SlideShare a Scribd company logo
1 of 1
Download to read offline
MATTHEW WARR PROFESSIONAL PORTFOLIO PROJECT OVERVIEW No.3 
RESUME/PORTFOLIO | CONFIDENTIAL 
 
   
 
 
This  80,000  ft2  office  space  refurbishment  project  was  characterised  by  an  extremely  condensed  and  therefore 
intense pre‐construction phase. From a standing start Trinity had 3 weeks to complete the design and procurement 
process  before  commencing  works  on  site.  This  involved  designing  the  base  M&E  systems,  taking  Motorola’s 
comments on board and making the appropriate adjustments, procuring all the plant and equipment and getting all 
the sub‐contractors on board.  While classed as a refurbishment project, for Trinity it was effectively a new build 
because 99% of the building services were new, the exception being some retained perimeter lighting.  
 
 
 
 
 
 
Project Title    MOTOROLA, TRILOGY BUILDING, SWINDON 
Client    HXRUK (KP) Ltd 
M&E Consultant    Wye  Solutions 
Main Contractor    Blenheim House Construction Ltd 
Value M&E Works    £2,000,000 
Duration    February 2010 – July 2010 (6months) 
Contract Type    JCT 05 Design and Build 
The mechanical works comprised a big VRV 
air conditioning system with Heat Recovery 
Units  for  fresh  air  ventilation,  cooling 
systems  for  the  Data  Centre  and 
Communications room and the usual HCW 
domestic  supply  and  sanitaryware.    Key 
electrical  services  included  a  new  MCB 
distribution  board  supplying  power  to  the 
new  mechanical  plant  and  small  power  to 
the  office  accommodation.  There  were 
data  and  comms  electrical  installations 
together with brand new lighting schemes, 
a  new  fire  alarm  system,  security  access 
control,  intruder  alarms  and  CCTV  and  a 
large UPS system as well. The project was 
originally  programmed  over  5  months  but 
due to the requirements of the new tenant, 
Motorola,  the  project  had  to  be  fast‐
tracked to enable handover 3 weeks earlier 
than the original targeted completion date.

More Related Content

What's hot

Deep Retrofit: Retrofit of a 1950s Crumlin Cottage
Deep Retrofit: Retrofit of a 1950s Crumlin CottageDeep Retrofit: Retrofit of a 1950s Crumlin Cottage
Deep Retrofit: Retrofit of a 1950s Crumlin CottageSustainableEnergyAut
 
111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3DenysStephens
 
Delivering Sustainability Digitally - Data & Sustainability
Delivering Sustainability Digitally - Data & SustainabilityDelivering Sustainability Digitally - Data & Sustainability
Delivering Sustainability Digitally - Data & Sustainabilityconstructingexcellence
 
NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...
NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...
NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...New York Public Transit Association
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial worksgrahamelanders
 
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)REMOURBAN
 
NZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean ArmstrongNZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean ArmstrongSustainableEnergyAut
 
Creative Install for Data Center - Charlotte, North Carolina
Creative Install for Data Center - Charlotte, North CarolinaCreative Install for Data Center - Charlotte, North Carolina
Creative Install for Data Center - Charlotte, North CarolinaMcKenney's Inc
 
Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineerChris Owen
 
The role of delivered performance june2009
The role of delivered performance june2009The role of delivered performance june2009
The role of delivered performance june2009Toronto 2030 District
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDYPaul Harrison
 
ACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design BuildACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design BuildWilliam Naughton, P.G.
 
