exhibitions
 
BLOOM_May2024 (r). Balmer Lawrie Online Monthly Bulletin
BLOOM_May2024 (r). Balmer Lawrie Online Monthly BulletinBLOOM_May2024 (r). Balmer Lawrie Online Monthly Bulletin
BLOOM_May2024 (r). Balmer Lawrie Online Monthly Bulletin
BalmerLawrie
 
Turn Digital Reputation Threats into Offense Tactics - Daniel Lemin
Turn Digital Reputation Threats into Offense Tactics - Daniel LeminTurn Digital Reputation Threats into Offense Tactics - Daniel Lemin
Turn Digital Reputation Threats into Offense Tactics - Daniel Lemin
DigiMarCon - Digital Marketing, Media and Advertising Conferences & Exhibitions
 
[Google March 2024 Update] How To Thrive: Content, Link Building & SEO
[Google March 2024 Update] How To Thrive: Content, Link Building & SEO[Google March 2024 Update] How To Thrive: Content, Link Building & SEO
[Google March 2024 Update] How To Thrive: Content, Link Building & SEO
Search Engine Journal
 
SEO as the Backbone of Digital Marketing
SEO as the Backbone of Digital MarketingSEO as the Backbone of Digital Marketing
SEO as the Backbone of Digital Marketing
Felipe Bazon
 
Why People Fail in Network Marketing Business
Why People Fail in Network Marketing BusinessWhy People Fail in Network Marketing Business
Why People Fail in Network Marketing Business
Harish Kumar
 
Luxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdf
Luxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdfLuxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdf
Luxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdf
KiranRai75
 
WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...
WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...
WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...
Veronika Höller
 

Recently uploaded (20)

How to use Short Form Video To Grow Your Brand and Business - Keenya Kelly
How to use Short Form Video To Grow Your Brand and Business - Keenya KellyHow to use Short Form Video To Grow Your Brand and Business - Keenya Kelly
How to use Short Form Video To Grow Your Brand and Business - Keenya Kelly
 
Etsy Marketing Guide - Tips For Selling Digital Products
Etsy Marketing Guide - Tips For Selling Digital ProductsEtsy Marketing Guide - Tips For Selling Digital Products
Etsy Marketing Guide - Tips For Selling Digital Products
 
What is digital marketing And why is it used?
What is digital marketing And why is it used?What is digital marketing And why is it used?
What is digital marketing And why is it used?
 
janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...
janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...
janani Digital Marketer|Digital Marketing consultant|Marketing Promotion|Coim...
 
SEO Master Class - Steve Wiideman, Wiideman Consulting Group
SEO Master Class - Steve Wiideman,  Wiideman Consulting GroupSEO Master Class - Steve Wiideman,  Wiideman Consulting Group
SEO Master Class - Steve Wiideman, Wiideman Consulting Group
 
Exploring the Top Digital Marketing Company in Canada
Exploring the Top Digital Marketing Company in CanadaExploring the Top Digital Marketing Company in Canada
Exploring the Top Digital Marketing Company in Canada
 
The Good the Bad and The Ugly of Marketing Measurement
The Good the Bad and The Ugly of Marketing MeasurementThe Good the Bad and The Ugly of Marketing Measurement
The Good the Bad and The Ugly of Marketing Measurement
 
Gokila digital marketing| consultant| Coimbatore
Gokila digital marketing| consultant| CoimbatoreGokila digital marketing| consultant| Coimbatore
Gokila digital marketing| consultant| Coimbatore
 
Unlocking Everyday Narratives: The Power of Storytelling in Marketing - Chad...
Unlocking Everyday Narratives: The Power of Storytelling in Marketing  - Chad...Unlocking Everyday Narratives: The Power of Storytelling in Marketing  - Chad...
Unlocking Everyday Narratives: The Power of Storytelling in Marketing - Chad...
 
