2. Style sheet
My product is going to have a slightly teal and orange
look to it or a blueish look to make colours pop. I will
use the movie letters text to make my product more
movie like and YouTube like to make it fit with the
platform that my product will be going on. The images
at the left are some one the style of images I will be
using in my product to also show where I am and what
is going on. I will be using the letter box in my product
to make it more cinematic and to change up the style
of video. The style I am going for with the scooter
riding and the photography appeal to my audience as
my audience is aimed towards photography and
scooter riding.
3.
4. Layout 1
This is a mock up of a
thumbnail of what it will look
like but I will be using my own
images to make it, I like this
style because it looks
professional and its quite
simple with the layout. The
symmetry of the image works
well as there are to long images
at the sides then a image of
one guy in between them. The
white in the middle with the
title on it stands out really well
and it separates the images up
really well. This is probably the
style of thumbnail that I will do
for my final product.
5. Layout 2
I like this style as it has the
title at the top witch lets the
viewer know what the video
is and then has images from
the video on the bottom row
and photos I’ve taken during
that week or day. The white
at the top breaks up the
images and stands out and
makes it easy to read. The
images vary in colour and
works well as each image
has a different feel to them.
the thumbnail draws you in
with the little snapshots of
the week instead of one
image and it also make you
want to find out different
parts of the week.
6. Story Boards1) Skatepark
2) Manchester for a concert.
3) Traveling London.
4) Going on the Orbit slide.
5) Photo shoot.
7. Story Boards
• Monday- going to Birmingham to a skatepark.
• Tuesday- going to Rowntree skatepark in York.
• Wednesday- going to Leeds to take photos.
• Thursday- chilling day more photos and exploring.
• Friday- skatepark.
• Saturday- more skatepark.
• Sunday- skatepark, photos and exploring.
8. Props & Locations
Equipment Locations needed
Scooter Manchester
Bmx London
Camera Leeds
Microphone The works skateparks
Camera accessories Rowntree skatepark
Laptop
Computer
9. Contingency Planning
Potential Issue Solution
Losing work. Saving it and backing it up to another place.
Software crashing. Saving every few minuets to ensure that this
isn't a possibility and you wont lose all your
work you might just lose a sentence or two.
Not keeping to deadline. Do it in own time to get it in for example at
home or in breaks that I have at college.
Work not looking like the plan. Make sure you check your pre production so
then you keep to what you have planned or if
you have changed your product make sure you
talk about it in your evaluation so then they
know that you have and why you have.
Run out of time. Do work in frees or at home to ensure I can
finish in time. Ask the tutor for a extension so
then you can have more time to finish.
Run out of space on file. Put work on a memory stick or on a hard drive
so then you have more space to put your work
on.
10. Health and Safety
Potential Issue How will the issue be
avoided?
Eye strain. Take breaks away from the computer and
phones so then your eyes don’t hurt.
Back ache. Make sure that the chair is positioned properly
and don’t slouch in the chair then your back
doesn’t hurt and so then you are comfy in your
chair.
Headache. Take brakes from computer and drink water and
go for a walk out side to get some fresh air this
will help with preventing headaches.
Electric shock. Make sure all equipment has been tested and
that there is no water near electrical equipment
this will ensure that you don’t get an electric
shock.
Hand cramp. Sit in proper typing position and have rests
from typing then your hand doesn’t get over
worked and cramped up.
fire hazard. Make sure all equipment has been tested and
make sure fire exits are clear and make sure
that there is a fire extinguisher.
11. Schedule
Day Plan of Action Resources Required
Day 1 Monday skatepark scooter, camera, tripod.
Day 2 Tuesday traveling to Manchester to a concert camera, microphone.
Day 3 Wednesday traveling to London camera.
Day 4 Wednesday- Sunday doing things in London Camera, microphone
Day 5 editing SD card, computer,
premiere.
Day 6 editing SD card, computer,
premiere.
Day 7 doing anything that need improving Computer, power point
Day 8 doing anything that need improving Computer, power point
Editor's Notes
Explore colours, fonts and image styles similar to what you want to produce. Discuss all three elements in relation to why you chose them and where you may use them in your project. Go over as many pages as you need to
Mock up of a potential design using the colours and fonts established in your style sheet and sourced images
Mock up of a potential design using the colours and fonts established in your style sheet and sourced images