NYC BoileRx Program -2015
NYC BoileRx Program -2015NYC BoileRx Program -2015
NYC BoileRx Program -2015Brian Blauvelt
 
One Click LCA & IES Integration
One Click LCA & IES IntegrationOne Click LCA & IES Integration
One Click LCA & IES IntegrationIES VE
 
DLF CORPORATE GREENS RESALE
DLF CORPORATE GREENS RESALEDLF CORPORATE GREENS RESALE
DLF CORPORATE GREENS RESALEJJJJJKL
 
High Performance Green Design for High-Precision Manufacturing
High Performance Green Design for High-Precision ManufacturingHigh Performance Green Design for High-Precision Manufacturing
High Performance Green Design for High-Precision Manufacturingcjmichal
 
Jack Allen Industrial Resume
Jack Allen Industrial ResumeJack Allen Industrial Resume
Jack Allen Industrial ResumeJack Allen
 
Diesel Production: Plant Layout
Diesel Production: Plant LayoutDiesel Production: Plant Layout
Diesel Production: Plant LayoutPratik Patel
 
Health Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan ReddingtonHealth Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan ReddingtonSustainableEnergyAut
 

What's hot (20)

Deep Retrofit: Retrofit of a 1950s Crumlin Cottage
Deep Retrofit: Retrofit of a 1950s Crumlin CottageDeep Retrofit: Retrofit of a 1950s Crumlin Cottage
Deep Retrofit: Retrofit of a 1950s Crumlin Cottage
 
111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3
 
Delivering Sustainability Digitally - Data & Sustainability
Delivering Sustainability Digitally - Data & SustainabilityDelivering Sustainability Digitally - Data & Sustainability
Delivering Sustainability Digitally - Data & Sustainability
 
NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...
NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...
NYSERDA Partnerships: Opportunities for Funding New Programs and Technologies...
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)
REMOURBAN Information package n2 - Low Temperature District Heating (LTDH)
 
NZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean ArmstrongNZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean Armstrong
 
Creative Install for Data Center - Charlotte, North Carolina
Creative Install for Data Center - Charlotte, North CarolinaCreative Install for Data Center - Charlotte, North Carolina
Creative Install for Data Center - Charlotte, North Carolina
 
Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineer
 
The role of delivered performance june2009
The role of delivered performance june2009The role of delivered performance june2009
The role of delivered performance june2009
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDY
 
ACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design BuildACEC Award Winning AFRC_Middletown CT Design Build
ACEC Award Winning AFRC_Middletown CT Design Build
 
NYC BoileRx Program -2015
NYC BoileRx Program -2015NYC BoileRx Program -2015
NYC BoileRx Program -2015
 
One Click LCA & IES Integration
One Click LCA & IES IntegrationOne Click LCA & IES Integration
One Click LCA & IES Integration
 
DLF CORPORATE GREENS RESALE
DLF CORPORATE GREENS RESALEDLF CORPORATE GREENS RESALE
DLF CORPORATE GREENS RESALE
 
High Performance Green Design for High-Precision Manufacturing
High Performance Green Design for High-Precision ManufacturingHigh Performance Green Design for High-Precision Manufacturing
High Performance Green Design for High-Precision Manufacturing
 
Energy in Schools by John Dolan
Energy in Schools by John DolanEnergy in Schools by John Dolan
Energy in Schools by John Dolan
 
Jack Allen Industrial Resume
Jack Allen Industrial ResumeJack Allen Industrial Resume
Jack Allen Industrial Resume
 
Diesel Production: Plant Layout
Diesel Production: Plant LayoutDiesel Production: Plant Layout
Diesel Production: Plant Layout
 
Health Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan ReddingtonHealth Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan Reddington
 

Viewers also liked

2. Brochure Paramount Club
2. Brochure Paramount Club2. Brochure Paramount Club
2. Brochure Paramount ClubMatthew Warr
 
9. Brochure Centre Point
9. Brochure Centre Point9. Brochure Centre Point
9. Brochure Centre PointMatthew Warr
 
1. Brochure Soho Hotel
1. Brochure Soho Hotel1. Brochure Soho Hotel
1. Brochure Soho HotelMatthew Warr
 
4. Brochure M&R Towers
4. Brochure M&R Towers4. Brochure M&R Towers
4. Brochure M&R TowersMatthew Warr
 

Viewers also liked (7)