Top digital marketing institutein noida
Top digital marketing institutein noidaTop digital marketing institutein noida
Top digital marketing institutein noida
 
Enhancing a Luxury Furniture E-commerce Store with Expert Shopify Management
Enhancing a Luxury Furniture E-commerce Store with Expert Shopify ManagementEnhancing a Luxury Furniture E-commerce Store with Expert Shopify Management
Enhancing a Luxury Furniture E-commerce Store with Expert Shopify Management
 
Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...
Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...
Trust Element Assessment: How Your Online Presence Affects Outbound Lead Gene...
 
Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...
Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...
Digital Marketing Trends - Experts Insights on How to Gain a Competitive Edge...
 
BLOOM_May2024 (r). Balmer Lawrie Online Monthly Bulletin
BLOOM_May2024 (r). Balmer Lawrie Online Monthly BulletinBLOOM_May2024 (r). Balmer Lawrie Online Monthly Bulletin
BLOOM_May2024 (r). Balmer Lawrie Online Monthly Bulletin
 
Turn Digital Reputation Threats into Offense Tactics - Daniel Lemin
Turn Digital Reputation Threats into Offense Tactics - Daniel LeminTurn Digital Reputation Threats into Offense Tactics - Daniel Lemin
Turn Digital Reputation Threats into Offense Tactics - Daniel Lemin
 
[Google March 2024 Update] How To Thrive: Content, Link Building & SEO
[Google March 2024 Update] How To Thrive: Content, Link Building & SEO[Google March 2024 Update] How To Thrive: Content, Link Building & SEO
[Google March 2024 Update] How To Thrive: Content, Link Building & SEO
 
SEO as the Backbone of Digital Marketing
SEO as the Backbone of Digital MarketingSEO as the Backbone of Digital Marketing
SEO as the Backbone of Digital Marketing
 
Why People Fail in Network Marketing Business
Why People Fail in Network Marketing BusinessWhy People Fail in Network Marketing Business
Why People Fail in Network Marketing Business
 
Luxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdf
Luxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdfLuxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdf
Luxury Hanloom Saree Brand ,Capstone Project_Kiran Bansal.pdf
 
WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...
WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...
WTS-Berlin-2024-Veronika-Höller-Innovate-NextGEN-SEO-Merging-AI-Multimedia-an...
 

