Embed presentation
Downloaded 31 times












A 5000 ton per day urea plant concept is presented that aims to lower fabrication costs through economies of scale. This mega plant concept uses proven individual process steps that do not require scaling up from a 4000 ton plant. It also incorporates features like a double high pressure carbamate condenser for energy savings. The licensors have converted a conventional plant into this larger mega plant design to take advantage of the benefits of increased capacity like greater energy efficiency and productivity.