Sunrise
SunriseSunrise
Sunrise
 
2. Brochure Paramount Club
2. Brochure Paramount Club2. Brochure Paramount Club
2. Brochure Paramount Club
 
9. Brochure Centre Point
9. Brochure Centre Point9. Brochure Centre Point
9. Brochure Centre Point
 
1. Brochure Soho Hotel
1. Brochure Soho Hotel1. Brochure Soho Hotel
1. Brochure Soho Hotel
 
Roundhouse 1
Roundhouse 1Roundhouse 1
Roundhouse 1
 
4. Brochure M&R Towers
4. Brochure M&R Towers4. Brochure M&R Towers
4. Brochure M&R Towers
 
5. Brochure JPMC
5. Brochure JPMC5. Brochure JPMC
5. Brochure JPMC
 

Similar to 3. Brochure Trilogy Swindon

Similar to 3. Brochure Trilogy Swindon (20)

1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 
Terry CV June 2015
Terry CV June 2015Terry CV June 2015
Terry CV June 2015
 
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
william-first-revision
william-first-revisionwilliam-first-revision
william-first-revision
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
AStancescu Nov2014
AStancescu Nov2014AStancescu Nov2014
AStancescu Nov2014
 
william-second-revision (3)
william-second-revision (3)william-second-revision (3)
william-second-revision (3)
 
3 Case Studies x 3
3 Case Studies x 33 Case Studies x 3
3 Case Studies x 3
 
3 Case Studies x 3
3 Case Studies x 33 Case Studies x 3
3 Case Studies x 3
 
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdf
 
Resume - Hasitha Ketanwila
Resume - Hasitha KetanwilaResume - Hasitha Ketanwila
Resume - Hasitha Ketanwila
 
Appendices
AppendicesAppendices
Appendices
 
CV Aug16
CV Aug16CV Aug16
CV Aug16
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Abse lev1 2_104_launch(full permission)
Abse lev1 2_104_launch(full permission)Abse lev1 2_104_launch(full permission)
Abse lev1 2_104_launch(full permission)
 
10-3 Term Paper Submission QSO-680 Seminar in.docx
10-3 Term Paper Submission                    QSO-680 Seminar in.docx10-3 Term Paper Submission                    QSO-680 Seminar in.docx
10-3 Term Paper Submission QSO-680 Seminar in.docx
 

3. Brochure Trilogy Swindon

  • 1. MATTHEW WARR PROFESSIONAL PORTFOLIO PROJECT OVERVIEW No.3  RESUME/PORTFOLIO | CONFIDENTIAL            This  80,000  ft2  office  space  refurbishment  project  was  characterised  by  an  extremely  condensed  and  therefore  intense pre‐construction phase. From a standing start Trinity had 3 weeks to complete the design and procurement  process  before  commencing  works  on  site.  This  involved  designing  the  base  M&E  systems,  taking  Motorola’s  comments on board and making the appropriate adjustments, procuring all the plant and equipment and getting all  the sub‐contractors on board.  While classed as a refurbishment project, for Trinity it was effectively a new build  because 99% of the building services were new, the exception being some retained perimeter lighting.               Project Title    MOTOROLA, TRILOGY BUILDING, SWINDON  Client    HXRUK (KP) Ltd  M&E Consultant    Wye  Solutions  Main Contractor    Blenheim House Construction Ltd  Value M&E Works    £2,000,000  Duration    February 2010 – July 2010 (6months)  Contract Type    JCT 05 Design and Build  The mechanical works comprised a big VRV  air conditioning system with Heat Recovery  Units  for  fresh  air  ventilation,  cooling  systems  for  the  Data  Centre  and  Communications room and the usual HCW  domestic  supply  and  sanitaryware.    Key  electrical  services  included  a  new  MCB  distribution  board  supplying  power  to  the  new  mechanical  plant  and  small  power  to  the  office  accommodation.  There  were  data  and  comms  electrical  installations  together with brand new lighting schemes,  a  new  fire  alarm  system,  security  access  control,  intruder  alarms  and  CCTV  and  a  large UPS system as well. The project was  originally  programmed  over  5  months  but  due to the requirements of the new tenant,  Motorola,  the  project  had  to  be  fast‐ tracked to enable handover 3 weeks earlier  than the original targeted completion date.