7 QC quality control (7 QC) tools for continuous improvement of manufacturing processes

  • 1. Application of 7 Quality Control (7 QC) Tools for Continuous Improvement of Manufacturing Processes INTRODUCTION The 7 QC Tools are simple statistical tools used for problem solving. These tools were either developed in Japan orintroduced to Japan by the Quality Gurus such as Deming and Juran. In terms of importance, these are the most useful. Kaoru Ishikawa has stated that these 7 tools can be used to solve 95 percent ofall problems. These tools have been the foundation ofJapan's astomishing industrial resurgence after the second world war. For solving quality problems seven QC tools used are Pareto Diagram, Cause & Effect Diagram ,Histogram, Control Charts , Scat ter Diagrams, Graphs and Check Sheets . all this tools are important tools used widely at manufacturing field to monitor the over all operation and continuous process improvement. This tools are used to find out root causes and eliminates them , thus the ma nufacturing process can be improved. The modes of defects on production line are investigated through direct observation on the productio n line and statistical tools. Methodology For solving quality problems following seven QC tools are required 1. Pareto Diagram 2. Cause & Effect Diagram 3. Histogram 4. Control Charts 5. Scatter Diagrams 6. Graphs 7. Check Sheets
  • 2. 1) Pareto Diagram Pareto Diagram is a toolthat arranges items in the order of the magnitude of their contribution, thereby identifying a few items exerting maximum influence. This toolis used in SPC and quality improvement forprioritizing projects for improvement, prioritising setting up of corrective action teams to solve problems, identifying products on which most complaints are received, identifying the nature of complaints occurring most often, identifying most frequent causes forrejections orfor other similar purposes.The origin of the toollies in the observation by an Italian economist Vilfredo Pareto that a large portion of wealth was in the hands of a few people. He observed that such distribution pattern was common in most fields. Pareto principle also known as the 80/20 rule is used in the field of materials management for ABC analysis.20% ofthe items purchased by a company account for80% ofthe value. These constitute the A items on which maximum attention is paid. Dr.Juran suggested the use ofthis principle to quality control for separating the "vital few" problems from the "trivial many" now called the "useful many". Procedure : The steps in the preparation of a Pareto Diagram are : 1. From the available data calculate the contribution of each individual item. 2. Arrange the items in descending order of their individual contributions. If there are too many items contributing a small percentage of the contribution, group them togetheras "others". It is obvious that "others" will contribute more than a few single individual items. Still it is kept last in the new order ofitems. 3. Tabulate the items, their contributions in absolute number as well as in percent of total and cumulative contribution of the items. 4. Draw X and Y axes. Various items are represented on the X-axis. Unlike other graphs Pareto Diagrams have two Y-axes - one on the left representing numbers and the one on right representing the percent contributions.The scale for X-axis is selected in such a manner that all the items including others are accommodated between the two Y-axes. The scales for the Y-axes are so selected that the total number of items on the left side and 100% on the right side occupy the same height. 5. Draw bars representing the contributions of each item. 6. Plot points for cumulative contributions at the end of each item. A simple way to do this is to draw the bars for the second and each subsequentitemat theirnormal place on the X-axis as well as at a level where the previous bar ends.This bar at the higher level is drawn in dotted lines. Drawing the second bar is not normally recommended in the texts. 7. Connect the points. If additional bars as suggested in step 6are drawn this becomes simple. All one needs to do is - connect the diagonals of the bars to the origin. 8. The chart is now ready for interpretation. The slope ofthe chart suddenly changes at some point. This point separates the 'vital few' from the 'useful many' like the A,B and C class items in materials management. 2) Cause & Effect Diagram A Cause-and Effect Diagram is a tool that shows systematic relationship between a result or a symptomor an effect and its possible causes.It is an effective tool to systematically generate ideas about causes for problems and to present these in a structu red form. This tool was devised by Dr. Kouro Ishikawa and as mentioned earlier is also known as Ishikawa Diagram.
  • 3. Procedure The steps in the procedure to prepare a cause-and-effect diagram are : 1. Agree on the definition of the 'Effect' for which causes are to be found.Place the effect in the dark box at the right. Draw the spine or the backbone as a dark line leading to the box for the effect. 1. Determine the main groups or categories of causes.Place them in boxes and connect them through large bones to the backbone. 1. Brainstorm to find possible causes and subsidiary causes under each ofthe main groups.Make sure that the route from the cause to the effect is correctly depicted.The path must start from a root cause and end in the effect. 1. After completing all the main groups,brainstorm for more causes that may have escaped earlier. 1. Once the diagram is complete, discuss relative importance of the causes.Short list the important rootcauses. 3) Histogram Histograms or Frequency Distribution Diagrams are bar charts showing the distribution pattern of observations grouped in conv enient class intervals and arranged in order of magnitude. Histograms are usefulin studying patterns of distribution and in drawing conclusions about the process based on the pattern. The Procedure to prepare a Histogram consists ofthe following steps : 1. Collect data (preferably 50 or more observations ofan item). 1. Arrange all values in an ascending order. 1. Divide the entire range of values into a convenient number of groups each representing an equal class interval. It is cust omary to have number of groups equal to or less than the square root of the number of observations.However one should not b e too rigid about this. The reason for this cautionary note will be obvious when we see some examples. 1. Note the number of observations orfrequency in each group. 1. Draw X-axis and Y-axis and decide appropriate scales for the groups on X-axis and the number of observations orthe frequency on Y-axis. 1. Draw bars representing the frequency for each of the groups. 1. Provide a suitable title to the Histogram. 1. Study the pattern of distribution and draw conclusion.
  • 5. alternate peaks and vales cliff patern 4) Control Charts Variability is inherent in all manufacturing processes.These variations may be due to two causes ; i. Random / Chance causes (un-preventable). ii. Assignable causes (preventable). Control charts was developed by Dr. Walter A. Shewhart during 1920's while he was with Bell Telephone Laboratories. These charts separate out assignable causes. Control chart makes possible the diagnosis and correction of many production troubles and brings substantialimprovements in the quality of the products and reduction of spoilage and rework. It tells us when to leave a process alone as well as when to take action to correc trouble . BASIC CONCEPTS : a. Data is of two types : Variable - measured and expressed quantitatively Attribute - quanlitative b.mean and Range : ⎯X - Mean is the average of a sub-group R - Range is the difference between the minimum and maximum in a sub-group c.control Charts for Variables Charts depleting the variations in ⎯X and R with time are known as ⎯X and R charts. ⎯X and R charts are used for variable data when the sample size of the subgroup is 2-5. When the subgroup size is larger, s Charts are used instead of R charts where s is the standard deviation of the subgroup. d.control Charts for Attributes
  • 6. International Journal of Engineering Research and General Science Volume 2, Issue 4, June-July, 2014 ISSN 2091-2730 The control charts for attributes are p-chart, np-chart, c-chart and u-chart. Control charts for defectives are p and np charts. P charts are used when the sample size is constant and np charts are used when the sample size is variable. In the case where the number o f defects is the data available for plotting,c and u charts are used.If the sample size is constant,c charts are used and u charts are used for variable sample sizes. 5) Scatter Diagram When solving a problem or analysing a situation one needs to know the relationship between two variables. A relationship may or may not exist between two variables. If a relationship exists, it may be positive or negative, it may be strong or weak and may be simple or complex. A tool to study the relationship between two variables is known as Scatter Diagram. It consists of plotting a series of points representing several observations on a graph in which one variable is on X-axis and the othervariable in on Y-axis. If more than one set of values are identical, requiring more points at the same spot, a small circle is drawn around the original dot to indicate second point with the same values.The way the points lie scattered in the quadrant gives a goodindication ofthe relationship between the two variables. 6) Graphs Graphs of various types are used for pictoral representation of data. Pictoral representation enables the user or viewer to quickly grasp the meaning of the data. Different graphical representation of data are chosen depending on the purpose of the analysis and p reference of the audience. The different types of graphs used are as given below : Sr.No Type of graph purpose 1 Bar Graph To compare sizes of data 2 Line Graph To represent changes of data 3 Gantt chart To plan and schedule 4 Radar chart To represent changes in data (before and after) 5 Band Graph Same as above 7) Check Sheets 8.1 As measurement and collection of data forms the basis for any analysis, this activity needs to be planned in such a way that the information collected is both relevant and comprehensive.
  • 7. 8.2 Check sheets are tools forcollecting data.They are designed specific to the type ofdata to be collected.Check sheets aid in systematic collection of data. Some examples of check sheets are daily maintenance check sheets, attendance records, production log books, etc. Data collected using check sheets needs to be meaningfully classified. Such classification helps gaining a preliminary understanding of relevance and dispersion of the data so that further analysis can be planned to obtain a meaningful output.Meaningful classification of data is called stratification. Stratification may be by group, location, type, origin, symptom, etc. 7QC TOOLS THROUGH PDCA-CYCLE In successful application of quality tools an implemented quality management system is an advantage. The quality management principles are a starting point forthe company’s management striving for continuous efficiency improvement overa long period of time and customer satisfaction. A quality management system is based on the integrity of all production and support resources of a certain company.It enables a faultless process flow in meeting related contracts,standards and market quality requirements. Implementation of a quality management system is always a part of a company’s development processentification and/or process analysis. Continuous improvement as a fifth principle ofQMS (ISO 9001:2000) could not be realized without quality tools which are presented through four groups of activities of Deming’s quality cycle or PDCA-cycle, The PDCA-cycle is an integral part of process management and is designed to be used as a dynamic model because one cycle represents one complete step of improvement. The PDCA-cycle is used to coordinate continuous improvement efforts. It emphasizes and demonstrates that improvement programs must start with careful planning, must result in effective action, and must move on again to careful planning in a continuous cycle – the Deming’s quality cycle is never-ending. It is a strategy used to achieve breakthrough improvements in safety, quality, morale, delivery cost, and other critical business objectives. The completion of one cycle continues with the beginning of the next. A PDCA-cycle consists offour consecutive steps orphases,as follows: • Plan - analysis of what needs to be improved by taking into consideration areas that hold opportunities for change.Decision on what should be changed. • Do - implementation of the changes that are decided on in the Plan step. • Check - Control and measurement of processes and products in accordance to changes made in previous steps and in accordance with policy, goals and requirements on products.Report on results. • Act - Adoption or reaction to the changes or running the PDCA-cycle through again. Keeping improvement on-going. Seven basic quality tools (7QC tools) in correlation with PDCA-cycle steps Seven basic quality tools (7QC tools) Plan Do Plan , Check Plan ,Act Check Problem Identification Implement solutions Process analysis Solution Development Result Evaluation Flow chart √ √ Cause and Effect diagram √ √ Check Sheet √ √ √ Pareto diagram √ √ √ Histogram √ √ Scatter plot √ √ √ √ Control chart √ √ √
  • 8. International Journal of Engineering Research and General Science Volume 2, Issue 4, June-July, 2014 ISSN 2091-2730 CONCLUSION  Statististical QC is chiefly concerned in making sure that several procedures and working arrangements are in place to provid e for effective and efficient statistical processes , to minimize the risk of errors or weaknesses in procedures or systems or in source material  Seven QC tools are most helpful in troubleshooting issues related to quality  All processes are affected by multiple factors and therefore statistical QC tools can be applied to any process.  The continuous use of these tools upgrades the personnelcharacteristics of the people involved. It enhances their ability to think generate ideas, solve problem and do proper planning. REFERENCES: [1]Pyzdek, T., Quality Engineering Handbook, Second Edition, Marcel Dekker, Inc., New York, 2003. [2]Pimblott, J.G., Managing Improvement – Where to start, Quality Forum, Vol. 16, No. 4, 1990, pp.165-173. [3] Pratik J. Patel*, Sanjay C. Shah**, Sanjay Makwana [Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622,Vol.4, Issue 2( Version 1), February 2014, pp.129-134 ] [4] Paliska, G.; Pavletić, D. & Soković, M.[ advanced engineering 2(2008)1, ISSN 1846-5900] [5] Duško Pavletić, Mirko Soković,Glorija Paliska [International Journal for Quality research UDK- 658.562] [6]Bisgaard, S. 1993. Statistical Tools for Manufacturing. Manufacturing Review. 6(3): 192–200 [7]Juran J.M.,1974, Quality Control Handbook, McGrawHill, NewYork. [8]Kim, J.S. and Larsen, M.D. (1997): Integration of Statistical Techniques into Quality Improvement Systems. In Proceedings of the 41st Congress ofthe European Organization for Quality, 2,277-284 [9]S Raghuraman, KThiruppathi, JPraveen Kumar, BIndhirajith, ―Enhancement ofquality ofthe processes using statistical tools- A review‖, International Journal ofEngineering Science & Advanced technology, ISSN: 2250-3676, volume-2, Issue-4,1008-1017,2012. [10]Kamalesh Panthi, Syed M. Ahmed, ―Application ofQuality Tools to Improve Quality: A case study ofa building Remediation Contractor‖, Florida International University Miami, Florida. [11]Aichouni, M. „Quality Control – The Basic Tools and their Applications in Manufacturing and Services‟, ISBN 6690-75-688-2,Dar Al-Asshab Book Publishing, Riyadh., 2007 [12]Walker, H. Fand Levesque, J. 'The Innovation Process and Quality Tools', Quality Progress, Vol. 40,No. 7, July 2007,pp.18/22. [13]Gunther, J.,and Hawkins, F., 'Making TQM work: Quality tools forhuman service organizations'. Springer Publishing Company, NewYork, 1999